| Lead Project: 035-03-0020 |
| Parish: DESOTO, RED RIVER, BOSSIER |
| Routes: LA 175, US 84, LA 157, LA 2 |
| Description: DIST. 04 CHIP SEAL ON ROUTES LA 175, US 84, LA 157 AND LA 2 |
| Type Const:
asphaltic surface treatment, patching, painted striping, sig ns and barricades
|
| Estimated Construction Cost: $729,348.25 |
|
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - P.R. PARKER COMPANY INC |
- 2 - DREHER CONTRACTING, INC. |
- 3 - T. L. WALLACE CONSTRUCTION, INC. |
- 4 - MISSOURI PETROLEUM PRODUCTS CO. LLC |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 507-01-A |
asphaltic material (crs-2p emulsion)
|
131,979   |
GAL |
1.99 |
262,638.21 |
2.01 |
265,277.79 |
2.15 |
283,754.85 |
1.97 |
259,998.63 |
| 507-02-B |
aggregate (s2)
|
321,899   |
SQYD |
0.59 |
189,920.41 |
0.72 |
231,767.28 |
0.75 |
241,424.25 |
1.34 |
431,344.66 |
| 510-01-B |
pavement patching (12" minimum thickness)
|
200   |
SQYD |
60.00 |
12,000.00 |
70.00 |
14,000.00 |
120.00 |
24,000.00 |
180.00 |
36,000.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
15,000.00 |
15,000.00 |
15,000.00 |
15,000.00 |
12,700.00 |
12,700.00 |
12,700.00 |
12,700.00 |
| 713-06-A |
temporary reflectorized raised pavement markers (tabs)
|
6,031   |
EACH |
1.20 |
7,237.20 |
1.25 |
7,538.75 |
1.00 |
6,031.00 |
1.00 |
6,031.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
63,000.00 |
63,000.00 |
51,000.00 |
51,000.00 |
22,000.00 |
22,000.00 |
52,000.00 |
52,000.00 |
| 731-02 |
reflectorized raised pavement markers
|
3,016   |
EACH |
4.50 |
13,572.00 |
5.00 |
15,080.00 |
4.50 |
13,572.00 |
4.50 |
13,572.00 |
| 732-04-D |
plastic pavement legends & symbols (rr crossing)
|
2   |
EACH |
500.00 |
1,000.00 |
525.00 |
1,050.00 |
2,500.00 |
5,000.00 |
500.00 |
1,000.00 |
| 737-01-A |
painted traffic striping (solid line)(4" width)
|
136.060 |
MILE |
475.00 |
64,628.50 |
500.00 |
68,030.00 |
600.00 |
81,636.00 |
475.00 |
64,628.50 |
| 737-02-A |
painted traffic striping (broken line)(4" width)
|
29.800 |
MILE |
325.00 |
9,685.00 |
350.00 |
10,430.00 |
300.00 |
8,940.00 |
325.00 |
9,685.00 |
| 737-03-E |
painted traffic striping (solid line)(24" width)
|
44   |
LNFT |
10.00 |
440.00 |
10.00 |
440.00 |
0.90 |
39.60 |
10.00 |
440.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
639,121.32 |
|
679,613.82 |
|
699,097.70 |
|
887,399.79 |
|