Letting of 2/27/2008 LA DOTD Headquarters


REBID
go back
Go Back
DBE GOAL FED
Lead Project: 057-02-0028
Parish: ACADIA
Routes: LA 13
Description: HIST. PARKERSON AVE. REDEVELOPMENT-FIRST ST. TO COURT CIRCLE
Type Const: class ii bc, drain struct, superpave acp, pccp, landscaping, lighting, traffic signals,
water and sewer lines, and related work.
Estimated Construction Cost: $4,518,515.65
 
RankLicenseBidderConstruction Bid
1 00568 MERRICK CONSTRUCTION CO. $4,989,764.05
2 38299 K.A.S. CONSTRUCTION LLC $5,444,898.40
 
Item Number Item Description Quantity Unit of Measure - 1 -
MERRICK CONSTRUCTION CO.
- 2 -
K.A.S. CONSTRUCTION LLC

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-01 removal of structures & obstructions lump      LUMP 200,000.00 200,000.00 160,000.00 160,000.00        
202-02-C removal of portland cement concrete pavement 13,133      SQYD 4.00 52,532.00 15.00 196,995.00        
202-02-D removal of concrete walks & drives 4,021      SQYD 3.75 15,078.75 12.00 48,252.00        
202-02-I removal of traffic signal equipment lump      LUMP 900.00 900.00 15,000.00 15,000.00        
203-05 excavation & embankment lump      LUMP 50,000.00 50,000.00 400,000.00 400,000.00        
204-06 temporary silt fencing 400      LNFT 0.25 100.00 4.00 1,600.00        
302-01 class ii base course 235.1    CUYD 80.00 18,808.00 105.00 24,685.50        
302-02-G class ii base course (5" thick) 118.0    SQYD 10.00 1,180.00 45.00 5,310.00        
302-02-H class ii base course (9" thick) 11,378.0    SQYD 30.00 341,340.00 41.00 466,498.00        
304-01 lime 144.85   TON 100.00 14,485.00 165.00 23,900.25        
304-04-D lime treatment (type d) (12" thick) 11,496      SQYD 0.50 5,748.00 3.00 34,488.00        
402-01 traffic maintenance aggregate (vehicular measurement) 600.0    CUYD 75.00 45,000.00 85.00 51,000.00        
502-01 superpave asphaltic concrete 200.0    TON 225.00 45,000.00 150.00 30,000.00        
509-01 cold planing asphaltic pavement 89      SQYD 45.00 4,005.00 25.00 2,225.00        
510-01-B pavement patching (12" minimum thickness) 150      SQYD 220.00 33,000.00 75.00 11,250.00        
601-01-G portland cement concrete pavement (8" thick) 10,338.0    SQYD 125.00 1,292,250.00 80.00 827,040.00        
601-01-O portland cement concrete pavement (12" thick) 112.0    SQYD 95.00 10,640.00 125.00 14,000.00        
701-03-F storm drain pipe (15" rcp/pcp) 1,341      LNFT 100.00 134,100.00 65.00 87,165.00        
701-03-G storm drain pipe (18" rcp/pcp) 267      LNFT 105.00 28,035.00 75.00 20,025.00        
701-03-I storm drain pipe (24" rcp/pcp) 146      LNFT 125.00 18,250.00 90.00 13,140.00        
701-03-M storm drain pipe (36" rcp/pcp) 45      LNFT 175.00 7,875.00 200.00 9,000.00        
701-07-C yard drain pipe (8") 20      LNFT 90.00 1,800.00 50.00 1,000.00        
702-02-B manholes (r-cb-11) 16      EACH 5,000.00 80,000.00 4,250.00 68,000.00        
702-03-A catch basins (cb-01) 1      EACH 4,000.00 4,000.00 3,500.00 3,500.00        
702-03-C catch basins (cb-06) 2      EACH 5,000.00 10,000.00 5,500.00 11,000.00        
702-03-G catch basins (cb-09) 30      EACH 4,000.00 120,000.00 5,875.00 176,250.00        
702-04-A adjusting manholes 3      EACH 2,000.00 6,000.00 1,850.00 5,550.00        
703-03 perforated pipe underdrains 1,578      LNFT 12.00 18,936.00 12.00 18,936.00        
703-04 nonperforated pipe underdrains 300      LNFT 100.00 30,000.00 13.00 3,900.00        
706-01-A concrete walk (4" thick) 4,215.0    SQYD 50.00 210,750.00 55.00 231,825.00        
706-02-C concrete drive (6" thick) 158.5    SQYD 60.00 9,510.00 85.00 13,472.50        
707-01 concrete curb 4,942.3    LNFT 15.00 74,134.50 12.00 59,307.60        
707-03 combination concrete curb & gutter 306.6    LNFT 35.00 10,731.00 38.00 11,650.80        
710-01 flowable fill 750      CUYD 100.00 75,000.00 95.00 71,250.00        
713-01 temporary signs & barricades lump      LUMP 250,000.00 250,000.00 150,000.00 150,000.00        
713-03-A temporary pavement markings (broken line)(4" width)(4'
length)
0.152  MILE 400.00 60.80 15,000.00 2,280.00        
713-03-A-01 temporary pvmt. markings (broken line)(4" w)(4' l)
(type i removable)
0.152  MILE 4,000.00 608.00 4,500.00 684.00        
713-04-A-01 temporary pavement markings (solid line)(4" width)
(type i removable)
1.218  MILE 16,000.00 19,488.00 16,500.00 20,097.00        
714-01 slab sodding 1,435      SQYD 4.00 5,740.00 4.00 5,740.00        
719-01-A plants (drake elm, ulmus parvifolia "drake", 3.5"-4"
cal, full canopy, b&b)
20      EACH 600.00 12,000.00 550.00 11,000.00        
