| 201-01 |
clearing & grubbing
|
lump |
LUMP |
20,000.00 |
20,000.00 |
65,000.00 |
65,000.00 |
50,000.00 |
50,000.00 |
100,000.00 |
100,000.00 |
| 202-02-A-01 |
removal of bridge(sta.105+39.46; 20.80'x 79.54' timber
bridge) |
1   |
EACH |
12,000.00 |
12,000.00 |
10,000.00 |
10,000.00 |
15,000.00 |
15,000.00 |
25,000.00 |
25,000.00 |
| 202-02-A-02 |
removal of bridge(sta.105+46.10; 20.00'x 92.00' timber
bridge) |
1   |
EACH |
14,000.00 |
14,000.00 |
10,000.00 |
10,000.00 |
16,000.00 |
16,000.00 |
25,000.00 |
25,000.00 |
| 202-02-A-03 |
removal of bridge(sta.14+99.66; 18.62'x 43.82' timber
bridge) |
1   |
EACH |
6,000.00 |
6,000.00 |
10,000.00 |
10,000.00 |
7,500.00 |
7,500.00 |
25,000.00 |
25,000.00 |
| 202-02-G |
removal of surfacing & stabilized base
|
2,755.7 |
SQYD |
6.00 |
16,534.20 |
6.00 |
16,534.20 |
6.00 |
16,534.20 |
10.00 |
27,557.00 |
| 203-05 |
excavation and embankment
|
lump |
LUMP |
15,000.00 |
15,000.00 |
110,000.00 |
110,000.00 |
72,000.00 |
72,000.00 |
2,500.00 |
2,500.00 |
| 204-02 |
temporary hay or straw bales
|
300   |
EACH |
8.00 |
2,400.00 |
15.00 |
4,500.00 |
5.00 |
1,500.00 |
20.00 |
6,000.00 |
| 204-03 |
temporary slope drains
|
640   |
LNFT |
5.00 |
3,200.00 |
18.00 |
11,520.00 |
1.00 |
640.00 |
15.00 |
9,600.00 |
| 204-05-A |
temporary sediment check dams (hay)
|
16   |
EACH |
64.00 |
1,024.00 |
200.00 |
3,200.00 |
100.00 |
1,600.00 |
150.00 |
2,400.00 |
| 204-06 |
temporary silt fencing
|
2,460   |
LNFT |
4.00 |
9,840.00 |
3.00 |
7,380.00 |
3.00 |
7,380.00 |
5.00 |
12,300.00 |
| 302-01 |
class ii base course
|
674.4 |
CUYD |
70.00 |
47,208.00 |
100.00 |
67,440.00 |
100.00 |
67,440.00 |
125.00 |
84,300.00 |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
45   |
CUYD |
60.00 |
2,700.00 |
60.00 |
2,700.00 |
100.00 |
4,500.00 |
125.00 |
5,625.00 |
| 502-01 |
superpave asphaltic concrete
|
526.1 |
TON |
200.00 |
105,220.00 |
160.00 |
84,176.00 |
285.00 |
149,938.50 |
175.00 |
92,067.50 |
| 704-03 |
blocked out guard rail
|
215.6 |
LNFT |
26.00 |
5,605.60 |
23.00 |
4,958.80 |
25.00 |
5,390.00 |
30.00 |
6,468.00 |
| 704-07-A |
guard rail bridge attachments (single thrie beam)
|
25.0 |
LNFT |
55.00 |
1,375.00 |
53.00 |
1,325.00 |
50.00 |
1,250.00 |
100.00 |
2,500.00 |
| 704-08-B |
guard rail transitions (double thrie beam)
|
350.0 |
LNFT |
70.00 |
24,500.00 |
65.00 |
22,750.00 |
60.00 |
21,000.00 |
100.00 |
35,000.00 |
| 704-09 |
guard rail anchor sections (turndown)
|
250.0 |
LNFT |
65.00 |
16,250.00 |
38.00 |
9,500.00 |
40.00 |
10,000.00 |
50.00 |
12,500.00 |
| 705-02 |
combination mesh & barbed wire fence
|
340   |
LNFT |
10.00 |
3,400.00 |
10.00 |
3,400.00 |
15.00 |
5,100.00 |
10.00 |
3,400.00 |
| 711-01-D |
