| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BEN ALLEN, INC. |
- 2 - GILCHRIST CONSTRUCTION CO. LLC |
- 3 - C W & W CONTRACTORS, INC. |
- 4 - GERACE CONSTRUCTION LLC |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
25,000.00 |
25,000.00 |
35,000.00 |
35,000.00 |
5,000.00 |
5,000.00 |
21,000.00 |
21,000.00 |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
5,000.00 |
5,000.00 |
2,500.00 |
2,500.00 |
5,000.00 |
5,000.00 |
16,500.00 |
16,500.00 |
| 202-02-A-01 |
removal of bridge (sta. 113+97.15; 20.06' x 39.10';
timber trestle bridge) |
1   |
EACH |
5,000.00 |
5,000.00 |
7,000.00 |
7,000.00 |
10,000.00 |
10,000.00 |
35,000.00 |
35,000.00 |
| 202-02-G |
removal of surfacing & stabilized base
|
1,391.0 |
SQYD |
4.50 |
6,259.50 |
4.00 |
5,564.00 |
5.00 |
6,955.00 |
8.00 |
11,128.00 |
| 202-02-H |
removal of guard rail
|
280   |
LNFT |
11.00 |
3,080.00 |
15.00 |
4,200.00 |
10.00 |
2,800.00 |
6.00 |
1,680.00 |
| 203-02 |
drainage excavation
|
489   |
CUYD |
7.50 |
3,667.50 |
20.00 |
9,780.00 |
20.00 |
9,780.00 |
10.00 |
4,890.00 |
| 203-05 |
excavation and embankment
|
lump |
LUMP |
35,000.00 |
35,000.00 |
75,000.00 |
75,000.00 |
70,000.00 |
70,000.00 |
52,000.00 |
52,000.00 |
| 204-02 |
temporary hay or straw bales
|
100   |
EACH |
7.50 |
750.00 |
15.00 |
1,500.00 |
10.00 |
1,000.00 |
50.00 |
5,000.00 |
| 204-06 |
temporary silt fencing
|
1,600   |
LNFT |
3.00 |
4,800.00 |
2.00 |
3,200.00 |
3.00 |
4,800.00 |
2.50 |
4,000.00 |
| 302-02-D |
class ii base course (8 1/2" thick)
|
2,116.5 |
SQYD |
26.00 |
55,029.00 |
25.00 |
52,912.50 |
22.00 |
46,563.00 |
35.00 |
74,077.50 |
| 304-01 |
lime
|
189.00 |
TON |
1.00 |
189.00 |
150.00 |
28,350.00 |
182.00 |
34,398.00 |
35.00 |
6,615.00 |
| 304-04-D |
lime treatment (type d) (12" thick)
|
1,200   |
SQYD |
9.00 |
10,800.00 |
1.00 |
1,200.00 |
5.00 |
6,000.00 |
15.00 |
18,000.00 |
| 502-01 |
superpave asphaltic concrete
|
433.4 |
TON |
175.00 |
75,845.00 |
175.00 |
75,845.00 |
220.00 |
95,348.00 |
200.00 |
86,680.00 |
| 704-03 |
blocked out guard rail
|
150.0 |
LNFT |
27.50 |
4,125.00 |
19.00 |
2,850.00 |
25.00 |
3,750.00 |
20.00 |
3,000.00 |
| 704-08-B |
guard rail transitions (double thrie beam)
|
100.0 |
LNFT |
60.50 |
6,050.00 |
60.00 |
6,000.00 |
60.00 |
6,000.00 |
60.00 |
6,000.00 |
| 704-11-A |
guard rail end treatment (flared)
|
4   |
EACH |
2,475.00 |
9,900.00 |
2,000.00 |
8,000.00 |
2,500.00 |
10,000.00 |
2,000.00 |
8,000.00 |
| 705-02 |
combination mesh & barbed wire fence
|
225   |
LNFT |
12.00 |
2,700.00 |
10.00 |
2,250.00 |
15.00 |
3,375.00 |
11.00 |
2,475.00 |
| 708-01 |
right-of-way monument
|
10   |
EACH |
175.00 |
1,750.00 |
350.00 |
3,500.00 |
200.00 |
2,000.00 |
400.00 |
4,000.00 |
| 708-02 |
right-of-way monument witness post
