| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - C W & W CONTRACTORS, INC. |
- 2 - F. J. BURNELL, INC. |
- 3 - JEFF MERCER LLC |
VANTEL, INC |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-01 |
removal of structures and obstructions
|
lump |
LUMP |
10,000.00 |
10,000.00 |
65,000.00 |
65,000.00 |
20,000.00 |
20,000.00 |
10,000.00 |
10,000.00 |
| 202-02-C |
removal of portland cement concrete pavement
|
265   |
SQYD |
10.00 |
2,650.00 |
20.00 |
5,300.00 |
15.00 |
3,975.00 |
15.00 |
3,975.00 |
| 202-02-D |
removal of concrete walks & drives
|
1,850   |
SQYD |
5.00 |
9,250.00 |
12.00 |
22,200.00 |
20.00 |
37,000.00 |
15.00 |
27,750.00 |
| 202-02-F |
removal of concrete combination curb & gutter
|
2,575.0 |
LNFT |
5.00 |
12,875.00 |
10.00 |
25,750.00 |
5.00 |
12,875.00 |
9.00 |
23,175.00 |
| 203-05 |
excavation and embankment
|
lump |
LUMP |
15,000.00 |
15,000.00 |
35,000.00 |
35,000.00 |
35,000.00 |
35,000.00 |
2,500.00 |
2,500.00 |
| 302-02-A |
class ii base course (4" thick)
|
1,565.0 |
SQYD |
10.00 |
15,650.00 |
30.00 |
46,950.00 |
30.00 |
46,950.00 |
16.00 |
25,040.00 |
| 302-02-B |
class ii base course (6" thick)
|
975.0 |
SQYD |
15.00 |
14,625.00 |
40.00 |
39,000.00 |
35.00 |
34,125.00 |
24.00 |
23,400.00 |
| 510-01-B |
pavement patching (12" minimum thickness)
|
70   |
SQYD |
135.00 |
9,450.00 |
225.00 |
15,750.00 |
250.00 |
17,500.00 |
100.00 |
7,000.00 |
| 702-04-A |
adjusting manholes
|
6   |
EACH |
500.00 |
3,000.00 |
1,500.00 |
9,000.00 |
4,000.00 |
24,000.00 |
1,000.00 |
6,000.00 |
| 706-01-B |
concrete walk (5" thick)
|
1,340.0 |
SQYD |
70.00 |
93,800.00 |
65.00 |
87,100.00 |
125.00 |
167,500.00 |
60.00 |
80,400.00 |
| 706-02-C |
concrete drive (6" thick)
|
435.0 |
SQYD |
70.00 |
30,450.00 |
75.00 |
32,625.00 |
125.00 |
54,375.00 |
93.00 |
40,455.00 |
| 707-03 |
combination concrete curb & gutter
|
2,800.0 |
LNFT |
30.00 |
84,000.00 |
40.00 |
112,000.00 |
50.00 |
140,000.00 |
22.00 |
61,600.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
20,000.00 |
20,000.00 |
100,000.00 |
100,000.00 |
15,000.00 |
15,000.00 |
15,000.00 |
15,000.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
100,000.00 |
100,000.00 |
140,000.00 |
140,000.00 |
160,000.00 |
160,000.00 |
98,500.00 |
98,500.00 |
| 729-01 |
sign (type a)
|
85.0 |
SQFT |
50.00 |
4,250.00 |
60.00 |
5,100.00 |
100.00 |
8,500.00 |
500.00 |
42,500.00 |
| 729-02 |
sign (type b)
|
30.0 |
SQFT |
50.00 |
1,500.00 |
60.00 |
1,800.00 |
100.00 |
3,000.00 |
500.00 |
15,000.00 |
| 730-01 |
trenching and backfilling
|
1,885   |
LNFT |
3.50 |
6,597.50 |
4.60 |
8,671.00 |
3.45 |
6,503.25 |
20.00 |
37,700.00 |
| 730-02-A |
conduit with conductors (2#8 xhhw-2, 1#8 bare solid
ground in 1 1/4" sch 40 pvc, underground) |
580   |
LNFT |
6.50 |
3,770.00 |
17.00 |
