Letting of 5/28/2008 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 451-06-0138
Parish: OUACHITA
Routes: I-20
Description: I-20 ELEVATED SECTION (WEST APPROACH)
Type Const: hydro-demolition, concrete overlay, bridge rail modifications and related work.
Estimated Construction Cost: $12,309,038.91
Maximum Number of Days Allowed for Construction: 225
Calculated Daily User Cost: $15,000.00
 
RankLicenseBidderConstruction Bid Bidder's Proposed
Contract Time
Total Bid
1 33131 AMERICAN CONTRACTING & SERVICES,INC $12,682,834.54 170 $15,232,834.54
2 47347 KIEWIT LOUISIANA CO $19,979,191.09 133 $21,974,191.09
 
Item Number Item Description Quantity Unit of Measure - 1 -
AMERICAN CONTRACTING & SERVICES,INC
- 2 -
KIEWIT LOUISIANA CO

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-01 removal of structures & obstructions lump      LUMP 83,000.00 83,000.00 60,000.00 60,000.00        
202-02-H removal of guard rail 50      LNFT 16.00 800.00 25.00 1,250.00        
202-02-K removal of concrete barrier transition 2      EACH 3,500.00 7,000.00 2,000.00 4,000.00        
704-07-A guard rail bridge attachments (single thrie beam) 150.0    LNFT 70.00 10,500.00 70.00 10,500.00        
713-01 temporary signs & barricades lump      LUMP 500,000.00 500,000.00 867,000.00 867,000.00        
713-03-B-01 temporary pvmt. markings (broken line)(4" w)(10' l)
(type i removable)
2.803  MILE 4,800.00 13,454.40 3,960.00 11,099.88        
713-04-A-01 temporary pvmt. markings (solid line)(4" w)(type i
removable)
3.167  MILE 16,000.00 50,672.00 12,000.00 38,004.00        
713-05-F temporary pavement legends and symbols (exit lane only) 5      EACH 1,100.00 5,500.00 500.00 2,500.00        
727-01 mobilization lump      LUMP 1,268,283.44 1,268,283.44 1,990,000.00 1,990,000.00        
731-02 reflectorized raised pavement markers 696      EACH 6.00 4,176.00 6.60 4,593.60        
732-01-C plastic pavement striping 1,207      LNFT 1.30 1,569.10 1.10 1,327.70        
732-01-E plastic pavement striping 110      LNFT 4.20 462.00 3.30 363.00        
732-02-A plastic pavement striping 3.167  MILE 3,000.00 9,501.00 3,300.00 10,451.10        
732-03-A-01 plastic pvmt striping (broken line)(4"width)preformed
marking tape (type v)
2.803  MILE 4,700.00 13,174.10 5,800.00 16,257.40        
732-04-F plastic pavement legends & symbols (exit lane only) 5      EACH 600.00 3,000.00 1,100.00 5,500.00        
732-05 removal of existing markings 6.199  MILE 6,000.00 37,194.00 100.00 619.90        
740-01 construction layout lump      LUMP 70,000.00 70,000.00 0.01 0.01        
806-01 deformed reinforcing steel 1,000      LB 3.00 3,000.00 1.50 1,500.00        
S-101 hydro-demolition 37,319.3    SQYD 80.00 2,985,544.00 175.00 6,530,877.50        
S-102-A furnishing latex modified cement concrete - very early
strength
3,029.97   CUYD 800.00 2,423,976.00 1,000.00 3,029,970.00        
S-102-B placing and finishing latex modified concrete - very
early strength overlay
37,319.3    SQYD 45.00 1,679,368.50 90.00 3,358,737.00        
S-103-A full depth deck patching (25.0 sq. ft. and under) 5,000.0    SQFT 25.00 125,000.00 40.00 200,000.00        
S-103-B full depth deck patching (25.1 sq. ft. and over) 2,000.0    SQFT 25.00 50,000.00 40.00 80,000.00        
S-104 removal, storage and re-installation of impact
attenuators
2      EACH 7,000.00 14,000.00 12,000.00 24,000.00        
S-105 bridge rail modifications 15,487      LF 180.00 2,787,660.00 220.00 3,407,140.00        
S-106 dynamic message sign unit 8      EACH 18,000.00 144,000.00 15,000.00 120,000.00        
S-107 motorist assistance patrol 1,000      HOUR 100.00 100,000.00 200.00 200,000.00        
S-108 portable speed radar monitor 2      EACH 6,000.00 12,000.00 550.00 1,100.00        
S-109 truck mounted impact attenuators (construction zone) 8      EACH 35,000.00 280,000.00 300.00 2,400.00        
                       
 ITEM TOTAL (CONSTRUCTION BID)       12,682,834.54   19,979,191.09        
 NUMBER OF DAYS BID AT $15,000 PER DAY.       2,550,000.00   1,995,000.00        
 TOTAL BID       15,232,834.54   21,974,191.09        