Letting of 2/27/2008 LA DOTD Headquarters


READV
go back
Go Back
 
Lead Project: 021-03-0031
Parish: DESOTO
Routes: US 171, US 84
Description: STATE ROUTE IN MANSFIELD
Type Const: grading, drainage struct, lime trmt, class ii base course, portland cement concrete
pavement, asphaltic concrete pavement, conc. slab span and girder bridges & related work
Estimated Construction Cost: $42,450,062.83
Maximum Number of Days Allowed for Construction: 775
Calculated Daily User Cost: $4,600.00
 
RankLicenseBidderConstruction Bid Bidder's Proposed
Contract Time
Total Bid
1 36374 BEST-YET BUILDERS, LLC $42,426,114.61 600 $45,186,114.61
2 39462 DENTON-JAMES LLC $42,616,118.26 775 $46,181,118.26
3 42076 AUSTIN BRIDGE & ROAD, LP $42,994,229.76 740 $46,398,229.76
4 12312 GILCHRIST CONSTRUCTION CO. LLC $43,412,711.98 749 $46,858,111.98
5 34567 JAMES CONSTRUCTION GROUP LLC $44,321,316.85 775 $47,886,316.85
 
Item Number Item Description Quantity Unit of Measure - 1 -
BEST-YET BUILDERS, LLC
- 2 -
DENTON-JAMES LLC
- 3 -
AUSTIN BRIDGE & ROAD, LP
- 4 -
GILCHRIST CONSTRUCTION CO. LLC
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing and grubbing lump      lump 300,000.00 300,000.00 1,000,000.00 1,000,000.00 1,090,000.00 1,090,000.00 825,000.00 825,000.00
202-01 removal of structures and obstructions lump      lump 520,000.00 520,000.00 600,000.00 600,000.00 125,000.00 125,000.00 150,000.00 150,000.00
202-02-A removal of 13.3 m x 30.5 m concrete slab span bridge
(sta. 11+476)
1      ea 55,000.00 55,000.00 24,000.00 24,000.00 50,000.00 50,000.00 20,000.00 20,000.00
202-02-B-01 removal of box culvert (sta. 5+440; 1-1200 mm x 914 mm
x 14.7 m)
1      ea 4,000.00 4,000.00 6,000.00 6,000.00 8,000.00 8,000.00 5,000.00 5,000.00
202-02-B-02 removal of box culvert (sta. 6+140; 1-609 mm x 609 mm
x 14.2 m)
1      ea 4,000.00 4,000.00 3,000.00 3,000.00 10,000.00 10,000.00 4,000.00 4,000.00
202-02-B-03 removal of box culvert (sta. 5+559; 6-1800 mm x
1800 mm x 20.42 m)
1      ea 55,000.00 55,000.00 20,000.00 20,000.00 14,000.00 14,000.00 14,000.00 14,000.00
202-02-B-04 removal of box culvert (sta. 7+371; 2-1900 mm x
1066 mm x 53.65 m)
1      ea 40,000.00 40,000.00 16,000.00 16,000.00 18,000.00 18,000.00 15,000.00 15,000.00
202-02-B-05 removal of box culvert (sta. 9+150; 3-1800 mm x
1800 mm x 15.60 m)
1      ea 15,000.00 15,000.00 12,000.00 12,000.00 12,000.00 12,000.00 11,000.00 11,000.00
202-02-B-06 removal of box culvert (sta. 9+869.500 (la 3103);
900 mm x 600 mm x 13.0 m)
1      ea 3,000.00 3,000.00 3,800.00 3,800.00 10,500.00 10,500.00 4,000.00 4,000.00
202-02-C removal of portland cement concrete pavement 52,670      sq m 4.85 255,449.50 7.50 395,025.00 4.60 242,282.00 5.80 305,486.00
202-02-D removal of concrete walks & drives 9,132      sq m 4.00 36,528.00 10.00 91,320.00 4.60 42,007.20 4.00 36,528.00
202-02-E removal of concrete curbs 799.8    ln m 16.50 13,196.70 9.00 7,198.20 7.00 5,598.60 10.00 7,998.00
202-02-F removal of concrete combination curb & gutter 947.5    ln m 16.50 15,633.75 15.00 14,212.50 9.00 8,527.50 6.00 5,685.00
202-02-G removal of surfacing & stabilized base 32,547.0    sq m 3.60 117,169.20 4.00 130,188.00 3.80 123,678.60 3.30 107,405.10
202-02-H removal of guard rail 124      ln m 14.00 1,736.00 15.00 1,860.00 25.00 3,100.00 40.00 4,960.00
202-02-01 removal of 7.6 m x 19.0 m single story wood frame
residence (rt. of sta. 5+115)(contains friable
asbestos)
1      each 1.00 1.00 1.00 1.00 8,000.00 8,000.00 1,000.00 1,000.00
202-02-02 removal of 13.3 m x 16.8 m wood frame residence (lt.
of sta. 5+236)
1      each 1.00 1.00 1.00 1.00 11,000.00 11,000.00 100.00 100.00
202-02-03 removal of 13.0 m x 14.6 m wood frame residence (rt.
of sta. 5+5+371)
1      each 1.00 1.00 1.00 1.00 9,000.00 9,000.00 1,000.00 1,000.00
202-02-04 removal of 8.8 m x 22.8 m wood frame residence (rt. of
sta. 5+756) (contains non-friable asbestos)
1      each 1.00 1.00 1.00 1.00 10,000.00 10,000.00 100.00 100.00
202-02-05 removal of 8.7 m x 22.5 m wood frame residence (rt. of
sta. 5+778) (contains friable asbestos)
1      each 1.00 1.00 1.00 1.00 10,000.00 10,000.00 100.00 100.00
202-02-06 removal of 3.7 m x 5.5 m metal storage building (rt.
of sta. 5+816)
1      each 1.00 1.00 1.00 1.00 1,000.00 1,000.00 100.00 100.00
202-02-07 removal of 9.9 m x 8.6 m wood frame residence (rt. of
sta. 5+916)(contains non-friable asbestos)
1      each 1.00 1.00 1.00 1.00 5,000.00 5,000.00 1,000.00 1,000.00
202-02-08 removal of 12.5 m x 10.7 m single story concrete block
building (rt. of sta. 6+408)
1      each 1.00 1.00 1.00 1.00 6,000.00 6,000.00 1,000.00 1,000.00
202-02-09 removal of 13.7 m x 8.7 m single story wood frame
residence (lt. of sta. 6+532)
1      each 1.00 1.00 1.00 1.00 3,500.00 3,500.00 100.00 100.00
202-02-10 removal of 18.2 m x 4.1 m mobile home (rt. of sta.
6+682)
1      each 1.00 1.00 1.00 1.00 4,000.00 4,000.00 100.00 100.00
202-02-11 removal of 8.7 m x 14.2 m wood frame residence (rt. of
sta. 6+850)
1      each 1.00 1.00 1.00 1.00 6,000.00 6,000.00 1,000.00 1,000.00
202-02-12 removal of 9.2 m x 15.4 m wood frame residence (rt. of
sta. 5+886)
1      each 1.00 1.00 1.00 1.00 5,200.00 5,200.00 1,000.00 1,000.00
202-02-13 removal of 11.9 m x 19.3 m single story wood frame
building (lt. of sta. 6+915)
1      each 1.00 1.00 1.00 1.00 9,000.00 9,000.00 100.00 100.00
202-02-14 removal of 8.8 m x 16.5 m wood frame residence (rt. of
sta. 6+970) (contains non-friable asbestos)
1      each 1.00 1.00 1.00 1.00 7,000.00 7,000.00 1,000.00 1,000.00
202-02-15 removal of 8.7 m x 13.5 m wood frame building (rt. of
sta. 7+040)(contains non-friable asbestos)
1      each 1.00 1.00 1.00 1.00 5,500.00 5,500.00 100.00 100.00
202-02-16 removal of 10.4 m x 12.0 m single story wood frame
residence (rt. of sta. 7+070)
1      each 1.00 1.00 1.00 1.00 4,300.00 4,300.00 100.00 100.00
202-02-17 removal of wood frame building (rt. of sta. 7+228) 1      each 1.00 1.00 1.00 1.00 4,300.00 4,300.00 1,000.00 1,000.00
202-02-18 removal of 7.5 m x 30.7 m metal gas canopy (rt. of
sta. 7+400)
1      each 1.00 1.00 1.00 1.00 8,000.00 8,000.00 1,000.00 1,000.00
202-02-19 removal of 10.0 m x 12.4 m wood garage (lt. of sta.
7+450)
1      each 1.00 1.00 1.00 1.00 5,000.00 5,000.00 1,000.00 1,000.00
202-02-20 removal of 7.6 m x 13.9 m single story wood frame
residence (rt. of sta. 7+555)(contains
non-friable asbestos)
1      each 1.00 1.00 1.00 1.00 4,000.00 4,000.00 1,000.00 1,000.00
202-02-21 removal of 8.9 m x 14.7 m single story wood frame
residence (lt. of sta. 7+632)(contains
non-friable asbestos)
1      each 1.00 1.00 1.00 1.00 7,000.00 7,000.00 1,000.00 1,000.00
202-02-22 removal of wood frame building (lt. of sta. 7+650)
(contains non-friable asbestos)
1      each 1.00 1.00 1.00 1.00 5,000.00 5,000.00 1,000.00 1,000.00
202-02-23 removal of 30.6 m x 9.1 m metal building (rt. of sta.
