| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - GILCHRIST CONSTRUCTION CO. LLC |
- 2 - DIAMOND B CONSTRUCTION CO., L.L.C. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
5,000.00 |
5,000.00 |
10,000.00 |
10,000.00 |
|
|
|
|
| 202-02-H |
removal of guard rail
|
400   |
LNFT |
11.00 |
4,400.00 |
10.00 |
4,000.00 |
|
|
|
|
| 203-07 |
borrow (vehicular measurement)
|
100   |
CUYD |
28.00 |
2,800.00 |
15.00 |
1,500.00 |
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
2,486   |
CUYD |
110.00 |
273,460.00 |
75.00 |
186,450.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
8,622.2 |
TON |
88.00 |
758,753.60 |
103.00 |
888,086.60 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
915.8 |
TON |
125.00 |
114,475.00 |
182.00 |
166,675.60 |
|
|
|
|
| 510-01-A |
pavement patching (6" minimum thickness)
|
530   |
SQYD |
85.00 |
45,050.00 |
100.00 |
53,000.00 |
|
|
|
|
| 510-02 |
pavement widening
|
575.0 |
SQYD |
59.00 |
33,925.00 |
63.00 |
36,225.00 |
|
|
|
|
| 701-02-D/E |
cross drain pipe arch (24" equiv. rcpa or 30" equiv.
cmpa) |
96   |
LNFT |
215.00 |
20,640.00 |
160.00 |
15,360.00 |
|
|
|
|
| 704-01-B |
guard rail (single thrie beam) (6'-3" post spacing)
|
122.0 |
LNFT |
34.00 |
4,148.00 |
35.00 |
4,270.00 |
|
|
|
|
| 704-03 |
blocked out guard rail
|
100.0 |
LNFT |
22.00 |
2,200.00 |
22.00 |
2,200.00 |
|
|
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
200.0 |
LNFT |
60.00 |
12,000.00 |
55.00 |
11,000.00 |
|
|
|
|
| 704-11-B |
guard rail end treatment (tangent)
|
8   |
EACH |
2,600.00 |
20,800.00 |
2,500.00 |
20,000.00 |
|
|
|
|
| 707-04 |
asphaltic curb
|
80.0 |
LNFT |
12.00 |
960.00 |
30.00 |
2,400.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
20,000.00 |
20,000.00 |
25,000.00 |
25,000.00 |
|
|
|
|
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
4.959 |
MILE |
350.00 |
1,735.65 |
130.00 |
644.67 |
|
|
|
|
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
3.908 |
MILE |
1.00 |
3.91 |
350.00 |
1,367.80 |
|
|
|
|
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
4.009 |
MILE |
1.00 |
4.01 |
650.00 |
2,605.85 |
|
|
|
|
| 726-01 |
bedding material
|
28.0 |
CUYD |
100.00 |
2,800.00 |
125.00 |
3,500.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
75,000.00 |
75,000.00 |
163,000.00 |
163,000.00 |
|
|
|
|
| 729-16-B |
object marker assembly (type 2)
|
4   |
EACH |
60.00 |
240.00 |
110.00 |
440.00 |
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
8   |
EACH |
75.00 |
600.00 |
75.00 |
600.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
655   |
EACH |
5.00 |
3,275.00 |
5.00 |
3,275.00 |
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
24   |
LNFT |
10.00 |
240.00 |
4.00 |
96.00 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
4.009 |
MILE |
2,500.00 |
10,022.50 |
2,500.00 |
10,022.50 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
3.908 |
MILE |
750.00 |
2,931.00 |
750.00 |
2,931.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
10,000.00 |
10,000.00 |
15,000.00 |
15,000.00 |
|
|
|
|
| S-001 |
cleaning existing ditches
|
60   |
LNFT |
40.00 |
2,400.00 |
15.00 |
900.00 |
|
|
|
|
| S-002 |
surface preparation
|
lump |
LUMP |
40,000.00 |
40,000.00 |
51,500.00 |
51,500.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,467,863.67 |
|
1,682,050.02 |
|
|
|
|
|