Letting of 3/26/2008 LA DOTD Headquarters


 
go back
Go Back
 
Lead Project: 832-08-0009
Parish: LIVINGSTON
Routes: LA 1036
Description: S. JCT LA 441 - E. JCT LA 442
Type Const: cold planing, in-place cement treated base course, asphaltic concrete overlay, drainage
structures and related work.
Estimated Construction Cost: $2,361,365.65
 
RankLicenseBidderConstruction Bid
1 06276 BARRIERE CONSTRUCTION CO., LLC. $2,085,000.00
2 00849 F.G. SULLIVAN, JR. CONTRACTOR LLC $2,383,422.08
3 00481 COASTAL BRIDGE CO., L.L.C. $2,465,667.53
4 12487 DIAMOND B CONSTRUCTION CO., L.L.C. $2,622,929.76
5 00046 BARBER BROS. CONTRACTING CO., L.L.C $3,245,126.25
 
Item Number Item Description Quantity Unit of Measure - 1 -
BARRIERE CONSTRUCTION CO., LLC.
- 2 -
F.G. SULLIVAN, JR. CONTRACTOR LLC
- 3 -
COASTAL BRIDGE CO., L.L.C.
- 4 -
DIAMOND B CONSTRUCTION CO., L.L.C.
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-01 removal of structures & obstructions lump      LUMP 3,500.00 3,500.00 500.00 500.00 10,000.00 10,000.00 20,000.00 20,000.00
202-02-D removal of concrete walks & drives 36      SQYD 50.00 1,800.00 20.00 720.00 20.00 720.00 75.00 2,700.00
202-02-H removal of guard rail 862      LNFT 5.00 4,310.00 5.00 4,310.00 10.00 8,620.00 10.00 8,620.00
203-07 borrow (vehicular measurement) 2,345      CUYD 24.00 56,280.00 10.00 23,450.00 5.00 11,725.00 22.00 51,590.00
203-07-A borrow (vehicular meas.)(selected soils) 3,366      CUYD 5.00 16,830.00 10.00 33,660.00 10.00 33,660.00 22.00 74,052.00
204-02 temporary hay or straw bales 300      EACH 8.00 2,400.00 9.00 2,700.00 10.00 3,000.00 9.00 2,700.00
204-06 temporary silt fencing 880      LNFT 2.00 1,760.00 2.00 1,760.00 2.25 1,980.00 2.50 2,200.00
303-02 removal of existing patches 1,332      SQYD 5.00 6,660.00 1.00 1,332.00 10.00 13,320.00 10.00 13,320.00
304-05 lime treatment (type e) 442.25   TON 50.00 22,112.50 100.00 44,225.00 350.00 154,787.50 333.00 147,269.25
308-01-A in-place cement treated base course (12" thick) 64,181      SQYD 6.00 385,086.00 6.50 417,176.50 6.25 401,131.25 6.50 417,176.50
402-01 traffic maintenance aggregate (vehicular measurement) 51.3    CUYD 85.00 4,360.50 35.00 1,795.50 50.00 2,565.00 62.74 3,218.56
502-01 superpave asphaltic concrete 11,975.6    TON 70.00 838,292.00 65.00 778,414.00 80.00 958,048.00 81.00 970,023.60
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
1,235.0    TON 1.00 1,235.00 150.00 185,250.00 100.00 123,500.00 140.00 172,900.00
509-01 cold planing asphaltic pavement 43,246      SQYD 1.50 64,869.00 2.50 108,115.00 2.50 108,115.00 1.85 80,005.10
509-01-A cold planing asphaltic pavement(4 1/2" depth) 9,979      SQYD 1.70 16,964.30 4.50 44,905.50 3.25 32,431.75 4.00 39,916.00
509-02 contractor retained reclaimed asphaltic pavement - 3,187      CUYD 10.00 - 31,870.00 0.01 - 31.87 0.00 0.00 0.10 - 318.70
701-02-D cross drain pipe arch (24" equiv. rcpa) 288      LNFT 160.00 46,080.00 170.00 48,960.00 120.00 34,560.00 200.00 57,600.00
701-02-E cross drain pipe arch (30" equiv. rcpa) 48      LNFT 175.00 8,400.00 200.00 9,600.00 160.00 7,680.00 215.00 10,320.00
701-02-F cross drain pipe arch (36" equiv. rcpa) 256      LNFT 190.00 48,640.00 225.00 57,600.00 200.00 51,200.00 250.00 64,000.00
701-02-G cross drain pipe arch (42" equiv. rcpa) 112      LNFT 260.00 29,120.00 250.00 28,000.00 235.00 26,320.00 375.00 42,000.00
701-02-H cross drain pipe arch (48" equiv. rcpa) 56      LNFT 290.00 16,240.00 300.00 16,800.00 275.00 15,400.00 400.00 22,400.00