7+828)
1      each 1.00 1.00 1.00 1.00 9,000.00 9,000.00 1,000.00 1,000.00
202-02-24 removal of 18.5 m x 15.1 m metal building on slab (rt.
of sta. 7+838) (contains non-friable asbestos)
1      each 1.00 1.00 1.00 1.00 12,000.00 12,000.00 5,000.00 5,000.00
202-02-25 removal of 3.2 m x 6.1 m metal portable building (rt.
of sta. 7+855)
1      each 1.00 1.00 1.00 1.00 800.00 800.00 100.00 100.00
202-02-26 removal of 14.0 m x 19.8 m single story brick
residence (rt. of sta. 8+130)(contains friable
asbestos)
1      each 1.00 1.00 1.00 1.00 10,000.00 10,000.00 1,000.00 1,000.00
202-02-27 removal of 10.6 m x 18.6 m single story brick
residence (rt. of sta. 8+200)(contains
non-friable asbestos)
1      each 1.00 1.00 1.00 1.00 8,000.00 8,000.00 1,000.00 1,000.00
202-02-28 removal of 6.9 m x 9.2 m wood frame garage (rt. of
sta. 8+209)
1      each 1.00 1.00 1.00 1.00 2,000.00 2,000.00 100.00 100.00
202-02-29 removal of 9.3 m x 9.4 m single story wood frame
building (rt. of sta. 8+300)
1      each 1.00 1.00 1.00 1.00 5,000.00 5,000.00 100.00 100.00
202-02-30 removal of 3.0 m x 6.2 portable metal storage building
(rt. of sta. 8+774)
1      each 1.00 1.00 1.00 1.00 1,000.00 1,000.00 100.00 100.00
202-02-31 removal of 17.9 m x 8.3 m abandoned wood frame
building (rt. of sta. 9+423)(contains non-friable
asbestos)
1      each 1.00 1.00 1.00 1.00 7,000.00 7,000.00 1,000.00 1,000.00
202-02-32 removal of 16.1 m x 14.9 m single story wood frame
residence (lt. of sta. 10+102 mcenery street)
1      each 1.00 1.00 1.00 1.00 8,200.00 8,200.00 1,000.00 1,000.00
202-02-33 removal of storage building (lt. of sta.
10+102 mcenery street)
1      each 1.00 1.00 1.00 1.00 5,000.00 5,000.00 1,000.00 1,000.00
202-02-34 removal of 33.7 m x 35.8 m wood frame building (rt. of
sta. 10+180 polk street)(contains non-friable
asbestos)
1      each 1.00 1.00 1.00 1.00 40,000.00 40,000.00 8,000.00 8,000.00
202-02-35 removal of 10.2 m x 13.7 m brick bank teller building
(rt. of sta. 10+239 polk street)
1      each 1.00 1.00 1.00 1.00 5,000.00 5,000.00 1,000.00 1,000.00
202-02-36 removal of 10.2 m x 13.7 m drive thru canopy (rt. of
sta. 10+239 polk street)
1      each 1.00 1.00 1.00 1.00 6,000.00 6,000.00 1,000.00 1,000.00
202-02-37 removal of 18.3 m x 33.4 m brick building (lt. of sta.
10+250 polk street)
1      each 1.00 1.00 1.00 1.00 30,000.00 30,000.00 8,000.00 8,000.00
202-02-38 removal of 20.4 m x 26.4 m brick building (lt. of sta.
10+300 polk street) (contains non-friable
asbestos)
1      each 1.00 1.00 1.00 1.00 25,000.00 25,000.00 8,000.00 8,000.00
202-02-39 removal of 11.7 m x 12.7 m single story wood frame
residence (lt. of sta. 9+880 kings highway)
1      each 1.00 1.00 1.00 1.00 8,000.00 8,000.00 1,000.00 1,000.00
202-02-40 removal of 17.1 m x 3.8 m mobile home (rt. of sta.
9+884 kings highway)
1      each 1.00 1.00 1.00 1.00 4,000.00 4,000.00 1,000.00 1,000.00
202-02-41 removal of 19.1 m x 10.1 m single story wood frame
residence (rt. of sta. 9+910 kings highway)
1      each 1.00 1.00 1.00 1.00 8,000.00 8,000.00 1,000.00 1,000.00
202-02-42 removal of 20.7 m x 13.0 m single story wood frame
residence (rt. of sta. 9+928 kings highway)
1      each 1.00 1.00 1.00 1.00 9,000.00 9,000.00 1,000.00 1,000.00
202-02-43 removal of 23.3 m x 15.3 m moveable storage building
(lt. of sta. 9+980 kings highway)
1      each 1.00 1.00 1.00 1.00 12,000.00 12,000.00 1,000.00 1,000.00
202-02-44 removal of 7.4 m x 11.2 m single story wood frame
residence (lt. of sta. 10+100 miss. st.)(cont.
non-friable asb.)
1      each 1.00 1.00 1.00 1.00 3,500.00 3,500.00 1,000.00 1,000.00
202-02-45 removal of 11.0 m x 9.6 m wood frame residence (lt. of
sta. 10+055 clark street)(contains non-friable
asbestos)
1      each 1.00 1.00 1.00 1.00 4,500.00 4,500.00 1,000.00 1,000.00
202-07 plugging existing water wells 4      each 2,000.00 8,000.00 2,500.00 10,000.00 2,000.00 8,000.00 2,000.00 8,000.00
203-01 general excavation 592,600      cu m 3.37 1,997,062.00 3.40 2,014,840.00 2.80 1,659,280.00 4.45 2,637,070.00
203-02 drainage excavation 53,661      cu m 10.51 563,977.11 6.00 321,966.00 6.20 332,698.20 7.00 375,627.00
203-03 embankment 704,527      cu m 7.00 4,931,689.00 6.30 4,438,520.10 12.20 8,595,229.40 6.00 4,227,162.00
203-04 nonplastic embankment) 27      cu m 20.00 540.00 300.00 8,100.00 160.00 4,320.00 400.00 10,800.00
203-07-B borrow (vehicular measurement)(plastic soils) 96      cu m 20.00 1,920.00 100.00 9,600.00 15.00 1,440.00 100.00 9,600.00
204-02 temporary hay or straw bales 2,347      ea 10.00 23,470.00 10.00 23,470.00 15.00 35,205.00 45.00 105,615.00
204-03 temporary slope drains 790      ln m 33.00 26,070.00 45.00 35,550.00 40.00 31,600.00 40.00 31,600.00
204-05-A temporary sediment check dams (hay) 57      ea 100.00 5,700.00 150.00 8,550.00 120.00 6,840.00 750.00 42,750.00
204-05-B temporary sediment check dams (stone) 11      ea 500.00 5,500.00 700.00 7,700.00 500.00 5,500.00 1,450.00 15,950.00
204-06 temporary silt fencing 8,974      ln m 4.55 40,831.70 5.50 49,357.00 5.50 49,357.00 6.00 53,844.00
204-07 temporary stone construction entrance 6      ea 1,000.00 6,000.00 2,500.00 15,000.00 2,800.00 16,800.00 4,000.00 24,000.00
302-02-C-01 class ii base course (200 mm thick)(soil cement) 176,541.7    sq m 10.00 1,765,417.00 10.30 1,818,379.51 9.40 1,659,491.98 12.25 2,162,635.83
302-02-F-01 class ii base course (300 mm thick)(stone or recycled
pccp)
6,947.0    sq m 29.00 201,463.00 38.00 263,986.00 25.00 173,675.00 35.00 243,145.00
302-02-G-01 class ii base course (100 mm thick)(stone or recycled
pccp)
176,541.7    sq m 9.75 1,721,281.58 11.50 2,030,229.55 8.80 1,553,566.96 11.00 1,941,958.70
304-05 lime treatment (type e) 1,630.84   Mg 1.00 1,630.84 250.00 407,710.00 60.00 97,850.40 168.00 273,981.12
401-02 aggregate surface course (adjusted vehicular
measurement)
582      cu m 95.00 55,290.00 100.00 58,200.00 55.00 32,010.00 120.00 69,840.00
402-01 traffic maintenance aggregate (vehicular measurement) 10,000.0    cu m 1.00 10,000.00 55.00 550,000.00 48.00 480,000.00 63.00 630,000.00
502-01 superpave asphaltic concrete 4,492.2    Mg 100.00 449,220.00 130.00 583,986.00 110.00 494,142.00 132.00 592,970.40