riprap (55 lb,18" thick)
|
2,929   |
SQYD |
80.00 |
234,320.00 |
145.00 |
424,705.00 |
50.00 |
146,450.00 |
75.00 |
219,675.00 |
| 711-04 |
geotextile fabric
|
2,929   |
SQYD |
2.00 |
5,858.00 |
2.00 |
5,858.00 |
5.00 |
14,645.00 |
3.50 |
10,251.50 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
25,000.00 |
25,000.00 |
45,000.00 |
45,000.00 |
30,000.00 |
30,000.00 |
25,000.00 |
25,000.00 |
| 716-01-A |
mulch (vegetative)
|
3.00 |
TON |
1,000.00 |
3,000.00 |
600.00 |
1,800.00 |
1,000.00 |
3,000.00 |
750.00 |
2,250.00 |
| 717-01 |
seeding
|
69   |
LB |
3.00 |
207.00 |
12.00 |
828.00 |
20.00 |
1,380.00 |
10.00 |
690.00 |
| 718-01 |
fertilizer
|
1,470   |
LB |
1.00 |
1,470.00 |
0.75 |
1,102.50 |
1.00 |
1,470.00 |
0.50 |
735.00 |
| 725-03 |
low profile runaround
|
3   |
EACH |
41,000.00 |
123,000.00 |
30,000.00 |
90,000.00 |
100,000.00 |
300,000.00 |
50,000.00 |
150,000.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
147,000.00 |
147,000.00 |
200,000.00 |
200,000.00 |
320,000.00 |
320,000.00 |
75,000.00 |
75,000.00 |
| 729-16-C |
object marker assembly (type 3)
|
24   |
EACH |
85.00 |
2,040.00 |
90.00 |
2,160.00 |
100.00 |
2,400.00 |
100.00 |
2,400.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
30,000.00 |
30,000.00 |
40,000.00 |
40,000.00 |
30,000.00 |
30,000.00 |
10,000.00 |
10,000.00 |
| 804-01-B |
precast concrete piles (14")
|
675   |
LNFT |
81.50 |
55,012.50 |
52.00 |
35,100.00 |
75.00 |
50,625.00 |
200.00 |
135,000.00 |
| 804-01-C |
precast concrete piles (16")
|
2,997   |
LNFT |
98.40 |
294,904.80 |
58.00 |
173,826.00 |
90.00 |
269,730.00 |
206.00 |
617,382.00 |
| 804-12 |
loading permanent piles
|
3   |
EACH |
1,000.00 |
3,000.00 |
2,000.00 |
6,000.00 |
1.00 |
3.00 |
2,500.00 |
7,500.00 |
| 805-10-A |
bridge superstructure & substructure(90 degree
crossing; 24' roadway, precast only with cast-in-place bents) |
13   |
SPAN |
33,000.00 |
429,000.00 |
30,000.00 |
390,000.00 |
26,500.00 |
344,500.00 |
10,000.00 |
130,000.00 |
| 805-10-B |
bridge superstructure & substructure(90 degree
crossing; 24' roadway, cast-in-place only) |
4   |
SPAN |
34,000.00 |
136,000.00 |
34,000.00 |
136,000.00 |
26,500.00 |
106,000.00 |
20,000.00 |
80,000.00 |
| S-101 |
concrete approach slabs(24'clear roadway; 90 degree
crossing, w/o asphalt) |
4   |
EACH |
15,200.00 |
60,800.00 |
8,500.00 |
34,000.00 |
10,000.00 |
40,000.00 |
10,000.00 |
40,000.00 |
| S-102 |
concrete approach slabs (24'clear roadway;90 degree
crossing,w/o asphalt, curved) |
2   |
EACH |
15,200.00 |
30,400.00 |
8,500.00 |
17,000.00 |
10,000.00 |
20,000.00 |
10,000.00 |
20,000.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,887,269.10 |
|
2,047,763.50 |
|
2,132,975.70 |
|
IRREGULAR |
|