|
10   |
EACH |
175.00 |
1,750.00 |
350.00 |
3,500.00 |
200.00 |
2,000.00 |
400.00 |
4,000.00 |
| 712-04 |
flexible revetment
|
345   |
SQYD |
73.00 |
25,185.00 |
80.00 |
27,600.00 |
85.00 |
29,325.00 |
70.00 |
24,150.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
10,000.00 |
10,000.00 |
18,500.00 |
18,500.00 |
40,000.00 |
40,000.00 |
10,000.00 |
10,000.00 |
| 716-01-A |
mulch (vegetative)
|
4.6 |
TON |
400.00 |
1,840.00 |
425.00 |
1,955.00 |
600.00 |
2,760.00 |
400.00 |
1,840.00 |
| 717-01 |
seeding
|
80   |
LB |
5.00 |
400.00 |
11.00 |
880.00 |
35.00 |
2,800.00 |
11.00 |
880.00 |
| 718-01 |
fertilizer
|
2,670   |
LB |
0.50 |
1,335.00 |
0.40 |
1,068.00 |
1.00 |
2,670.00 |
0.50 |
1,335.00 |
| 720-01-E |
erosion control system, flexible channel liner (type e)
|
487   |
SQYD |
4.00 |
1,948.00 |
5.00 |
2,435.00 |
5.00 |
2,435.00 |
5.00 |
2,435.00 |
| 720-01-F |
erosion control system, flexible channel liner (type f)
|
307   |
SQYD |
4.00 |
1,228.00 |
5.00 |
1,535.00 |
5.00 |
1,535.00 |
5.00 |
1,535.00 |
| 722-01 |
project site laboratory
|
1   |
EACH |
5,000.00 |
5,000.00 |
20,000.00 |
20,000.00 |
20,000.00 |
20,000.00 |
15,000.00 |
15,000.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
58,000.00 |
58,000.00 |
78,000.00 |
78,000.00 |
75,000.00 |
75,000.00 |
85,000.00 |
85,000.00 |
| 729-16-C |
object marker assembly (type 3)
|
4   |
EACH |
82.50 |
330.00 |
100.00 |
400.00 |
100.00 |
400.00 |
85.00 |
340.00 |
| 731-02 |
reflectorized raised pavement markers
|
17   |
EACH |
15.00 |
255.00 |
20.00 |
340.00 |
55.00 |
935.00 |
22.00 |
374.00 |
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
0.252 |
MILE |
7,800.00 |
1,965.60 |
9,000.00 |
2,268.00 |
10,000.00 |
2,520.00 |
8,000.00 |
2,016.00 |
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
0.126 |
MILE |
2,370.00 |
298.62 |
3,000.00 |
378.00 |
3,000.00 |
378.00 |
5,500.00 |
693.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
9,000.00 |
9,000.00 |
20,000.00 |
20,000.00 |
15,000.00 |
15,000.00 |
30,000.00 |
30,000.00 |
| 804-01-B |
precast concrete piles (14")
|
1,140   |
LNFT |
53.00 |
60,420.00 |
46.00 |
52,440.00 |
90.00 |
102,600.00 |
75.00 |
85,500.00 |
| 804-12 |
loading permanent piles
|
1   |
EACH |
0.00 |
0.00 |
2,500.00 |
2,500.00 |
1.00 |
1.00 |
1,000.00 |
1,000.00 |
| 805-01-F |
class a concrete (bents)
|
29.12 |
CUYD |
900.00 |
26,208.00 |
1,400.00 |
40,768.00 |
800.00 |
23,296.00 |
2,000.00 |
58,240.00 |
| 805-03 |
class aa concrete
|
108.60 |
CUYD |
800.00 |
86,880.00 |
700.00 |
76,020.00 |
600.00 |
65,160.00 |
800.00 |
86,880.00 |
| 806-01 |
deformed reinforcing steel
|
24,321   |
LB |
0.93 |
22,618.53 |
1.00 |
24,321.00 |
2.00 |
48,642.00 |
1.00 |
24,321.00 |
| 810-01 |
concrete railing (barrier)
|
160.00 |
