| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - MERRICK CONSTRUCTION CO. |
- 2 - K.A.S. CONSTRUCTION LLC |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
200,000.00 |
200,000.00 |
160,000.00 |
160,000.00 |
|
|
|
|
| 202-02-C |
removal of portland cement concrete pavement
|
13,133   |
SQYD |
4.00 |
52,532.00 |
15.00 |
196,995.00 |
|
|
|
|
| 202-02-D |
removal of concrete walks & drives
|
4,021   |
SQYD |
3.75 |
15,078.75 |
12.00 |
48,252.00 |
|
|
|
|
| 202-02-I |
removal of traffic signal equipment
|
lump |
LUMP |
900.00 |
900.00 |
15,000.00 |
15,000.00 |
|
|
|
|
| 203-05 |
excavation & embankment
|
lump |
LUMP |
50,000.00 |
50,000.00 |
400,000.00 |
400,000.00 |
|
|
|
|
| 204-06 |
temporary silt fencing
|
400   |
LNFT |
0.25 |
100.00 |
4.00 |
1,600.00 |
|
|
|
|
| 302-01 |
class ii base course
|
235.1 |
CUYD |
80.00 |
18,808.00 |
105.00 |
24,685.50 |
|
|
|
|
| 302-02-G |
class ii base course (5" thick)
|
118.0 |
SQYD |
10.00 |
1,180.00 |
45.00 |
5,310.00 |
|
|
|
|
| 302-02-H |
class ii base course (9" thick)
|
11,378.0 |
SQYD |
30.00 |
341,340.00 |
41.00 |
466,498.00 |
|
|
|
|
| 304-01 |
lime
|
144.85 |
TON |
100.00 |
14,485.00 |
165.00 |
23,900.25 |
|
|
|
|
| 304-04-D |
lime treatment (type d) (12" thick)
|
11,496   |
SQYD |
0.50 |
5,748.00 |
3.00 |
34,488.00 |
|
|
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
600.0 |
CUYD |
75.00 |
45,000.00 |
85.00 |
51,000.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
200.0 |
TON |
225.00 |
45,000.00 |
150.00 |
30,000.00 |
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
89   |
SQYD |
45.00 |
4,005.00 |
25.00 |
2,225.00 |
|
|
|
|
| 510-01-B |
pavement patching (12" minimum thickness)
|
150   |
SQYD |
220.00 |
33,000.00 |
75.00 |
11,250.00 |
|
|
|
|
| 601-01-G |
portland cement concrete pavement (8" thick)
|
10,338.0 |
SQYD |
125.00 |
1,292,250.00 |
80.00 |
827,040.00 |
|
|
|
|
| 601-01-O |
portland cement concrete pavement (12" thick)
|
112.0 |
SQYD |
95.00 |
10,640.00 |
125.00 |
14,000.00 |
|
|
|
|
| 701-03-F |
storm drain pipe (15" rcp/pcp)
|
1,341   |
LNFT |
100.00 |
134,100.00 |
65.00 |
87,165.00 |
|
|
|
|
| 701-03-G |
storm drain pipe (18" rcp/pcp)
|
267   |
LNFT |
105.00 |
28,035.00 |
75.00 |
20,025.00 |
|
|
|
|
| 701-03-I |
storm drain pipe (24" rcp/pcp)
|
146   |
LNFT |
125.00 |
18,250.00 |
90.00 |
13,140.00 |
|
|
|
|
| 701-03-M |
storm drain pipe (36" rcp/pcp)
|
45   |
LNFT |
175.00 |
7,875.00 |
200.00 |
9,000.00 |
|
|
|
|
| 701-07-C |
yard drain pipe (8")
|
20   |
LNFT |
90.00 |
1,800.00 |
50.00 |
1,000.00 |
|
|
|
|
| 702-02-B |
manholes (r-cb-11)
|
16   |
EACH |
5,000.00 |
80,000.00 |
4,250.00 |
68,000.00 |
|
|
|
|
| 702-03-A |
catch basins (cb-01)
|
1   |
EACH |
4,000.00 |
4,000.00 |
3,500.00 |
3,500.00 |
|
|
|
|
| 702-03-C |
catch basins (cb-06)
|
2   |
EACH |
5,000.00 |
10,000.00 |
5,500.00 |
11,000.00 |
|
|
|
|
| 702-03-G |
catch basins (cb-09)
|
30   |
EACH |
4,000.00 |
120,000.00 |
5,875.00 |
176,250.00 |
|
|
|
|
| 702-04-A |
adjusting manholes
|
3   |
EACH |
2,000.00 |
6,000.00 |
1,850.00 |
5,550.00 |
|
|
|
|
| 703-03 |
perforated pipe underdrains
|
1,578   |
LNFT |
12.00 |
18,936.00 |
12.00 |
18,936.00 |
|
|
|
|
| 703-04 |
nonperforated pipe underdrains
|
300   |
LNFT |
100.00 |
30,000.00 |
13.00 |
3,900.00 |