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
209.4    Mg 110.00 23,034.00 240.00 50,256.00 120.00 25,128.00 220.00 46,068.00
509-01 cold planing asphaltic pavement 9,576      sq m 3.00 28,728.00 4.00 38,304.00 2.50 23,940.00 2.50 23,940.00
509-02 contractor retained reclaimed asphaltic pavement - 479      cu m 0.10 - 47.90 0.01 - 4.79 0.10 - 47.90 0.01 - 4.79
510-01-C pavement patching (400 mm minimum thickness) 252      sq m 112.00 28,224.00 140.00 35,280.00 180.00 45,360.00 200.00 50,400.00
510-02 pavement widening (200 mm thickness) 1,082.8    sq m 62.00 67,133.60 95.00 102,866.00 36.00 38,980.80 75.00 81,210.00
601-01-K portland cement concrete pavement (250 mm thick) 141,664.2    sq m 72.61 10,286,237.56 55.00 7,791,531.00 51.50 7,295,706.30 60.75 8,606,100.15
601-02-K portland cement concrete pavement (250 mm thick)
(crossovers & turnouts)
10,367.7    sq m 95.00 984,931.50 70.00 725,739.00 64.00 663,532.80 75.00 777,577.50
601-03-A-K portland cement concrete shoulder (125 mm thick -
250 mm thick)
19,360.6    sq m 60.00 1,161,636.00 55.00 1,064,833.00 60.00 1,161,636.00 36.00 696,981.60
601-04 portland cement concrete pavement coring 215      ea 100.00 21,500.00 100.00 21,500.00 125.00 26,875.00 125.00 26,875.00
602-08 grinding concrete pavement 1,184.5    sq m 25.00 29,612.50 30.00 35,535.00 18.00 21,321.00 11.25 13,325.63
701-01-G cross drain pipe (450 mm pcp/rcp) 172.7    ln m 200.00 34,540.00 200.00 34,540.00 150.00 25,905.00 215.00 37,130.50
701-01-I cross drain pipe (600 mm pcp/rcp) 108.8    ln m 250.00 27,200.00 180.00 19,584.00 185.00 20,128.00 220.00 23,936.00
701-01-K cross drain pipe (750 mm pcp/rcp) 26.0    ln m 300.00 7,800.00 250.00 6,500.00 222.00 5,772.00 580.00 15,080.00
701-01-M cross drain pipe (900 mm pcp/rcp) 81.4    ln m 500.00 40,700.00 290.00 23,606.00 290.00 23,606.00 430.00 35,002.00
701-01-O cross drain pipe (1200 mm pcp/rcp) 47.3    ln m 600.00 28,380.00 470.00 22,231.00 465.00 21,994.50 615.00 29,089.50
701-01-P cross drain pipe (1350 mm rcp) 34.5    ln m 875.00 30,187.50 600.00 20,700.00 699.00 24,115.50 685.00 23,632.50
701-02-E cross drain pipe arch (750 mm equiv. rcpa) 39.6    ln m 400.00 15,840.00 350.00 13,860.00 300.00 11,880.00 355.00 14,058.00
701-03-F storm drain pipe (375 mm pcp/rcp) 2,449.9    ln m 105.00 257,239.50 170.00 416,483.00 135.00 330,736.50 215.00 526,728.50
701-03-G storm drain pipe (450 mm pcp/rcp) 701.4    ln m 125.00 87,675.00 180.00 126,252.00 145.00 101,703.00 225.00 157,815.00
701-03-G-01 storm drain pipe (450 mm cmp)(outfall) 99.6    ln m 100.00 9,960.00 240.00 23,904.00 145.00 14,442.00 205.00 20,418.00
701-03-I storm drain pipe (600 mm pcp/rcp) 647.5    ln m 175.00 113,312.50 210.00 135,975.00 180.00 116,550.00 260.00 168,350.00
701-03-I-01 storm drain pipe (600 mm cmp)(outfall) 10.0    ln m 185.00 1,850.00 290.00 2,900.00 188.00 1,880.00 475.00 4,750.00
701-03-K storm drain pipe (750 mm pcp/rcp) 464.6    ln m 244.00 113,362.40 250.00 116,150.00 222.00 103,141.20 330.00 153,318.00
701-03-K-01 storm drain pipe (750 mm cmp)(outfall) 14.0    ln m 200.00 2,800.00 440.00 6,160.00 222.00 3,108.00 455.00 6,370.00
701-03-M storm drain pipe (900 mm pcp/rcp) 414.8    ln m 297.00 123,195.60 310.00 128,588.00 292.00 121,121.60 440.00 182,512.00
701-03-M-01 storm drain pipe (900 mm cmp)(outfall) 18.7    ln m 297.00 5,553.90 480.00 8,976.00 292.00 5,460.40 455.00 8,508.50
701-03-N storm drain pipe (1050 mm pcp/rcp) 100.6    ln m 400.00 40,240.00 440.00 44,264.00 388.00 39,032.80 545.00 54,827.00
701-03-N-01 storm drain pipe (1050 mm cmp)(outfall) 8.5    ln m 400.00 3,400.00 660.00 5,610.00 388.00 3,298.00 790.00 6,715.00
701-03-O storm drain pipe (1200 mm pcp/rcp) 195.3    ln m 500.00 97,650.00 490.00 95,697.00 472.00 92,181.60 650.00 126,945.00
701-03-O-01 storm drain pipe (1200 mm cmp)(outfall) 7.7    ln m 400.00 3,080.00 740.00 5,698.00 472.00 3,634.40 965.00 7,430.50
701-04-E storm drain pipe arch (750 mm equiv. rcpa) 95.3    ln m 265.00 25,254.50 340.00 32,402.00 303.00 28,875.90 475.00 45,267.50
701-05-G side drain pipe (450 mm) 357.2    ln m 100.00 35,720.00 170.00 60,724.00 144.00 51,436.80 185.00 66,082.00
701-05-G-01 side drain pipe (450 mm)(erosion) 37.0    ln m 100.00 3,700.00 180.00 6,660.00 144.00 5,328.00 345.00 12,765.00
701-05-I side drain pipe (600 mm) 138.5    ln m 166.00 22,991.00 210.00 29,085.00 191.00 26,453.50 275.00 38,087.50
701-05-K side drain pipe (750 mm) 208.4    ln m 200.00 41,680.00 230.00 47,932.00 225.00 46,890.00 300.00 62,520.00
701-05-M side drain pipe (900 mm) 103.8    ln m 265.00 27,507.00 280.00 29,064.00 293.00 30,413.40 400.00 41,520.00
701-09 fabricating pipe fittings 4      ea 2,000.00 8,000.00 3,000.00 12,000.00 3,000.00 12,000.00 3,500.00 14,000.00
702-02-F manholes (mh-01m) 18      ea 3,900.00 70,200.00 4,400.00 79,200.00 3,800.00 68,400.00 5,000.00 90,000.00
702-02-G manholes (r-cb-36) 57      ea 3,100.00 176,700.00 4,400.00 250,800.00 2,500.00 142,500.00 2,500.00 142,500.00
702-02-H manholes (special detail) 4      ea 3,900.00 15,600.00 5,000.00 20,000.00 2,700.00 10,800.00 5,500.00 22,000.00
702-03-A catch basins (cb-01m) 70      ea 3,000.00 210,000.00 2,400.00 168,000.00 2,600.00 182,000.00 2,000.00 140,000.00
702-03-C catch basins (cb-06m) 123      ea 3,000.00 369,000.00 4,000.00 492,000.00 4,030.00 495,690.00 3,200.00 393,600.00
702-03-I catch basins (double curb opening) 57      ea 4,000.00 228,000.00 6,000.00 342,000.00 3,420.00 194,940.00 6,000.00 342,000.00
702-03-J catch basins (paved gutter drain) 59      ea 1,500.00 88,500.00 4,000.00 236,000.00 3,500.00 206,500.00 4,000.00 236,000.00
702-04-A adjusting manholes 9      ea 1,000.00 9,000.00 1,300.00 11,700.00 1,000.00 9,000.00 1,000.00 9,000.00
702-05-A cross drain end treatment ((1 barrel, 600 mm rcp) 2      ea 1,000.00 2,000.00 1,500.00 3,000.00 1,022.00 2,044.00 2,000.00 4,000.00
702-05-B cross drain end treatment (1 barrel, 750 mm rcp) 2      ea 2,500.00 5,000.00 2,000.00 4,000.00 1,725.00 3,450.00 2,500.00 5,000.00
702-05-C cross drain end treatment (1 barrel, 750 mm equiv.
