Letting of 2/27/2008 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 454-01-0080
Parish: E BATON ROUGE
Routes: I-12
Description: MILLERVILLE ROAD - LIVINGSTON PARISH LINE
Type Const: grading, drainage structures, cold planing asphaltic pvmt, stone matrix asphalt,
superpave asphaltic concreteoverlay, concrete patching, underseal concrete slab, and related work
Estimated Construction Cost: $4,620,613.11
Maximum Number of Days Allowed for Construction: 185
Calculated Daily User Cost: $5,000.00
 
RankLicenseBidderConstruction Bid Bidder's Proposed
Contract Time
Total Bid
1 00481 COASTAL BRIDGE CO., L.L.C. $5,531,766.99 150 $6,281,766.99
2 00046 BARBER BROS. CONTRACTING CO., L.L.C $7,501,325.60 165 $8,326,325.60
3 46547 KNISH CORPORATION $8,057,961.32 60 $8,357,961.32
 
Item Number Item Description Quantity Unit of Measure - 1 -
COASTAL BRIDGE CO., L.L.C.
- 2 -
BARBER BROS. CONTRACTING CO., L.L.C
- 3 -
KNISH CORPORATION

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-I removal of sign mounting (3 1/2" size post) 14      EACH 625.00 8,750.00 1,000.00 14,000.00 625.00 8,750.00    
202-02-J removal of sign mounting (w6 x 12 size post) 6      EACH 900.00 5,400.00 1,200.00 7,200.00 900.00 5,400.00    
202-02-K removal of sign mounting (w8 x 24 size post) 16      EACH 1,100.00 17,600.00 1,500.00 24,000.00 1,100.00 17,600.00    
202-02-L removal of sign mounting (w10 x 33 size post) 2      EACH 1,200.00 2,400.00 2,000.00 4,000.00 1,200.00 2,400.00    
203-07 borrow (vehicular measurement) 2,790      CUYD 25.00 69,750.00 50.00 139,500.00 50.00 139,500.00    
204-02 temporary hay or straw bales 112      EACH 10.00 1,120.00 20.00 2,240.00 9.00 1,008.00    
204-06 temporary silt fencing 33,103      LNFT 2.00 66,206.00 1.50 49,654.50 3.75 124,136.25    
502-01 superpave asphaltic concrete 15,256.8    TON 100.00 1,525,680.00 120.00 1,830,816.00 151.00 2,303,776.80    
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
200.0    TON 150.00 30,000.00 200.00 40,000.00 250.00 50,000.00    
508-01 asphalt concrete (sma) wearing course 5,084.7    TON 140.00 711,858.00 200.00 1,016,940.00 150.00 762,705.00    
509-01 cold planing asphaltic pavement 27,363      SQYD 3.00 82,089.00 5.00 136,815.00 5.00 136,815.00    
509-02 contractor retained reclaimed asphaltic pavement - 570      CUYD 1.00 - 570.00 0.00 0.00 0.01 - 5.70    
510-01-A pavement patching (6" minimum thickness) 100      SQYD 80.00 8,000.00 120.00 12,000.00 250.00 25,000.00    
602-02-A cleaning and resealing existing longitudinal pavement
joints
63,496      LNFT 0.25 15,874.00 3.00 190,488.00 2.95 187,313.20    
602-02-B cleaning and resealing existing transverse pavement
joints
30,684      LNFT 1.50 46,026.00 5.00 153,420.00 3.35 102,791.40    
602-03 cleaning and sealing random cracks 635      LNFT 5.00 3,175.00 10.00 6,350.00 11.85 7,524.75    
602-05-S-01 full depth patching of jointed conc pvmt (14" thick)
(16.0 sq yds & under)
390.1    SQYD 300.00 117,030.00 800.00 312,080.00 825.00 321,832.50    
602-05-S-02 full depth patching of jointed conc pvmt (14" thick)
(16.1-48.0 sq yds)
253.1    SQYD 250.00 63,275.00 800.00 202,480.00 825.00 208,807.50    
602-07 patching continuously reinforced concrete pavement 1,909.5    SQYD 300.00 572,850.00 800.00 1,527,600.00 745.00 1,422,577.50    
713-01 temporary signs & barricades lump      LUMP 575,000.00 575,000.00 500,000.00 500,000.00 790,626.00 790,626.00    
713-02-C temporary pavement markings (8" width) 10,930      LNFT 0.35 3,825.50 0.50 5,465.00 0.35 3,825.50    
