| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - COASTAL BRIDGE CO., L.L.C. |
- 2 - BARBER BROS. CONTRACTING CO., L.L.C |
- 3 - KNISH CORPORATION |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-I |
removal of sign mounting (3 1/2" size post)
|
14   |
EACH |
625.00 |
8,750.00 |
1,000.00 |
14,000.00 |
625.00 |
8,750.00 |
|
|
| 202-02-J |
removal of sign mounting (w6 x 12 size post)
|
6   |
EACH |
900.00 |
5,400.00 |
1,200.00 |
7,200.00 |
900.00 |
5,400.00 |
|
|
| 202-02-K |
removal of sign mounting (w8 x 24 size post)
|
16   |
EACH |
1,100.00 |
17,600.00 |
1,500.00 |
24,000.00 |
1,100.00 |
17,600.00 |
|
|
| 202-02-L |
removal of sign mounting (w10 x 33 size post)
|
2   |
EACH |
1,200.00 |
2,400.00 |
2,000.00 |
4,000.00 |
1,200.00 |
2,400.00 |
|
|
| 203-07 |
borrow (vehicular measurement)
|
2,790   |
CUYD |
25.00 |
69,750.00 |
50.00 |
139,500.00 |
50.00 |
139,500.00 |
|
|
| 204-02 |
temporary hay or straw bales
|
112   |
EACH |
10.00 |
1,120.00 |
20.00 |
2,240.00 |
9.00 |
1,008.00 |
|
|
| 204-06 |
temporary silt fencing
|
33,103   |
LNFT |
2.00 |
66,206.00 |
1.50 |
49,654.50 |
3.75 |
124,136.25 |
|
|
| 502-01 |
superpave asphaltic concrete
|
15,256.8 |
TON |
100.00 |
1,525,680.00 |
120.00 |
1,830,816.00 |
151.00 |
2,303,776.80 |
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
200.0 |
TON |
150.00 |
30,000.00 |
200.00 |
40,000.00 |
250.00 |
50,000.00 |
|
|
| 508-01 |
asphalt concrete (sma) wearing course
|
5,084.7 |
TON |
140.00 |
711,858.00 |
200.00 |
1,016,940.00 |
150.00 |
762,705.00 |
|
|
| 509-01 |
cold planing asphaltic pavement
|
27,363   |
SQYD |
3.00 |
82,089.00 |
5.00 |
136,815.00 |
5.00 |
136,815.00 |
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 570   |
CUYD |
1.00 |
- 570.00 |
0.00 |
0.00 |
0.01 |
- 5.70 |
|
|
| 510-01-A |
pavement patching (6" minimum thickness)
|
100   |
SQYD |
80.00 |
8,000.00 |
120.00 |
12,000.00 |
250.00 |
25,000.00 |
|
|
| 602-02-A |
cleaning and resealing existing longitudinal pavement
joints |
63,496   |
LNFT |
0.25 |
15,874.00 |
3.00 |
190,488.00 |
2.95 |
187,313.20 |
|
|
| 602-02-B |
cleaning and resealing existing transverse pavement
joints |
30,684   |
LNFT |
1.50 |
46,026.00 |
5.00 |
153,420.00 |
3.35 |
102,791.40 |
|
|
| 602-03 |
cleaning and sealing random cracks
|
635   |
LNFT |
5.00 |
3,175.00 |
10.00 |
6,350.00 |
11.85 |
7,524.75 |
|
|
| 602-05-S-01 |
full depth patching of jointed conc pvmt (14" thick)
(16.0 sq yds & under) |
390.1 |
SQYD |
300.00 |
117,030.00 |
800.00 |
312,080.00 |
825.00 |
321,832.50 |
|
|
| 602-05-S-02 |
full depth patching of jointed conc pvmt (14" thick)
(16.1-48.0 sq yds) |
253.1 |
SQYD |
250.00 |
63,275.00 |
800.00 |
202,480.00 |
825.00 |
208,807.50 |
|
|
| 602-07 |
patching continuously reinforced concrete pavement
|
1,909.5 |
SQYD |
300.00 |
572,850.00 |
800.00 |
1,527,600.00 |
745.00 |
1,422,577.50 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
575,000.00 |
575,000.00 |
500,000.00 |
500,000.00 |
790,626.00 |
790,626.00 |
|
|
| 713-02-C |
temporary pavement markings (8" width)
|
10,930   |
LNFT |
0.35 |
3,825.50 |
0.50 |
5,465.00 |
0.35 |
3,825.50 |
|
|
| 713-02-E |
temporary pavement markings (24" width)
|
1,209   |
LNFT |
1.00 |
1,209.00 |
1.20 |
1,450.80 |
0.90 |
1,088.10 |
|
|
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
18.882 |
MILE |
425.00 |
8,024.85 |
350.00 |
6,608.70 |
600.00 |
11,329.20 |
|
|
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
12.588 |
MILE |
400.00 |
5,035.20 |
450.00 |
5,664.60 |
395.00 |
4,972.26 |
|
|
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
27.228 |
MILE |