701-08 relaying pipe 20      LNFT 220.00 4,400.00 120.00 2,400.00 150.00 3,000.00 115.00 2,300.00
701-15 concrete collar 3      EACH 2,500.00 7,500.00 1,000.00 3,000.00 750.00 2,250.00 750.00 2,250.00
704-01-A guard rail (single thrie beam)(3'-1 1/2" post spacing) 312.5    LNFT 52.00 16,250.00 45.00 14,062.50 48.00 15,000.00 48.00 15,000.00
704-01-B guard rail (single thrie beam)(6'-3" post spacing) 534.0    LNFT 63.00 33,642.00 55.00 29,370.00 55.00 29,370.00 52.00 27,768.00
704-03 blocked out guard rail 112.5    LNFT 23.00 2,587.50 20.00 2,250.00 25.00 2,812.50 18.00 2,025.00
704-11-A guard rail end treatment (flared) 12      EACH 2,500.00 30,000.00 2,000.00 24,000.00 2,500.00 30,000.00 2,100.00 25,200.00
711-03-C riprap (30 lb) 139.0    TON 110.00 15,290.00 100.00 13,900.00 90.00 12,510.00 110.00 15,290.00
713-01 temporary signs & barricades lump      LUMP 90,853.40 90,853.40 140,100.00 140,100.00 15,000.00 15,000.00 30,000.00 30,000.00
713-02-A temporary pavement markings (4" width) 765      LNFT 0.10 76.50 0.10 76.50 0.15 114.75 0.10 76.50
713-02-E temporary pavement markings (24" width) 36      LNFT 1.00 36.00 0.10 3.60 1.00 36.00 1.00 36.00
713-03-A temporary pavement markings (broken line)(4" width)(4'
length)
13.320  MILE 350.00 4,662.00 600.00 7,992.00 400.00 5,328.00 130.00 1,731.60
713-03-B temporary pavement markings (broken line)(4" width)
(10' length)
6.600  MILE 10.00 66.00 10.00 66.00 300.00 1,980.00 300.00 1,980.00
713-04-A temporary pavement markings (solid line)(4" width) 45.780  MILE 10.00 457.80 10.00 457.80 1.00 45.78 450.00 20,601.00
726-01 bedding material 180.3    CUYD 65.00 11,719.50 0.01 1.80 100.00 18,030.00 100.00 18,030.00
727-01 mobilization lump      LUMP 195,000.00 195,000.00 199,900.00 199,900.00 225,000.00 225,000.00 160,000.00 160,000.00
729-16-C object marker assembly (type 3) 62      EACH 80.00 4,960.00 70.00 4,340.00 75.00 4,650.00 75.00 4,650.00
731-02 reflectorized raised pavement markers 587      EACH 4.10 2,406.70 5.00 2,935.00 4.50 2,641.50 5.00 2,935.00
732-01-A plastic pavement striping (4" width) 255      LNFT 0.30 76.50 0.35 89.25 0.50 127.50 0.35 89.25
732-01-E plastic pavement striping (24" width) 12      LNFT 2.10 25.20 2.50 30.00 3.00 36.00 2.15 25.80
732-02-A plastic pavement striping (solid line) (4" width) 15.260  MILE 2,410.00 36,776.60 2,800.00 42,728.00 2,300.00 35,098.00 2,500.00 38,150.00
732-03-A plastic pavement striping (broken line)(4" width) 2.200  MILE 610.00 1,342.00 750.00 1,650.00 700.00 1,540.00 745.30 1,639.66
735-01 mailboxes 54      EACH 1.00 54.00 5.00 270.00 1.00 54.00 1.21 65.34
735-02 mailbox supports (single) 54      EACH 85.00 4,590.00 150.00 8,100.00 150.00 8,100.00 103.01 5,562.54
739-01 hydro-seeding 5.38   ACRE 950.00 5,111.00 1,100.00 5,918.00 1,000.00 5,380.00 1,151.33 6,194.16
740-01 construction layout lump      LUMP 62,000.00 62,000.00 49,900.00 49,900.00 20,000.00 20,000.00 24,700.00 24,700.00
S-001 sawcutting of concrete/asphalt driveways and turnouts
(full depth)
480      LNFT 0.10 48.00 8.00 3,840.00 10.00 4,800.00 12.92 6,201.60
S-002 cleaning existing ditches 2,400      LNFT 5.00 12,000.00 7.00 16,800.00 10.00 24,000.00 3.64 8,736.00
                       
 CONTRACTOR TOTAL       2,085,000.00   2,383,422.08   2,465,667.53   2,622,929.76
 
Item Number Item Description Quantity Unit of Measure - 5 -
BARBER BROS. CONTRACTING CO., L.L.C

