| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BEST-YET BUILDERS, LLC |
- 2 - DENTON-JAMES LLC |
- 3 - AUSTIN BRIDGE & ROAD, LP |
- 4 - GILCHRIST CONSTRUCTION CO. LLC |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing and grubbing
|
lump |
lump |
300,000.00 |
300,000.00 |
1,000,000.00 |
1,000,000.00 |
1,090,000.00 |
1,090,000.00 |
825,000.00 |
825,000.00 |
| 202-01 |
removal of structures and obstructions
|
lump |
lump |
520,000.00 |
520,000.00 |
600,000.00 |
600,000.00 |
125,000.00 |
125,000.00 |
150,000.00 |
150,000.00 |
| 202-02-A |
removal of 13.3 m x 30.5 m concrete slab span bridge
(sta. 11+476) |
1   |
ea |
55,000.00 |
55,000.00 |
24,000.00 |
24,000.00 |
50,000.00 |
50,000.00 |
20,000.00 |
20,000.00 |
| 202-02-B-01 |
removal of box culvert (sta. 5+440; 1-1200 mm x 914 mm
x 14.7 m) |
1   |
ea |
4,000.00 |
4,000.00 |
6,000.00 |
6,000.00 |
8,000.00 |
8,000.00 |
5,000.00 |
5,000.00 |
| 202-02-B-02 |
removal of box culvert (sta. 6+140; 1-609 mm x 609 mm
x 14.2 m) |
1   |
ea |
4,000.00 |
4,000.00 |
3,000.00 |
3,000.00 |
10,000.00 |
10,000.00 |
4,000.00 |
4,000.00 |
| 202-02-B-03 |
removal of box culvert (sta. 5+559; 6-1800 mm x
1800 mm x 20.42 m) |
1   |
ea |
55,000.00 |
55,000.00 |
20,000.00 |
20,000.00 |
14,000.00 |
14,000.00 |
14,000.00 |
14,000.00 |
| 202-02-B-04 |
removal of box culvert (sta. 7+371; 2-1900 mm x
1066 mm x 53.65 m) |
1   |
ea |
40,000.00 |
40,000.00 |
16,000.00 |
16,000.00 |
18,000.00 |
18,000.00 |
15,000.00 |
15,000.00 |
| 202-02-B-05 |
removal of box culvert (sta. 9+150; 3-1800 mm x
1800 mm x 15.60 m) |
1   |
ea |
15,000.00 |
15,000.00 |
12,000.00 |
12,000.00 |
12,000.00 |
12,000.00 |
11,000.00 |
11,000.00 |
| 202-02-B-06 |
removal of box culvert (sta. 9+869.500 (la 3103);
900 mm x 600 mm x 13.0 m) |
1   |
ea |
3,000.00 |
3,000.00 |
3,800.00 |
3,800.00 |
10,500.00 |
10,500.00 |
4,000.00 |
4,000.00 |
| 202-02-C |
removal of portland cement concrete pavement
|
52,670   |
sq m |
4.85 |
255,449.50 |
7.50 |
395,025.00 |
4.60 |
242,282.00 |
5.80 |
305,486.00 |
| 202-02-D |
removal of concrete walks & drives
|
9,132   |
sq m |
4.00 |
36,528.00 |
10.00 |
91,320.00 |
4.60 |
42,007.20 |
4.00 |
36,528.00 |
| 202-02-E |
removal of concrete curbs
|
799.8 |
ln m |
16.50 |
13,196.70 |
9.00 |
7,198.20 |
7.00 |
5,598.60 |
10.00 |
7,998.00 |
| 202-02-F |
removal of concrete combination curb & gutter
|
947.5 |
ln m |
16.50 |
15,633.75 |
15.00 |
14,212.50 |
9.00 |
8,527.50 |
6.00 |
5,685.00 |
| 202-02-G |
removal of surfacing & stabilized base
|
32,547.0 |
sq m |
3.60 |
117,169.20 |
4.00 |
130,188.00 |
3.80 |
123,678.60 |
3.30 |
107,405.10 |
| 202-02-H |
removal of guard rail
|
124   |
ln m |
14.00 |
1,736.00 |
15.00 |
1,860.00 |
25.00 |
3,100.00 |
40.00 |
4,960.00 |
| 202-02-01 |
removal of 7.6 m x 19.0 m single story wood frame
residence (rt. of sta. 5+115)(contains friable asbestos) |
1   |
each |
1.00 |
1.00 |
1.00 |
1.00 |
8,000.00 |
8,000.00 |
1,000.00 |
1,000.00 |
| 202-02-02 |
removal of 13.3 m x 16.8 m wood frame residence (lt.
