| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - W. E. MCDONALD & SON, LLC. |
- 2 - DIAMOND B CONSTRUCTION CO., L.L.C. |
- 3 - GILCHRIST CONSTRUCTION CO. LLC |
- 4 - APECK CONSTRUCTION, INC. |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
5,000.00 |
5,000.00 |
10,000.00 |
10,000.00 |
20,000.00 |
20,000.00 |
17,800.47 |
17,800.47 |
| 203-07 |
borrow (vehicular measurement)
|
159   |
CUYD |
10.00 |
1,590.00 |
13.50 |
2,146.50 |
20.00 |
3,180.00 |
24.51 |
3,897.09 |
| 203-07-A |
borrow (vehicular meas.)(selected soils)
|
115   |
CUYD |
10.00 |
1,150.00 |
30.00 |
3,450.00 |
25.00 |
2,875.00 |
25.69 |
2,954.35 |
| 304-05 |
lime treatment (type e)
|
181.91 |
TON |
425.00 |
77,311.75 |
515.00 |
93,683.65 |
250.00 |
45,477.50 |
468.99 |
85,313.97 |
| 305-01-D |
subgrade layer (12" thick)
|
34,967   |
SQYD |
6.93 |
242,321.31 |
6.75 |
236,027.25 |
7.40 |
258,755.80 |
8.45 |
295,471.15 |
| 308-01-A |
in-place cement treated base course (12" thick)
|
71,557   |
SQYD |
6.93 |
495,890.01 |
7.00 |
500,899.00 |
6.20 |
443,653.40 |
6.58 |
470,845.06 |
| 308-02 |
removal of existing patches
|
250   |
SQYD |
15.00 |
3,750.00 |
20.00 |
5,000.00 |
5.00 |
1,250.00 |
23.54 |
5,885.00 |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
1,341   |
CUYD |
25.00 |
33,525.00 |
32.00 |
42,912.00 |
58.00 |
77,778.00 |
47.20 |
63,295.20 |
| 502-01 |
superpave asphaltic concrete
|
7,499.9 |
TON |
71.00 |
532,492.90 |
72.24 |
541,792.78 |
76.00 |
569,992.40 |
88.67 |
665,016.13 |
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
472.3 |
TON |
140.00 |
66,122.00 |
140.00 |
66,122.00 |
140.00 |
66,122.00 |
139.23 |
65,758.33 |
| 509-01 |
cold planing asphaltic pavement
|
69,863   |
SQYD |
1.10 |
76,849.30 |
1.15 |
80,342.45 |
1.35 |
94,315.05 |
0.97 |
67,767.11 |
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 3,293   |
CUYD |
0.10 |
- 329.30 |
0.10 |
- 329.30 |
0.10 |
- 329.30 |
0.01 |
- 32.93 |
| 701-02-D/E |
cross drain pipe arch (24" equiv. rcpa or 30" equiv.
cmpa) |
96   |
LNFT |
55.00 |
5,280.00 |
135.00 |
12,960.00 |
260.00 |
24,960.00 |
108.13 |
10,380.48 |
| 701-02-E/F |
cross drain pipe arch (30" equiv. rcpa or 36" equiv.
cmpa) |
56   |
LNFT |
70.00 |
3,920.00 |
160.00 |
8,960.00 |
265.00 |
14,840.00 |
164.66 |
9,220.96 |
| 701-02-H/I |
cross drain pipe arch (48" equiv. rcpa or 54" equiv.
cmpa) |
48   |
LNFT |
110.00 |
5,280.00 |
220.00 |
10,560.00 |
350.00 |
16,800.00 |
265.61 |
12,749.28 |
| 701-02-N/P |
cross drain pipe arch (84" equiv. rcpa or 96" equiv.
