| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - FORBY CONTRACTING, INC. |
- 2 - JEFF MERCER LLC |
- 3 - KNISH CORPORATION |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 602-02-A |
cleaning and resealing existing longitudinal pavement
joints |
17,488   |
LNFT |
1.45 |
25,357.60 |
2.00 |
34,976.00 |
1.50 |
26,232.00 |
|
|
| 602-02-B |
cleaning and resealing existing transverse pavement
joints |
27,197   |
LNFT |
1.95 |
53,034.15 |
2.00 |
54,394.00 |
2.00 |
54,394.00 |
|
|
| 602-03 |
cleaning and sealing cracks
|
7,000   |
LNFT |
3.00 |
21,000.00 |
2.00 |
14,000.00 |
3.00 |
21,000.00 |
|
|
| 602-05-G-01 |
full depth patching of jointed conc pvmt (8" thick)
(16.0 sq yds & under) |
217.0 |
SQYD |
175.00 |
37,975.00 |
210.00 |
45,570.00 |
250.00 |
54,250.00 |
|
|
| 602-05-G-02 |
full depth patching of jointed conc pvmt (8" thick)
(16.1-48.0 sq yds) |
86.5 |
SQYD |
125.00 |
10,812.50 |
155.00 |
13,407.50 |
250.00 |
21,625.00 |
|
|
| 707-01 |
concrete curb
|
109.0 |
LNFT |
10.00 |
1,090.00 |
35.00 |
3,815.00 |
15.00 |
1,635.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
15,000.00 |
15,000.00 |
4,000.00 |
4,000.00 |
12,500.00 |
12,500.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
21,500.00 |
21,500.00 |
25,000.00 |
25,000.00 |
25,000.00 |
25,000.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
1,025   |
EACH |
5.10 |
5,227.50 |
7.00 |
7,175.00 |
5.00 |
5,125.00 |
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
400   |
LNFT |
0.65 |
260.00 |
1.20 |
480.00 |
0.80 |
320.00 |
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
720   |
LNFT |
2.65 |
1,908.00 |
3.25 |
2,340.00 |
2.40 |
1,728.00 |
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
5.689 |
MILE |
2,650.00 |
15,075.85 |
2,600.00 |
14,791.40 |
2,500.00 |
14,222.50 |
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
4.167 |
MILE |
695.00 |
2,896.07 |
850.00 |
3,541.95 |
1,000.00 |
4,167.00 |
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
18   |
EACH |
135.00 |
2,430.00 |
200.00 |
3,600.00 |
165.00 |
2,970.00 |
|
|
| S-001 |
concrete islands
|
lump |
LUMP |
16,150.00 |
16,150.00 |
35,000.00 |
35,000.00 |
30,000.00 |
30,000.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
229,716.67 |
|
262,090.85 |
|
275,168.50 |
|
|
|