| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - JOHN BAILEY, INC. |
- 2 - GILCHRIST CONSTRUCTION CO. LLC |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
125,000.00 |
125,000.00 |
20,000.00 |
20,000.00 |
|
|
|
|
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
35,000.00 |
35,000.00 |
20,000.00 |
20,000.00 |
|
|
|
|
| 202-02-D |
removal of concrete walks & drives
|
52   |
SQYD |
20.00 |
1,040.00 |
12.00 |
624.00 |
|
|
|
|
| 202-02-G |
removal of surfacing & stabilized base
|
22.5 |
SQYD |
10.00 |
225.00 |
20.00 |
450.00 |
|
|
|
|
| 202-02-I |
removal of asphaltic concrete pavement
|
563.6 |
SQYD |
25.00 |
14,090.00 |
8.00 |
4,508.80 |
|
|
|
|
| 203-01 |
general excavation
|
483   |
CUYD |
15.00 |
7,245.00 |
22.00 |
10,626.00 |
|
|
|
|
| 203-03 |
embankment
|
1,101   |
CUYD |
18.00 |
19,818.00 |
23.00 |
25,323.00 |
|
|
|
|
| 203-04 |
nonplastic embankment
|
15   |
CUYD |
80.00 |
1,200.00 |
180.00 |
2,700.00 |
|
|
|
|
| 204-02 |
temporary hay or straw bales
|
50   |
EACH |
25.00 |
1,250.00 |
20.00 |
1,000.00 |
|
|
|
|
| 204-06 |
temporary silt fencing
|
1,115   |
LNFT |
4.00 |
4,460.00 |
2.00 |
2,230.00 |
|
|
|
|
| 304-05 |
lime treatment (type e)
|
26.07 |
TON |
250.00 |
6,517.50 |
500.00 |
13,035.00 |
|
|
|
|
| 305-01-D |
subgrade layer (12" thick)
|
3,514   |
SQYD |
10.00 |
35,140.00 |
28.00 |
98,392.00 |
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
33.7 |
CUYD |
60.00 |
2,022.00 |
225.00 |
7,582.50 |
|
|
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
54.0 |
CUYD |
45.00 |
2,430.00 |
110.00 |
5,940.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
2,074.7 |
TON |
136.00 |
282,159.20 |
100.00 |
207,470.00 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
227.7 |
TON |
147.00 |
33,471.90 |
220.00 |
50,094.00 |
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
208   |
SQYD |
66.00 |
13,728.00 |
40.00 |
8,320.00 |
|
|
|
|
| 510-01-B |
pavement patching (12" minimum thickness)
|
300   |
SQYD |
70.00 |
21,000.00 |
140.00 |
42,000.00 |
|
|
|
|
| 701-03-F |
storm drain pipe (15" rcp/pcp)
|
53   |
LNFT |
90.00 |
4,770.00 |
190.00 |
10,070.00 |
|
|
|
|
| 701-03-G |
storm drain pipe (18" rcp/pcp)
|
246   |
LNFT |
96.00 |
23,616.00 |
200.00 |
49,200.00 |
|
|
|
|
| 701-04-D |
storm drain pipe arch (24" equiv. rcpa)
|
530   |
LNFT |
117.00 |
62,010.00 |
210.00 |
111,300.00 |
|
|
|
|
| 701-04-E |
storm drain pipe arch (30" equiv. rcpa)
|
113   |
LNFT |
135.00 |
15,255.00 |
215.00 |
24,295.00 |
|
|
|
|
| 701-04-G |
storm drain pipe arch (42" equiv. rcpa)
|
16   |
LNFT |
180.00 |
2,880.00 |
220.00 |
3,520.00 |
|
|
|
|
| 701-07-C |
yard drain pipe (8")
|
5   |
LNFT |
42.00 |
210.00 |
150.00 |
750.00 |
|
|
|
|
| 701-11-G |
reinforced concrete pipe arch (extension)(42" equiv.)
