| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - COASTAL BRIDGE CO., L.L.C. |
- 2 - F.G. SULLIVAN, JR. CONTRACTOR LLC |
- 3 - BARRIERE CONSTRUCTION CO., LLC |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-H |
removal of guard rail
|
3,248   |
LNFT |
5.00 |
16,240.00 |
6.00 |
19,488.00 |
5.00 |
16,240.00 |
|
|
| 202-02-I |
removal of concrete foundation (4' x 8')
|
21   |
EACH |
1,500.00 |
31,500.00 |
25.00 |
525.00 |
500.00 |
10,500.00 |
|
|
| 203-07 |
borrow (vehicular measurement)
|
21,976   |
CUYD |
15.00 |
329,640.00 |
5.00 |
109,880.00 |
24.00 |
527,424.00 |
|
|
| 204-06 |
temporary silt fencing
|
1,500   |
LNFT |
2.00 |
3,000.00 |
2.00 |
3,000.00 |
1.00 |
1,500.00 |
|
|
| 502-01 |
superpave asphaltic concrete
|
124,025.5 |
TON |
73.50 |
9,115,874.25 |
75.00 |
9,301,912.50 |
83.00 |
10,294,116.50 |
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
713.9 |
TON |
150.00 |
107,085.00 |
75.00 |
53,542.50 |
250.00 |
178,475.00 |
|
|
| 508-01 |
asphalt concrete (sma) wearing course
|
27,624.7 |
TON |
88.00 |
2,430,973.60 |
75.00 |
2,071,852.50 |
120.00 |
3,314,964.00 |
|
|
| 509-01-A |
cold planing asphaltic pavement (1" average depth)
|
1,422   |
SQYD |
10.00 |
14,220.00 |
10.00 |
14,220.00 |
5.00 |
7,110.00 |
|
|
| 509-01-B |
cold planing asphaltic pavement (2" deep)
|
147,526   |
SQYD |
4.75 |
700,748.50 |
3.75 |
553,222.50 |
1.50 |
221,289.00 |
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 6,177   |
CUYD |
0.01 |
- 61.77 |
0.01 |
- 61.77 |
20.00 |
- 123,540.00 |
|
|
| 602-03 |
cleaning and sealing cracks
|
320   |
LNFT |
4.00 |
1,280.00 |
5.00 |
1,600.00 |
2.50 |
800.00 |
|
|
| 602-07 |
patching continuously reinforced concrete pavement
|
6,717.3 |
SQYD |
180.00 |
1,209,114.00 |
300.00 |
2,015,190.00 |
224.00 |
1,504,675.20 |
|
|
| 704-01-C |
guard rail (double thrie beam)(3'-1 1/2" post spacing)
|
241.6 |
LNFT |
45.00 |
10,872.00 |
65.00 |
15,704.00 |
55.00 |
13,288.00 |
|
|
| 704-03 |
blocked out guard rail
|
2,514.0 |
LNFT |
20.00 |
50,280.00 |
20.00 |
50,280.00 |
30.00 |
75,420.00 |
|
|
| 704-06 |
guard rail anchor sections (trailing end)
|
12.6 |
LNFT |
80.00 |
1,008.00 |
75.00 |
945.00 |
95.00 |
1,197.00 |
|
|
| 704-06-A |
guard rail anchor sections (trailing end)(single thrie
beam) |
12.6 |
LNFT |
90.00 |
1,134.00 |
85.00 |
1,071.00 |
105.00 |
1,323.00 |
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
300.0 |
LNFT |
60.00 |
18,000.00 |
60.00 |
18,000.00 |
70.00 |
21,000.00 |
|
|
| 704-10 |
guard rail anchor block
|
12   |
EACH |
1,000.00 |
12,000.00 |
1,100.00 |
13,200.00 |
1,200.00 |
14,400.00 |
|
|
| 704-11-A |
guard rail end treatment (flared)
|
16   |
EACH |
2,000.00 |
32,000.00 |
2,300.00 |
36,800.00 |
2,300.00 |
36,800.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