9,860.00 |
7.00 |
4,060.00 |
5.00 |
2,900.00 |
| 730-02-B |
conduit with conductors (2#6 xhhw-2, 1#6 bare solid
ground in 1 1/4" sch 40 pvc, underground) |
1,800   |
LNFT |
7.25 |
13,050.00 |
18.25 |
32,850.00 |
7.50 |
13,500.00 |
6.00 |
10,800.00 |
| 730-02-C |
conduit with conductors (4#6 xhhw-2, 1#6 bare solid
ground in 1 1/4" sch 40 pvc, underground) |
600   |
LNFT |
11.50 |
6,900.00 |
25.00 |
15,000.00 |
10.50 |
6,300.00 |
9.00 |
5,400.00 |
| 730-02-D |
conduit with conductors (2#3 xhhw-2, 1#3 bare solid
ground in 1 1/2" sch 40 pvc, underground) |
100   |
LNFT |
14.50 |
1,450.00 |
27.00 |
2,700.00 |
14.00 |
1,400.00 |
10.00 |
1,000.00 |
| 730-04 |
jacked or bored casing (6", sch 80 pvc)
|
210   |
LNFT |
35.00 |
7,350.00 |
71.00 |
14,910.00 |
35.00 |
7,350.00 |
65.00 |
13,650.00 |
| 730-08 |
electrical service point (service entrance)
|
2   |
EACH |
2,500.00 |
5,000.00 |
2,100.00 |
4,200.00 |
2,500.00 |
5,000.00 |
3,000.00 |
6,000.00 |
| 730-16 |
underground junction box (12" x 12" x 8" min)
|
10   |
EACH |
400.00 |
4,000.00 |
350.00 |
3,500.00 |
400.00 |
4,000.00 |
1,000.00 |
10,000.00 |
| 730-17 |
structure junction box (12" x 12" x 8" min)
|
11   |
EACH |
600.00 |
6,600.00 |
685.00 |
7,535.00 |
525.00 |
5,775.00 |
1,500.00 |
16,500.00 |
| 730-18 |
service pole
|
2   |
EACH |
1,200.00 |
2,400.00 |
575.00 |
1,150.00 |
1,050.00 |
2,100.00 |
2,500.00 |
5,000.00 |
| 731-02 |
reflectorized raised pavement markers
|
22   |
EACH |
10.00 |
220.00 |
6.00 |
132.00 |
55.00 |
1,210.00 |
55.00 |
1,210.00 |
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
2   |
EACH |
400.00 |
800.00 |
200.00 |
400.00 |
450.00 |
900.00 |
440.00 |
880.00 |
| 732-04-C |
plastic pavement legends & symbols (only)
|
2   |
EACH |
400.00 |
800.00 |
225.00 |
450.00 |
450.00 |
900.00 |
440.00 |
880.00 |
| 737-02-A |
painted traffic striping (broken line)(4" width)
|
0.050 |
MILE |
500.00 |
25.00 |
500.00 |
25.00 |
1,200.00 |
60.00 |
1,500.00 |
75.00 |
| 737-03-A |
painted traffic striping (solid line)(4" width)
|
3,065   |
LNFT |
0.30 |
919.50 |
0.20 |
613.00 |
1.25 |
3,831.25 |
1.10 |
3,371.50 |
| 737-03-C |
painted traffic striping (solid line)(8" width)
|
150   |
LNFT |
1.00 |
150.00 |
0.50 |
75.00 |
0.50 |
75.00 |
0.35 |
52.50 |
| 737-03-D |
painted traffic striping (solid line)(12" width)
|
620   |
LNFT |
1.00 |
620.00 |
0.60 |
372.00 |
1.00 |
620.00 |
2.00 |
1,240.00 |
| 737-03-E |
painted traffic striping (solid line)(24" width)
|
80   |
LNFT |
5.00 |
400.00 |
2.00 |
160.00 |
3.50 |
280.00 |
3.30 |
264.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
20,000.00 |
20,000.00 |
24,000.00 |
24,000.00 |
50,000.00 |
50,000.00 |
15,000.00 |
15,000.00 |
| 741-01-A |
water main (8" c900 sdr 19)
|
373   |
LNFT |
75.00 |
27,975.00 |
165.00 |
61,545.00 |