800.00 |
21,782.40 |
900.00 |
24,505.20 |
790.00 |
21,510.12 |
|
|
| 713-05-A |
temporary pavement legends and symbols (arrow)
|
36   |
EACH |
50.00 |
1,800.00 |
60.00 |
2,160.00 |
50.00 |
1,800.00 |
|
|
| 713-05-C |
temporary pavement legends and symbols (only)
|
18   |
EACH |
50.00 |
900.00 |
60.00 |
1,080.00 |
50.00 |
900.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
775,000.00 |
775,000.00 |
500,000.00 |
500,000.00 |
589,700.00 |
589,700.00 |
|
|
| 729-08-B |
mounting (3 1/2" post)
|
14   |
EACH |
800.00 |
11,200.00 |
1,500.00 |
21,000.00 |
780.00 |
10,920.00 |
|
|
| 729-08-F |
mounting (w6 x 12)
|
6   |
EACH |
900.00 |
5,400.00 |
2,000.00 |
12,000.00 |
875.00 |
5,250.00 |
|
|
| 729-08-H |
mounting (w8 x 24)
|
16   |
EACH |
1,800.00 |
28,800.00 |
3,000.00 |
48,000.00 |
1,800.00 |
28,800.00 |
|
|
| 729-08-I |
mounting (w10 x 33)
|
2   |
EACH |
2,200.00 |
4,400.00 |
4,000.00 |
8,000.00 |
2,150.00 |
4,300.00 |
|
|
| 729-16-B |
object marker assembly (type 2)
|
20   |
EACH |
50.00 |
1,000.00 |
80.00 |
1,600.00 |
50.00 |
1,000.00 |
|
|
| 729-16-C |
object marker assembly (type 3)
|
20   |
EACH |
75.00 |
1,500.00 |
120.00 |
2,400.00 |
75.00 |
1,500.00 |
|
|
| 729-17 |
milepost assembly (ground mounted)
|
4   |
EACH |
600.00 |
2,400.00 |
800.00 |
3,200.00 |
100.00 |
400.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
3,042   |
EACH |
5.10 |
15,514.20 |
6.00 |
18,252.00 |
5.10 |
15,514.20 |
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
3,643   |
LNFT |
1.00 |
3,643.00 |
1.20 |
4,371.60 |
0.90 |
3,278.70 |
|
|
| 732-01-D |
plastic pavement striping (12" width)
|
1,895   |
LNFT |
1.75 |
3,316.25 |
2.00 |
3,790.00 |
1.75 |
3,316.25 |
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
403   |
LNFT |
3.25 |
1,309.75 |
4.00 |
1,612.00 |
3.25 |
1,309.75 |
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
9.076 |
MILE |
2,600.00 |
23,597.60 |
3,000.00 |
27,228.00 |
2,590.00 |
23,506.84 |
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
6.294 |
MILE |
710.00 |
4,468.74 |
800.00 |
5,035.20 |
710.00 |
4,468.74 |
|
|
| 739-01 |
hydro-seeding
|
6.84 |
ACRE |
950.00 |
6,498.00 |
1,200.00 |
8,208.00 |
1,800.00 |
12,312.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
375,000.00 |
375,000.00 |
20,000.00 |
20,000.00 |
21,500.00 |
21,500.00 |
|
|
| S-001 |
rumble strips (ground-in)
|
8.0 |
MILE |
2,500.00 |
20,000.00 |
1,200.00 |
9,600.00 |
969.37 |
7,754.96 |
|
|
| S-002 |
dynamic message sign unit
|
8   |
EACH |
12,000.00 |
96,000.00 |
25,000.00 |
200,000.00 |
11,445.00 |
91,560.00 |
|
|
| S-003 |
milling concrete pavement (3/4" avg depth)
|
4,300   |
SQYD |
8.00 |
34,400.00 |
35.00 |
150,500.00 |
35.00 |
150,500.00 |
|
|
| S-004 |
sawing and sealing longitudinal joints in asphaltic
concrete overlay |
34,762   |
LNFT |
1.25 |
43,452.50 |
3.00 |
104,286.00 |
3.50 |
121,667.00 |
|
|
| S-005 |
sawing and sealing transverse joints in asphaltic
concrete overlay |
14,256   |
LNFT |
1.25 |
17,820.00 |
3.00 |
42,768.00 |
4.50 |
64,152.00 |
|
|
| S-006 |
sawcuts in asphaltic concrete lifts
|
147,054   |
LNFT |
0.50 |
73,527.00 |
0.50 |
73,527.00 |
1.50 |
220,581.00 |
|
|
| S-008 |
cleaning shoulder underdrain outlets
|
1,943   |
LNFT |
10.00 |
19,430.00 |
10.00 |
19,430.00 |
5.50 |
10,686.50 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | ITEM TOTAL (CONSTRUCTION BID) |
|
|
|
5,531,766.99 |
|
7,501,325.60 |
|
8,057,961.32 |
|
|
| | NUMBER OF DAYS BID AT $5,000 PER DAY. |
|
|
|
750,000.00 |
|
825,000.00 |
|
300,000.00 |
|
|
| | TOTAL BID |
|
|
|
6,281,766.99 |
|
8,326,325.60 |
|
8,357,961.32 |
|
|
|