rcpa)
2      ea 3,000.00 6,000.00 2,500.00 5,000.00 2,333.00 4,666.00 2,500.00 5,000.00
702-05-D cross drain end treatment (1 barrel, 900 mm rcp) 2      ea 3,000.00 6,000.00 3,000.00 6,000.00 2,333.00 4,666.00 3,000.00 6,000.00
702-05-E cross drain end treatment (1 barrel, 1200 mm rcp) 2      ea 8,000.00 16,000.00 8,000.00 16,000.00 3,000.00 6,000.00 10,000.00 20,000.00
704-03 blocked out guard rail 405.77   ln m 72.50 29,418.33 80.00 32,461.60 60.00 24,346.20 60.00 24,346.20
704-08-B guard rail transitions (double thrie beam) 68.58   ln m 190.00 13,030.20 200.00 13,716.00 180.00 12,344.40 190.00 13,030.20
704-11-A guard rail end treatment (flared) 9      ea 2,200.00 19,800.00 3,000.00 27,000.00 2,200.00 19,800.00 2,000.00 18,000.00
705-01 barbed wire fence 2,498      ln m 14.50 36,221.00 22.00 54,956.00 25.00 62,450.00 20.00 49,960.00
705-02 combination mesh & barbed wire fence 225      ln m 16.50 3,712.50 25.00 5,625.00 28.00 6,300.00 21.00 4,725.00
705-04 single swinging driveway gates 2      each 450.00 900.00 800.00 1,600.00 700.00 1,400.00 585.00 1,170.00
705-05 double swinging driveway gates 13      dbgt 600.00 7,800.00 1,200.00 15,600.00 800.00 10,400.00 850.00 11,050.00
705-06-A chain link fence (1200 mm height) 894      ln m 37.00 33,078.00 60.00 53,640.00 80.00 71,520.00 55.00 49,170.00
705-06-B chain link fence (1500 mm height) 217      ln m 45.00 9,765.00 70.00 15,190.00 95.00 20,615.00 73.00 15,841.00
705-06-C chain link fence (1800 mm height) 353      ln m 52.00 18,356.00 75.00 26,475.00 102.00 36,006.00 85.00 30,005.00
705-08-A 4.0-meter double gates for chain link fence (1200mm
height)
3      dbgt 700.00 2,100.00 1,200.00 3,600.00 1,800.00 5,400.00 1,100.00 3,300.00
705-08-C 4.0-meter double gates for chain link fence (1800mm
height)
3      dbgt 900.00 2,700.00 1,600.00 4,800.00 2,400.00 7,200.00 1,200.00 3,600.00
706-01-A concrete walk (100 mm thick) 3,759.1    sq m 50.00 187,955.00 50.00 187,955.00 38.00 142,845.80 45.00 169,159.50
706-02-C concrete drive (150 mm thick) 7,691.8    sq m 60.00 461,508.00 57.00 438,432.60 50.00 384,590.00 55.00 423,049.00
706-03-A incidental concrete paving (100 mm thick) 29.0    sq m 100.00 2,900.00 100.00 2,900.00 60.00 1,740.00 250.00 7,250.00
706-03-C incidental concrete paving (150 mm thick) 2,409.0    sq m 60.00 144,540.00 65.00 156,585.00 93.00 224,037.00 55.00 132,495.00
707-01 concrete curb 8,248.2    ln m 5.00 41,241.00 20.00 164,964.00 8.00 65,985.60 10.00 82,482.00
707-03 combination concrete curb & gutter 208.9    ln m 66.00 13,787.40 100.00 20,890.00 65.00 13,578.50 75.00 15,667.50
708-01 right-of-way monument 275      ea 170.00 46,750.00 120.00 33,000.00 150.00 41,250.00 325.00 89,375.00
708-02 right-of-way monument witness post 135      ea 55.00 7,425.00 120.00 16,200.00 60.00 8,100.00 325.00 43,875.00
711-01-C riprap (15 kg, 360 mm thick) 11,376      sq m 60.00 682,560.00 50.00 568,800.00 57.00 648,432.00 44.00 500,544.00
711-01-D riprap (25 kg, 450 mm thick) 426      sq m 75.00 31,950.00 70.00 29,820.00 80.00 34,080.00 60.00 25,560.00
711-04 geotextile fabric 11,802      sq m 2.00 23,604.00 2.00 23,604.00 2.60 30,685.20 2.40 28,324.80
712-01-C concrete cast-in-place revetment (150 mm thick) 78      sq m 80.00 6,240.00 170.00 13,260.00 240.00 18,720.00 170.00 13,260.00
712-04 flexible revetment 2,400      sq m 75.00 180,000.00 55.00 132,000.00 70.00 168,000.00 55.00 132,000.00
713-01 temporary signs & barricades lump      lump 300,000.00 300,000.00 400,000.00 400,000.00 220,000.00 220,000.00 800,000.00 800,000.00
713-03-A temporary pavement markings (broken line)(100 mm width)
(1.2 m length)
2.010  km 500.00 1,005.00 550.00 1,105.50 222.00 446.22 500.00 1,005.00
713-03-B temporary pavement markings (broken line)(100mm width)
(3.0m length)
0.267  km 220.00 58.74 300.00 80.10 292.00 77.96 600.00 160.20
713-04-A temporary pavement markings (solid line)(100 mm width) 35.621  km 550.00 19,591.55 350.00 12,467.35 344.00 12,253.62 400.00 14,248.40
713-08 temporary precast concrete barrier (department
furnished)
11      ea 500.00 5,500.00 440.00 4,840.00 2,000.00 22,000.00 1,400.00 15,400.00
716-01-A mulch (vegetative) 128,558.0    kg 0.50 64,279.00 1.20 154,269.60 0.75 96,418.50 0.58 74,563.64
717-01 seeding 2,100      kg 15.40 32,340.00 19.00 39,900.00 15.00 31,500.00 18.50 38,850.00
718-01 fertilizer 67,200      kg 1.10 73,920.00 0.55 36,960.00 0.90 60,480.00 0.80 53,760.00
718-02 agricultural lime 52.5    Mg 135.00 7,087.50 130.00 6,825.00 145.00 7,612.50 175.00 9,187.50
720-01-A erosion control system, slope protection (type a) 40,039      sq m 1.35 54,052.65 1.60 64,062.40 1.33 53,251.87 1.40 56,054.60
720-01-C erosion control system, flexible channel liner (type c) 8,372      sq m 1.53 12,809.16 1.60 13,395.20 1.49 12,474.28 2.90 24,278.80
720-01-D erosion control system, flexible channel liner (type d) 7,347      sq m 1.53 11,240.91 1.60 11,755.20 1.51 11,093.97 2.90 21,306.30
720-01-E erosion control system, flexible channel liner (type e) 4,828      sq m 1.53 7,386.84 3.00 14,484.00 1.51 7,290.28 4.00 19,312.00
720-01-F erosion control system, flexible channel liner (type f) 2,788      sq m 1.53 4,265.64 4.40 12,267.20 7.00 19,516.00 4.00 11,152.00
722-02 project site laboratory (equipped) 1      ea 20,000.00 20,000.00 40,000.00 40,000.00 10,000.00 10,000.00 200,000.00 200,000.00
725-01-A temporary detour roads (6.0 m width) 95.0    ln m 360.00 34,200.00 700.00 66,500.00 489.35 46,488.25 445.00 42,275.00
725-01-B temporary detour roads (7.3 m width) 303.6    ln m 408.00 123,868.80 700.00 212,520.00 504.41 153,138.88 500.00 151,800.00
725-01-C temporary detour roads (11.4 m width) 406.2    ln m 675.00 274,185.00 1,000.00 406,200.00 1,160.55 471,415.41 700.00 284,340.00
726-01 bedding material 4,768.1    cu m 75.00 357,607.50 90.00 429,129.00 78.00 371,911.80 100.00 476,810.00
727-01 mobilization lump      lump 4,000,000.00 4,000,000.00 4,200,000.00 4,200,000.00 3,000,000.00 3,000,000.00 4,000,000.00 4,000,000.00
728-01-01 jacked or bored pipe (400 mm sch. 40 steel casing) 44.7    ln m 600.00 26,820.00 200.00 8,940.00 1,250.00 55,875.00 620.00 27,714.00
729-01 sign (type a) 9.00   sq m 330.00 2,970.00 100.00 900.00 300.00 2,700.00 350.00 3,150.00
729-16-C object marker assembly (type 3) 46      ea 100.00 4,600.00 100.00 4,600.00 70.00 3,220.00 85.00 3,910.00
729-19-A dead end road installation (type a) 4      ea 2,100.00 8,400.00 1,600.00 6,400.00 1,250.00 5,000.00 1,500.00 6,000.00
730-04 jacking or bored casing (1" pec conduit, sch. 80) 40      ln m 50.00 2,000.00 45.00 1,800.00 40.00 1,600.00 60.00 2,400.00
731-02 reflectorized raised pavement markers 7,186      ea 5.60 40,241.60 4.70 33,774.20 4.58 32,911.88 5.30 38,085.80
732-01-C plastic pavement striping (200 mm width) 912      ln m 3.00 2,736.00 2.60 2,371.20 2.47 2,252.64 2.80 2,553.60
732-01-D plastic pavement striping (300 mm width) 59      ln m 4.75 280.25 4.00 236.00 3.70 218.30 4.25 250.75
732-01-E plastic pavement striping (600 mm width) 845      ln m 9.10 7,689.50 8.00 6,760.00 7.39 6,244.55 8.50 7,182.50
732-02-A plastic pavement striping (solid line)(100 mm width) 41.585  km 1,800.00 74,853.00 1,300.00 54,060.50 1,273.49 52,958.08 1,400.00 58,219.00
732-03-A plastic pavement striping (broken line)(100 mm width) 8.468  km 460.00 3,895.28 380.00 3,217.84 356.58 3,019.52 400.00 3,387.20
732-03-A-01 plastic pvmt striping(broken line)(100mmwidth)
(preformed marking tape) (type v)
14.639  km 9,000.00 131,751.00 2,200.00 32,205.80 2,037.58 29,828.13 2,300.00 33,669.70
732-04-A plastic pavement legends & symbols (arrow) 96      ea 200.00 19,200.00 150.00 14,400.00 137.54 13,203.84 155.00 14,880.00
732-04-B plastic pavement legends & symbols (double arrow) 6      ea 730.00 4,380.00 160.00 960.00 152.82 916.92 175.00 1,050.00
732-04-C plastic pavement legends & symbols (only) 10      ea 250.00 2,500.00 150.00 1,500.00 137.54 1,375.40 155.00 1,550.00
732-04-D plastic pavement legends & symbols (rr crossing) 4      ea 470.00 1,880.00 160.00 640.00 152.82 611.28 175.00 700.00
732-05 removal of existing markings 1.663  km 3,300.00 5,487.90 5,000.00 8,315.00 4,075.17 6,777.01 4,500.00 7,483.50