65.00 |
24,245.00 |
50.00 |
18,650.00 |
| 741-01-B |
water main (12" c900 sdr 19)
|
412   |
LNFT |
100.00 |
41,200.00 |
175.00 |
72,100.00 |
115.00 |
47,380.00 |
59.00 |
24,308.00 |
| 741-04 |
fire hydrant
|
2   |
EACH |
3,500.00 |
7,000.00 |
3,500.00 |
7,000.00 |
6,800.00 |
13,600.00 |
5,000.00 |
10,000.00 |
| 741-05 |
water service line (1" copper, type k)
|
1,000   |
LNFT |
15.00 |
15,000.00 |
15.00 |
15,000.00 |
48.00 |
48,000.00 |
10.00 |
10,000.00 |
| 741-11 |
adjusting water valve and meter box
|
15   |
EACH |
500.00 |
7,500.00 |
700.00 |
10,500.00 |
1,570.00 |
23,550.00 |
500.00 |
7,500.00 |
| 741-13 |
removing fire hydrant
|
2   |
EACH |
1,500.00 |
3,000.00 |
575.00 |
1,150.00 |
2,600.00 |
5,200.00 |
1,000.00 |
2,000.00 |
| 742-01 |
sanitary sewer pipe (4" c900 sdr 35)
|
1,000   |
LNFT |
15.00 |
15,000.00 |
15.00 |
15,000.00 |
25.00 |
25,000.00 |
18.00 |
18,000.00 |
| 805-01 |
class a concrete
|
15.00 |
CUYD |
1,200.00 |
18,000.00 |
1,500.00 |
22,500.00 |
1,500.00 |
22,500.00 |
200.00 |
3,000.00 |
| S-001 |
brick pavers
|
2,505   |
SQFT |
16.00 |
40,080.00 |
12.50 |
31,312.50 |
48.00 |
120,240.00 |
15.00 |
37,575.00 |
| S-002 |
temporary business entrances
|
lump |
LUMP |
20,000.00 |
20,000.00 |
1,000.00 |
1,000.00 |
8,000.00 |
8,000.00 |
1,500.00 |
1,500.00 |
| S-003 |
decorative street light assembly
|
35   |
EACH |
5,700.00 |
199,500.00 |
4,300.00 |
150,500.00 |
5,500.00 |
192,500.00 |
5,300.00 |
185,500.00 |
| S-004 |
sawcut (per 1" depth)
|
34,135   |
INFT |
2.00 |
68,270.00 |
2.00 |
68,270.00 |
5.00 |
170,675.00 |
6.00 |
204,810.00 |
| S-005 |
sidewalk drain cover
|
7   |
EACH |
500.00 |
3,500.00 |
1,200.00 |
8,400.00 |
500.00 |
3,500.00 |
500.00 |
3,500.00 |
| S-006 |
roof drain downspouts
|
4   |
EACH |
500.00 |
2,000.00 |
1,200.00 |
4,800.00 |
1,000.00 |
4,000.00 |
1,000.00 |
4,000.00 |
| S-007 |
utility access cover
|
2   |
EACH |
1,000.00 |
2,000.00 |
10,000.00 |
20,000.00 |
5,000.00 |
10,000.00 |
1,500.00 |
3,000.00 |
| S-008 |
manhole rehabilitation
|
6   |
EACH |
5,000.00 |
30,000.00 |
4,600.00 |
27,600.00 |
3,800.00 |
22,800.00 |
1,000.00 |
6,000.00 |
| S-009 |
sewer main cured-in-place liner (8")
|
700   |
LNFT |
100.00 |
70,000.00 |
70.00 |
49,000.00 |
95.00 |
66,500.00 |
60.00 |
42,000.00 |
| S-010 |
adjusting gas valves and meters
|
4   |
EACH |
500.00 |
2,000.00 |
200.00 |
800.00 |
1,000.00 |
4,000.00 |
200.00 |
800.00 |
| S-011 |
adjusting sewer cleanouts
|
2   |
EACH |
500.00 |
1,000.00 |
300.00 |
600.00 |
1,375.00 |
2,750.00 |
250.00 |
500.00 |
| S-012 |
wheel stops
|
6   |
EACH |
200.00 |
1,200.00 |
150.00 |
900.00 |
750.00 |
4,500.00 |
250.00 |
1,500.00 |
| | SUBTOTAL GENERAL |
|
|
|
1,081,777.00 |
|
1,437,155.50 |
|
1,712,604.50 |
|
1,198,361.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE A |