of sta. 5+236) |
1   |
each |
1.00 |
1.00 |
1.00 |
1.00 |
11,000.00 |
11,000.00 |
100.00 |
100.00 |
| 202-02-03 |
removal of 13.0 m x 14.6 m wood frame residence (rt.
of sta. 5+5+371) |
1   |
each |
1.00 |
1.00 |
1.00 |
1.00 |
9,000.00 |
9,000.00 |
1,000.00 |
1,000.00 |
| 202-02-04 |
removal of 8.8 m x 22.8 m wood frame residence (rt. of
sta. 5+756) (contains non-friable asbestos) |
1   |
each |
1.00 |
1.00 |
1.00 |
1.00 |
10,000.00 |
10,000.00 |
100.00 |
100.00 |
| 202-02-05 |
removal of 8.7 m x 22.5 m wood frame residence (rt. of
sta. 5+778) (contains friable asbestos) |
1   |
each |
1.00 |
1.00 |
1.00 |
1.00 |
10,000.00 |
10,000.00 |
100.00 |
100.00 |
| 202-02-06 |
removal of 3.7 m x 5.5 m metal storage building (rt.
of sta. 5+816) |
1   |
each |
1.00 |
1.00 |
1.00 |
1.00 |
1,000.00 |
1,000.00 |
100.00 |
100.00 |
| 202-02-07 |
removal of 9.9 m x 8.6 m wood frame residence (rt. of
sta. 5+916)(contains non-friable asbestos) |
1   |
each |
1.00 |
1.00 |
1.00 |
1.00 |
5,000.00 |
5,000.00 |
1,000.00 |
1,000.00 |
| 202-02-08 |
removal of 12.5 m x 10.7 m single story concrete block
building (rt. of sta. 6+408) |
1   |
each |
1.00 |
1.00 |
1.00 |
1.00 |
6,000.00 |
6,000.00 |
1,000.00 |
1,000.00 |
| 202-02-09 |
removal of 13.7 m x 8.7 m single story wood frame
residence (lt. of sta. 6+532) |
1   |
each |
1.00 |
1.00 |
1.00 |
1.00 |
3,500.00 |
3,500.00 |
100.00 |
100.00 |
| 202-02-10 |
removal of 18.2 m x 4.1 m mobile home (rt. of sta.
6+682) |
1   |
each |
1.00 |
1.00 |
1.00 |
1.00 |
4,000.00 |
4,000.00 |
100.00 |
100.00 |
| 202-02-11 |
removal of 8.7 m x 14.2 m wood frame residence (rt. of
sta. 6+850) |
1   |
each |
1.00 |
1.00 |
1.00 |
1.00 |
6,000.00 |
6,000.00 |
1,000.00 |
1,000.00 |
| 202-02-12 |
removal of 9.2 m x 15.4 m wood frame residence (rt. of
sta. 5+886) |
1   |
each |
1.00 |
1.00 |
1.00 |
1.00 |
5,200.00 |
5,200.00 |
1,000.00 |
1,000.00 |
| 202-02-13 |
removal of 11.9 m x 19.3 m single story wood frame
building (lt. of sta. 6+915) |
1   |
each |
1.00 |
1.00 |
1.00 |
1.00 |
9,000.00 |
9,000.00 |
100.00 |
100.00 |
| 202-02-14 |
removal of 8.8 m x 16.5 m wood frame residence (rt. of
sta. 6+970) (contains non-friable asbestos) |
1   |
each |
1.00 |
1.00 |
1.00 |
1.00 |
7,000.00 |
7,000.00 |
1,000.00 |
1,000.00 |
| 202-02-15 |
removal of 8.7 m x 13.5 m wood frame building (rt. of
sta. 7+040)(contains non-friable asbestos) |
1   |
each |
1.00 |
1.00 |
1.00 |
1.00 |
5,500.00 |
5,500.00 |
100.00 |
100.00 |
| 202-02-16 |
removal of 10.4 m x 12.0 m single story wood frame
residence (rt. of sta. 7+070) |
1   |
each |
1.00 |
1.00 |
1.00 |
1.00 |
4,300.00 |
4,300.00 |
100.00 |
100.00 |
| 202-02-17 |
removal of wood frame building (rt. of sta. 7+228)
|
1   |
each |
1.00 |
1.00 |
1.00 |
1.00 |
4,300.00 |
4,300.00 |
1,000.00 |
1,000.00 |
| 202-02-18 |
removal of 7.5 m x 30.7 m metal gas canopy (rt. of
sta. 7+400) |
1   |
each |
1.00 |
1.00 |
1.00 |
1.00 |
8,000.00 |
8,000.00 |
1,000.00 |
1,000.00 |
| 202-02-19 |
removal of 10.0 m x 12.4 m wood garage (lt. of sta.