735-01 mailboxes 107      each 80.00 8,560.00 1.00 107.00 50.00 5,350.00 30.00 3,210.00
735-02 mailbox supports (single) 107      each 150.00 16,050.00 140.00 14,980.00 140.00 14,980.00 200.00 21,400.00
736-01 trenching and backfilling 546      ln m 11.00 6,006.00 10.00 5,460.00 10.00 5,460.00 11.00 6,006.00
736-04-01 signal support (9.14 m steel strain pole) 8      ea 8,300.00 66,400.00 8,000.00 64,000.00 8,000.00 64,000.00 9,200.00 73,600.00
736-04-02 signal support (9.76 m steel strain pole) 4      ea 8,300.00 33,200.00 8,000.00 32,000.00 8,000.00 32,000.00 9,200.00 36,800.00
736-05-01 signal heads (3 section, ryg) 16      each 1,400.00 22,400.00 1,400.00 22,400.00 1,300.00 20,800.00 1,500.00 24,000.00
736-05-02 signal heads (5 section, r, lt. y, y, lt. g, g) 9      each 2,100.00 18,900.00 2,200.00 19,800.00 1,900.00 17,100.00 2,200.00 19,800.00
736-05-03 signal heads (5 section, r, rt. y, y, rt. g, g) 2      each 2,100.00 4,200.00 2,200.00 4,400.00 1,900.00 3,800.00 2,200.00 4,400.00
736-06 signal service 3      ea 1,700.00 5,100.00 1,600.00 4,800.00 1,500.00 4,500.00 1,700.00 5,100.00
736-08 signal controller 3      ea 20,000.00 60,000.00 20,000.00 60,000.00 18,000.00 54,000.00 20,000.00 60,000.00
736-09 loop detector (saw cut, loop wire, sealant) 132      ln m 50.00 6,600.00 50.00 6,600.00 45.00 5,940.00 53.00 6,996.00
736-10-A underground junction box (type d) 6      ea 350.00 2,100.00 320.00 1,920.00 300.00 1,800.00 350.00 2,100.00
736-10-B underground junction box (type e) 6      ea 500.00 3,000.00 440.00 2,640.00 400.00 2,400.00 470.00 2,820.00
736-10-C underground junction box (type f) 6      ea 600.00 3,600.00 550.00 3,300.00 500.00 3,000.00 590.00 3,540.00
736-10-D underground junction box (type h) 3      ea 1,600.00 4,800.00 1,600.00 4,800.00 1,500.00 4,500.00 1,700.00 5,100.00
736-11-A conduit (1" pec, sch. 80) 530      ln m 5.00 2,650.00 4.40 2,332.00 4.00 2,120.00 4.50 2,385.00
736-11-B conduit (3" pec, sch. 80) 15      ln m 11.00 165.00 11.00 165.00 10.00 150.00 11.50 172.50
736-12-A conductor (2c #14 awg, 600v, with outer shield) 2,841      ln m 3.30 9,375.30 3.30 9,375.30 3.00 8,523.00 3.50 9,943.50
736-12-B conductor (3c power, 6 gauge #6 awg) 12      ln m 20.00 240.00 17.00 204.00 16.00 192.00 18.80 225.60
736-12-C conductor (6c #14 awg, 600v) 233      ln m 7.00 1,631.00 7.00 1,631.00 6.00 1,398.00 7.50 1,747.50
736-12-D conductor (10c #14 awg, 600v) 788      ln m 11.00 8,668.00 11.00 8,668.00 10.00 7,880.00 11.50 9,062.00
739-01 hydro-seeding 40.0    hctr 4,000.00 160,000.00 2,600.00 104,000.00 2,500.00 100,000.00 2,800.00 112,000.00
740-01 construction layout lump      lump 500,000.00 500,000.00 500,000.00 500,000.00 380,000.00 380,000.00 630,000.00 630,000.00
741-11 adjusting water valve and meter box 4      ea 300.00 1,200.00 600.00 2,400.00 300.00 1,200.00 1,000.00 4,000.00
742-01-A sanitary sewer pipe (200 mm, pvc sdr 35) 2,318      ln m 110.00 254,980.00 140.00 324,520.00 147.00 340,746.00 165.00 382,470.00
742-01-B sanitary sewer pipe (250 mm, pvc sdr 35) 33      ln m 110.00 3,630.00 250.00 8,250.00 154.00 5,082.00 175.00 5,775.00
742-01-C sanitary sewer pipe (305 mm, pvc sdr 35) 34      ln m 120.00 4,080.00 260.00 8,840.00 160.00 5,440.00 180.00 6,120.00
742-01-D sanitary sewer pipe (200 mm, ductile iron) 48      ln m 250.00 12,000.00 380.00 18,240.00 234.00 11,232.00 265.00 12,720.00
742-01-E sanitary sewer pipe (250 mm, ductile iron) 54      ln m 275.00 14,850.00 360.00 19,440.00 262.00 14,148.00 300.00 16,200.00
742-01-F sanitary sewer pipe (305 mm, ductile iron) 12      ln m 275.00 3,300.00 400.00 4,800.00 288.00 3,456.00 325.00 3,900.00
742-02 adjusting sanitary sewer house connections 105      ea 450.00 47,250.00 420.00 44,100.00 125.00 13,125.00 140.00 14,700.00
742-03 adjusting sanitary sewer service lines 1,176      ln m 50.00 58,800.00 42.00 49,392.00 36.00 42,336.00 42.00 49,392.00
804-01-B precast concrete piles (350 mm) 580.8    ln m 175.00 101,640.00 250.00 145,200.00 230.00 133,584.00 197.00 114,417.60
804-01-D precast concrete piles (450 mm) 1,360.0    ln m 228.00 310,080.00 250.00 340,000.00 285.00 387,600.00 215.00 292,400.00
804-01-F precast concrete piles (600 mm) 184.0    ln m 384.00 70,656.00 600.00 110,400.00 418.00 76,912.00 290.00 53,360.00
804-12-B loading permanent piles (350 mm) 1      ea 13,000.00 13,000.00 1,000.00 1,000.00 20,000.00 20,000.00 1,000.00 1,000.00
804-12-D loading permanent piles (450 mm) 1      ea 14,000.00 14,000.00 1,000.00 1,000.00 22,000.00 22,000.00 1,000.00 1,000.00
804-12-F loading permanent piles (600 mm) 1      ea 17,000.00 17,000.00 1,000.00 1,000.00 20,027.70 20,027.70 1,000.00 1,000.00
804-13-B precast concrete indicator piles (350 mm) 1      ea 12,500.00 12,500.00 10,000.00 10,000.00 4,600.00 4,600.00 8,000.00 8,000.00
804-13-D precast concrete indicator piles (450 mm) 2      ea 13,300.00 26,600.00 11,000.00 22,000.00 7,000.00 14,000.00 15,000.00 30,000.00
804-13-F precast concrete indicator piles (600 mm) 2      ea 20,500.00 41,000.00 14,000.00 28,000.00 8,000.00 16,000.00 16,000.00 32,000.00
804-17 dynamic monitoring 5      ea 2,600.00 13,000.00 1,200.00 6,000.00 1,650.00 8,250.00 5,000.00 25,000.00
805-01 class a concrete 30.74   cu m 945.00 29,049.30 900.00 27,666.00 800.00 24,592.00 2,400.00 73,776.00
805-01-B class a concrete (box culvert headwalls) 193.41   cu m 800.00 154,728.00 1,500.00 290,115.00 2,500.00 483,525.00 1,300.00 251,433.00
805-01-F class a concrete (bents) 342.24   cu m 950.00 325,128.00 1,000.00 342,240.00 1,228.54 420,455.53 1,100.00 376,464.00
805-03 class aa concrete 807.37   cu m 850.00 686,264.50 850.00 686,264.50 1,350.00 1,089,949.50 1,100.00 888,107.00
805-08-B precast-prestressed concrete girders (type ii) 951.00   ln m 341.00 324,291.00 260.00 247,260.00 250.00 237,750.00 168.00 159,768.00
805-11 strip seal joints 97.40   ln m 671.00 65,355.40 480.00 46,752.00 500.00 48,700.00 475.00 46,265.00
805-12-E reinforced concrete box culverts (1200 mm x 1200 mm) 255.00   ln m 1,000.00 255,000.00 800.00 204,000.00 750.00 191,250.00 925.00 235,875.00
805-12-P reinforced concrete box culverts (2100 mm x 2100 mm) 128.40   ln m 2,000.00 256,800.00 1,800.00 231,120.00 1,650.00 211,860.00 1,800.00 231,120.00
805-12-S reinforced concrete box culverts (2400 mm x 2400 mm) 359.00   ln m 2,137.00 767,183.00 1,800.00 646,200.00 1,750.00 628,250.00 2,000.00 718,000.00
805-12-Y reinforced concrete box culverts (900 mm x 900 mm) 167.00   ln m 550.00 91,850.00 550.00 91,850.00 700.00 116,900.00 750.00 125,250.00
806-01 deformed reinforcing steel 51,976      kg 2.25 116,946.00 2.00 103,952.00 2.30 119,544.80 1.85 96,155.60
806-02 deformed reinforcing steel (epoxy coated) 107,847      kg 3.08 332,168.76 2.70 291,186.90 2.50 269,617.50 1.25 134,808.75
807-08 structural metalwork lump      lump 34,000.00 34,000.00 8,000.00 8,000.00 19,000.00 19,000.00 15,000.00 15,000.00
810-01 concrete railing (barrier) 391.92   ln m 268.00 105,034.56 210.00 82,303.20 250.00 97,980.00 200.00 78,384.00
813-01 concrete approach slabs 1,682.40   sq m 255.00 429,012.00 230.00 386,952.00 275.00 462,660.00 255.00 429,012.00
S-001 video detector device and connection 11      each 8,500.00 93,500.00 8,000.00 88,000.00 7,400.00 81,400.00 8,200.00 90,200.00
S-002 temporary sediment basin lump      lump 10,000.00 10,000.00 11,000.00 11,000.00 20,000.00 20,000.00 6,000.00 6,000.00
S-003 temporary diversions associated with box culvert lump      lump 10,000.00 10,000.00 20,000.00 20,000.00 25,000.00 25,000.00 30,000.00 30,000.00
S-004 diversions associated with graded slopes lump      lump 20,000.00 20,000.00 20,000.00 20,000.00 30,000.00 30,000.00 30,000.00 30,000.00
S-005 video detection system lump      lump 6,000.00 6,000.00 5,500.00 5,500.00 5,000.00 5,000.00 5,500.00 5,500.00
S-006 field office lump      lump 100,000.00 100,000.00 150,000.00 150,000.00 200,000.00 200,000.00 125,000.00 125,000.00
S-007 archaelogical construction monitoring lump      lump 20,000.00 20,000.00 20,000.00 20,000.00 5,000.00 5,000.00 6,000.00 6,000.00
S-103 impact attenuator (construction zone) 2      each 20,000.00 40,000.00 24,000.00 48,000.00 16,000.00 32,000.00 20,000.00 40,000.00
