Letting of 3/26/2008 LA DOTD Headquarters


 
go back
Go Back
 
Lead Project: 805-14-0005
Parish: AVOYELLES
Routes: LA 1187
Description: W. JCT. LA 114 - E. JCT. LA 114
Type Const: drainage structures, pavement patching, superpave asphaltic concrete overlay, pavement
widening, and related work
Estimated Construction Cost: $1,177,325.99
 
RankLicenseBidderConstruction Bid
1 12312 GILCHRIST CONSTRUCTION CO. LLC $1,467,863.67
2 12487 DIAMOND B CONSTRUCTION CO., L.L.C. $1,682,050.02
 
Item Number Item Description Quantity Unit of Measure - 1 -
GILCHRIST CONSTRUCTION CO. LLC
- 2 -
DIAMOND B CONSTRUCTION CO., L.L.C.

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-01 removal of structures & obstructions lump      LUMP 5,000.00 5,000.00 10,000.00 10,000.00        
202-02-H removal of guard rail 400      LNFT 11.00 4,400.00 10.00 4,000.00        
203-07 borrow (vehicular measurement) 100      CUYD 28.00 2,800.00 15.00 1,500.00        
401-02 aggregate surface course (adjusted vehicular
measurement)
2,486      CUYD 110.00 273,460.00 75.00 186,450.00        
502-01 superpave asphaltic concrete 8,622.2    TON 88.00 758,753.60 103.00 888,086.60        
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
915.8    TON 125.00 114,475.00 182.00 166,675.60        
510-01-A pavement patching (6" minimum thickness) 530      SQYD 85.00 45,050.00 100.00 53,000.00        
510-02 pavement widening 575.0    SQYD 59.00 33,925.00 63.00 36,225.00        
701-02-D/E cross drain pipe arch (24" equiv. rcpa or 30" equiv.
cmpa)
96      LNFT 215.00 20,640.00 160.00 15,360.00        
704-01-B guard rail (single thrie beam) (6'-3" post spacing) 122.0    LNFT 34.00 4,148.00 35.00 4,270.00        
704-03 blocked out guard rail 100.0    LNFT 22.00 2,200.00 22.00 2,200.00        
704-08-B guard rail transitions (double thrie beam) 200.0    LNFT 60.00 12,000.00 55.00 11,000.00        
704-11-B guard rail end treatment (tangent) 8      EACH 2,600.00 20,800.00 2,500.00 20,000.00        
707-04 asphaltic curb 80.0    LNFT 12.00 960.00 30.00 2,400.00        
713-01 temporary signs & barricades lump      LUMP 20,000.00 20,000.00 25,000.00 25,000.00        
713-03-A temporary pavement markings (broken line)(4" width)(4'
length)
4.959  MILE 350.00 1,735.65 130.00 644.67        
713-03-B temporary pavement markings (broken line)(4" width)
(10' length)
3.908  MILE 1.00 3.91 350.00 1,367.80        
713-04-A temporary pavement markings (solid line)(4" width) 4.009  MILE 1.00 4.01 650.00 2,605.85        
726-01 bedding material 28.0    CUYD 100.00 2,800.00 125.00 3,500.00        
727-01 mobilization lump      LUMP 75,000.00 75,000.00 163,000.00 163,000.00        
729-16-B object marker assembly (type 2) 4      EACH 60.00 240.00 110.00 440.00        
729-16-C object marker assembly (type 3) 8      EACH 75.00 600.00 75.00 600.00        
731-02 reflectorized raised pavement markers 655      EACH 5.00 3,275.00 5.00 3,275.00        
732-01-E plastic pavement striping (24" width) 24      LNFT 10.00 240.00 4.00 96.00        
732-02-A plastic pavement striping (solid line) (4" width) 4.009  MILE 2,500.00 10,022.50 2,500.00 10,022.50        
732-03-A plastic pavement striping (broken line)(4" width) 3.908  MILE 750.00 2,931.00 750.00 2,931.00        
740-01 construction layout lump      LUMP 10,000.00 10,000.00 15,000.00 15,000.00        
S-001 cleaning existing ditches 60      LNFT 40.00 2,400.00 15.00 900.00        
S-002 surface preparation lump      LUMP 40,000.00 40,000.00 51,500.00 51,500.00        
                       
 CONTRACTOR TOTAL       1,467,863.67   1,682,050.02        