February 06, 2014 Error processing SSI file

Letting of 2/27/2008 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 822-10-0007
Parish: GRANT
Routes: LA 3098
Description: LA 3098 BRIDGE AND APPROACHES
Type Const: grading, class ii base course, superpave asphaltic concrete pavement, concrete
slab span bridge, and related work.
Estimated Construction Cost: $598,089.05
 
RankLicenseBidderConstruction Bid
1 23112 BEN ALLEN, INC. $639,474.35
2 12312 GILCHRIST CONSTRUCTION CO. LLC $777,338.30
3 18546 C W & W CONTRACTORS, INC. $833,649.20
4 39580 GERACE CONSTRUCTION LLC $885,763.50
5 14422 T. L. WALLACE CONSTRUCTION, INC. $977,976.45
6 45210 CERES ENVIRONMENTAL SERVICES,INC. $1,012,206.76
7 09090 GUINN BROTHERS, LLC. $1,058,441.60
 
Item Number Item Description Quantity Unit of Measure - 1 -
BEN ALLEN, INC.
- 2 -
GILCHRIST CONSTRUCTION CO. LLC
- 3 -
C W & W CONTRACTORS, INC.
- 4 -
GERACE CONSTRUCTION LLC
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 25,000.00 25,000.00 35,000.00 35,000.00 5,000.00 5,000.00 21,000.00 21,000.00
202-01 removal of structures & obstructions lump      LUMP 5,000.00 5,000.00 2,500.00 2,500.00 5,000.00 5,000.00 16,500.00 16,500.00
202-02-A-01 removal of bridge (sta. 113+97.15; 20.06' x 39.10';
timber trestle bridge)
1      EACH 5,000.00 5,000.00 7,000.00 7,000.00 10,000.00 10,000.00 35,000.00 35,000.00
202-02-G removal of surfacing & stabilized base 1,391.0    SQYD 4.50 6,259.50 4.00 5,564.00 5.00 6,955.00 8.00 11,128.00
202-02-H removal of guard rail 280      LNFT 11.00 3,080.00 15.00 4,200.00 10.00 2,800.00 6.00 1,680.00
203-02 drainage excavation 489      CUYD 7.50 3,667.50 20.00 9,780.00 20.00 9,780.00 10.00 4,890.00
203-05 excavation and embankment lump      LUMP 35,000.00 35,000.00 75,000.00 75,000.00 70,000.00 70,000.00 52,000.00 52,000.00
204-02 temporary hay or straw bales 100      EACH 7.50 750.00 15.00 1,500.00 10.00 1,000.00 50.00 5,000.00
204-06 temporary silt fencing 1,600      LNFT 3.00 4,800.00 2.00 3,200.00 3.00 4,800.00 2.50 4,000.00
302-02-D class ii base course (8 1/2" thick) 2,116.5    SQYD 26.00 55,029.00 25.00 52,912.50 22.00 46,563.00 35.00 74,077.50
304-01 lime 189.00   TON 1.00 189.00 150.00 28,350.00 182.00 34,398.00 35.00 6,615.00
304-04-D lime treatment (type d) (12" thick) 1,200      SQYD 9.00 10,800.00 1.00 1,200.00 5.00 6,000.00 15.00 18,000.00
502-01 superpave asphaltic concrete 433.4    TON 175.00 75,845.00 175.00 75,845.00 220.00 95,348.00 200.00 86,680.00
704-03 blocked out guard rail 150.0    LNFT 27.50 4,125.00 19.00 2,850.00 25.00 3,750.00 20.00 3,000.00
704-08-B guard rail transitions (double thrie beam) 100.0    LNFT 60.50 6,050.00 60.00 6,000.00 60.00 6,000.00 60.00 6,000.00
704-11-A guard rail end treatment (flared) 4      EACH 2,475.00 9,900.00 2,000.00 8,000.00 2,500.00 10,000.00 2,000.00 8,000.00