S-104 retroreflective sheeting panels lump      lump 2,500.00 2,500.00 7,000.00 7,000.00 1,500.00 1,500.00 4,500.00 4,500.00
S-105 precast concrete piles (600 mm)(dotd furnished) 592.0    ln m 245.00 145,040.00 400.00 236,800.00 240.00 142,080.00 130.00 76,960.00
                       
 ITEM TOTAL (CONSTRUCTION BID)       42,426,114.61   42,616,118.26   42,994,229.76   43,412,711.98
 NUMBER OF DAYS BID AT $4,600 PER DAY.       2,760,000.00   3,565,000.00   3,404,000.00   3,445,400.00
 TOTAL BID       45,186,114.61   46,181,118.26   46,398,229.76   46,858,111.98
 
Item Number Item Description Quantity Unit of Measure - 5 -
JAMES CONSTRUCTION GROUP LLC

 

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing and grubbing lump      lump 800,000.00 800,000.00            
202-01 removal of structures and obstructions lump      lump 200,000.00 200,000.00            
202-02-A removal of 13.3 m x 30.5 m concrete slab span bridge
(sta. 11+476)
1      ea 35,000.00 35,000.00            
202-02-B-01 removal of box culvert (sta. 5+440; 1-1200 mm x 914 mm
x 14.7 m)
1      ea 3,000.00 3,000.00            
202-02-B-02 removal of box culvert (sta. 6+140; 1-609 mm x 609 mm
x 14.2 m)
1      ea 3,000.00 3,000.00            
202-02-B-03 removal of box culvert (sta. 5+559; 6-1800 mm x
1800 mm x 20.42 m)
1      ea 20,000.00 20,000.00            
202-02-B-04 removal of box culvert (sta. 7+371; 2-1900 mm x
1066 mm x 53.65 m)
1      ea 16,000.00 16,000.00            
202-02-B-05 removal of box culvert (sta. 9+150; 3-1800 mm x
1800 mm x 15.60 m)
1      ea 10,000.00 10,000.00            
202-02-B-06 removal of box culvert (sta. 9+869.500 (la 3103);
900 mm x 600 mm x 13.0 m)
1      ea 2,800.00 2,800.00            
202-02-C removal of portland cement concrete pavement 52,670      sq m 6.00 316,020.00            
202-02-D removal of concrete walks & drives 9,132      sq m 10.00 91,320.00            
202-02-E removal of concrete curbs 799.8    ln m 30.00 23,994.00            
202-02-F removal of concrete combination curb & gutter 947.5    ln m 30.00 28,425.00            
202-02-G removal of surfacing & stabilized base 32,547.0    sq m 4.00 130,188.00            
202-02-H removal of guard rail 124      ln m 10.00 1,240.00            
202-02-01 removal of 7.6 m x 19.0 m single story wood frame
residence (rt. of sta. 5+115)(contains friable
asbestos)
1      each 1,000.00 1,000.00            
202-02-02 removal of 13.3 m x 16.8 m wood frame residence (lt.
of sta. 5+236)
1      each 1,000.00 1,000.00            
202-02-03 removal of 13.0 m x 14.6 m wood frame residence (rt.
of sta. 5+5+371)
1      each 1,000.00 1,000.00            
202-02-04 removal of 8.8 m x 22.8 m wood frame residence (rt. of
sta. 5+756) (contains non-friable asbestos)
1      each 1,000.00 1,000.00            
202-02-05 removal of 8.7 m x 22.5 m wood frame residence (rt. of
sta. 5+778) (contains friable asbestos)
1      each 1,000.00 1,000.00            
202-02-06 removal of 3.7 m x 5.5 m metal storage building (rt.
of sta. 5+816)
1      each 1,000.00 1,000.00            
202-02-07 removal of 9.9 m x 8.6 m wood frame residence (rt. of
sta. 5+916)(contains non-friable asbestos)
1      each 1,000.00 1,000.00            
202-02-08 removal of 12.5 m x 10.7 m single story concrete block
building (rt. of sta. 6+408)
1      each 1,000.00 1,000.00            
202-02-09 removal of 13.7 m x 8.7 m single story wood frame
residence (lt. of sta. 6+532)
1      each 1,000.00 1,000.00            
202-02-10 removal of 18.2 m x 4.1 m mobile home (rt. of sta.
6+682)
1      each 500.00 500.00            
202-02-11 removal of 8.7 m x 14.2 m wood frame residence (rt. of
sta. 6+850)
1      each 1,000.00 1,000.00            
202-02-12 removal of 9.2 m x 15.4 m wood frame residence (rt. of
sta. 5+886)
1      each 1,000.00 1,000.00            
202-02-13 removal of 11.9 m x 19.3 m single story wood frame
building (lt. of sta. 6+915)
1      each 1,000.00 1,000.00            
202-02-14 removal of 8.8 m x 16.5 m wood frame residence (rt. of
sta. 6+970) (contains non-friable asbestos)
1      each 1,000.00 1,000.00            
202-02-15 removal of 8.7 m x 13.5 m wood frame building (rt. of
sta. 7+040)(contains non-friable asbestos)
1      each 1,000.00 1,000.00            
202-02-16 removal of 10.4 m x 12.0 m single story wood frame
residence (rt. of sta. 7+070)
1      each 1,000.00 1,000.00            
202-02-17 removal of wood frame building (rt. of sta. 7+228) 1      each 1,000.00 1,000.00            
202-02-18 removal of 7.5 m x 30.7 m metal gas canopy (rt. of
sta. 7+400)
1      each 500.00 500.00            
202-02-19 removal of 10.0 m x 12.4 m wood garage (lt. of sta.
7+450)
1      each 1,000.00 1,000.00            
202-02-20 removal of 7.6 m x 13.9 m single story wood frame
residence (rt. of sta. 7+555)(contains
non-friable asbestos)
1      each 1,000.00 1,000.00            
202-02-21 removal of 8.9 m x 14.7 m single story wood frame
residence (lt. of sta. 7+632)(contains
non-friable asbestos)
1      each 1,000.00 1,000.00            
202-02-22 removal of wood frame building (lt. of sta. 7+650)
(contains non-friable asbestos)
1      each 1,000.00 1,000.00            
202-02-23 removal of 30.6 m x 9.1 m metal building (rt. of sta.
7+828)
1      each 1,000.00 1,000.00            
202-02-24 removal of 18.5 m x 15.1 m metal building on slab (rt.
of sta. 7+838) (contains non-friable asbestos)
1      each 1,000.00 1,000.00            
202-02-25 removal of 3.2 m x 6.1 m metal portable building (rt.
of sta. 7+855)
1      each 50.00 50.00            
202-02-26 removal of 14.0 m x 19.8 m single story brick
residence (rt. of sta. 8+130)(contains friable
asbestos)
1      each 1,000.00 1,000.00            
202-02-27 removal of 10.6 m x 18.6 m single story brick
residence (rt. of sta. 8+200)(contains
non-friable asbestos)
1      each 1,000.00 1,000.00            
202-02-28 removal of 6.9 m x 9.2 m wood frame garage (rt. of
sta. 8+209)
1      each 1,000.00 1,000.00            
202-02-29 removal of 9.3 m x 9.4 m single story wood frame
building (rt. of sta. 8+300)
1      each 1,000.00 1,000.00            
202-02-30 removal of 3.0 m x 6.2 portable metal storage building
(rt. of sta. 8+774)
1      each 50.00 50.00            
202-02-31 removal of 17.9 m x 8.3 m abandoned wood frame
building (rt. of sta. 9+423)(contains non-friable
asbestos)
1      each 1,000.00 1,000.00            
202-02-32 removal of 16.1 m x 14.9 m single story wood frame
residence (lt. of sta. 10+102 mcenery street)
1      each 1,000.00 1,000.00            
202-02-33 removal of storage building (lt. of sta.
10+102 mcenery street)
1      each 50.00 50.00            
202-02-34 removal of 33.7 m x 35.8 m wood frame building (rt. of
sta. 10+180 polk street)(contains non-friable
asbestos)
1      each 1,000.00 1,000.00            
202-02-35 removal of 10.2 m x 13.7 m brick bank teller building
(rt. of sta. 10+239 polk street)
1      each 1,000.00 1,000.00            
202-02-36 removal of 10.2 m x 13.7 m drive thru canopy (rt. of
sta. 10+239 polk street)
1      each 1,000.00 1,000.00            
202-02-37 removal of 18.3 m x 33.4 m brick building (lt. of sta.
10+250 polk street)
1      each 1,000.00 1,000.00            
202-02-38 removal of 20.4 m x 26.4 m brick building (lt. of sta.
10+300 polk street) (contains non-friable
asbestos)
1      each 1,000.00 1,000.00            
202-02-39 removal of 11.7 m x 12.7 m single story wood frame
residence (lt. of sta. 9+880 kings highway)
1      each 1,000.00 1,000.00            
202-02-40 removal of 17.1 m x 3.8 m mobile home (rt. of sta.
9+884 kings highway)
1      each 500.00 500.00            
202-02-41 removal of 19.1 m x 10.1 m single story wood frame
residence (rt. of sta. 9+910 kings highway)
1      each 1,000.00 1,000.00            
202-02-42 removal of 20.7 m x 13.0 m single story wood frame
residence (rt. of sta. 9+928 kings highway)
1      each 1,000.00 1,000.00            
202-02-43 removal of 23.3 m x 15.3 m moveable storage building
(lt. of sta. 9+980 kings highway)
1      each 50.00 50.00            
202-02-44 removal of 7.4 m x 11.2 m single story wood frame
residence (lt. of sta. 10+100 miss. st.)(cont.
non-friable asb.)