713-02-E temporary pavement markings (24" width) 1,209      LNFT 1.00 1,209.00 1.20 1,450.80 0.90 1,088.10    
713-03-A temporary pavement markings (broken line)(4" width)(4'
length)
18.882  MILE 425.00 8,024.85 350.00 6,608.70 600.00 11,329.20    
713-03-B temporary pavement markings (broken line)(4" width)
(10' length)
12.588  MILE 400.00 5,035.20 450.00 5,664.60 395.00 4,972.26    
713-04-A temporary pavement markings (solid line)(4" width) 27.228  MILE 800.00 21,782.40 900.00 24,505.20 790.00 21,510.12    
713-05-A temporary pavement legends and symbols (arrow) 36      EACH 50.00 1,800.00 60.00 2,160.00 50.00 1,800.00    
713-05-C temporary pavement legends and symbols (only) 18      EACH 50.00 900.00 60.00 1,080.00 50.00 900.00    
727-01 mobilization lump      LUMP 775,000.00 775,000.00 500,000.00 500,000.00 589,700.00 589,700.00    
729-08-B mounting (3 1/2" post) 14      EACH 800.00 11,200.00 1,500.00 21,000.00 780.00 10,920.00    
729-08-F mounting (w6 x 12) 6      EACH 900.00 5,400.00 2,000.00 12,000.00 875.00 5,250.00    
729-08-H mounting (w8 x 24) 16      EACH 1,800.00 28,800.00 3,000.00 48,000.00 1,800.00 28,800.00    
729-08-I mounting (w10 x 33) 2      EACH 2,200.00 4,400.00 4,000.00 8,000.00 2,150.00 4,300.00    
729-16-B object marker assembly (type 2) 20      EACH 50.00 1,000.00 80.00 1,600.00 50.00 1,000.00    
729-16-C object marker assembly (type 3) 20      EACH 75.00 1,500.00 120.00 2,400.00 75.00 1,500.00    
729-17 milepost assembly (ground mounted) 4      EACH 600.00 2,400.00 800.00 3,200.00 100.00 400.00    
731-02 reflectorized raised pavement markers 3,042      EACH 5.10 15,514.20 6.00 18,252.00 5.10 15,514.20    
732-01-C plastic pavement striping (8" width) 3,643      LNFT 1.00 3,643.00 1.20 4,371.60 0.90 3,278.70    
732-01-D plastic pavement striping (12" width) 1,895      LNFT 1.75 3,316.25 2.00 3,790.00 1.75 3,316.25    
732-01-E plastic pavement striping (24" width) 403      LNFT 3.25 1,309.75 4.00 1,612.00 3.25 1,309.75    
732-02-A plastic pavement striping (solid line) (4" width) 9.076  MILE 2,600.00 23,597.60 3,000.00 27,228.00 2,590.00 23,506.84    
732-03-A plastic pavement striping (broken line)(4" width) 6.294  MILE 710.00 4,468.74 800.00 5,035.20 710.00 4,468.74    
739-01 hydro-seeding 6.84   ACRE 950.00 6,498.00 1,200.00 8,208.00 1,800.00 12,312.00    
740-01 construction layout lump      LUMP 375,000.00 375,000.00 20,000.00 20,000.00 21,500.00 21,500.00    
S-001 rumble strips (ground-in) 8.0    MILE 2,500.00 20,000.00 1,200.00 9,600.00 969.37 7,754.96    
S-002 dynamic message sign unit 8      EACH 12,000.00 96,000.00 25,000.00 200,000.00 11,445.00 91,560.00    
S-003 milling concrete pavement (3/4" avg depth) 4,300      SQYD 8.00 34,400.00 35.00 150,500.00 35.00 150,500.00    
S-004 sawing and sealing longitudinal joints in asphaltic
concrete overlay
34,762      LNFT 1.25 43,452.50 3.00 104,286.00 3.50 121,667.00    
S-005 sawing and sealing transverse joints in asphaltic
concrete overlay
14,256      LNFT 1.25 17,820.00 3.00 42,768.00 4.50 64,152.00    
S-006 sawcuts in asphaltic concrete lifts 147,054      LNFT 0.50 73,527.00 0.50 73,527.00 1.50 220,581.00    
S-008 cleaning shoulder underdrain outlets 1,943      LNFT 10.00 19,430.00 10.00 19,430.00 5.50 10,686.50    
                       
 ITEM TOTAL (CONSTRUCTION BID)       5,531,766.99   7,501,325.60   8,057,961.32    
 NUMBER OF DAYS BID AT $5,000 PER DAY.       750,000.00   825,000.00   300,000.00    
 TOTAL BID       6,281,766.99   8,326,325.60   8,357,961.32    