| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - DIAMOND B CONSTRUCTION CO., L.L.C. |
- 2 - D & J CONSTRUCTION CO., INC. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
4,000.00 |
4,000.00 |
3,000.00 |
3,000.00 |
|
|
|
|
| 203-07 |
borrow (vehicular measurement)
|
80   |
CUYD |
26.00 |
2,080.00 |
15.00 |
1,200.00 |
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
581   |
CUYD |
62.00 |
36,022.00 |
45.00 |
26,145.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
12,628.0 |
TON |
94.00 |
1,187,032.00 |
96.00 |
1,212,288.00 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
124.3 |
TON |
245.00 |
30,453.50 |
176.00 |
21,876.80 |
|
|
|
|
| 507-01-A |
asphaltic material (crs-2p cold applied emulsion)
|
52,043   |
GAL |
2.91 |
151,445.13 |
2.50 |
130,107.50 |
|
|
|
|
| 507-02-B |
aggregate (s2)
|
76,533   |
SQYD |
1.33 |
101,788.89 |
1.20 |
91,839.60 |
|
|
|
|
| 507-02-C |
aggregate (s3)
|
76,533   |
SQYD |
1.07 |
81,890.31 |
1.10 |
84,186.30 |
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
76,533   |
SQYD |
2.65 |
202,812.45 |
2.75 |
210,465.75 |
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 3,196   |
CUYD |
0.10 |
- 319.60 |
0.01 |
- 31.96 |
|
|
|
|
| 510-01-C |
pavement patching (18" minimum thickness)
|
1,868   |
SQYD |
125.00 |
233,500.00 |
175.00 |
326,900.00 |
|
|
|
|
| 510-03 |
pavement joint repair
|
385.9 |
TON |
185.00 |
71,391.50 |
250.00 |
96,475.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
52,000.00 |
52,000.00 |
132,000.00 |
132,000.00 |
|
|
|
|
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
16.308 |
MILE |
130.00 |
2,120.04 |
250.00 |
4,077.00 |
|
|
|
|
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
15.597 |
MILE |
325.00 |
5,069.03 |
200.00 |
3,119.40 |
|
|
|
|
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
35.724 |
MILE |
600.00 |
21,434.40 |
1.00 |
35.72 |
|
|
|
|
| 716-01-A |
mulch (vegetative)
|
10.6 |
TON |
450.00 |
4,770.00 |
400.00 |
4,240.00 |
|
|
|
|
| 717-01 |
seeding
|
237   |
LB |
10.00 |
2,370.00 |
8.00 |
1,896.00 |
|
|
|
|
| 718-01 |
fertilizer
|
5,270   |
LB |
0.50 |
2,635.00 |
0.40 |
2,108.00 |
|
|
|
|
| 726-01 |
bedding material
|
16.4 |
CUYD |
125.00 |
2,050.00 |
100.00 |
1,640.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
255,000.00 |
255,000.00 |
175,000.00 |
175,000.00 |
|
|
|
|
| 729-16-B |
object marker assembly (type 2)
|
4   |
EACH |
100.00 |
400.00 |
100.00 |
400.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
718   |
EACH |
5.00 |
3,590.00 |
8.00 |
5,744.00 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
11.908 |
MILE |
2,500.00 |
29,770.00 |
2,900.00 |
34,533.20 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
5.199 |
MILE |
800.00 |
4,159.20 |
1,000.00 |
5,199.00 |
|
|
|
|
| 735-01 |
mailboxes
|
1   |
EACH |
13.00 |
13.00 |
25.00 |
25.00 |
|
|
|
|
| 735-02 |
mailbox supports (single)
|
1   |
EACH |
800.00 |
800.00 |
500.00 |
500.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
21,000.00 |
21,000.00 |
20,000.00 |
20,000.00 |
|
|
|
|
| 805-12-Y |
reinforced concrete box culverts (2'x 2')
|
38.0 |
LNFT |
460.00 |
17,480.00 |
400.00 |
15,200.00 |
|
|
|
|
| S-001 |
tree trimming
|
lump |
LUMP |
31,000.00 |
31,000.00 |
18,000.00 |
18,000.00 |
|
|
|
|
| S-002 |
cleaning existing ditches
|
300   |
LNFT |
17.00 |
5,100.00 |
8.00 |
2,400.00 |
|
|
|
|
| S-003 |
saw-cutting
|
7,292   |
LNFT |
3.25 |
23,699.00 |
3.00 |
21,876.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
2,586,555.85 |
|
2,652,445.31 |
|
|
|
|
|