additive alternate a1
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE A1 |
|
|
|
|
|
|
|
|
|
|
|
| 202-01-A |
removal of structures and obstructions (add alt a1)
|
lump |
LUMP |
5,000.00 |
5,000.00 |
10,000.00 |
10,000.00 |
25,000.00 |
25,000.00 |
10,000.00 |
10,000.00 |
| 202-02-D-A |
removal of concrete walks & drives (add alt a1)
|
425   |
SQYD |
5.00 |
2,125.00 |
12.00 |
5,100.00 |
15.00 |
6,375.00 |
15.00 |
6,375.00 |
| 202-02-F-A |
removal of concrete combination curb & gutter (add alt
a1) |
540.0 |
LNFT |
5.00 |
2,700.00 |
10.00 |
5,400.00 |
5.00 |
2,700.00 |
9.00 |
4,860.00 |
| 203-05-A |
excavation and embankment (add alt a1)
|
lump |
LUMP |
3,000.00 |
3,000.00 |
5,000.00 |
5,000.00 |
25,000.00 |
25,000.00 |
2,000.00 |
2,000.00 |
| 302-02-A-A |
class ii base course (4" thick)(add alt a1)
|
425.0 |
SQYD |
10.00 |
4,250.00 |
30.00 |
12,750.00 |
40.00 |
17,000.00 |
16.00 |
6,800.00 |
| 302-02-B-A |
class ii base course (6" thick)(add alt a1)
|
120.0 |
SQYD |
15.00 |
1,800.00 |
40.00 |
4,800.00 |
50.00 |
6,000.00 |
24.00 |
2,880.00 |
| 702-04-A-A |
adjusting manholes (add alt a1)
|
1   |
EACH |
500.00 |
500.00 |
1,500.00 |
1,500.00 |
8,000.00 |
8,000.00 |
1,000.00 |
1,000.00 |
| 706-01-B-A |
concrete walk (5" thick)(add alt a1)
|
355.0 |
SQYD |
70.00 |
24,850.00 |
65.00 |
23,075.00 |
125.00 |
44,375.00 |
60.00 |
21,300.00 |
| 707-03-A |
combination concrete curb & gutter (add alt a1)
|
540.0 |
LNFT |
30.00 |
16,200.00 |
40.00 |
21,600.00 |
50.00 |
27,000.00 |
22.00 |
11,880.00 |
| 713-01-A |
temporary signs & barricades (add alt a1)
|
lump |
LUMP |
5,000.00 |
5,000.00 |
3,000.00 |
3,000.00 |
4,500.00 |
4,500.00 |
10,000.00 |
10,000.00 |
| 729-01-A |
sign (type a)(add alt a1)
|
5.0 |
SQFT |
50.00 |
250.00 |
60.00 |
300.00 |
100.00 |
500.00 |
500.00 |
2,500.00 |
| 729-02-A |
sign (type b)(add alt a1)
|
15.0 |
SQFT |
50.00 |
750.00 |
60.00 |
900.00 |
100.00 |
1,500.00 |
500.00 |
7,500.00 |
| 730-01-A |
trenching and backfilling (add alt a1)
|
500   |
LNFT |
3.50 |
1,750.00 |
4.60 |
2,300.00 |
3.50 |
1,750.00 |
20.00 |
10,000.00 |
| 730-02-A-A |
conduit with conductors (2#8 xhhw-2, 1#8 bare solid
ground in 1 1/4" sch 40 pvc, underground)(add alt a1) |
300   |
LNFT |
6.50 |
1,950.00 |
17.00 |
5,100.00 |
6.00 |
1,800.00 |
5.00 |
1,500.00 |
| 730-02-B-A |
conduit with conductors (2#6 xhhw-2, 1#6 bare solid
ground in 1 1/4" sch 40 pvc, underground)(add alt a1) |
360   |
LNFT |
7.25 |
2,610.00 |
18.25 |
6,570.00 |
7.00 |
2,520.00 |
6.00 |
2,160.00 |
| 730-04-A |
jacked or bored casing (6", sch 80 pvc)(add alt a1)
|
40   |
LNFT |
35.00 |
1,400.00 |
71.00 |
2,840.00 |
35.00 |
1,400.00 |
65.00 |
2,600.00 |
| 730-16-A |
underground junction box (12" x 12" x 8" min) (add alt
a1) |
2   |
EACH |
400.00 |
800.00 |
