| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - T. L. WALLACE CONSTRUCTION, INC. |
- 2 - P.R. PARKER COMPANY INC |
- 3 - MISSOURI PETROLEUM PRODUCTS CO. LLC |
- 4 - W. R. CORE, LLC. |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
2,750.00 |
2,750.00 |
6,000.00 |
6,000.00 |
6,000.00 |
6,000.00 |
5,000.00 |
5,000.00 |
| 203-07 |
borrow (vehicular measurement)
|
150   |
CUYD |
33.00 |
4,950.00 |
15.00 |
2,250.00 |
15.00 |
2,250.00 |
50.00 |
7,500.00 |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
250   |
CUYD |
80.00 |
20,000.00 |
53.00 |
13,250.00 |
53.00 |
13,250.00 |
120.00 |
30,000.00 |
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
730.0 |
TON |
150.00 |
109,500.00 |
140.00 |
102,200.00 |
140.00 |
102,200.00 |
210.00 |
153,300.00 |
| 507-01-A |
asphaltic material (crs-2p emulsion)
|
223,433   |
GAL |
2.17 |
484,849.61 |
2.19 |
489,318.27 |
2.00 |
446,866.00 |
2.10 |
469,209.30 |
| 507-02-B |
aggregate (s2)
|
281,131   |
SQYD |
0.80 |
224,904.80 |
0.95 |
267,074.45 |
1.27 |
357,036.37 |
1.15 |
323,300.65 |
| 507-02-C |
aggregate (s3)
|
281,131   |
SQYD |
0.63 |
177,112.53 |
0.78 |
219,282.18 |
1.27 |
357,036.37 |
0.85 |
238,961.35 |
| 507-02-D |
aggregate (s1a)
|
80,660   |
SQYD |
1.25 |
100,825.00 |
1.22 |
98,405.20 |
1.27 |
102,438.20 |
1.85 |
149,221.00 |
| 510-01-A |
pavement patching (6" minimum thickness)
|
250   |
SQYD |
137.00 |
34,250.00 |
75.00 |
18,750.00 |
75.00 |
18,750.00 |
175.00 |
43,750.00 |
| 510-01-B |
pavement patching (12" minimum thickness)
|
1,230   |
SQYD |
105.00 |
129,150.00 |
95.00 |
116,850.00 |
95.00 |
116,850.00 |
135.00 |
166,050.00 |
| 510-02 |
pavement widening
|
375.0 |
SQYD |
77.15 |
28,931.25 |
65.00 |
24,375.00 |
65.00 |
24,375.00 |
145.00 |
54,375.00 |
| 701-02-D/E |
cross drain pipe arch (24" equiv. rcpa or 30" equiv.
cmpa) |
120   |
LNFT |
150.00 |
18,000.00 |
170.00 |
20,400.00 |
170.00 |
20,400.00 |
225.00 |
27,000.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
14,720.00 |
14,720.00 |
37,000.00 |
37,000.00 |
14,720.00 |
14,720.00 |
16,500.00 |
16,500.00 |
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
13.573 |
MILE |
300.00 |
4,071.90 |
300.00 |
4,071.90 |
450.00 |
6,107.85 |
300.00 |
4,071.90 |
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
60.850 |
MILE |
600.00 |
36,510.00 |
600.00 |
36,510.00 |
600.00 |
36,510.00 |
600.00 |
36,510.00 |
| 713-06-A |
temporary reflectorized raised pavement markers (tabs)
|
14,271   |
EACH |
1.00 |
14,271.00 |
1.30 |
18,552.30 |
1.00 |
14,271.00 |
1.60 |
22,833.60 |
| 716-01-A |
mulch (vegetative)
|
0.2 |
TON |
2,800.00 |
560.00 |
2,100.00 |
420.00 |
1,000.00 |
200.00 |
10,000.00 |
2,000.00 |
| 717-01 |
seeding
|
3   |
LB |
23.00 |
69.00 |
21.00 |
63.00 |
300.00 |
900.00 |
300.00 |
900.00 |
| 718-01 |
fertilizer
|
100   |
LB |
3.50 |
350.00 |
1.20 |
120.00 |
25.00 |
2,500.00 |
2.00 |
200.00 |
| 726-01 |
bedding material
|
27.0 |
CUYD |
95.00 |
2,565.00 |
58.00 |
1,566.00 |
58.00 |
1,566.00 |
100.00 |
2,700.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
68,000.00 |
68,000.00 |
170,000.00 |
170,000.00 |
110,000.00 |
110,000.00 |
52,000.00 |
52,000.00 |
| 729-16-B |
object marker assembly (type 2)
|
6   |
EACH |
220.00 |
1,320.00 |
75.00 |
450.00 |
200.00 |
1,200.00 |
100.00 |
600.00 |
| 731-02 |
reflectorized raised pavement markers
|
3,103   |
EACH |
4.50 |
13,963.50 |
4.50 |
13,963.50 |
5.00 |
15,515.00 |
4.50 |
13,963.50 |
| 737-01-A |
painted traffic striping (solid line)(4" width)
|
60.850 |
MILE |
600.00 |
36,510.00 |
600.00 |
36,510.00 |
600.00 |
36,510.00 |
600.00 |
36,510.00 |
| 737-02-A |
painted traffic striping (broken line)(4" width)
|
13.573 |
MILE |
300.00 |
4,071.90 |
300.00 |
4,071.90 |
450.00 |
6,107.85 |
300.00 |
4,071.90 |
| 737-03-E |
painted traffic striping (solid line)(24" width)
|
42   |
LNFT |
0.80 |
33.60 |
0.80 |
33.60 |
12.00 |
504.00 |
0.80 |
33.60 |
| 740-01 |
construction layout
|
lump |
LUMP |
22,000.00 |
22,000.00 |
11,000.00 |
11,000.00 |
2,500.00 |
2,500.00 |
15,000.00 |
15,000.00 |
| S-001 |
saw cutting
|
13,910   |
INFT |
1.25 |
17,387.50 |
0.01 |
139.10 |
0.01 |
139.10 |
2.25 |
31,297.50 |
| S-002 |
cleaning existing ditches
|
50   |
LNFT |
12.00 |
600.00 |
20.00 |
1,000.00 |
20.00 |
1,000.00 |
20.00 |
1,000.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,572,226.59 |
|
1,713,626.40 |
|
1,817,702.74 |
|
1,907,859.30 |
|