 

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-01 removal of structures & obstructions lump      LUMP 30,000.00 30,000.00            
202-02-D removal of concrete walks & drives 36      SQYD 50.00 1,800.00            
202-02-H removal of guard rail 862      LNFT 10.00 8,620.00            
203-07 borrow (vehicular measurement) 2,345      CUYD 20.00 46,900.00            
203-07-A borrow (vehicular meas.)(selected soils) 3,366      CUYD 16.00 53,856.00            
204-02 temporary hay or straw bales 300      EACH 20.00 6,000.00            
204-06 temporary silt fencing 880      LNFT 2.00 1,760.00            
303-02 removal of existing patches 1,332      SQYD 40.00 53,280.00            
304-05 lime treatment (type e) 442.25   TON 600.00 265,350.00            
308-01-A in-place cement treated base course (12" thick) 64,181      SQYD 10.00 641,810.00            
402-01 traffic maintenance aggregate (vehicular measurement) 51.3    CUYD 40.00 2,052.00            
502-01 superpave asphaltic concrete 11,975.6    TON 85.00 1,017,926.00            
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
1,235.0    TON 120.00 148,200.00            
509-01 cold planing asphaltic pavement 43,246      SQYD 3.00 129,738.00            
509-01-A cold planing asphaltic pavement(4 1/2" depth) 9,979      SQYD 4.00 39,916.00            
509-02 contractor retained reclaimed asphaltic pavement - 3,187      CUYD 0.00 0.00            
701-02-D cross drain pipe arch (24" equiv. rcpa) 288      LNFT 140.00 40,320.00            
701-02-E cross drain pipe arch (30" equiv. rcpa) 48      LNFT 165.00 7,920.00            
701-02-F cross drain pipe arch (36" equiv. rcpa) 256      LNFT 190.00 48,640.00            
701-02-G cross drain pipe arch (42" equiv. rcpa) 112      LNFT 210.00 23,520.00            
701-02-H cross drain pipe arch (48" equiv. rcpa) 56      LNFT 250.00 14,000.00            
701-08 relaying pipe 20      LNFT 250.00 5,000.00            
701-15 concrete collar 3      EACH 1,500.00 4,500.00            
704-01-A guard rail (single thrie beam)(3'-1 1/2" post spacing) 312.5    LNFT 50.00 15,625.00            
704-01-B guard rail (single thrie beam)(6'-3" post spacing) 534.0    LNFT 60.00 32,040.00            
704-03 blocked out guard rail 112.5    LNFT 25.00 2,812.50            
704-11-A guard rail end treatment (flared) 12      EACH 2,400.00 28,800.00            
711-03-C riprap (30 lb) 139.0    TON 80.00 11,120.00            
713-01 temporary signs & barricades lump      LUMP 200,000.00 200,000.00            
713-02-A temporary pavement markings (4" width) 765      LNFT 0.15 114.75            
713-02-E temporary pavement markings (24" width) 36      LNFT 1.00 36.00            
713-03-A temporary pavement markings (broken line)(4" width)(4'
length)
13.320  MILE 400.00 5,328.00            
713-03-B temporary pavement markings (broken line)(4" width)
(10' length)
6.600  MILE 350.00 2,310.00            
713-04-A temporary pavement markings (solid line)(4" width) 45.780  MILE 475.00 21,745.50            
726-01 bedding material 180.3    CUYD 60.00 10,818.00            
727-01 mobilization lump      LUMP 200,000.00 200,000.00            
729-16-C object marker assembly (type 3) 62      EACH 80.00 4,960.00            
731-02 reflectorized raised pavement markers 587      EACH 5.00 2,935.00            
732-01-A plastic pavement striping (4" width) 255      LNFT 0.50 127.50            
732-01-E plastic pavement striping (24" width) 12      LNFT 4.00 48.00            
732-02-A plastic pavement striping (solid line) (4" width) 15.260  MILE 2,800.00 42,728.00            
732-03-A plastic pavement striping (broken line)(4" width) 2.200  MILE 800.00 1,760.00            
735-01 mailboxes 54      EACH 10.00 540.00            
735-02 mailbox supports (single) 54      EACH 150.00 8,100.00            
739-01 hydro-seeding 5.38   ACRE 1,500.00 8,070.00            
740-01 construction layout lump      LUMP 30,000.00 30,000.00            
S-001 sawcutting of concrete/asphalt driveways and turnouts
(full depth)
480      LNFT 10.00 4,800.00            
S-002 cleaning existing ditches 2,400      LNFT 8.00 19,200.00            
                       
 CONTRACTOR TOTAL       3,245,126.25            