- 1 - MADDEN CONTRACTING CO., INC. |
|
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-D |
removal of concrete walks & drives
|
64   |
SQYD |
20.00 |
1,280.00 |
|
|
|
|
|
|
| 202-02-H |
removal of guard rail
|
330   |
LNFT |
6.00 |
1,980.00 |
|
|
|
|
|
|
| 202-02-I |
removal of culvert pipe
|
96   |
LNFT |
10.00 |
960.00 |
|
|
|
|
|
|
| 202-02-J |
removal of asphaltic surfacing from bridge deck
|
228   |
SQYD |
15.00 |
3,420.00 |
|
|
|
|
|
|
| 203-07 |
borrow (vehicular measurement)
|
8,000   |
CUYD |
14.00 |
112,000.00 |
|
|
|
|
|
|
| 203-07-A |
borrow (vehicular meas.)(selected soils)
|
4,000   |
CUYD |
14.00 |
56,000.00 |
|
|
|
|
|
|
| 303-02 |
removal of existing patches
|
400   |
SQYD |
10.00 |
4,000.00 |
|
|
|
|
|
|
| 308-01-A |
in-place cement treated base course (12" thick)
|
112,152   |
SQYD |
8.55 |
958,899.60 |
|
|
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
570   |
CUYD |
1.00 |
570.00 |
|
|
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
12,744.0 |
TON |
84.60 |
1,078,142.40 |
|
|
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
675.0 |
TON |
55.00 |
37,125.00 |
|
|
|
|
|
|
| 701-08 |
relaying pipe
|
44   |
LNFT |
150.00 |
6,600.00 |
|
|
|
|
|
|
| 701-10-I |
reinforced concrete pipe (extension)(24")
|
8   |
LNFT |
200.00 |
1,600.00 |
|
|
|
|
|
|
| 701-15 |
concrete collar
|
7   |
EACH |
975.00 |
6,825.00 |
|
|
|
|
|
|
| 704-01-A |
guard rail (single thrie beam)(3'-1 1/2" post spacing)
|
100.0 |
LNFT |
50.00 |
5,000.00 |
|
|
|
|
|
|
| 704-01-B |
guard rail (single thrie beam)(6'-3" post spacing)
|
114.0 |
LNFT |
59.00 |
6,726.00 |
|
|
|
|
|
|
| 704-03 |
blocked out guard rail
|
100.0 |
LNFT |
20.00 |
2,000.00 |
|
|
|
|
|
|
| 704-11-A |
guard rail end treatment (flared)
|
4   |
EACH |
2,100.00 |
8,400.00 |
|
|
|
|
|
|
| 712-02 |
sacked concrete revetment
|
60   |
SQYD |
80.00 |
4,800.00 |
|
|
|
|
|
|
| 712-03 |
stone revetment
|
260   |
SQYD |
80.00 |
20,800.00 |
|
|
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
97,100.00 |
97,100.00 |
|
|
|
|
|
|
| 713-02-E |
temporary pavement markings (24" width)
|
60   |
LNFT |
0.90 |
54.00 |
|
|
|
|
|
|
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
8.782 |
MILE |
400.00 |
3,512.80 |
|
|
|
|
|
|
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
1.750 |
MILE |
1.00 |
1.75 |
|
|
|
|
|
|
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
28.242 |
MILE |
1.00 |
28.24 |
|
|
|
|
|
|
| 716-01-A |
mulch (vegetative)
|
32.4 |
TON |
600.00 |
19,440.00 |
|
|
|
|
|
|
| 722-02 |
project site laboratory (equipped)
|
1   |
EACH |
2,500.00 |
2,500.00 |
|
|
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
97,100.00 |
97,100.00 |
|
|
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
4   |
EACH |
75.00 |
300.00 |
|
|
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
1,008   |
EACH |
4.50 |
4,536.00 |
|
|
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
60   |
LNFT |
3.00 |
180.00 |
|
|
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
28.242 |
MILE |
2,500.00 |
70,605.00 |
|
|
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
1.750 |
MILE |
700.00 |
1,225.00 |
|
|
|
|
|
|
| 739-01 |
hydro-seeding
|
18.52 |
ACRE |
1,200.00 |
22,224.00 |
|
|
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
22,450.00 |
22,450.00 |
|
|
|
|
|
|
| S-001 |
saw cutting existing concrete drives
|
190   |
LNFT |
12.00 |
2,280.00 |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
2,660,664.79 |
|
|
|
|
|
|
|