cmpa) |
128   |
LNFT |
250.00 |
32,000.00 |
600.00 |
76,800.00 |
500.00 |
64,000.00 |
303.64 |
38,865.92 |
| 701-02-R |
cross drain pipe arch (108" equiv. cmpa)
|
192   |
LNFT |
368.00 |
70,656.00 |
400.00 |
76,800.00 |
540.00 |
103,680.00 |
392.86 |
75,429.12 |
| 711-04 |
geotextile fabric
|
730   |
SQYD |
2.00 |
1,460.00 |
2.00 |
1,460.00 |
3.25 |
2,372.50 |
3.36 |
2,452.80 |
| 712-04 |
flexible revetment
|
484   |
SQYD |
69.00 |
33,396.00 |
75.00 |
36,300.00 |
60.00 |
29,040.00 |
39.65 |
19,190.60 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
9,800.00 |
9,800.00 |
17,000.00 |
17,000.00 |
50,000.00 |
50,000.00 |
25,682.52 |
25,682.52 |
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
11.815 |
MILE |
300.00 |
3,544.50 |
135.00 |
1,595.03 |
200.00 |
2,363.00 |
251.09 |
2,966.63 |
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
8.390 |
MILE |
0.01 |
0.08 |
320.00 |
2,684.80 |
1.00 |
8.39 |
350.22 |
2,938.35 |
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
34.866 |
MILE |
0.01 |
0.35 |
650.00 |
22,662.90 |
1.00 |
34.87 |
700.51 |
24,423.98 |
| 716-01-A |
mulch (vegetative)
|
6.8 |
TON |
250.00 |
1,700.00 |
525.00 |
3,570.00 |
300.00 |
2,040.00 |
642.06 |
4,366.01 |
| 717-01 |
seeding
|
102   |
LB |
8.00 |
816.00 |
11.00 |
1,122.00 |
10.00 |
1,020.00 |
22.47 |
2,291.94 |
| 718-01 |
fertilizer
|
3,370   |
LB |
0.45 |
1,516.50 |
0.65 |
2,190.50 |
0.60 |
2,022.00 |
0.70 |
2,359.00 |
| 722-01 |
project site laboratory
|
1   |
EACH |
6,000.00 |
6,000.00 |
6,000.00 |
6,000.00 |
20,000.00 |
20,000.00 |
9,339.10 |
9,339.10 |
| 726-01 |
bedding material
|
249.0 |
CUYD |
89.00 |
22,161.00 |
110.00 |
27,390.00 |
110.00 |
27,390.00 |
93.13 |
23,189.37 |
| 727-01 |
mobilization
|
lump |
LUMP |
103,000.00 |
103,000.00 |
100,000.00 |
100,000.00 |
110,000.00 |
110,000.00 |
60,000.00 |
60,000.00 |
| 729-16-B |
object marker assembly (type 2)
|
18   |
EACH |
60.00 |
1,080.00 |
65.00 |
1,170.00 |
70.00 |
1,260.00 |
102.65 |
1,847.70 |
| 731-02 |
reflectorized raised pavement markers
|
780   |
EACH |
7.00 |
5,460.00 |
5.00 |
3,900.00 |
5.60 |
4,368.00 |
5.25 |
4,095.00 |
| 732-01-E |
plastic pavement striping (24" width)
|
22   |
LNFT |
25.00 |
550.00 |
3.25 |
71.50 |
1.40 |
30.80 |
3.50 |
77.00 |
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
5.618 |
MILE |
4,800.00 |
26,966.40 |
2,650.00 |
14,887.70 |
2,800.00 |
15,730.40 |
2,919.51 |
16,401.81 |
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
4.195 |
MILE |
1,800.00 |
7,551.00 |
750.00 |
3,146.25 |
1,200.00 |
5,034.00 |
816.20 |
3,423.96 |
| 735-01 |
mailboxes
|
41   |
EACH |
1.00 |
41.00 |
1.00 |
41.00 |
10.00 |
410.00 |
29.90 |
1,225.90 |
| 735-02 |
mailbox supports (single)
|
23   |
EACH |
125.00 |
2,875.00 |
110.00 |
2,530.00 |
120.00 |
2,760.00 |
177.70 |
4,087.10 |
| 735-03 |
mailbox supports (double)
|
9   |
EACH |
175.00 |
1,575.00 |
150.00 |
1,350.00 |
160.00 |
1,440.00 |
242.55 |
2,182.95 |
| 735-04 |
mailbox supports (multiple)
|
2   |
EACH |
325.00 |
650.00 |
270.00 |
540.00 |
300.00 |
600.00 |
407.39 |
814.78 |
| 740-01 |
construction layout
|
lump |
LUMP |
8,500.00 |
8,500.00 |
13,500.00 |
13,500.00 |
22,000.00 |
22,000.00 |
46,193.25 |
46,193.25 |
| 805-12-C-01 |
reinforced concrete box culverts (6'x 3')(precast only,
astm c850) |
48.0 |
LNFT |
350.00 |
16,800.00 |
425.00 |
20,400.00 |
560.00 |
26,880.00 |
546.60 |
26,236.80 |
| S-001 |
cleaning existing ditches
|
1,000   |
LNFT |
6.00 |
6,000.00 |
11.00 |
11,000.00 |
5.00 |
5,000.00 |
7.00 |
7,000.00 |
| S-002 |
sack concrete headwall
|
180.0 |
CUYD |
459.00 |
82,620.00 |
180.00 |
32,400.00 |
90.00 |
16,200.00 |
439.41 |
79,093.80 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,996,871.80 |
|
2,095,038.01 |
|
2,155,353.81 |
|
2,262,497.04 |
|
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 5 - D & J CONSTRUCTION CO., INC. |
|
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
5,000.00 |
5,000.00 |
|
|
|
|
|
|
| 203-07 |
borrow (vehicular measurement)
|
159   |
CUYD |
11.00 |
1,749.00 |
|
|
|
|
|
|
| 203-07-A |
borrow (vehicular meas.)(selected soils)
|
115   |
CUYD |
11.00 |
1,265.00 |
|
|
|
|
|
|
| 304-05 |
lime treatment (type e)
|
181.91 |
TON |
450.00 |
81,859.50 |
|
|
|
|
|
|
| 305-01-D |
subgrade layer (12" thick)
|
34,967   |
SQYD |
7.25 |
253,510.75 |
|
|
|
|
|
|
| 308-01-A |
in-place cement treated base course (12" thick)
|
71,557   |
SQYD |
7.25 |
518,788.25 |
|
|
|
|
|
|
| 308-02 |
removal of existing patches
|
250   |
SQYD |
16.00 |
4,000.00 |
|
|
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
1,341   |
CUYD |
35.00 |
46,935.00 |
|
|
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
7,499.9 |
TON |
92.00 |
689,990.80 |
|
|
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
472.3 |
TON |
92.00 |
43,451.60 |
|
|
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
69,863   |
SQYD |
1.05 |
73,356.15 |
|
|
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 3,293   |
CUYD |
0.01 |
- 32.93 |
|
|
|
|
|
|
| 701-02-D/E |
cross drain pipe arch (24" equiv. rcpa or 30" equiv.
