| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - SPECIALTY TRACKHOE & DOZER SERV.INC |
- 2 - F. J. BURNELL, INC. |
- 3 - BLOUNT BROS. CONSTRUCTION, INC. |
- 4 - QUALITY DESIGN & CONSTRUCTION, INC. |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-D |
removal of concrete walks & drives
|
278   |
SQYD |
15.00 |
4,170.00 |
15.00 |
4,170.00 |
12.00 |
3,336.00 |
18.00 |
5,004.00 |
| 202-02-F |
removal of concrete combination curb & gutter
|
14.0 |
LNFT |
30.00 |
420.00 |
30.00 |
420.00 |
12.00 |
168.00 |
18.00 |
252.00 |
| 202-02-I |
removal of pipe
|
1,124   |
LNFT |
12.00 |
13,488.00 |
20.00 |
22,480.00 |
20.00 |
22,480.00 |
10.00 |
11,240.00 |
| 202-02-J |
removal of headwall
|
5   |
EACH |
1,300.00 |
6,500.00 |
1,000.00 |
5,000.00 |
1,000.00 |
5,000.00 |
410.00 |
2,050.00 |
| 202-02-K |
removal of catch basin
|
1   |
EACH |
2,000.00 |
2,000.00 |
1,000.00 |
1,000.00 |
1,000.00 |
1,000.00 |
600.00 |
600.00 |
| 202-02-L |
removal of paved slope drains
|
16.1 |
SQYD |
205.00 |
3,300.50 |
50.00 |
805.00 |
10.00 |
161.00 |
30.00 |
483.00 |
| 203-05 |
excavation and embankment
|
lump |
LUMP |
46,000.00 |
46,000.00 |
50,000.00 |
50,000.00 |
70,000.00 |
70,000.00 |
45,800.00 |
45,800.00 |
| 204-02 |
temporary hay or straw bales
|
30   |
EACH |
20.00 |
600.00 |
20.00 |
600.00 |
15.00 |
450.00 |
14.00 |
420.00 |
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
39.1 |
CUYD |
75.00 |
2,932.50 |
75.00 |
2,932.50 |
60.00 |
2,346.00 |
78.00 |
3,049.80 |
| 510-01-A |
pavement patching (6" minimum thickness)
|
246   |
SQYD |
85.00 |
20,910.00 |
150.00 |
36,900.00 |
55.00 |
13,530.00 |
100.00 |
24,600.00 |
| 602-05-K-03 |
full depth patching of jointed conc pvmt (10" thick)
(48.1 sq yds & over) |
70.5 |
SQYD |
175.00 |
12,337.50 |
200.00 |
14,100.00 |
250.00 |
17,625.00 |
408.00 |
28,764.00 |
| 702-02-A |
manholes (mh-06)
|
1   |
EACH |
4,500.00 |
4,500.00 |
5,000.00 |
5,000.00 |
5,250.00 |
5,250.00 |
3,400.00 |
3,400.00 |
| 702-03-A |
catch basins (cb-01)
|
1   |
EACH |
2,062.50 |
2,062.50 |
5,000.00 |
5,000.00 |
2,850.00 |
2,850.00 |
3,400.00 |
3,400.00 |
| 702-07-B |
cross drain safety end (type 2)
|
2   |
EACH |
3,500.00 |
7,000.00 |
4,000.00 |
8,000.00 |
5,000.00 |
10,000.00 |
5,230.00 |
10,460.00 |
| 702-08-B |
side drain safety end (type 2)
|
20   |
EACH |
3,000.00 |
60,000.00 |
4,000.00 |
80,000.00 |
5,500.00 |
110,000.00 |
5,230.00 |
104,600.00 |
| 706-02-C |
concrete drive (6" thick)
|
295.0 |
SQYD |
75.00 |
22,125.00 |
65.00 |
19,175.00 |
60.00 |
17,700.00 |
82.40 |
24,308.00 |
| 706-03-A |
incidental concrete paving (4" thick)
|
16.1 |
SQYD |
120.00 |
1,932.00 |
100.00 |
1,610.00 |
52.00 |
837.20 |
82.40 |
1,326.64 |
| 707-03 |
combination concrete curb & gutter
|
14.0 |
LNFT |
75.00 |
1,050.00 |
100.00 |
1,400.00 |
25.00 |
350.00 |
26.00 |
364.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
25,000.00 |
25,000.00 |
25,000.00 |
25,000.00 |
30,000.00 |
30,000.00 |
23,900.00 |
23,900.00 |
| 713-02-A |
temporary pavement markings (4" width)
|
1,200   |
LNFT |
1.25 |
1,500.00 |
1.00 |
1,200.00 |
3.00 |
3,600.00 |
2.00 |
2,400.00 |
| 717-01 |
seeding
|
68   |
LB |
10.00 |
680.00 |
10.00 |
680.00 |
20.00 |
1,360.00 |
10.50 |
714.00 |
| 718-01 |
fertilizer
|
2,250   |
LB |
0.75 |
1,687.50 |
1.00 |
2,250.00 |
1.00 |
2,250.00 |
3.20 |
7,200.00 |
| 720-01-A |
erosion control system, slope protection (type a)
|
10,648   |
SQYD |
1.50 |
15,972.00 |
2.25 |
23,958.00 |
2.00 |
21,296.00 |
2.10 |
22,360.80 |
| 726-01 |
bedding material
|
457.0 |
CUYD |
80.00 |
36,560.00 |
100.00 |
45,700.00 |
75.00 |
34,275.00 |
132.00 |
60,324.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
50,000.00 |
50,000.00 |
80,000.00 |
80,000.00 |
75,000.00 |
75,000.00 |
62,300.00 |
62,300.00 |
| 732-01-A |
plastic pavement striping ( 4" width)
|
52   |
LNFT |
31.25 |
1,625.00 |
25.00 |
1,300.00 |
100.00 |
5,200.00 |
61.00 |
3,172.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
15,000.00 |
15,000.00 |
20,000.00 |
20,000.00 |
30,000.00 |
30,000.00 |
14,300.00 |
14,300.00 |
| 805-12-Y |
reinforced concrete box culverts (3'x 2')
|
988.0 |
LNFT |
180.00 |
177,840.00 |
200.00 |
197,600.00 |
275.00 |
271,700.00 |
351.00 |
346,788.00 |
| 805-12-Z |
reinforced concrete box culverts (3'x 3')
|
576.0 |
LNFT |
200.00 |
115,200.00 |
225.00 |
129,600.00 |
300.00 |
172,800.00 |
398.00 |
229,248.00 |
| S-001 |
full depth sawcutting
|
1,145   |
LNFT |
12.50 |
14,312.50 |
15.00 |
17,175.00 |
10.00 |
11,450.00 |
23.00 |
26,335.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
666,705.00 |
|
803,055.50 |
|
942,014.20 |
|
1,069,163.24 |
|