1      each 1,000.00 1,000.00            
202-02-45 removal of 11.0 m x 9.6 m wood frame residence (lt. of
sta. 10+055 clark street)(contains non-friable
asbestos)
1      each 1,000.00 1,000.00            
202-07 plugging existing water wells 4      each 1,500.00 6,000.00            
203-01 general excavation 592,600      cu m 5.00 2,963,000.00            
203-02 drainage excavation 53,661      cu m 12.00 643,932.00            
203-03 embankment 704,527      cu m 8.00 5,636,216.00            
203-04 nonplastic embankment) 27      cu m 220.00 5,940.00            
203-07-B borrow (vehicular measurement)(plastic soils) 96      cu m 40.00 3,840.00            
204-02 temporary hay or straw bales 2,347      ea 14.00 32,858.00            
204-03 temporary slope drains 790      ln m 42.00 33,180.00            
204-05-A temporary sediment check dams (hay) 57      ea 120.00 6,840.00            
204-05-B temporary sediment check dams (stone) 11      ea 500.00 5,500.00            
204-06 temporary silt fencing 8,974      ln m 7.60 68,202.40            
204-07 temporary stone construction entrance 6      ea 6,000.00 36,000.00            
302-02-C-01 class ii base course (200 mm thick)(soil cement) 176,541.7    sq m 10.50 1,853,687.85            
302-02-F-01 class ii base course (300 mm thick)(stone or recycled
pccp)
6,947.0    sq m 35.00 243,145.00            
302-02-G-01 class ii base course (100 mm thick)(stone or recycled
pccp)
176,541.7    sq m 12.00 2,118,500.40            
304-05 lime treatment (type e) 1,630.84   Mg 200.00 326,168.00            
401-02 aggregate surface course (adjusted vehicular
measurement)
582      cu m 105.00 61,110.00            
402-01 traffic maintenance aggregate (vehicular measurement) 10,000.0    cu m 80.00 800,000.00            
502-01 superpave asphaltic concrete 4,492.2    Mg 135.63 609,277.09            
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
209.4    Mg 248.15 51,962.61            
509-01 cold planing asphaltic pavement 9,576      sq m 2.52 24,131.52            
509-02 contractor retained reclaimed asphaltic pavement - 479      cu m 1.00 - 479.00            
510-01-C pavement patching (400 mm minimum thickness) 252      sq m 140.00 35,280.00            
510-02 pavement widening (200 mm thickness) 1,082.8    sq m 85.00 92,038.00            
601-01-K portland cement concrete pavement (250 mm thick) 141,664.2    sq m 62.50 8,854,012.50            
601-02-K portland cement concrete pavement (250 mm thick)
(crossovers & turnouts)
10,367.7    sq m 80.00 829,416.00            
601-03-A-K portland cement concrete shoulder (125 mm thick -
250 mm thick)
19,360.6    sq m 60.00 1,161,636.00            
601-04 portland cement concrete pavement coring 215      ea 70.00 15,050.00            
602-08 grinding concrete pavement 1,184.5    sq m 30.00 35,535.00            
701-01-G cross drain pipe (450 mm pcp/rcp) 172.7    ln m 170.00 29,359.00            
701-01-I cross drain pipe (600 mm pcp/rcp) 108.8    ln m 220.00 23,936.00            
701-01-K cross drain pipe (750 mm pcp/rcp) 26.0    ln m 310.00 8,060.00            
701-01-M cross drain pipe (900 mm pcp/rcp) 81.4    ln m 345.00 28,083.00            
701-01-O cross drain pipe (1200 mm pcp/rcp) 47.3    ln m 530.00 25,069.00            
701-01-P cross drain pipe (1350 mm rcp) 34.5    ln m 780.00 26,910.00            
701-02-E cross drain pipe arch (750 mm equiv. rcpa) 39.6    ln m 400.00 15,840.00            
701-03-F storm drain pipe (375 mm pcp/rcp) 2,449.9    ln m 160.00 391,984.00            
701-03-G storm drain pipe (450 mm pcp/rcp) 701.4    ln m 170.00 119,238.00            
701-03-G-01 storm drain pipe (450 mm cmp)(outfall) 99.6    ln m 170.00 16,932.00            
701-03-I storm drain pipe (600 mm pcp/rcp) 647.5    ln m 220.00 142,450.00            
701-03-I-01 storm drain pipe (600 mm cmp)(outfall) 10.0    ln m 220.00 2,200.00            
701-03-K storm drain pipe (750 mm pcp/rcp) 464.6    ln m 260.00 120,796.00            
701-03-K-01 storm drain pipe (750 mm cmp)(outfall) 14.0    ln m 260.00 3,640.00            
701-03-M storm drain pipe (900 mm pcp/rcp) 414.8    ln m 335.00 138,958.00            
701-03-M-01 storm drain pipe (900 mm cmp)(outfall) 18.7    ln m 335.00 6,264.50            
701-03-N storm drain pipe (1050 mm pcp/rcp) 100.6    ln m 330.00 33,198.00            
701-03-N-01 storm drain pipe (1050 mm cmp)(outfall) 8.5    ln m 330.00 2,805.00            
701-03-O storm drain pipe (1200 mm pcp/rcp) 195.3    ln m 530.00 103,509.00            
701-03-O-01 storm drain pipe (1200 mm cmp)(outfall) 7.7    ln m 530.00 4,081.00            
701-04-E storm drain pipe arch (750 mm equiv. rcpa) 95.3    ln m 330.00 31,449.00            
701-05-G side drain pipe (450 mm) 357.2    ln m 170.00 60,724.00            
701-05-G-01 side drain pipe (450 mm)(erosion) 37.0    ln m 170.00 6,290.00            
701-05-I side drain pipe (600 mm) 138.5    ln m 220.00 30,470.00            
701-05-K side drain pipe (750 mm) 208.4    ln m 350.00 72,940.00            
701-05-M side drain pipe (900 mm) 103.8    ln m 335.00 34,773.00            
701-09 fabricating pipe fittings 4      ea 2,000.00 8,000.00            
702-02-F manholes (mh-01m) 18      ea 3,550.00 63,900.00            
702-02-G manholes (r-cb-36) 57      ea 2,400.00 136,800.00            
702-02-H manholes (special detail) 4      ea 12,500.00 50,000.00            
702-03-A catch basins (cb-01m) 70      ea 2,450.00 171,500.00            
702-03-C catch basins (cb-06m) 123      ea 1,830.00 225,090.00            
702-03-I catch basins (double curb opening) 57      ea 3,050.00 173,850.00            
702-03-J catch basins (paved gutter drain) 59      ea 4,000.00 236,000.00            
702-04-A adjusting manholes 9      ea 2,270.00 20,430.00            
702-05-A cross drain end treatment ((1 barrel, 600 mm rcp) 2      ea 1,100.00 2,200.00            
702-05-B cross drain end treatment (1 barrel, 750 mm rcp) 2      ea 1,700.00 3,400.00            
702-05-C cross drain end treatment (1 barrel, 750 mm equiv.