cmpa) |
96   |
LNFT |
75.00 |
7,200.00 |
|
|
|
|
|
|
| 701-02-E/F |
cross drain pipe arch (30" equiv. rcpa or 36" equiv.
cmpa) |
56   |
LNFT |
100.00 |
5,600.00 |
|
|
|
|
|
|
| 701-02-H/I |
cross drain pipe arch (48" equiv. rcpa or 54" equiv.
cmpa) |
48   |
LNFT |
150.00 |
7,200.00 |
|
|
|
|
|
|
| 701-02-N/P |
cross drain pipe arch (84" equiv. rcpa or 96" equiv.
cmpa) |
128   |
LNFT |
300.00 |
38,400.00 |
|
|
|
|
|
|
| 701-02-R |
cross drain pipe arch (108" equiv. cmpa)
|
192   |
LNFT |
400.00 |
76,800.00 |
|
|
|
|
|
|
| 711-04 |
geotextile fabric
|
730   |
SQYD |
3.00 |
2,190.00 |
|
|
|
|
|
|
| 712-04 |
flexible revetment
|
484   |
SQYD |
70.00 |
33,880.00 |
|
|
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
100,000.00 |
100,000.00 |
|
|
|
|
|
|
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
11.815 |
MILE |
225.00 |
2,658.38 |
|
|
|
|
|
|
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
8.390 |
MILE |
200.00 |
1,678.00 |
|
|
|
|
|
|
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
34.866 |
MILE |
1.00 |
34.87 |
|
|
|
|
|
|
| 716-01-A |
mulch (vegetative)
|
6.8 |
TON |
800.00 |
5,440.00 |
|
|
|
|
|
|
| 717-01 |
seeding
|
102   |
LB |
8.00 |
816.00 |
|
|
|
|
|
|
| 718-01 |
fertilizer
|
3,370   |
LB |
0.60 |
2,022.00 |
|
|
|
|
|
|
| 722-01 |
project site laboratory
|
1   |
EACH |
10,000.00 |
10,000.00 |
|
|
|
|
|
|
| 726-01 |
bedding material
|
249.0 |
CUYD |
90.00 |
22,410.00 |
|
|
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
125,000.00 |
125,000.00 |
|
|
|
|
|
|
| 729-16-B |
object marker assembly (type 2)
|
18   |
EACH |
100.00 |
1,800.00 |
|
|
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
780   |
EACH |
8.00 |
6,240.00 |
|
|
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
22   |
LNFT |
25.00 |
550.00 |
|
|
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
5.618 |
MILE |
3,600.00 |
20,224.80 |
|
|
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
4.195 |
MILE |
2,600.00 |
10,907.00 |
|
|
|
|
|
|
| 735-01 |
mailboxes
|
41   |
EACH |
1.00 |
41.00 |
|
|
|
|
|
|
| 735-02 |
mailbox supports (single)
|
23   |
EACH |
125.00 |
2,875.00 |
|
|
|
|
|
|
| 735-03 |
mailbox supports (double)
|
9   |
EACH |
200.00 |
1,800.00 |
|
|
|
|
|
|
| 735-04 |
mailbox supports (multiple)
|
2   |
EACH |
350.00 |
700.00 |
|
|
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
25,000.00 |
25,000.00 |
|
|
|
|
|
|
| 805-12-C-01 |
reinforced concrete box culverts (6'x 3')(precast only,
astm c850) |
48.0 |
LNFT |
400.00 |
19,200.00 |
|
|
|
|
|
|
| S-001 |
cleaning existing ditches
|
1,000   |
LNFT |
7.00 |
7,000.00 |
|
|
|
|
|
|
| S-002 |
sack concrete headwall
|
180.0 |
CUYD |
475.00 |
85,500.00 |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
2,343,040.17 |
|
|
|
|
|
|
|