Letting of 5/28/2008 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 713-02-0116
Parish: ALLEN
Routes:
Description: OLD PUMP ROAD BRIDGES OVER CALCASIEU RIVER RELIEF I, II, III
Type Const: grading, class ii base course, superpave asphaltic concrete pavement, precast prestressed
concrete girder spans bridge, and related work.
Estimated Construction Cost: $1,734,917.25
 
RankLicenseBidderConstruction Bid
1 12879 PETERS CONSTRUCTION CO., INC. $1,887,269.10
2 12312 GILCHRIST CONSTRUCTION CO. LLC $2,047,763.50
3 09090 GUINN BROTHERS, LLC. $2,132,975.70
 12094 CECIL D. GASSIOTT IRREGULAR
 
Item Number Item Description Quantity Unit of Measure - 1 -
PETERS CONSTRUCTION CO., INC.
- 2 -
GILCHRIST CONSTRUCTION CO. LLC
- 3 -
GUINN BROTHERS, LLC.

CECIL D. GASSIOTT
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 20,000.00 20,000.00 65,000.00 65,000.00 50,000.00 50,000.00 100,000.00 100,000.00
202-02-A-01 removal of bridge(sta.105+39.46; 20.80'x 79.54' timber
bridge)
1      EACH 12,000.00 12,000.00 10,000.00 10,000.00 15,000.00 15,000.00 25,000.00 25,000.00
202-02-A-02 removal of bridge(sta.105+46.10; 20.00'x 92.00' timber
bridge)
1      EACH 14,000.00 14,000.00 10,000.00 10,000.00 16,000.00 16,000.00 25,000.00 25,000.00
202-02-A-03 removal of bridge(sta.14+99.66; 18.62'x 43.82' timber
bridge)
1      EACH 6,000.00 6,000.00 10,000.00 10,000.00 7,500.00 7,500.00 25,000.00 25,000.00
202-02-G removal of surfacing & stabilized base 2,755.7    SQYD 6.00 16,534.20 6.00 16,534.20 6.00 16,534.20 10.00 27,557.00
203-05 excavation and embankment lump      LUMP 15,000.00 15,000.00 110,000.00 110,000.00 72,000.00 72,000.00 2,500.00 2,500.00
204-02 temporary hay or straw bales 300      EACH 8.00 2,400.00 15.00 4,500.00 5.00 1,500.00 20.00 6,000.00
204-03 temporary slope drains 640      LNFT 5.00 3,200.00 18.00 11,520.00 1.00 640.00 15.00 9,600.00
204-05-A temporary sediment check dams (hay) 16      EACH 64.00 1,024.00 200.00 3,200.00 100.00 1,600.00 150.00 2,400.00
204-06 temporary silt fencing 2,460      LNFT 4.00 9,840.00 3.00 7,380.00 3.00 7,380.00 5.00 12,300.00
302-01 class ii base course 674.4    CUYD 70.00 47,208.00 100.00 67,440.00 100.00 67,440.00 125.00 84,300.00
401-02 aggregate surface course (adjusted vehicular
measurement)
45      CUYD 60.00 2,700.00 60.00 2,700.00 100.00 4,500.00 125.00 5,625.00
502-01 superpave asphaltic concrete 526.1    TON 200.00 105,220.00 160.00 84,176.00 285.00 149,938.50 175.00 92,067.50
704-03 blocked out guard rail 215.6    LNFT 26.00 5,605.60 23.00 4,958.80 25.00 5,390.00 30.00 6,468.00
704-07-A guard rail bridge attachments (single thrie beam) 25.0    LNFT 55.00 1,375.00 53.00 1,325.00 50.00 1,250.00 100.00 2,500.00
704-08-B guard rail transitions (double thrie beam) 350.0    LNFT 70.00 24,500.00 65.00 22,750.00 60.00 21,000.00 100.00 35,000.00
704-09 guard rail anchor sections (turndown) 250.0    LNFT 65.00 16,250.00 38.00 9,500.00 40.00 10,000.00 50.00 12,500.00
705-02 combination mesh & barbed wire fence 340      LNFT 10.00 3,400.00 10.00 3,400.00 15.00 5,100.00 10.00 3,400.00
711-01-D riprap (55 lb,18" thick) 2,929      SQYD 80.00 234,320.00 145.00 424,705.00 50.00 146,450.00 75.00 219,675.00
711-04 geotextile fabric 2,929      SQYD 2.00 5,858.00 2.00 5,858.00 5.00 14,645.00 3.50 10,251.50
713-01 temporary signs & barricades lump      LUMP 25,000.00 25,000.00 45,000.00 45,000.00 30,000.00 30,000.00 25,000.00 25,000.00
716-01-A mulch (vegetative) 3.00   TON 1,000.00 3,000.00 600.00 1,800.00 1,000.00 3,000.00 750.00 2,250.00
717-01 seeding 69      LB 3.00 207.00 12.00 828.00 20.00 1,380.00 10.00 690.00
718-01 fertilizer 1,470      LB 1.00 1,470.00 0.75 1,102.50 1.00 1,470.00 0.50 735.00
725-03 low profile runaround 3      EACH 41,000.00 123,000.00 30,000.00 90,000.00 100,000.00 300,000.00 50,000.00 150,000.00
727-01 mobilization lump      LUMP 147,000.00 147,000.00 200,000.00 200,000.00 320,000.00 320,000.00 75,000.00 75,000.00
729-16-C object marker assembly (type 3) 24      EACH 85.00 2,040.00 90.00 2,160.00 100.00 2,400.00 100.00 2,400.00
740-01 construction layout lump      LUMP 30,000.00 30,000.00 40,000.00 40,000.00 30,000.00 30,000.00 10,000.00 10,000.00
804-01-B precast concrete piles (14") 675      LNFT 81.50 55,012.50 52.00 35,100.00 75.00 50,625.00 200.00 135,000.00
804-01-C precast concrete piles (16") 2,997      LNFT 98.40 294,904.80 58.00 173,826.00 90.00 269,730.00 206.00 617,382.00
804-12 loading permanent piles 3      EACH 1,000.00 3,000.00 2,000.00 6,000.00 1.00 3.00 2,500.00 7,500.00
805-10-A bridge superstructure & substructure(90 degree
crossing; 24' roadway, precast only with
cast-in-place bents)
13      SPAN 33,000.00 429,000.00 30,000.00 390,000.00 26,500.00 344,500.00 10,000.00 130,000.00
805-10-B bridge superstructure & substructure(90 degree
crossing; 24' roadway, cast-in-place only)
4      SPAN 34,000.00 136,000.00 34,000.00 136,000.00 26,500.00 106,000.00 20,000.00 80,000.00
S-101 concrete approach slabs(24'clear roadway; 90 degree
crossing, w/o asphalt)
4      EACH 15,200.00 60,800.00 8,500.00 34,000.00 10,000.00 40,000.00 10,000.00 40,000.00
S-102 concrete approach slabs (24'clear roadway;90 degree
crossing,w/o asphalt, curved)
2      EACH 15,200.00 30,400.00 8,500.00 17,000.00 10,000.00 20,000.00 10,000.00 20,000.00
                       
 CONTRACTOR TOTAL       1,887,269.10   2,047,763.50   2,132,975.70   IRREGULAR