| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - AMERICAN CONTRACTING & SERVICES,INC |
- 2 - KIEWIT LOUISIANA CO |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
83,000.00 |
83,000.00 |
60,000.00 |
60,000.00 |
|
|
|
|
| 202-02-H |
removal of guard rail
|
50   |
LNFT |
16.00 |
800.00 |
25.00 |
1,250.00 |
|
|
|
|
| 202-02-K |
removal of concrete barrier transition
|
2   |
EACH |
3,500.00 |
7,000.00 |
2,000.00 |
4,000.00 |
|
|
|
|
| 704-07-A |
guard rail bridge attachments (single thrie beam)
|
150.0 |
LNFT |
70.00 |
10,500.00 |
70.00 |
10,500.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
500,000.00 |
500,000.00 |
867,000.00 |
867,000.00 |
|
|
|
|
| 713-03-B-01 |
temporary pvmt. markings (broken line)(4" w)(10' l)
(type i removable) |
2.803 |
MILE |
4,800.00 |
13,454.40 |
3,960.00 |
11,099.88 |
|
|
|
|
| 713-04-A-01 |
temporary pvmt. markings (solid line)(4" w)(type i
removable) |
3.167 |
MILE |
16,000.00 |
50,672.00 |
12,000.00 |
38,004.00 |
|
|
|
|
| 713-05-F |
temporary pavement legends and symbols (exit lane only)
|
5   |
EACH |
1,100.00 |
5,500.00 |
500.00 |
2,500.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
1,268,283.44 |
1,268,283.44 |
1,990,000.00 |
1,990,000.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
696   |
EACH |
6.00 |
4,176.00 |
6.60 |
4,593.60 |
|
|
|
|
| 732-01-C |
plastic pavement striping
|
1,207   |
LNFT |
1.30 |
1,569.10 |
1.10 |
1,327.70 |
|
|
|
|
| 732-01-E |
plastic pavement striping
|
110   |
LNFT |
4.20 |
462.00 |
3.30 |
363.00 |
|
|
|
|
| 732-02-A |
plastic pavement striping
|
3.167 |
MILE |
3,000.00 |
9,501.00 |
3,300.00 |
10,451.10 |
|
|
|
|
| 732-03-A-01 |
plastic pvmt striping (broken line)(4"width)preformed
marking tape (type v) |
2.803 |
MILE |
4,700.00 |
13,174.10 |
5,800.00 |
16,257.40 |
|
|
|
|
| 732-04-F |
plastic pavement legends & symbols (exit lane only)
|
5   |
EACH |
600.00 |
3,000.00 |
1,100.00 |
5,500.00 |
|
|
|
|
| 732-05 |
removal of existing markings
|
6.199 |
MILE |
6,000.00 |
37,194.00 |
100.00 |
619.90 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
70,000.00 |
70,000.00 |
0.01 |
0.01 |
|
|
|
|
| 806-01 |
deformed reinforcing steel
|
1,000   |
LB |
3.00 |
3,000.00 |
1.50 |
1,500.00 |
|
|
|
|
| S-101 |
hydro-demolition
|
37,319.3 |
SQYD |
80.00 |
2,985,544.00 |
175.00 |
6,530,877.50 |
|
|
|
|
| S-102-A |
furnishing latex modified cement concrete - very early
strength |
3,029.97 |
CUYD |
800.00 |
2,423,976.00 |
1,000.00 |
3,029,970.00 |
|
|
|
|
| S-102-B |
placing and finishing latex modified concrete - very
early strength overlay |
37,319.3 |
SQYD |
45.00 |
1,679,368.50 |
90.00 |
3,358,737.00 |
|
|
|
|
| S-103-A |
full depth deck patching (25.0 sq. ft. and under)
|
5,000.0 |
SQFT |
25.00 |
125,000.00 |
40.00 |
200,000.00 |
|
|
|
|
| S-103-B |
full depth deck patching (25.1 sq. ft. and over)
|
2,000.0 |
SQFT |
25.00 |
50,000.00 |
40.00 |
80,000.00 |
|
|
|
|
| S-104 |
removal, storage and re-installation of impact
attenuators |
2   |
EACH |
7,000.00 |
14,000.00 |
12,000.00 |
24,000.00 |
|
|
|
|
| S-105 |
bridge rail modifications
|
15,487   |
LF |
180.00 |
2,787,660.00 |
220.00 |
3,407,140.00 |
|
|
|
|
| S-106 |
dynamic message sign unit
|
8   |
EACH |
18,000.00 |
144,000.00 |
15,000.00 |
120,000.00 |
|
|
|
|
| S-107 |
motorist assistance patrol
|
1,000   |
HOUR |
100.00 |
100,000.00 |
200.00 |
200,000.00 |
|
|
|
|
| S-108 |
portable speed radar monitor
|
2   |
EACH |
6,000.00 |
12,000.00 |
550.00 |
1,100.00 |
|
|
|
|
| S-109 |
truck mounted impact attenuators (construction zone)
|
8   |
EACH |
35,000.00 |
280,000.00 |
300.00 |
2,400.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | ITEM TOTAL (CONSTRUCTION BID) |
|
|
|
12,682,834.54 |
|
19,979,191.09 |
|
|
|
|
| | NUMBER OF DAYS BID AT $15,000 PER DAY. |
|
|
|
2,550,000.00 |
|
1,995,000.00 |
|
|
|
|
| | TOTAL BID |
|
|
|
15,232,834.54 |
|
21,974,191.09 |
|
|
|
|
|