350.00 |
700.00 |
375.00 |
750.00 |
1,000.00 |
2,000.00 |
| 730-17-A |
structure junction box (12" x 12" x 8" min)(add alt a1)
|
1   |
EACH |
600.00 |
600.00 |
685.00 |
685.00 |
600.00 |
600.00 |
1,500.00 |
1,500.00 |
| 737-03-A-A |
painted traffic striping (solid line)(4" width)(add
alt a1) |
250   |
LNFT |
1.00 |
250.00 |
0.75 |
187.50 |
2.00 |
500.00 |
1.20 |
300.00 |
| 737-03-D-A |
painted traffic striping (solid line)(12" width)(add
alt a1) |
75   |
LNFT |
2.00 |
150.00 |
2.00 |
150.00 |
2.00 |
150.00 |
2.00 |
150.00 |
| 737-03-E-A |
painted traffic striping (solid line)(24" width)(add
alt a1) |
15   |
LNFT |
5.00 |
75.00 |
5.00 |
75.00 |
4.00 |
60.00 |
3.50 |
52.50 |
| 740-01-A |
construction layout (add alt a1)
|
lump |
LUMP |
5,000.00 |
5,000.00 |
3,000.00 |
3,000.00 |
6,500.00 |
6,500.00 |
15,000.00 |
15,000.00 |
| S-001-A |
brick pavers (add alt a1)
|
605   |
SQFT |
16.00 |
9,680.00 |
12.50 |
7,562.50 |
48.00 |
29,040.00 |
15.00 |
9,075.00 |
| S-003-A |
decorative street light assembly (add alt a1)
|
10   |
EACH |
5,700.00 |
57,000.00 |
4,300.00 |
43,000.00 |
5,500.00 |
55,000.00 |
5,300.00 |
53,000.00 |
| S-004-A |
sawcut (per 1" depth)(add alt a1)
|
5,380   |
LNFT |
2.00 |
10,760.00 |
2.00 |
10,760.00 |
5.00 |
26,900.00 |
9.00 |
48,420.00 |
| S-005-A |
sidewalk drain cover (add alt a1)
|
2   |
EACH |
500.00 |
1,000.00 |
1,200.00 |
2,400.00 |
500.00 |
1,000.00 |
500.00 |
1,000.00 |
| | SUBTOTAL ALT A1 |
|
|
|
159,450.00 |
|
178,755.00 |
|
295,920.00 |
|
233,852.50 |
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE B |
additive alternate b1
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE B1 |
|
|
|
|
|
|
|
|
|
|
|
| 202-01-B |
removal of structures and obstructions (add alt b1)
|
lump |
LUMP |
4,000.00 |
4,000.00 |
10,000.00 |
10,000.00 |
25,000.00 |
25,000.00 |
10,000.00 |
10,000.00 |
| 202-02-D-B |
removal of concrete walks & drives (add alt b1)
|
220   |
SQYD |
5.00 |
1,100.00 |
12.00 |
2,640.00 |
10.00 |
2,200.00 |
15.00 |
3,300.00 |
| 202-02-F-B |
removal of concrete combination curb & gutter (add alt
b1) |
215.0 |
LNFT |
5.00 |
1,075.00 |
10.00 |
2,150.00 |
5.00 |
1,075.00 |
9.00 |
1,935.00 |
| 203-05-B |
excavation and embankment (add alt b1)
|
lump |
LUMP |
2,000.00 |
2,000.00 |
5,000.00 |
5,000.00 |
25,000.00 |
25,000.00 |
300.00 |
300.00 |
| 302-02-A-B |
class ii base course (4" thick)(add alt b1)
|
50.0 |
SQYD |
10.00 |
500.00 |
30.00 |
1,500.00 |
40.00 |
2,000.00 |
16.00 |
800.00 |
| 302-02-B-B |
class ii base course (6" thick)(add alt b1)
|
220.0 |
SQYD |
15.00 |
3,300.00 |
40.00 |
8,800.00 |
45.00 |
9,900.00 |
24.00 |
5,280.00 |
| 702-04-A-B |
adjusting manholes (add alt b1)
|
1   |
EACH |
500.00 |
500.00 |
1,500.00 |
1,500.00 |
8,000.00 |
8,000.00 |
1,000.00 |
1,000.00 |
| 706-01-B-B |