7+450) |
1   |
each |
1.00 |
1.00 |
1.00 |
1.00 |
5,000.00 |
5,000.00 |
1,000.00 |
1,000.00 |
| 202-02-20 |
removal of 7.6 m x 13.9 m single story wood frame
residence (rt. of sta. 7+555)(contains non-friable asbestos) |
1   |
each |
1.00 |
1.00 |
1.00 |
1.00 |
4,000.00 |
4,000.00 |
1,000.00 |
1,000.00 |
| 202-02-21 |
removal of 8.9 m x 14.7 m single story wood frame
residence (lt. of sta. 7+632)(contains non-friable asbestos) |
1   |
each |
1.00 |
1.00 |
1.00 |
1.00 |
7,000.00 |
7,000.00 |
1,000.00 |
1,000.00 |
| 202-02-22 |
removal of wood frame building (lt. of sta. 7+650)
(contains non-friable asbestos) |
1   |
each |
1.00 |
1.00 |
1.00 |
1.00 |
5,000.00 |
5,000.00 |
1,000.00 |
1,000.00 |
| 202-02-23 |
removal of 30.6 m x 9.1 m metal building (rt. of sta.
7+828) |
1   |
each |
1.00 |
1.00 |
1.00 |
1.00 |
9,000.00 |
9,000.00 |
1,000.00 |
1,000.00 |
| 202-02-24 |
removal of 18.5 m x 15.1 m metal building on slab (rt.
of sta. 7+838) (contains non-friable asbestos) |
1   |
each |
1.00 |
1.00 |
1.00 |
1.00 |
12,000.00 |
12,000.00 |
5,000.00 |
5,000.00 |
| 202-02-25 |
removal of 3.2 m x 6.1 m metal portable building (rt.
of sta. 7+855) |
1   |
each |
1.00 |
1.00 |
1.00 |
1.00 |
800.00 |
800.00 |
100.00 |
100.00 |
| 202-02-26 |
removal of 14.0 m x 19.8 m single story brick
residence (rt. of sta. 8+130)(contains friable asbestos) |
1   |
each |
1.00 |
1.00 |
1.00 |
1.00 |
10,000.00 |
10,000.00 |
1,000.00 |
1,000.00 |
| 202-02-27 |
removal of 10.6 m x 18.6 m single story brick
residence (rt. of sta. 8+200)(contains non-friable asbestos) |
1   |
each |
1.00 |
1.00 |
1.00 |
1.00 |
8,000.00 |
8,000.00 |
1,000.00 |
1,000.00 |
| 202-02-28 |
removal of 6.9 m x 9.2 m wood frame garage (rt. of
sta. 8+209) |
1   |
each |
1.00 |
1.00 |
1.00 |
1.00 |
2,000.00 |
2,000.00 |
100.00 |
100.00 |
| 202-02-29 |
removal of 9.3 m x 9.4 m single story wood frame
building (rt. of sta. 8+300) |
1   |
each |
1.00 |
1.00 |
1.00 |
1.00 |
5,000.00 |
5,000.00 |
100.00 |
100.00 |
| 202-02-30 |
removal of 3.0 m x 6.2 portable metal storage building
(rt. of sta. 8+774) |
1   |
each |
1.00 |
1.00 |
1.00 |
1.00 |
1,000.00 |
1,000.00 |
100.00 |
100.00 |
| 202-02-31 |
removal of 17.9 m x 8.3 m abandoned wood frame
building (rt. of sta. 9+423)(contains non-friable asbestos) |
1   |
each |
1.00 |
1.00 |
1.00 |
1.00 |
7,000.00 |
7,000.00 |
1,000.00 |
1,000.00 |
| 202-02-32 |
removal of 16.1 m x 14.9 m single story wood frame
residence (lt. of sta. 10+102 mcenery street) |
1   |
each |
1.00 |
1.00 |
1.00 |
1.00 |
8,200.00 |
8,200.00 |
1,000.00 |
1,000.00 |
| 202-02-33 |
removal of storage building (lt. of sta.
