Letting of 2/27/2008 LA DOTD Headquarters


 
go back
Go Back
 
Lead Project: 837-04-0019
Parish: OUACHITA
Routes: LA 8406
Description: LOUISVILLE AVE. - FORSYTHE AVE.
Type Const: pavement patching and related work.
Estimated Construction Cost: $551,135.75
 
RankLicenseBidderConstruction Bid
1 21982 FORBY CONTRACTING, INC. $557,564.69
2 46547 KNISH CORPORATION $669,214.69
3 15099 AMETHYST CONSTRUCTION, INC. $692,740.60
4 44289 JEFF MERCER LLC $967,352.40
5 47347 KIEWIT LOUISIANA CO $1,189,067.68
 
Item Number Item Description Quantity Unit of Measure - 1 -
FORBY CONTRACTING, INC.
- 2 -
KNISH CORPORATION
- 3 -
AMETHYST CONSTRUCTION, INC.
- 4 -
JEFF MERCER LLC
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-E removal of concrete curbs 1,730.0    LNFT 3.00 5,190.00 10.00 17,300.00 8.00 13,840.00 1.00 1,730.00
602-02-A cleaning and resealing existing longitudinal pavement
joints
14,196      LNFT 1.75 24,843.00 3.25 46,137.00 1.85 26,262.60 2.00 28,392.00
602-02-B cleaning and resealing existing transverse pavement
joints
11,376      LNFT 2.25 25,596.00 3.25 36,972.00 2.35 26,733.60 2.00 22,752.00
602-05-I-01 full depth patching of jointed conc pvmt (9" thick)
(16.0 sq yds & under)
1,489.2    SQYD 155.00 230,826.00 165.00 245,718.00 155.00 230,826.00 230.00 342,516.00
602-05-I-02 full depth patching of jointed conc pvmt (9" thick)
(16.1 - 48.0 sq yds)
633.8    SQYD 140.00 88,732.00 165.00 104,577.00 145.00 91,901.00 195.00 123,591.00
602-05-I-03 full depth patching of jointed conc pvmt (9" thick)
(48.1 sq yds & over)
607.0    SQYD 130.00 78,910.00 165.00 100,155.00 135.00 81,945.00 180.00 109,260.00
702-04-A adjusting manholes 22      EACH 250.00 5,500.00 1,000.00 22,000.00 2,200.00 48,400.00 750.00 16,500.00
707-01 concrete curb 1,743.0    LNFT 9.00 15,687.00 25.00 43,575.00 16.00 27,888.00 55.00 95,865.00
713-01 temporary signs & barricades lump      LUMP 25,000.00 25,000.00 10,000.00 10,000.00 75,000.00 75,000.00 30,000.00 30,000.00
727-01 mobilization lump      LUMP 30,000.00 30,000.00 11,500.00 11,500.00 30,000.00 30,000.00 160,000.00 160,000.00
731-02 reflectorized raised pavement markers 2,046      EACH 5.00 10,230.00 5.00 10,230.00 5.50 11,253.00 7.00 14,322.00
732-01-C plastic pavement striping (8" width) 275      LNFT 0.80 220.00 0.80 220.00 1.00 275.00 1.20 330.00
732-01-E plastic pavement striping (24" width) 408      LNFT 2.75 1,122.00 2.75 1,122.00 3.00 1,224.00 3.25 1,326.00
732-02-A plastic pavement striping (solid line) (4" width) 4.039  MILE 2,510.00 10,137.89 2,510.00 10,137.89 2,600.00 10,501.40 2,600.00 10,501.40
732-03-A plastic pavement striping (broken line)(4" width) 2.020  MILE 790.00 1,595.80 790.00 1,595.80 800.00 1,616.00 850.00 1,717.00
732-04-A plastic pavement legends & symbols (arrow) 4      EACH 175.00 700.00 175.00 700.00 200.00 800.00 200.00 800.00
732-04-C plastic pavement legends & symbols (only) 3      EACH 225.00 675.00 225.00 675.00 225.00 675.00 250.00 750.00
732-04-D plastic pavement legends & symbols (rr crossing) 4      EACH 400.00 1,600.00 400.00 1,600.00 400.00 1,600.00 500.00 2,000.00
741-11 adjusting water valve and meter box 10      EACH 100.00 1,000.00 500.00 5,000.00 1,200.00 12,000.00 500.00 5,000.00
                       
 CONTRACTOR TOTAL       557,564.69   669,214.69   692,740.60   967,352.40
 
Item Number Item Description Quantity Unit of Measure - 5 -
KIEWIT LOUISIANA CO

 

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-E removal of concrete curbs 1,730.0    LNFT 5.00 8,650.00            
602-02-A cleaning and resealing existing longitudinal pavement
joints
14,196      LNFT 1.59 22,571.64            
602-02-B cleaning and resealing existing transverse pavement
joints
11,376      LNFT 1.59 18,087.84            
602-05-I-01 full depth patching of jointed conc pvmt (9" thick)
(16.0 sq yds & under)
1,489.2    SQYD 316.00 470,587.20            
602-05-I-02 full depth patching of jointed conc pvmt (9" thick)
(16.1 - 48.0 sq yds)
633.8    SQYD 316.00 200,280.80            
602-05-I-03 full depth patching of jointed conc pvmt (9" thick)
(48.1 sq yds & over)
607.0    SQYD 316.00 191,812.00            
702-04-A adjusting manholes 22      EACH 500.00 11,000.00            
707-01 concrete curb 1,743.0    LNFT 20.00 34,860.00            
713-01 temporary signs & barricades lump      LUMP 73,600.00 73,600.00            
727-01 mobilization lump      LUMP 119,000.00 119,000.00            
731-02 reflectorized raised pavement markers 2,046      EACH 6.60 13,503.60            
732-01-C plastic pavement striping (8" width) 275      LNFT 1.10 302.50            
732-01-E plastic pavement striping (24" width) 408      LNFT 3.30 1,346.40            
732-02-A plastic pavement striping (solid line) (4" width) 4.039  MILE 3,300.00 13,328.70            
732-03-A plastic pavement striping (broken line)(4" width) 2.020  MILE 1,100.00 2,222.00            
732-04-A plastic pavement legends & symbols (arrow) 4      EACH 165.00 660.00            
732-04-C plastic pavement legends & symbols (only) 3      EACH 165.00 495.00            
732-04-D plastic pavement legends & symbols (rr crossing) 4      EACH 440.00 1,760.00            
741-11 adjusting water valve and meter box 10      EACH 500.00 5,000.00            
                       
 CONTRACTOR TOTAL       1,189,067.68            