LNFT |
75.00 |
12,000.00 |
90.00 |
14,400.00 |
80.00 |
12,800.00 |
90.00 |
14,400.00 |
| 813-01 |
concrete approach slabs
|
275.56 |
SQYD |
210.00 |
57,867.60 |
230.00 |
63,378.80 |
220.00 |
60,623.20 |
275.00 |
75,779.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
639,474.35 |
|
777,338.30 |
|
833,649.20 |
|
885,763.50 |
|
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 5 - T. L. WALLACE CONSTRUCTION, INC. |
- 6 - CERES ENVIRONMENTAL SERVICES,INC. |
- 7 - GUINN BROTHERS, LLC. |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
131,842.00 |
131,842.00 |
37,500.00 |
37,500.00 |
60,000.00 |
60,000.00 |
|
|
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
18,500.00 |
18,500.00 |
12,500.00 |
12,500.00 |
10,000.00 |
10,000.00 |
|
|
| 202-02-A-01 |
removal of bridge (sta. 113+97.15; 20.06' x 39.10';
timber trestle bridge) |
1   |
EACH |
35,420.00 |
35,420.00 |
9,750.00 |
9,750.00 |
20,000.00 |
20,000.00 |
|
|
| 202-02-G |
removal of surfacing & stabilized base
|
1,391.0 |
SQYD |
14.20 |
19,752.20 |
25.00 |
34,775.00 |
10.00 |
13,910.00 |
|
|
| 202-02-H |
removal of guard rail
|
280   |
LNFT |
4.75 |
1,330.00 |
3.75 |
1,050.00 |
15.00 |
4,200.00 |
|
|
| 203-02 |
drainage excavation
|
489   |
CUYD |
23.60 |
11,540.40 |
15.00 |
7,335.00 |
15.00 |
7,335.00 |
|
|
| 203-05 |
excavation and embankment
|
lump |
LUMP |
79,600.00 |
79,600.00 |
52,487.50 |
52,487.50 |
65,000.00 |
65,000.00 |
|
|
| 204-02 |
temporary hay or straw bales
|
100   |
EACH |
10.60 |
1,060.00 |
8.75 |
875.00 |
10.00 |
1,000.00 |
|
|
| 204-06 |
temporary silt fencing
|
1,600   |
LNFT |
2.85 |
4,560.00 |
3.75 |
6,000.00 |
5.00 |
8,000.00 |
|
|
| 302-02-D |
class ii base course (8 1/2" thick)
|
2,116.5 |
SQYD |
44.70 |
94,607.55 |
22.50 |
47,621.25 |
31.00 |
65,611.50 |
|
|
| 304-01 |
lime
|
189.00 |
TON |
177.00 |
33,453.00 |
162.50 |
30,712.50 |
200.00 |
37,800.00 |
|
|
| 304-04-D |
lime treatment (type d) (12" thick)
|
1,200   |
SQYD |
4.75 |
5,700.00 |
3.75 |
4,500.00 |
15.00 |
18,000.00 |
|
|
| 502-01 |
superpave asphaltic concrete
|
433.4 |
TON |
189.00 |
81,912.60 |
225.00 |
97,515.00 |
270.00 |
117,018.00 |
|
|
| 704-03 |
blocked out guard rail
|
150.0 |
LNFT |
21.20 |
3,180.00 |
21.25 |
3,187.50 |
25.00 |
3,750.00 |
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
100.0 |
LNFT |
64.70 |
6,470.00 |
56.25 |
5,625.00 |
75.00 |
7,500.00 |
|
|
| 704-11-A |
guard rail end treatment (flared)
|
4   |
EACH |
2,240.00 |
8,960.00 |
2,000.00 |
8,000.00 |
3,000.00 |
12,000.00 |
|
|
| 705-02 |
combination mesh & barbed wire fence
|
225   |
LNFT |
11.80 |
2,655.00 |
5.00 |
1,125.00 |
15.00 |
3,375.00 |
|
|
| 708-01 |
right-of-way monument
|
10   |
EACH |
283.00 |
2,830.00 |
137.50 |
1,375.00 |
400.00 |
4,000.00 |
|
|
| 708-02 |