10+102 mcenery street) |
1   |
each |
1.00 |
1.00 |
1.00 |
1.00 |
5,000.00 |
5,000.00 |
1,000.00 |
1,000.00 |
| 202-02-34 |
removal of 33.7 m x 35.8 m wood frame building (rt. of
sta. 10+180 polk street)(contains non-friable asbestos) |
1   |
each |
1.00 |
1.00 |
1.00 |
1.00 |
40,000.00 |
40,000.00 |
8,000.00 |
8,000.00 |
| 202-02-35 |
removal of 10.2 m x 13.7 m brick bank teller building
(rt. of sta. 10+239 polk street) |
1   |
each |
1.00 |
1.00 |
1.00 |
1.00 |
5,000.00 |
5,000.00 |
1,000.00 |
1,000.00 |
| 202-02-36 |
removal of 10.2 m x 13.7 m drive thru canopy (rt. of
sta. 10+239 polk street) |
1   |
each |
1.00 |
1.00 |
1.00 |
1.00 |
6,000.00 |
6,000.00 |
1,000.00 |
1,000.00 |
| 202-02-37 |
removal of 18.3 m x 33.4 m brick building (lt. of sta.
10+250 polk street) |
1   |
each |
1.00 |
1.00 |
1.00 |
1.00 |
30,000.00 |
30,000.00 |
8,000.00 |
8,000.00 |
| 202-02-38 |
removal of 20.4 m x 26.4 m brick building (lt. of sta.
10+300 polk street) (contains non-friable asbestos) |
1   |
each |
1.00 |
1.00 |
1.00 |
1.00 |
25,000.00 |
25,000.00 |
8,000.00 |
8,000.00 |
| 202-02-39 |
removal of 11.7 m x 12.7 m single story wood frame
residence (lt. of sta. 9+880 kings highway) |
1   |
each |
1.00 |
1.00 |
1.00 |
1.00 |
8,000.00 |
8,000.00 |
1,000.00 |
1,000.00 |
| 202-02-40 |
removal of 17.1 m x 3.8 m mobile home (rt. of sta.