719-01-B plants (windmill palm, trachycarpus fortunei, 8'-9' ht,
50 gal container)
27      EACH 500.00 13,500.00 2,500.00 67,500.00        
719-01-C plants ("big blue liriope, liriope muscari "big blue",
4" pot, spaced 12" o.c.)
1,410      EACH 4.00 5,640.00 2.50 3,525.00        
719-02 top dressing mulch (3" depth) 156      SQYD 10.00 1,560.00 10.00 1,560.00        
719-03 bed preparation (12" depth) 156      SQYD 27.00 4,212.00 15.00 2,340.00        
726-01 bedding material 227.0    CUYD 50.00 11,350.00 45.00 10,215.00        
727-01 mobilization lump      LUMP 490,000.00 490,000.00 520,000.00 520,000.00        
730-01 trenching and backfilling 4,500      LNFT 6.50 29,250.00 6.00 27,000.00        
730-02-A conduit with conductors (2" empty with #10 pull wire) 1,800      LNFT 6.00 10,800.00 4.00 7,200.00        
730-02-B conduit with conductors (4" empty with #10 pull wire) 3,200      LNFT 9.00 28,800.00 7.50 24,000.00        
730-02-C conduit with conductors (8" empty with #8 pull wire) 273      LNFT 20.00 5,460.00 17.00 4,641.00        
730-08-A electrical service point (second st pad) 1      EACH 3,375.00 3,375.00 2,600.00 2,600.00        
730-08-B electrical service point (fourth st pad) 1      EACH 3,375.00 3,375.00 2,700.00 2,700.00        
730-16-A underground junction box (type j junction box) 16      EACH 2,700.00 43,200.00 4,400.00 70,400.00        
730-16-B underground junction box (type h handhole) 8      EACH 3,200.00 25,600.00 5,250.00 42,000.00        
732-01-C plastic pavement striping (8" width) 1,100      LNFT 1.00 1,100.00 1.25 1,375.00        
732-01-E plastic pavement striping (24" width) 123      LNFT 3.50 430.50 4.00 492.00        
732-02-A plastic pavement striping (solid line) (4" width) 2.300  MILE 2,400.00 5,520.00 2.50 5.75        
732-04-F plastic pavement legends & symbols (handicap) 6      EACH 160.00 960.00 195.00 1,170.00        
732-05 removal of existing markings (sta 6+72 to 16+36) 0.183  MILE 7,000.00 1,281.00 8,500.00 1,555.50        
740-01 construction layout lump      LUMP 250,000.00 250,000.00 105,000.00 105,000.00        
740-02 utility oversight and coordination lump      LUMP 200,000.00 200,000.00 75,000.00 75,000.00        
741-01-A water main (2" pvc) 1,003      LNFT 13.00 13,039.00 12.00 12,036.00        
741-01-B water main (1" pvc) 202      LNFT 12.00 2,424.00 11.00 2,222.00        
741-05-A water service line (3/4" pvc) 544      LNFT 11.00 5,984.00 9.00 4,896.00        
741-11 adjusting water valve and meter box 10      EACH 35.00 350.00 750.00 7,500.00        
742-01 sanitary sewer pipe (6" sdr 26 pvc) 2,491      LNFT 25.00 62,275.00 27.00 67,257.00        
S-001 sawcut (per 1" depth) 21,562      LNFT 1.25 26,952.50 3.00 64,686.00        
S-002-A column foundation (type b) 32      EACH 800.00 25,600.00 1,800.00 57,600.00        
S-002-B column foundation (type c) 4      EACH 3,000.00 12,000.00 2,100.00 8,400.00        
S-003 furnish and install 18" x 2' bolt-down trench frame
and cover
84      EACH 500.00 42,000.00 700.00 58,800.00        
S-004 root barrier 840      LNFT 10.00 8,400.00 9.00 7,560.00        
S-005-A concrete pavers (2-3/8" holland stone i) 1,003.5    SQYD 75.00 75,262.50 185.00 185,647.50        
S-005-B concrete pavers (2-3/8" holland stone ii) 1,085.1    SQYD 75.00 81,382.50 190.00 206,169.00        
S-006 concrete stencils 1,341.6    SQYD 60.00 80,496.00 140.00 187,824.00        
S-007-A clean mainline 720      LNFT 2.50 1,800.00 2.75 1,980.00        
S-007-B tv mainline 720      LNFT 3.25 2,340.00 3.75 2,700.00        
S-008 6" x 6" wye cleanout 40      EACH 350.00 14,000.00 850.00 34,000.00        
S-009-A internal repair 14" sewer line 720      LNFT 63.00 45,360.00 75.00 54,000.00        
S-009-B reconnect sewer services 40      EACH 100.00 4,000.00 125.00 5,000.00        
S-010 extra excavation to lower service 2 to 6 ft 740      LNFT 20.00 14,800.00 40.00 29,600.00        
S-011 select backfill for sewer services 655      CUYD 25.00 16,375.00 45.00 29,475.00        
S-012 excavate for service line defect (to determine origin) 9      EACH 350.00 3,150.00 2,500.00 22,500.00        
S-013 sewer service riser 6      EACH 1,000.00 6,000.00 750.00 4,500.00        
S-014 backflow preventer and valve(3") 1      EACH 19,100.00 19,100.00 2,850.00 2,850.00        
S-015 quick connect water valve 27      EACH 525.00 14,175.00 1,200.00 32,400.00        
S-016 dynamic message sign 4      EACH 5,000.00 20,000.00 19,500.00 78,000.00        
                       
 CONTRACTOR TOTAL       4,989,764.05   5,444,898.40        