concrete walk (5" thick)(add alt b1)
|
200.0 |
SQYD |
70.00 |
14,000.00 |
65.00 |
13,000.00 |
200.00 |
40,000.00 |
60.00 |
12,000.00 |
| 707-03-B |
combination concrete curb & gutter (add alt b1)
|
220.0 |
LNFT |
30.00 |
6,600.00 |
40.00 |
8,800.00 |
50.00 |
11,000.00 |
22.00 |
4,840.00 |
| 713-01-B |
temporary signs & barricades (add alt b1)
|
lump |
LUMP |
5,000.00 |
5,000.00 |
3,000.00 |
3,000.00 |
7,500.00 |
7,500.00 |
10,000.00 |
10,000.00 |
| 729-01-B |
sign (type a)(add alt b1)
|
6.0 |
SQFT |
50.00 |
300.00 |
60.00 |
360.00 |
100.00 |
600.00 |
500.00 |
3,000.00 |
| 730-01-B |
trenching and backfilling (add alt b1)
|
225   |
LNFT |
3.50 |
787.50 |
4.60 |
1,035.00 |
3.75 |
843.75 |
20.00 |
4,500.00 |
| 730-02-B-B |
conduit with conductors (2#6 xhhw-2, 1#6 bare solid
ground in 1 1/4" sch 40 pvc, underground)(add alt b1) |
225   |
LNFT |
7.25 |
1,631.25 |
18.25 |
4,106.25 |
65.00 |
14,625.00 |
6.00 |
1,350.00 |
| 730-04-B |
jacked or bored casing (6", sch 80 pvc)(add alt b1)
|
40   |
LNFT |
35.00 |
1,400.00 |
71.00 |
2,840.00 |
40.00 |
1,600.00 |
65.00 |
2,600.00 |
| 730-16-B |
underground junction box (12" x 12" x 8" min) (add alt
b1) |
2   |
EACH |
400.00 |
800.00 |
350.00 |
700.00 |
450.00 |
900.00 |
1,000.00 |
2,000.00 |
| 737-03-A-B |
painted traffic striping (solid line)(4" width)(add
alt b1) |
210   |
LNFT |
1.00 |
210.00 |
0.75 |
157.50 |
2.00 |
420.00 |
1.10 |
231.00 |
| 740-01-B |
construction layout (add alt b1)
|
lump |
LUMP |
5,000.00 |
5,000.00 |
3,000.00 |
3,000.00 |
7,500.00 |
7,500.00 |
10,000.00 |
10,000.00 |
| S-001-B |
brick pavers (add alt b1)
|
210   |
SQFT |
16.00 |
3,360.00 |
12.50 |
2,625.00 |
48.00 |
10,080.00 |
15.00 |
3,150.00 |
| S-002-B |
temporary business entrances (add alt b1)
|
lump |
LUMP |
5,000.00 |
5,000.00 |
1,000.00 |
1,000.00 |
30,000.00 |
30,000.00 |
9,000.00 |
9,000.00 |
| S-003-B |
decorative street light assembly (add alt b1)
|
3   |
EACH |
5,700.00 |
17,100.00 |
4,300.00 |
12,900.00 |
5,500.00 |
16,500.00 |
5,300.00 |
15,900.00 |
| S-004-B |
sawcut (per 1" depth)(add alt b1)
|
2,130   |
LNFT |
2.00 |
4,260.00 |
2.00 |
4,260.00 |
6.00 |
12,780.00 |
9.00 |
19,170.00 |
| | SUBTOTAL ALT B1 |
|
|
|
77,923.75 |
|
89,373.75 |
|
227,523.75 |
|
120,356.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE C |
additive alternate c1
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE C1 |
|
|
|
|
|
|
|
|
|
|
|
| 202-01-C |
removal of structures and obstructions (add alt c1)
|
lump |
LUMP |
3,000.00 |
3,000.00 |
5,000.00 |
5,000.00 |
25,000.00 |
25,000.00 |
10,000.00 |
10,000.00 |
| 202-02-D-C |
removal of concrete walks & drives (add alt c1)
|
120   |
SQYD |
5.00 |
600.00 |
12.00 |
1,440.00 |
10.00 |
1,200.00 |
15.00 |
1,800.00 |
| 202-02-F-C |
removal of concrete combination curb & gutter (add alt