|
|
|
|
| 706-01-A |
concrete walk (4" thick)
|
4,215.0 |
SQYD |
50.00 |
210,750.00 |
55.00 |
231,825.00 |
|
|
|
|
| 706-02-C |
concrete drive (6" thick)
|
158.5 |
SQYD |
60.00 |
9,510.00 |
85.00 |
13,472.50 |
|
|
|
|
| 707-01 |
concrete curb
|
4,942.3 |
LNFT |
15.00 |
74,134.50 |
12.00 |
59,307.60 |
|
|
|
|
| 707-03 |
combination concrete curb & gutter
|
306.6 |
LNFT |
35.00 |
10,731.00 |
38.00 |
11,650.80 |
|
|
|
|
| 710-01 |
flowable fill
|
750   |
CUYD |
100.00 |
75,000.00 |
95.00 |
71,250.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
250,000.00 |
250,000.00 |
150,000.00 |
150,000.00 |
|
|
|
|
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
0.152 |
MILE |
400.00 |
60.80 |
15,000.00 |
2,280.00 |
|
|
|
|
| 713-03-A-01 |
temporary pvmt. markings (broken line)(4" w)(4' l)
(type i removable) |
0.152 |
MILE |
4,000.00 |
608.00 |
4,500.00 |
684.00 |
|
|
|
|
| 713-04-A-01 |
temporary pavement markings (solid line)(4" width)
(type i removable) |
1.218 |
MILE |
16,000.00 |
19,488.00 |
16,500.00 |
20,097.00 |
|
|
|
|
| 714-01 |
slab sodding
|
1,435   |
SQYD |
4.00 |
5,740.00 |
4.00 |
5,740.00 |
|
|
|
|
| 719-01-A |
plants (drake elm, ulmus parvifolia "drake", 3.5"-4"
cal, full canopy, b&b) |
20   |
EACH |
600.00 |
12,000.00 |
550.00 |
11,000.00 |
|
|
|
|
| 719-01-B |
plants (windmill palm, trachycarpus fortunei, 8'-9' ht,
50 gal container) |
27   |
EACH |
500.00 |
13,500.00 |
2,500.00 |
67,500.00 |
|
|
|
|
| 719-01-C |
plants ("big blue liriope, liriope muscari "big blue",
4" pot, spaced 12" o.c.) |
1,410   |
EACH |
4.00 |
5,640.00 |
2.50 |
3,525.00 |
|
|
|
|
| 719-02 |
top dressing mulch (3" depth)
|
156   |
SQYD |
10.00 |
1,560.00 |
10.00 |
1,560.00 |
|
|
|
|
| 719-03 |
bed preparation (12" depth)
|
156   |
SQYD |
27.00 |
4,212.00 |
15.00 |
2,340.00 |
|
|
|
|
| 726-01 |
bedding material
|
227.0 |
CUYD |
50.00 |
11,350.00 |
45.00 |
10,215.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
490,000.00 |
490,000.00 |
520,000.00 |
520,000.00 |
|
|
|
|
| 730-01 |
trenching and backfilling
|
4,500   |
LNFT |
6.50 |
29,250.00 |
6.00 |
27,000.00 |
|
|
|
|
| 730-02-A |
conduit with conductors (2" empty with #10 pull wire)
|
1,800   |
LNFT |
6.00 |
10,800.00 |
4.00 |
7,200.00 |
|
|
|
|
| 730-02-B |
conduit with conductors (4" empty with #10 pull wire)
|
3,200   |
LNFT |
9.00 |
28,800.00 |
7.50 |
24,000.00 |
|
|
|
|
| 730-02-C |
conduit with conductors (8" empty with #8 pull wire)
|
273   |
LNFT |
20.00 |
5,460.00 |
17.00 |
4,641.00 |
|
|
|
|
| 730-08-A |
electrical service point (second st pad)
|
1   |
EACH |
3,375.00 |
3,375.00 |
2,600.00 |
2,600.00 |
|
|
|
|
| 730-08-B |
electrical service point (fourth st pad)
|
1   |
EACH |
3,375.00 |
3,375.00 |
2,700.00 |
2,700.00 |
|
|
|
|
| 730-16-A |
underground junction box (type j junction box)
|
16   |
EACH |
2,700.00 |
43,200.00 |
4,400.00 |
70,400.00 |
|
|
|
|
| 730-16-B |
underground junction box (type h handhole)
|
8   |
EACH |
3,200.00 |
25,600.00 |
5,250.00 |
42,000.00 |
|
|
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
1,100   |
LNFT |
1.00 |
1,100.00 |
1.25 |
1,375.00 |
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
123   |
LNFT |
3.50 |
430.50 |
4.00 |
492.00 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
2.300 |