705-02 combination mesh & barbed wire fence 225      LNFT 12.00 2,700.00 10.00 2,250.00 15.00 3,375.00 11.00 2,475.00
708-01 right-of-way monument 10      EACH 175.00 1,750.00 350.00 3,500.00 200.00 2,000.00 400.00 4,000.00
708-02 right-of-way monument witness post 10      EACH 175.00 1,750.00 350.00 3,500.00 200.00 2,000.00 400.00 4,000.00
712-04 flexible revetment 345      SQYD 73.00 25,185.00 80.00 27,600.00 85.00 29,325.00 70.00 24,150.00
713-01 temporary signs & barricades lump      LUMP 10,000.00 10,000.00 18,500.00 18,500.00 40,000.00 40,000.00 10,000.00 10,000.00
716-01-A mulch (vegetative) 4.6    TON 400.00 1,840.00 425.00 1,955.00 600.00 2,760.00 400.00 1,840.00
717-01 seeding 80      LB 5.00 400.00 11.00 880.00 35.00 2,800.00 11.00 880.00
718-01 fertilizer 2,670      LB 0.50 1,335.00 0.40 1,068.00 1.00 2,670.00 0.50 1,335.00
720-01-E erosion control system, flexible channel liner (type e) 487      SQYD 4.00 1,948.00 5.00 2,435.00 5.00 2,435.00 5.00 2,435.00
720-01-F erosion control system, flexible channel liner (type f) 307      SQYD 4.00 1,228.00 5.00 1,535.00 5.00 1,535.00 5.00 1,535.00
722-01 project site laboratory 1      EACH 5,000.00 5,000.00 20,000.00 20,000.00 20,000.00 20,000.00 15,000.00 15,000.00
727-01 mobilization lump      LUMP 58,000.00 58,000.00 78,000.00 78,000.00 75,000.00 75,000.00 85,000.00 85,000.00
729-16-C object marker assembly (type 3) 4      EACH 82.50 330.00 100.00 400.00 100.00 400.00 85.00 340.00
731-02 reflectorized raised pavement markers 17      EACH 15.00 255.00 20.00 340.00 55.00 935.00 22.00 374.00
732-02-A plastic pavement striping (solid line) (4" width) 0.252  MILE 7,800.00 1,965.60 9,000.00 2,268.00 10,000.00 2,520.00 8,000.00 2,016.00
732-03-A plastic pavement striping (broken line)(4" width) 0.126  MILE 2,370.00 298.62 3,000.00 378.00 3,000.00 378.00 5,500.00 693.00
740-01 construction layout lump      LUMP 9,000.00 9,000.00 20,000.00 20,000.00 15,000.00 15,000.00 30,000.00 30,000.00
804-01-B precast concrete piles (14") 1,140      LNFT 53.00 60,420.00 46.00 52,440.00 90.00 102,600.00 75.00 85,500.00
804-12 loading permanent piles 1      EACH 0.00 0.00 2,500.00 2,500.00 1.00 1.00 1,000.00 1,000.00
805-01-F class a concrete (bents) 29.12   CUYD 900.00 26,208.00 1,400.00 40,768.00 800.00 23,296.00 2,000.00 58,240.00
805-03 class aa concrete 108.60   CUYD 800.00 86,880.00 700.00 76,020.00 600.00 65,160.00 800.00 86,880.00
806-01 deformed reinforcing steel 24,321      LB 0.93 22,618.53 1.00 24,321.00 2.00 48,642.00 1.00 24,321.00
810-01 concrete railing (barrier) 160.00   LNFT 75.00 12,000.00 90.00 14,400.00 80.00 12,800.00 90.00 14,400.00
813-01 concrete approach slabs 275.56   SQYD 210.00 57,867.60 230.00 63,378.80 220.00 60,623.20 275.00 75,779.00
                       