c1) |
225.0 |
LNFT |
5.00 |
1,125.00 |
10.00 |
2,250.00 |
5.00 |
1,125.00 |
12.00 |
2,700.00 |
| 203-05-C |
excavation and embankment (add alt c1)
|
lump |
LUMP |
2,000.00 |
2,000.00 |
5,000.00 |
5,000.00 |
25,000.00 |
25,000.00 |
300.00 |
300.00 |
| 302-02-A-C |
class ii base course (4" thick)(add alt c1)
|
120.0 |
SQYD |
10.00 |
1,200.00 |
30.00 |
3,600.00 |
40.00 |
4,800.00 |
16.00 |
1,920.00 |
| 302-02-B-C |
class ii base course (6" thick)(add alt c1)
|
50.0 |
SQYD |
15.00 |
750.00 |
40.00 |
2,000.00 |
45.00 |
2,250.00 |
24.00 |
1,200.00 |
| 706-01-B-C |
concrete walk (5" thick)(add alt c1)
|
100.0 |
SQYD |
70.00 |
7,000.00 |
65.00 |
6,500.00 |
150.00 |
15,000.00 |
60.00 |
6,000.00 |
| 707-03-C |
combination concrete curb & gutter (add alt c1)
|
225.0 |
LNFT |
30.00 |
6,750.00 |
40.00 |
9,000.00 |
50.00 |
11,250.00 |
22.00 |
4,950.00 |
| 713-01-C |
temporary signs & barricades (add alt c1)
|
lump |
LUMP |
5,000.00 |
5,000.00 |
3,000.00 |
3,000.00 |
9,000.00 |
9,000.00 |
10,000.00 |
10,000.00 |
| 730-01-C |
trenching and backfilling (add alt c1)
|
190   |
LNFT |
3.50 |
665.00 |
4.60 |
874.00 |
3.50 |
665.00 |
20.00 |
3,800.00 |
| 730-02-A-C |
conduit with conductors (2#8 xhhw-2, 1#8 bare solid
ground in 1 1/4" sch 40 pvc, underground)(add alt c1) |
250   |
LNFT |
6.50 |
1,625.00 |
17.00 |
4,250.00 |
6.00 |
1,500.00 |
5.00 |
1,250.00 |
| 730-04-C |
jacked or bored casing (6", sch 80 pvc)(add alt c1)
|
100   |
LNFT |
35.00 |
3,500.00 |
71.00 |
7,100.00 |
35.00 |
3,500.00 |
65.00 |
6,500.00 |
| 730-16-C |
underground junction box (12" x 12" x 8" min) (add alt
c1) |
2   |
EACH |
400.00 |
800.00 |
350.00 |
700.00 |
400.00 |
800.00 |
1,000.00 |
2,000.00 |
| 740-01-C |
construction layout (add alt c1)
|
lump |
LUMP |
5,000.00 |
5,000.00 |
3,000.00 |
3,000.00 |
8,500.00 |
8,500.00 |
10,000.00 |
10,000.00 |
| 741-04-C |
fire hydrant (add alt c1)
|
1   |
EACH |
3,500.00 |
3,500.00 |
3,500.00 |
3,500.00 |
6,500.00 |
6,500.00 |
5,000.00 |
5,000.00 |
| 741-13-C |
removing fire hydrant (add alt c1)
|
1   |
EACH |
1,500.00 |
1,500.00 |
575.00 |
575.00 |
3,000.00 |
3,000.00 |
1,500.00 |
1,500.00 |
| S-001-C |
brick pavers (add alt c1)
|
200   |
SQFT |
16.00 |
3,200.00 |
12.50 |
2,500.00 |
48.00 |
9,600.00 |
15.00 |
3,000.00 |
| S-003-C |
decorative street light assembly (add alt c1)
|
4   |
EACH |
5,700.00 |
22,800.00 |
4,300.00 |
17,200.00 |
5,500.00 |
22,000.00 |
5,300.00 |
21,200.00 |
| S-004-C |
sawcut (per 1" depth)(add alt c1)
|
2,225   |
LNFT |
2.00 |
4,450.00 |
2.00 |
4,450.00 |
6.00 |
13,350.00 |
9.00 |
20,025.00 |
| | SUBTOTAL ALT C1 |
|
|
|
74,465.00 |
|
81,939.00 |
|
164,040.00 |
|
113,145.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,393,615.75 |
|
1,787,223.25 |
|
2,400,088.25 |
|
IRREGULAR |
|