| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BARRIERE CONSTRUCTION CO., LLC. |
- 2 - HUEY STOCKSTILL, INC. |
- 3 - BOH BROS. CONSTRUCTION CO., LLC. |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-C |
removal of portland cement concrete pavement
|
318   |
SQYD |
13.00 |
4,134.00 |
13.00 |
4,134.00 |
15.00 |
4,770.00 |
|
|
| 202-02-D |
removal of concrete walks & drives
|
21   |
SQYD |
30.00 |
630.00 |
60.00 |
1,260.00 |
15.00 |
315.00 |
|
|
| 202-02-E |
removal of concrete curbs
|
200.0 |
LNFT |
13.00 |
2,600.00 |
8.00 |
1,600.00 |
10.00 |
2,000.00 |
|
|
| 203-07 |
borrow (vehicular measurement)
|
200   |
CUYD |
27.00 |
5,400.00 |
28.00 |
5,600.00 |
30.00 |
6,000.00 |
|
|
| 203-07-A |
borrow (vehicular meas.)(selected soils)
|
157   |
CUYD |
27.00 |
4,239.00 |
28.00 |
4,396.00 |
25.00 |
3,925.00 |
|
|
| 308-01-A |
in-place cement treated base course (12" thick)
|
22,594   |
SQYD |
8.00 |
180,752.00 |
7.60 |
171,714.40 |
10.00 |
225,940.00 |
|
|
| 502-01 |
superpave asphaltic concrete
|
2,338.7 |
TON |
78.00 |
182,418.60 |
80.00 |
187,096.00 |
87.00 |
203,466.90 |
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
716.7 |
TON |
78.00 |
55,902.60 |
161.00 |
115,388.70 |
80.00 |
57,336.00 |
|
|
| 509-01 |
cold planing asphaltic pavement
|
440   |
SQYD |
33.00 |
14,520.00 |
16.00 |
7,040.00 |
5.00 |
2,200.00 |
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 18   |
CUYD |
1.00 |
- 18.00 |
0.00 |
0.00 |
10.00 |
- 180.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
60,000.00 |
60,000.00 |
30,000.00 |
30,000.00 |
80,000.00 |
80,000.00 |
|
|
| 713-02-E |
temporary pavement markings (24" width)
|
12   |
LNFT |
12.00 |
144.00 |
5.00 |
60.00 |
1.00 |
12.00 |
|
|
| 722-01 |
project site laboratory
|
1   |
EACH |
200.00 |
200.00 |
4,000.00 |
4,000.00 |
4,000.00 |
4,000.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
60,000.00 |
60,000.00 |
65,000.00 |
65,000.00 |
65,000.00 |
65,000.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
110   |
each |
7.00 |
770.00 |
6.00 |
660.00 |
5.00 |
550.00 |
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
12   |
LNFT |
12.00 |
144.00 |
4.00 |
48.00 |
2.50 |
30.00 |
|
|
| 732-02-A |
plastic pavement striping (solid line)(4" width)
|
6.572 |
MILE |
2,700.00 |
17,744.40 |
3,000.00 |
19,716.00 |
2,675.00 |
17,580.10 |
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
1.882 |
MILE |
700.00 |
1,317.40 |
1,000.00 |
1,882.00 |
675.00 |
1,270.35 |
|
|
| 735-01 |
mailboxes
|
52   |
EACH |
6.00 |
312.00 |
6.00 |
312.00 |
5.50 |
286.00 |
|
|
| 735-02 |
mailbox supports (single)
|
52   |
EACH |
130.00 |
6,760.00 |
140.00 |
7,280.00 |
135.00 |
7,020.00 |
|
|
| 739-01 |
hydro-seeding
|
2.84 |
ACRE |
1,200.00 |
3,408.00 |
1,400.00 |
3,976.00 |
1,150.00 |
3,266.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
19,000.00 |
19,000.00 |
12,000.00 |
12,000.00 |
2,000.00 |
2,000.00 |
|
|
| S-001 |
sawcutting of concrete/asphalt driveways and
turnouts(full depth) |
850   |
LNFT |
2.00 |
1,700.00 |
12.00 |
10,200.00 |
7.00 |
5,950.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
622,078.00 |
|
653,363.10 |
|
692,737.35 |
|
|
|