 CONTRACTOR TOTAL       639,474.35   777,338.30   833,649.20   885,763.50
 
Item Number Item Description Quantity Unit of Measure - 5 -
T. L. WALLACE CONSTRUCTION, INC.
- 6 -
CERES ENVIRONMENTAL SERVICES,INC.
- 7 -
GUINN BROTHERS, LLC.

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 131,842.00 131,842.00 37,500.00 37,500.00 60,000.00 60,000.00    
202-01 removal of structures & obstructions lump      LUMP 18,500.00 18,500.00 12,500.00 12,500.00 10,000.00 10,000.00    
202-02-A-01 removal of bridge (sta. 113+97.15; 20.06' x 39.10';
timber trestle bridge)
1      EACH 35,420.00 35,420.00 9,750.00 9,750.00 20,000.00 20,000.00    
202-02-G removal of surfacing & stabilized base 1,391.0    SQYD 14.20 19,752.20 25.00 34,775.00 10.00 13,910.00    
202-02-H removal of guard rail 280      LNFT 4.75 1,330.00 3.75 1,050.00 15.00 4,200.00    
203-02 drainage excavation 489      CUYD 23.60 11,540.40 15.00 7,335.00 15.00 7,335.00    
203-05 excavation and embankment lump      LUMP 79,600.00 79,600.00 52,487.50 52,487.50 65,000.00 65,000.00    
204-02 temporary hay or straw bales 100      EACH 10.60 1,060.00 8.75 875.00 10.00 1,000.00    
204-06 temporary silt fencing 1,600      LNFT 2.85 4,560.00 3.75 6,000.00 5.00 8,000.00    
302-02-D class ii base course (8 1/2" thick) 2,116.5    SQYD 44.70 94,607.55 22.50 47,621.25 31.00 65,611.50    
304-01 lime 189.00   TON 177.00 33,453.00 162.50 30,712.50 200.00 37,800.00    
304-04-D lime treatment (type d) (12" thick) 1,200      SQYD 4.75 5,700.00 3.75 4,500.00 15.00 18,000.00    
502-01 superpave asphaltic concrete 433.4    TON 189.00 81,912.60 225.00 97,515.00 270.00 117,018.00    
704-03 blocked out guard rail 150.0    LNFT 21.20 3,180.00 21.25 3,187.50 25.00 3,750.00    
704-08-B guard rail transitions (double thrie beam) 100.0    LNFT 64.70 6,470.00 56.25 5,625.00 75.00 7,500.00    
704-11-A guard rail end treatment (flared) 4      EACH 2,240.00 8,960.00 2,000.00 8,000.00 3,000.00 12,000.00    
705-02 combination mesh & barbed wire fence 225      LNFT 11.80 2,655.00 5.00 1,125.00 15.00 3,375.00    
708-01 right-of-way monument 10      EACH 283.00 2,830.00 137.50 1,375.00 400.00 4,000.00    
708-02 right-of-way monument witness post 10      EACH 248.00 2,480.00 125.00 1,250.00 400.00 4,000.00    
712-04 flexible revetment 345      SQYD 79.20 27,324.00 81.25 28,031.25 90.00 31,050.00    
713-01 temporary signs & barricades lump      LUMP 7,690.00 7,690.00 10,000.00 10,000.00 15,000.00 15,000.00    
716-01-A mulch (vegetative) 4.6    TON 471.00 2,166.60 8,750.00 40,250.00 1,500.00 6,900.00    
717-01 seeding 80      LB 11.80 944.00 25.00 2,000.00 25.00 2,000.00    
718-01 fertilizer 2,670      LB 0.44 1,174.80 5.00 13,350.00 1.00 2,670.00    
720-01-E erosion control system, flexible channel liner (type e) 487      SQYD 5.90 2,873.30 3.75 1,826.25 8.00 3,896.00    
720-01-F erosion control system, flexible channel liner (type f) 307      SQYD 5.90 1,811.30 3.75 1,151.25 8.00 2,456.00    
722-01 project site laboratory 1      EACH 8,830.00 8,830.00 12,500.00 12,500.00 20,000.00 20,000.00    
727-01 mobilization lump      LUMP 96,000.00 96,000.00 112,500.00 112,500.00 94,500.00 94,500.00    
729-16-C object marker assembly (type 3) 4      EACH 94.20 376.80 75.00 300.00 200.00 800.00    
731-02 reflectorized raised pavement markers 17      EACH 11.80 200.60 6.25 106.25 30.00 510.00    
732-02-A plastic pavement striping (solid line) (4" width) 0.252  MILE 11,800.00 2,973.60 9,750.00 2,457.00 15,000.00 3,780.00    
732-03-A plastic pavement striping (broken line)(4" width) 0.126  MILE 5,890.00 742.14 2,962.50 373.28 8,500.00 1,071.00    
740-01 construction layout lump      LUMP 11,000.00 11,000.00 31,250.00 31,250.00 15,000.00 15,000.00    
804-01-B precast concrete piles (14") 1,140      LNFT 48.60 55,404.00 93.75 106,875.00 68.00 77,520.00    
804-12 loading permanent piles 1      EACH 5,100.00 5,100.00 1,250.00 1,250.00 1.00 1.00    
805-01-F class a concrete (bents) 29.12   CUYD 708.00 20,616.96 1,500.00 43,680.00 1,600.00 46,592.00    
805-03 class aa concrete 108.60   CUYD 600.00 65,160.00 1,250.00 135,750.00 1,300.00 141,180.00    
806-01 deformed reinforcing steel 24,321      LB 1.00 24,321.00 1.13 27,482.73 1.50 36,481.50    
810-01 concrete railing (barrier) 160.00   LNFT 118.00 18,880.00 56.25 9,000.00 100.00 16,000.00    
813-01 concrete approach slabs 275.56   SQYD 285.00 78,534.60 250.00 68,890.00 285.00 78,534.60    
                       
 CONTRACTOR TOTAL       977,976.45   1,012,206.76   1,058,441.60    