|
11   |
LNFT |
300.00 |
3,300.00 |
450.00 |
4,950.00 |
|
|
|
|
| 701-15 |
concrete collar
|
1   |
EACH |
960.00 |
960.00 |
1,200.00 |
1,200.00 |
|
|
|
|
| 701-16-G |
plastic pipe (extension)(18"rpecp)
|
8   |
LNFT |
108.00 |
864.00 |
300.00 |
2,400.00 |
|
|
|
|
| 702-03-A |
catch basins (cb-01)
|
6   |
EACH |
3,360.00 |
20,160.00 |
4,000.00 |
24,000.00 |
|
|
|
|
| 702-03-H |
catch basins (cb-05)
|
1   |
EACH |
1,440.00 |
1,440.00 |
6,800.00 |
6,800.00 |
|
|
|
|
| 705-06-A |
chain link fence (4-foot height)
|
18   |
LNFT |
50.00 |
900.00 |
9.50 |
171.00 |
|
|
|
|
| 706-02-C |
concrete drive (6" thick)
|
23.2 |
SQYD |
78.00 |
1,809.60 |
130.00 |
3,016.00 |
|
|
|
|
| 706-03-C |
incidental concrete paving (6" thick)
|
75.9 |
SQYD |
90.00 |
6,831.00 |
130.00 |
9,867.00 |
|
|
|
|
| 707-03 |
combination concrete curb & gutter
|
122.1 |
LNFT |
50.00 |
6,105.00 |
52.00 |
6,349.20 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
95,000.00 |
95,000.00 |
250,000.00 |
250,000.00 |
|
|
|
|
| 713-03-A-01 |
temporary pvmt. markings (broken line)(4" w)(4' l)
(type i removable) |
0.182 |
MILE |
2,000.00 |
364.00 |
600.00 |
109.20 |
|
|
|
|
| 713-04-A-01 |
temporary pavement markings (solid line) (4" width)
(type 1 removable) |
0.392 |
MILE |
19,000.00 |
7,448.00 |
20,000.00 |
7,840.00 |
|
|
|
|
| 716-01-A |
mulch (vegetative)
|
0.89 |
ACRE |
5,000.00 |
4,450.00 |
2,500.00 |
2,225.00 |
|
|
|
|
| 717-01 |
seeding
|
36   |
LB |
20.00 |
720.00 |
10.00 |
360.00 |
|
|
|
|
| 718-01 |
fertilizer
|
890   |
LB |
1.00 |
890.00 |
0.40 |
356.00 |
|
|
|
|
| 722-02 |
project site laboratory (equipped)
|
1   |
EACH |
25,000.00 |
25,000.00 |
40,000.00 |
40,000.00 |
|
|
|
|
| 726-01 |
bedding material
|
212.8 |
CUYD |
85.00 |
18,088.00 |
115.00 |
24,472.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
94,500.00 |
94,500.00 |
130,000.00 |
130,000.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
544   |
EACH |
6.12 |
3,329.28 |
6.50 |
3,536.00 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
1.156 |
MILE |
3,180.00 |
3,676.08 |
3,600.00 |
4,161.60 |
|
|
|
|
| 732-02-C |
plastic pavement striping (solid line) (8" width)
|
0.086 |
MILE |
6,360.00 |
546.96 |
7,500.00 |
645.00 |
|
|
|
|
| 732-02-E |
plastic pavement striping (solid line) (24" width)
|
0.039 |
MILE |
19,200.00 |
748.80 |
22,000.00 |
858.00 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
0.059 |
MILE |
1,010.00 |
59.59 |
1,000.00 |
59.00 |
|
|
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
1   |
EACH |
234.00 |
234.00 |
250.00 |
250.00 |
|
|
|
|
| 732-04-C |
plastic pavement legends & symbols (only)
|
1   |
EACH |
252.00 |
252.00 |
280.00 |
280.00 |
|
|
|
|
| 735-01 |
mailboxes
|
3   |
EACH |
50.00 |
150.00 |
6.50 |
19.50 |
|
|
|
|
| 735-02 |
mailbox supports (single)
|
3   |
EACH |
175.00 |
525.00 |
200.00 |
600.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
12,500.00 |
12,500.00 |
100,000.00 |
100,000.00 |
|
|
|
|
| S-001 |
raised asphaltic concrete median (6" thick)
|
133.0 |
SQYD |
70.00 |
9,310.00 |
160.00 |
21,280.00 |
|
|
|
|
| S-002 |
dynamic message sign unit
|
2   |
EACH |
10,000.00 |
20,000.00 |
10,000.00 |
20,000.00 |
|
|
|
|
| S-003 |
catch basin (sta. 114+05.87)
|
1   |
EACH |
9,720.00 |
9,720.00 |
8,500.00 |
8,500.00 |
|
|
|
|
| S-004 |
mechanical sewer plant effluent tie-in
|
3   |
EACH |
960.00 |
2,880.00 |
1,000.00 |
3,000.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,067,298.91 |
|
1,396,734.80 |
|
|
|
|
|