MILE |
2,400.00 |
5,520.00 |
2.50 |
5.75 |
|
|
|
|
| 732-04-F |
plastic pavement legends & symbols (handicap)
|
6   |
EACH |
160.00 |
960.00 |
195.00 |
1,170.00 |
|
|
|
|
| 732-05 |
removal of existing markings (sta 6+72 to 16+36)
|
0.183 |
MILE |
7,000.00 |
1,281.00 |
8,500.00 |
1,555.50 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
250,000.00 |
250,000.00 |
105,000.00 |
105,000.00 |
|
|
|
|
| 740-02 |
utility oversight and coordination
|
lump |
LUMP |
200,000.00 |
200,000.00 |
75,000.00 |
75,000.00 |
|
|
|
|
| 741-01-A |
water main (2" pvc)
|
1,003   |
LNFT |
13.00 |
13,039.00 |
12.00 |
12,036.00 |
|
|
|
|
| 741-01-B |
water main (1" pvc)
|
202   |
LNFT |
12.00 |
2,424.00 |
11.00 |
2,222.00 |
|
|
|
|
| 741-05-A |
water service line (3/4" pvc)
|
544   |
LNFT |
11.00 |
5,984.00 |
9.00 |
4,896.00 |
|
|
|
|
| 741-11 |
adjusting water valve and meter box
|
10   |
EACH |
35.00 |
350.00 |
750.00 |
7,500.00 |
|
|
|
|
| 742-01 |
sanitary sewer pipe (6" sdr 26 pvc)
|
2,491   |
LNFT |
25.00 |
62,275.00 |
27.00 |
67,257.00 |
|
|
|
|
| S-001 |
sawcut (per 1" depth)
|
21,562   |
LNFT |
1.25 |
26,952.50 |
3.00 |
64,686.00 |
|
|
|
|
| S-002-A |
column foundation (type b)
|
32   |
EACH |
800.00 |
25,600.00 |
1,800.00 |
57,600.00 |
|
|
|
|
| S-002-B |
column foundation (type c)
|
4   |
EACH |
3,000.00 |
12,000.00 |
2,100.00 |
8,400.00 |
|
|
|
|
| S-003 |
furnish and install 18" x 2' bolt-down trench frame
and cover |
84   |
EACH |
500.00 |
42,000.00 |
700.00 |
58,800.00 |
|
|
|
|
| S-004 |
root barrier
|
840   |
LNFT |
10.00 |
8,400.00 |
9.00 |
7,560.00 |
|
|
|
|
| S-005-A |
concrete pavers (2-3/8" holland stone i)
|
1,003.5 |
SQYD |
75.00 |
75,262.50 |
185.00 |
185,647.50 |
|
|
|
|
| S-005-B |
concrete pavers (2-3/8" holland stone ii)
|
1,085.1 |
SQYD |
75.00 |
81,382.50 |
190.00 |
206,169.00 |
|
|
|
|
| S-006 |
concrete stencils
|
1,341.6 |
SQYD |
60.00 |
80,496.00 |
140.00 |
187,824.00 |
|
|
|
|
| S-007-A |
clean mainline
|
720   |
LNFT |
2.50 |
1,800.00 |
2.75 |
1,980.00 |
|
|
|
|
| S-007-B |
tv mainline
|
720   |
LNFT |
3.25 |
2,340.00 |
3.75 |
2,700.00 |
|
|
|
|
| S-008 |
6" x 6" wye cleanout
|
40   |
EACH |
350.00 |
14,000.00 |
850.00 |
34,000.00 |
|
|
|
|
| S-009-A |
internal repair 14" sewer line
|
720   |
LNFT |
63.00 |
45,360.00 |
75.00 |
54,000.00 |
|
|
|
|
| S-009-B |
reconnect sewer services
|
40   |
EACH |
100.00 |
4,000.00 |
125.00 |
5,000.00 |
|
|
|
|
| S-010 |
extra excavation to lower service 2 to 6 ft
|
740   |
LNFT |
20.00 |
14,800.00 |
40.00 |
29,600.00 |
|
|
|
|
| S-011 |
select backfill for sewer services
|
655   |
CUYD |
25.00 |
16,375.00 |
45.00 |
29,475.00 |
|
|
|
|
| S-012 |
excavate for service line defect (to determine origin)
|
9   |
EACH |
350.00 |
3,150.00 |
2,500.00 |
22,500.00 |
|
|
|
|
| S-013 |
sewer service riser
|
6   |
EACH |
1,000.00 |
6,000.00 |
750.00 |
4,500.00 |
|
|
|
|
| S-014 |
backflow preventer and valve(3")
|
1   |
EACH |
19,100.00 |
19,100.00 |
2,850.00 |
2,850.00 |
|
|
|
|
| S-015 |
quick connect water valve
|
27   |
EACH |
525.00 |
14,175.00 |
1,200.00 |
32,400.00 |
|
|
|
|
| S-016 |
dynamic message sign
|
4   |
EACH |
5,000.00 |
20,000.00 |
19,500.00 |
78,000.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
4,989,764.05 |
|
5,444,898.40 |
|
|
|
|
|