250,000.00 |
250,000.00 |
500,000.00 |
500,000.00 |
800,000.00 |
800,000.00 |
|
|
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
18.060 |
MILE |
1,000.00 |
18,060.00 |
500.00 |
9,030.00 |
400.00 |
7,224.00 |
|
|
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
36.120 |
MILE |
300.00 |
10,836.00 |
500.00 |
18,060.00 |
600.00 |
21,672.00 |
|
|
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
108.360 |
MILE |
625.00 |
67,725.00 |
800.00 |
86,688.00 |
1,000.00 |
108,360.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
1,800,000.00 |
1,800,000.00 |
1,000,000.00 |
1,000,000.00 |
1,200,000.00 |
1,200,000.00 |
|
|
| 729-16-B |
object marker assembly (type 2)
|
48   |
EACH |
70.00 |
3,360.00 |
65.00 |
3,120.00 |
60.00 |
2,880.00 |
|
|
| 729-16-C |
object marker assembly (type 3)
|
16   |
EACH |
80.00 |
1,280.00 |
75.00 |
1,200.00 |
95.00 |
1,520.00 |
|
|
| 729-17 |
milepost assembly (ground mounted)
|
24   |
EACH |
650.00 |
15,600.00 |
165.00 |
3,960.00 |
250.00 |
6,000.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
2,870   |
EACH |
5.00 |
14,350.00 |
6.00 |
17,220.00 |
6.00 |
17,220.00 |
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
72.240 |
MILE |
2,050.00 |
148,092.00 |
900.00 |
65,016.00 |
3,200.00 |
231,168.00 |
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
18.060 |
MILE |
700.00 |
12,642.00 |
900.00 |
16,254.00 |
950.00 |
17,157.00 |
|
|
| 739-01 |
hydro-seeding
|
55.70 |
ACRE |
1,000.00 |
55,700.00 |
1,000.00 |
55,700.00 |
1,500.00 |
83,550.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
100,000.00 |
100,000.00 |
314,500.00 |
314,500.00 |
30,000.00 |
30,000.00 |
|
|
| S-001 |
milling concrete pavement (1" avg. depth)
|
6,396   |
SQYD |
10.00 |
63,960.00 |
30.00 |
191,880.00 |
25.00 |
159,900.00 |
|
|
| S-002 |
dynamic message sign unit
|
8   |
EACH |
15,000.00 |
120,000.00 |
13,000.00 |
104,000.00 |
12,000.00 |
96,000.00 |
|
|
| S-003 |
rumble strips (ground-in)
|
36.7 |
MILE |
1,100.00 |
40,370.00 |
900.00 |
33,030.00 |
1,000.00 |
36,700.00 |
|
|
| S-004 |
high tension median cable barrier system
|
33,754   |
LNFT |
20.00 |
675,080.00 |
18.50 |
624,449.00 |
22.00 |
742,588.00 |
|
|
| S-005 |
median cable barrier gated end terminal
|
12   |
EACH |
3,000.00 |
36,000.00 |
3,200.00 |
38,400.00 |
3,600.00 |
43,200.00 |
|
|
| S-006 |
concrete mow pad
|
33,754   |
LNFT |
20.00 |
675,080.00 |
20.00 |
675,080.00 |
23.00 |
776,342.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | ITEM TOTAL (CONSTRUCTION BID) |
|
|
|
18,193,042.58 |
|
18,037,958.23 |
|
20,498,462.70 |
|
|
| | NUMBER OF DAYS BID AT $10,000 PER DAY. |
|
|
|
1,550,000.00 |
|
2,660,000.00 |
|
1,700,000.00 |
|
|
| | TOTAL BID |
|
|
|
19,743,042.58 |
|
20,697,958.23 |
|
22,198,462.70 |
|
|
|