9+884 kings highway) |
1   |
each |
1.00 |
1.00 |
1.00 |
1.00 |
4,000.00 |
4,000.00 |
1,000.00 |
1,000.00 |
| 202-02-41 |
removal of 19.1 m x 10.1 m single story wood frame
residence (rt. of sta. 9+910 kings highway) |
1   |
each |
1.00 |
1.00 |
1.00 |
1.00 |
8,000.00 |
8,000.00 |
1,000.00 |
1,000.00 |
| 202-02-42 |
removal of 20.7 m x 13.0 m single story wood frame
residence (rt. of sta. 9+928 kings highway) |
1   |
each |
1.00 |
1.00 |
1.00 |
1.00 |
9,000.00 |
9,000.00 |
1,000.00 |
1,000.00 |
| 202-02-43 |
removal of 23.3 m x 15.3 m moveable storage building
(lt. of sta. 9+980 kings highway) |
1   |
each |
1.00 |
1.00 |
1.00 |
1.00 |
12,000.00 |
12,000.00 |
1,000.00 |
1,000.00 |
| 202-02-44 |
removal of 7.4 m x 11.2 m single story wood frame
residence (lt. of sta. 10+100 miss. st.)(cont. non-friable asb.) |
1   |
each |
1.00 |
1.00 |
1.00 |
1.00 |
3,500.00 |
3,500.00 |
1,000.00 |
1,000.00 |
| 202-02-45 |
removal of 11.0 m x 9.6 m wood frame residence (lt. of
sta. 10+055 clark street)(contains non-friable asbestos) |
1   |
each |
1.00 |
1.00 |
1.00 |
1.00 |
4,500.00 |
4,500.00 |
1,000.00 |
1,000.00 |
| 202-07 |
plugging existing water wells
|
4   |
each |
2,000.00 |
8,000.00 |
2,500.00 |
10,000.00 |
2,000.00 |
8,000.00 |
2,000.00 |
8,000.00 |
| 203-01 |
general excavation
|
592,600   |
cu m |
3.37 |
1,997,062.00 |
3.40 |
2,014,840.00 |
2.80 |
1,659,280.00 |
4.45 |
2,637,070.00 |
| 203-02 |
drainage excavation
|
53,661   |
cu m |
10.51 |
563,977.11 |
6.00 |
321,966.00 |
6.20 |
332,698.20 |
7.00 |
375,627.00 |
| 203-03 |
embankment
|
704,527   |
cu m |
7.00 |
4,931,689.00 |
6.30 |
4,438,520.10 |
12.20 |
8,595,229.40 |
6.00 |
4,227,162.00 |
| 203-04 |
nonplastic embankment)
|
27   |
cu m |
20.00 |
540.00 |
300.00 |
8,100.00 |
160.00 |
4,320.00 |
400.00 |
10,800.00 |
| 203-07-B |
borrow (vehicular measurement)(plastic soils)
|
96   |
cu m |
20.00 |
1,920.00 |
100.00 |
9,600.00 |
15.00 |
1,440.00 |
100.00 |
9,600.00 |
| 204-02 |
temporary hay or straw bales
|
2,347   |
ea |
10.00 |
23,470.00 |
10.00 |
23,470.00 |
15.00 |
35,205.00 |
45.00 |
105,615.00 |
| 204-03 |
temporary slope drains
|
790   |
ln m |
33.00 |
26,070.00 |
45.00 |
35,550.00 |
40.00 |
31,600.00 |
40.00 |
31,600.00 |
| 204-05-A |
temporary sediment check dams (hay)
|
57   |
ea |
100.00 |
5,700.00 |
150.00 |
8,550.00 |
120.00 |
6,840.00 |
750.00 |
42,750.00 |
| 204-05-B |
temporary sediment check dams (stone)
|
11   |
ea |
500.00 |
5,500.00 |
700.00 |
7,700.00 |
500.00 |
5,500.00 |
1,450.00 |
15,950.00 |
| 204-06 |
temporary silt fencing
|
8,974   |
ln m |
4.55 |
40,831.70 |
5.50 |
49,357.00 |
5.50 |
49,357.00 |
6.00 |
53,844.00 |
| 204-07 |
temporary stone construction entrance
|
6   |
ea |
1,000.00 |
6,000.00 |
2,500.00 |
15,000.00 |
2,800.00 |
16,800.00 |
4,000.00 |
24,000.00 |
| 302-02-C-01 |
class ii base course (200 mm thick)(soil cement)
|
176,541.7 |
sq m |
10.00 |
1,765,417.00 |
10.30 |
1,818,379.51 |
9.40 |
1,659,491.98 |
12.25 |
2,162,635.83 |
| 302-02-F-01 |
class ii base course (300 mm thick)(stone or recycled
pccp) |
6,947.0 |
sq m |
29.00 |
201,463.00 |
38.00 |
263,986.00 |
25.00 |
173,675.00 |
35.00 |
