| Lead Project: 053-04-0039 |
| Parish: NATCHITOCHES, RAPIDES, AVOYELLES |
| Routes: LA 1, LA 112, LA 114 |
| Description: DISTRICWIDE SURFACE TREATMENTS |
Type Const:
pavement patching, asphaltic surface treatment, superpave asphaltic concrete pavement
and related work |
| Estimated Construction Cost: $1,440,081.93 |
|
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - T. L. WALLACE CONSTRUCTION, INC. |
- 2 - W. R. CORE, LLC. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
1,000   |
CUYD |
65.00 |
65,000.00 |
102.00 |
102,000.00 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
200.0 |
TON |
120.00 |
24,000.00 |
240.00 |
48,000.00 |
|
|
|
|
| 507-01-A |
asphaltic material (crs-2p emulsion)
|
150,217   |
GAL |
2.16 |
324,468.72 |
2.07 |
310,949.19 |
|
|
|
|
| 507-02-B |
aggregate (s2)
|
220,907   |
SQYD |
0.84 |
185,561.88 |
1.00 |
220,907.00 |
|
|
|
|
| 507-02-C |
aggregate (s3)
|
220,907   |
SQYD |
0.69 |
152,425.83 |
0.80 |
176,725.60 |
|
|
|
|
| 510-01-B |
pavement patching (12" minimum thickness)
|
730   |
SQYD |
115.00 |
83,950.00 |
110.00 |
80,300.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
9,950.00 |
9,950.00 |
10,500.00 |
10,500.00 |
|
|
|
|
| 713-02-E |
temporary pavement markings (24" width)
|
24   |
LNFT |
0.80 |
19.20 |
0.80 |
19.20 |
|
|
|
|
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
15.470 |
MILE |
300.00 |
4,641.00 |
300.00 |
4,641.00 |
|
|
|
|
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
43.862 |
MILE |
600.00 |
26,317.20 |
600.00 |
26,317.20 |
|
|
|
|
| 713-05-D |
temporary pavement legends and symbols (rr crossing)
|
2   |
EACH |
200.00 |
400.00 |
200.00 |
400.00 |
|
|
|
|
| 713-06-A |
temporary reflectorized raised pavement markers (tabs)
|
8,799   |
EACH |
1.00 |
8,799.00 |
1.60 |
14,078.40 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
45,000.00 |
45,000.00 |
45,000.00 |
45,000.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
2,200   |
EACH |
4.50 |
9,900.00 |
4.50 |
9,900.00 |
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
36   |
LNFT |
3.00 |
108.00 |
3.00 |
108.00 |
|
|
|
|
| 732-04-D |
plastic pavement legends & symbols (rr crossing)
|
2   |
EACH |
2,500.00 |
5,000.00 |
2,500.00 |
5,000.00 |
|
|
|
|
| 737-01-A |
painted traffic striping (solid line)(4" width)
|
43.862 |
MILE |
600.00 |
26,317.20 |
600.00 |
26,317.20 |
|
|
|
|
| 737-02-A |
painted traffic striping (broken line)(4" width)
|
15.470 |
MILE |
300.00 |
4,641.00 |
300.00 |
4,641.00 |
|
|
|
|
| 737-03-E |
painted traffic striping (solid line)(24" width)
|
12   |
LNFT |
0.60 |
7.20 |
0.60 |
7.20 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
17,000.00 |
17,000.00 |
4,500.00 |
4,500.00 |
|
|
|
|
| S-001 |
saw cutting
|
3,500   |
INFT |
2.25 |
7,875.00 |
2.20 |
7,700.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,001,381.23 |
|
1,098,010.99 |
|
|
|
|
|