right-of-way monument witness post
|
10   |
EACH |
248.00 |
2,480.00 |
125.00 |
1,250.00 |
400.00 |
4,000.00 |
|
|
| 712-04 |
flexible revetment
|
345   |
SQYD |
79.20 |
27,324.00 |
81.25 |
28,031.25 |
90.00 |
31,050.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
7,690.00 |
7,690.00 |
10,000.00 |
10,000.00 |
15,000.00 |
15,000.00 |
|
|
| 716-01-A |
mulch (vegetative)
|
4.6 |
TON |
471.00 |
2,166.60 |
8,750.00 |
40,250.00 |
1,500.00 |
6,900.00 |
|
|
| 717-01 |
seeding
|
80   |
LB |
11.80 |
944.00 |
25.00 |
2,000.00 |
25.00 |
2,000.00 |
|
|
| 718-01 |
fertilizer
|
2,670   |
LB |
0.44 |
1,174.80 |
5.00 |
13,350.00 |
1.00 |
2,670.00 |
|
|
| 720-01-E |
erosion control system, flexible channel liner (type e)
|
487   |
SQYD |
5.90 |
2,873.30 |
3.75 |
1,826.25 |
8.00 |
3,896.00 |
|
|
| 720-01-F |
erosion control system, flexible channel liner (type f)
|
307   |
SQYD |
5.90 |
1,811.30 |
3.75 |
1,151.25 |
8.00 |
2,456.00 |
|
|
| 722-01 |
project site laboratory
|
1   |
EACH |
8,830.00 |
8,830.00 |
12,500.00 |
12,500.00 |
20,000.00 |
20,000.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
96,000.00 |
96,000.00 |
112,500.00 |
112,500.00 |
94,500.00 |
94,500.00 |
|
|
| 729-16-C |
object marker assembly (type 3)
|
4   |
EACH |
94.20 |
376.80 |
75.00 |
300.00 |
200.00 |
800.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
17   |
EACH |
11.80 |
200.60 |
6.25 |
106.25 |
30.00 |
510.00 |
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
0.252 |
MILE |
11,800.00 |
2,973.60 |
9,750.00 |
2,457.00 |
15,000.00 |
3,780.00 |
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
0.126 |
MILE |
5,890.00 |
742.14 |
2,962.50 |
373.28 |
8,500.00 |
1,071.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
11,000.00 |
11,000.00 |
31,250.00 |
31,250.00 |
15,000.00 |
15,000.00 |
|
|
| 804-01-B |
precast concrete piles (14")
|
1,140   |
LNFT |
48.60 |
55,404.00 |
93.75 |
106,875.00 |
68.00 |
77,520.00 |
|
|
| 804-12 |
loading permanent piles
|
1   |
EACH |
5,100.00 |
5,100.00 |
1,250.00 |
1,250.00 |
1.00 |
1.00 |
|
|
| 805-01-F |
class a concrete (bents)
|
29.12 |
CUYD |
708.00 |
20,616.96 |
1,500.00 |
43,680.00 |
1,600.00 |
46,592.00 |
|
|
| 805-03 |
class aa concrete
|
108.60 |
CUYD |
600.00 |
65,160.00 |
1,250.00 |
135,750.00 |
1,300.00 |
141,180.00 |
|
|
| 806-01 |
deformed reinforcing steel
|
24,321   |
LB |
1.00 |
24,321.00 |
1.13 |
27,482.73 |
1.50 |
36,481.50 |
|
|
| 810-01 |
concrete railing (barrier)
|
160.00 |
LNFT |
118.00 |
18,880.00 |
56.25 |
9,000.00 |
100.00 |
16,000.00 |
|
|
| 813-01 |
concrete approach slabs
|
275.56 |
SQYD |
285.00 |
78,534.60 |
250.00 |
68,890.00 |
285.00 |
78,534.60 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
977,976.45 |
|
1,012,206.76 |
|
1,058,441.60 |
|
|
|