rcpa)
2      ea 2,400.00 4,800.00            
702-05-D cross drain end treatment (1 barrel, 900 mm rcp) 2      ea 2,400.00 4,800.00            
702-05-E cross drain end treatment (1 barrel, 1200 mm rcp) 2      ea 4,000.00 8,000.00            
704-03 blocked out guard rail 405.77   ln m 54.15 21,972.45            
704-08-B guard rail transitions (double thrie beam) 68.58   ln m 165.00 11,315.70            
704-11-A guard rail end treatment (flared) 9      ea 1,875.00 16,875.00            
705-01 barbed wire fence 2,498      ln m 18.45 46,088.10            
705-02 combination mesh & barbed wire fence 225      ln m 20.12 4,527.00            
705-04 single swinging driveway gates 2      each 450.00 900.00            
705-05 double swinging driveway gates 13      dbgt 675.00 8,775.00            
705-06-A chain link fence (1200 mm height) 894      ln m 57.35 51,270.90            
705-06-B chain link fence (1500 mm height) 217      ln m 68.20 14,799.40            
705-06-C chain link fence (1800 mm height) 353      ln m 86.80 30,640.40            
705-08-A 4.0-meter double gates for chain link fence (1200mm
height)
3      dbgt 800.00 2,400.00            
705-08-C 4.0-meter double gates for chain link fence (1800mm
height)
3      dbgt 1,250.00 3,750.00            
706-01-A concrete walk (100 mm thick) 3,759.1    sq m 50.00 187,955.00            
706-02-C concrete drive (150 mm thick) 7,691.8    sq m 50.00 384,590.00            
706-03-A incidental concrete paving (100 mm thick) 29.0    sq m 65.00 1,885.00            
706-03-C incidental concrete paving (150 mm thick) 2,409.0    sq m 45.00 108,405.00            
707-01 concrete curb 8,248.2    ln m 5.00 41,241.00            
707-03 combination concrete curb & gutter 208.9    ln m 82.00 17,129.80            
708-01 right-of-way monument 275      ea 155.00 42,625.00            
708-02 right-of-way monument witness post 135      ea 50.00 6,750.00            
711-01-C riprap (15 kg, 360 mm thick) 11,376      sq m 60.00 682,560.00            
711-01-D riprap (25 kg, 450 mm thick) 426      sq m 60.00 25,560.00            
711-04 geotextile fabric 11,802      sq m 3.00 35,406.00            
712-01-C concrete cast-in-place revetment (150 mm thick) 78      sq m 185.00 14,430.00            
712-04 flexible revetment 2,400      sq m 75.00 180,000.00            
713-01 temporary signs & barricades lump      lump 150,000.00 150,000.00            
713-03-A temporary pavement markings (broken line)(100 mm width)
(1.2 m length)
2.010  km 300.00 603.00            
713-03-B temporary pavement markings (broken line)(100mm width)
(3.0m length)
0.267  km 246.03 65.69            
713-04-A temporary pavement markings (solid line)(100 mm width) 35.621  km 492.01 17,525.89            
713-08 temporary precast concrete barrier (department
furnished)
11      ea 475.00 5,225.00            
716-01-A mulch (vegetative) 128,558.0    kg 0.75 96,418.50            
717-01 seeding 2,100      kg 17.60 36,960.00            
718-01 fertilizer 67,200      kg 0.70 47,040.00            
718-02 agricultural lime 52.5    Mg 90.00 4,725.00            
720-01-A erosion control system, slope protection (type a) 40,039      sq m 1.32 52,851.48            
720-01-C erosion control system, flexible channel liner (type c) 8,372      sq m 1.92 16,074.24            
720-01-D erosion control system, flexible channel liner (type d) 7,347      sq m 1.92 14,106.24            
720-01-E erosion control system, flexible channel liner (type e) 4,828      sq m 2.62 12,649.36            
720-01-F erosion control system, flexible channel liner (type f) 2,788      sq m 2.90 8,085.20            
722-02 project site laboratory (equipped) 1      ea 30,000.00 30,000.00            
725-01-A temporary detour roads (6.0 m width) 95.0    ln m 600.00 57,000.00            
725-01-B temporary detour roads (7.3 m width) 303.6    ln m 600.00 182,160.00            
725-01-C temporary detour roads (11.4 m width) 406.2    ln m 1,350.00 548,370.00            
726-01 bedding material 4,768.1    cu m 80.00 381,448.00            
727-01 mobilization lump      lump 4,000,000.00 4,000,000.00            
728-01-01 jacked or bored pipe (400 mm sch. 40 steel casing) 44.7    ln m 485.00 21,679.50            
729-01 sign (type a) 9.00   sq m 300.00 2,700.00            
729-16-C object marker assembly (type 3) 46      ea 70.00 3,220.00            
729-19-A dead end road installation (type a) 4      ea 1,250.00 5,000.00            
730-04 jacking or bored casing (1" pec conduit, sch. 80) 40      ln m 40.00 1,600.00            
731-02 reflectorized raised pavement markers 7,186      ea 5.00 35,930.00            
732-01-C plastic pavement striping (200 mm width) 912      ln m 3.30 3,009.60            
732-01-D plastic pavement striping (300 mm width) 59      ln m 4.95 292.05            
732-01-E plastic pavement striping (600 mm width) 845      ln m 9.90 8,365.50            
732-02-A plastic pavement striping (solid line)(100 mm width) 41.585  km 1,697.00 70,569.75            
732-03-A plastic pavement striping (broken line)(100 mm width) 8.468  km 493.00 4,174.72            
732-03-A-01 plastic pvmt striping(broken line)(100mmwidth)
(preformed marking tape) (type v)
14.639  km 3,259.00 47,708.50            
732-04-A plastic pavement legends & symbols (arrow) 96      ea 145.00 13,920.00            
732-04-B plastic pavement legends & symbols (double arrow) 6      ea 165.00 990.00            
732-04-C plastic pavement legends & symbols (only) 10      ea 155.00 1,550.00            
732-04-D plastic pavement legends & symbols (rr crossing) 4      ea 400.00 1,600.00            
732-05 removal of existing markings 1.663  km 10,000.00 16,630.00            
735-01 mailboxes 107      each 1.00 107.00            
735-02 mailbox supports (single) 107      each 130.00 13,910.00            
736-01 trenching and backfilling 546      ln m 10.00 5,460.00            
736-04-01 signal support (9.14 m steel strain pole) 8      ea 8,000.00 64,000.00            
736-04-02 signal support (9.76 m steel strain pole) 4      ea 8,000.00 32,000.00            
736-05-01 signal heads (3 section, ryg) 16      each 1,300.00 20,800.00            
736-05-02 signal heads (5 section, r, lt. y, y, lt. g, g) 9      each 1,900.00 17,100.00            
736-05-03 signal heads (5 section, r, rt. y, y, rt. g, g) 2      each 1,900.00 3,800.00            
736-06 signal service 3      ea 1,500.00 4,500.00            
736-08 signal controller 3      ea 18,000.00 54,000.00            
736-09 loop detector (saw cut, loop wire, sealant) 132      ln m 45.00 5,940.00            
736-10-A underground junction box (type d) 6      ea 300.00 1,800.00            
736-10-B underground junction box (type e) 6      ea 400.00 2,400.00            
736-10-C underground junction box (type f) 6      ea 500.00 3,000.00            
736-10-D underground junction box (type h) 3      ea 1,500.00 4,500.00            
736-11-A conduit (1" pec, sch. 80) 530      ln m 4.00 2,120.00            
736-11-B conduit (3" pec, sch. 80) 15      ln m 10.00 150.00            
736-12-A conductor (2c #14 awg, 600v, with outer shield) 2,841      ln m 3.00 8,523.00            
736-12-B conductor (3c power, 6 gauge #6 awg) 12      ln m 16.00 192.00            
736-12-C conductor (6c #14 awg, 600v) 233      ln m 6.50 1,514.50            
736-12-D conductor (10c #14 awg, 600v) 788      ln m 10.00 7,880.00            
739-01 hydro-seeding 40.0    hctr 2,450.00 98,000.00            
740-01 construction layout lump      lump 420,000.00 420,000.00            
741-11 adjusting water valve and meter box 4      ea 512.44 2,049.76            
742-01-A sanitary sewer pipe (200 mm, pvc sdr 35) 2,318      ln m 85.00 197,030.00            
742-01-B sanitary sewer pipe (250 mm, pvc sdr 35) 33      ln m 95.00 3,135.00            
742-01-C sanitary sewer pipe (305 mm, pvc sdr 35) 34      ln m 105.00 3,570.00            
742-01-D sanitary sewer pipe (200 mm, ductile iron) 48      ln m 200.00 9,600.00            
742-01-E sanitary sewer pipe (250 mm, ductile iron) 54      ln m 225.00 12,150.00            
742-01-F sanitary sewer pipe (305 mm, ductile iron) 12      ln m 250.00 3,000.00            
742-02 adjusting sanitary sewer house connections 105      ea 275.00 28,875.00            
742-03 adjusting sanitary sewer service lines 1,176      ln m 36.00 42,336.00            
804-01-B precast concrete piles (350 mm) 580.8    ln m 235.00 136,488.00            
804-01-D precast concrete piles (450 mm) 1,360.0    ln m 210.00 285,600.00            
804-01-F precast concrete piles (600 mm) 184.0    ln m 350.00 64,400.00            
804-12-B loading permanent piles (350 mm) 1      ea 2,500.00 2,500.00            
804-12-D loading permanent piles (450 mm) 1      ea 2,500.00 2,500.00            
804-12-F loading permanent piles (600 mm) 1      ea 2,500.00 2,500.00            
804-13-B precast concrete indicator piles (350 mm) 1      ea 10,000.00 10,000.00            
804-13-D precast concrete indicator piles (450 mm) 2      ea 10,000.00 20,000.00            
804-13-F precast concrete indicator piles (600 mm) 2      ea 14,000.00 28,000.00            
804-17 dynamic monitoring 5      ea 1,500.00 7,500.00            
805-01 class a concrete 30.74   cu m 2,500.00 76,850.00            
805-01-B class a concrete (box culvert headwalls) 193.41   cu m 1,285.00 248,531.85            
805-01-F class a concrete (bents) 342.24   cu m 815.00 278,925.60            
805-03 class aa concrete 807.37   cu m 800.00 645,896.00            
805-08-B precast-prestressed concrete girders (type ii) 951.00   ln m 270.00 256,770.00            
805-11 strip seal joints 97.40   ln m 515.00 50,161.00            
805-12-E reinforced concrete box culverts (1200 mm x 1200 mm) 255.00   ln m 770.00 196,350.00            
805-12-P reinforced concrete box culverts (2100 mm x 2100 mm) 128.40   ln m 1,700.00 218,280.00            
805-12-S reinforced concrete box culverts (2400 mm x 2400 mm) 359.00   ln m 1,800.00 646,200.00            
805-12-Y reinforced concrete box culverts (900 mm x 900 mm) 167.00   ln m 750.00 125,250.00            
806-01 deformed reinforcing steel 51,976      kg 2.05 106,550.80            
806-02 deformed reinforcing steel (epoxy coated) 107,847      kg 3.10 334,325.70            
807-08 structural metalwork lump      lump 5,000.00 5,000.00            
810-01 concrete railing (barrier) 391.92   ln m 215.00 84,262.80            
813-01 concrete approach slabs 1,682.40   sq m 200.00 336,480.00            
S-001 video detector device and connection 11      each 7,500.00 82,500.00            
S-002 temporary sediment basin lump      lump 10,000.00 10,000.00            
S-003 temporary diversions associated with box culvert lump      lump 6,000.00 6,000.00            
S-004 diversions associated with graded slopes lump      lump 35,000.00 35,000.00            
S-005 video detection system lump      lump 5,000.00 5,000.00            
S-006 field office lump      lump 70,000.00 70,000.00            
S-007 archaelogical construction monitoring lump      lump 15,000.00 15,000.00            
S-103 impact attenuator (construction zone) 2      each 21,000.00 42,000.00            
S-104 retroreflective sheeting panels lump      lump 3,000.00 3,000.00            
S-105 precast concrete piles (600 mm)(dotd furnished) 592.0    ln m 180.00 106,560.00            
                       
 ITEM TOTAL (CONSTRUCTION BID)       44,321,316.85            
 NUMBER OF DAYS BID AT $4,600 PER DAY.       3,565,000.00            
 TOTAL BID       47,886,316.85            