Letting of 5/28/2008 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 450-12-0032
Parish: ST JAMES, ST JOHN
Routes: I-10
Description: E END OF BLIND RIVER - W END OF RESERVE RELIEF CANAL
Type Const: grading, cold planing asphaltic concrete, superpave asphaltic concrete overlay,
pavement patching and related work.
Estimated Construction Cost: $19,970,763.70
Maximum Number of Days Allowed for Construction: 325
Calculated Daily User Cost: $10,000.00
 
RankLicenseBidderConstruction Bid Bidder's Proposed
Contract Time
Total Bid
1 00481 COASTAL BRIDGE CO., L.L.C. $18,193,042.58 155 $19,743,042.58
2 00849 F.G. SULLIVAN, JR. CONTRACTOR LLC $18,037,958.23 266 $20,697,958.23
3 06276 BARRIERE CONSTRUCTION CO., LLC $20,498,462.70 170 $22,198,462.70
 
Item Number Item Description Quantity Unit of Measure - 1 -
COASTAL BRIDGE CO., L.L.C.
- 2 -
F.G. SULLIVAN, JR. CONTRACTOR LLC
- 3 -
BARRIERE CONSTRUCTION CO., LLC

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-H removal of guard rail 3,248      LNFT 5.00 16,240.00 6.00 19,488.00 5.00 16,240.00    
202-02-I removal of concrete foundation (4' x 8') 21      EACH 1,500.00 31,500.00 25.00 525.00 500.00 10,500.00    
203-07 borrow (vehicular measurement) 21,976      CUYD 15.00 329,640.00 5.00 109,880.00 24.00 527,424.00    
204-06 temporary silt fencing 1,500      LNFT 2.00 3,000.00 2.00 3,000.00 1.00 1,500.00    
502-01 superpave asphaltic concrete 124,025.5    TON 73.50 9,115,874.25 75.00 9,301,912.50 83.00 10,294,116.50    
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
713.9    TON 150.00 107,085.00 75.00 53,542.50 250.00 178,475.00    
508-01 asphalt concrete (sma) wearing course 27,624.7    TON 88.00 2,430,973.60 75.00 2,071,852.50 120.00 3,314,964.00    
509-01-A cold planing asphaltic pavement (1" average depth) 1,422      SQYD 10.00 14,220.00 10.00 14,220.00 5.00 7,110.00    
509-01-B cold planing asphaltic pavement (2" deep) 147,526      SQYD 4.75 700,748.50 3.75 553,222.50 1.50 221,289.00    
509-02 contractor retained reclaimed asphaltic pavement - 6,177      CUYD 0.01 - 61.77 0.01 - 61.77 20.00 - 123,540.00    
602-03 cleaning and sealing cracks 320      LNFT 4.00 1,280.00 5.00 1,600.00 2.50 800.00    
602-07 patching continuously reinforced concrete pavement 6,717.3    SQYD 180.00 1,209,114.00 300.00 2,015,190.00 224.00 1,504,675.20    
704-01-C guard rail (double thrie beam)(3'-1 1/2" post spacing) 241.6    LNFT 45.00 10,872.00 65.00 15,704.00 55.00 13,288.00    
704-03 blocked out guard rail 2,514.0    LNFT 20.00 50,280.00 20.00 50,280.00 30.00 75,420.00    
704-06 guard rail anchor sections (trailing end) 12.6    LNFT 80.00 1,008.00 75.00 945.00 95.00 1,197.00    
704-06-A guard rail anchor sections (trailing end)(single thrie
beam)
12.6    LNFT 90.00 1,134.00 85.00 1,071.00 105.00 1,323.00    
704-08-B guard rail transitions (double thrie beam) 300.0    LNFT 60.00 18,000.00 60.00 18,000.00 70.00 21,000.00    
704-10 guard rail anchor block 12      EACH 1,000.00 12,000.00 1,100.00 13,200.00 1,200.00 14,400.00    
704-11-A guard rail end treatment (flared) 16      EACH 2,000.00 32,000.00 2,300.00 36,800.00 2,300.00 36,800.00    
713-01 temporary signs & barricades lump      LUMP 250,000.00 250,000.00 500,000.00 500,000.00 800,000.00 800,000.00    
713-03-A temporary pavement markings (broken line)(4" width)(4'
length)
18.060  MILE 1,000.00 18,060.00 500.00 9,030.00 400.00 7,224.00    
713-03-B temporary pavement markings (broken line)(4" width)
(10' length)
36.120  MILE 300.00 10,836.00 500.00 18,060.00 600.00 21,672.00    
713-04-A temporary pavement markings (solid line)(4" width) 108.360  MILE 625.00 67,725.00 800.00 86,688.00 1,000.00 108,360.00    
727-01 mobilization lump      LUMP 1,800,000.00 1,800,000.00 1,000,000.00 1,000,000.00 1,200,000.00 1,200,000.00    
729-16-B object marker assembly (type 2) 48      EACH 70.00 3,360.00 65.00 3,120.00 60.00 2,880.00    
729-16-C object marker assembly (type 3) 16      EACH 80.00 1,280.00 75.00 1,200.00 95.00 1,520.00    
729-17 milepost assembly (ground mounted) 24      EACH 650.00 15,600.00 165.00 3,960.00 250.00 6,000.00    
731-02 reflectorized raised pavement markers 2,870      EACH 5.00 14,350.00 6.00 17,220.00 6.00 17,220.00    
732-02-A plastic pavement striping (solid line) (4" width) 72.240  MILE 2,050.00 148,092.00 900.00 65,016.00 3,200.00 231,168.00    
732-03-A plastic pavement striping (broken line)(4" width) 18.060  MILE 700.00 12,642.00 900.00 16,254.00 950.00 17,157.00    
739-01 hydro-seeding 55.70   ACRE 1,000.00 55,700.00 1,000.00 55,700.00 1,500.00 83,550.00    
740-01 construction layout lump      LUMP 100,000.00 100,000.00 314,500.00 314,500.00 30,000.00 30,000.00    
S-001 milling concrete pavement (1" avg. depth) 6,396      SQYD 10.00 63,960.00 30.00 191,880.00 25.00 159,900.00    
S-002 dynamic message sign unit 8      EACH 15,000.00 120,000.00 13,000.00 104,000.00 12,000.00 96,000.00    
S-003 rumble strips (ground-in) 36.7    MILE 1,100.00 40,370.00 900.00 33,030.00 1,000.00 36,700.00    
S-004 high tension median cable barrier system 33,754      LNFT 20.00 675,080.00 18.50 624,449.00 22.00 742,588.00    
S-005 median cable barrier gated end terminal 12      EACH 3,000.00 36,000.00 3,200.00 38,400.00 3,600.00 43,200.00    
S-006 concrete mow pad 33,754      LNFT 20.00 675,080.00 20.00 675,080.00 23.00 776,342.00    
                       
 ITEM TOTAL (CONSTRUCTION BID)       18,193,042.58   18,037,958.23   20,498,462.70    
 NUMBER OF DAYS BID AT $10,000 PER DAY.       1,550,000.00   2,660,000.00   1,700,000.00    
 TOTAL BID       19,743,042.58   20,697,958.23   22,198,462.70    