243,145.00 |
| 302-02-G-01 |
class ii base course (100 mm thick)(stone or recycled
pccp) |
176,541.7 |
sq m |
9.75 |
1,721,281.58 |
11.50 |
2,030,229.55 |
8.80 |
1,553,566.96 |
11.00 |
1,941,958.70 |
| 304-05 |
lime treatment (type e)
|
1,630.84 |
Mg |
1.00 |
1,630.84 |
250.00 |
407,710.00 |
60.00 |
97,850.40 |
168.00 |
273,981.12 |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
582   |
cu m |
95.00 |
55,290.00 |
100.00 |
58,200.00 |
55.00 |
32,010.00 |
120.00 |
69,840.00 |
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
10,000.0 |
cu m |
1.00 |
10,000.00 |
55.00 |
550,000.00 |
48.00 |
480,000.00 |
63.00 |
630,000.00 |
| 502-01 |
superpave asphaltic concrete
|
4,492.2 |
Mg |
100.00 |
449,220.00 |
130.00 |
583,986.00 |
110.00 |
494,142.00 |
132.00 |
592,970.40 |
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
209.4 |
Mg |
110.00 |
23,034.00 |
240.00 |
50,256.00 |
120.00 |
25,128.00 |
220.00 |
46,068.00 |
| 509-01 |
cold planing asphaltic pavement
|
9,576   |
sq m |
3.00 |
28,728.00 |
4.00 |
38,304.00 |
2.50 |
23,940.00 |
2.50 |
23,940.00 |
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 479   |
cu m |
0.10 |
- 47.90 |
0.01 |
- 4.79 |
0.10 |
- 47.90 |
0.01 |
- 4.79 |
| 510-01-C |
pavement patching (400 mm minimum thickness)
|
252   |
sq m |
112.00 |
28,224.00 |
140.00 |
35,280.00 |
180.00 |
45,360.00 |
200.00 |
50,400.00 |
| 510-02 |
pavement widening (200 mm thickness)
|
1,082.8 |
sq m |
62.00 |
67,133.60 |
95.00 |
102,866.00 |
36.00 |
38,980.80 |
75.00 |
81,210.00 |
| 601-01-K |
portland cement concrete pavement (250 mm thick)
|
141,664.2 |
sq m |
72.61 |
10,286,237.56 |
55.00 |
7,791,531.00 |
51.50 |
7,295,706.30 |
60.75 |
8,606,100.15 |
| 601-02-K |
portland cement concrete pavement (250 mm thick)
(crossovers & turnouts) |
10,367.7 |
sq m |
95.00 |
984,931.50 |
70.00 |
725,739.00 |
64.00 |
663,532.80 |
75.00 |
777,577.50 |
| 601-03-A-K |
portland cement concrete shoulder (125 mm thick -
250 mm thick) |
19,360.6 |
sq m |
60.00 |
1,161,636.00 |
55.00 |
1,064,833.00 |
60.00 |
1,161,636.00 |
36.00 |
696,981.60 |
| 601-04 |
portland cement concrete pavement coring
|
215   |
ea |
100.00 |
21,500.00 |
100.00 |
21,500.00 |
125.00 |
26,875.00 |
125.00 |
26,875.00 |
| 602-08 |
grinding concrete pavement
|
1,184.5 |
sq m |
25.00 |
29,612.50 |
30.00 |
35,535.00 |
18.00 |
21,321.00 |
11.25 |
13,325.63 |
| 701-01-G |
cross drain pipe (450 mm pcp/rcp)
|
172.7 |
ln m |
200.00 |
34,540.00 |
200.00 |
34,540.00 |
150.00 |
25,905.00 |
215.00 |
37,130.50 |
| 701-01-I |
cross drain pipe (600 mm pcp/rcp)
|
108.8 |
ln m |
250.00 |
27,200.00 |
180.00 |
19,584.00 |
185.00 |
20,128.00 |
220.00 |
23,936.00 |
| 701-01-K |
cross drain pipe (750 mm pcp/rcp)
|
26.0 |
ln m |
300.00 |
7,800.00 |
250.00 |
6,500.00 |
222.00 |
5,772.00 |
580.00 |
15,080.00 |
| 701-01-M |
cross drain pipe (900 mm pcp/rcp)
|
81.4 |
ln m |
500.00 |
40,700.00 |
290.00 |
23,606.00 |
290.00 |
23,606.00 |
430.00 |
35,002.00 |
| 701-01-O |
cross drain pipe (1200 mm pcp/rcp)
|
47.3 |
ln m |
600.00 |
28,380.00 |
470.00 |
22,231.00 |
465.00 |
21,994.50 |
615.00 |
29,089.50 |
| 701-01-P |
cross drain pipe (1350 mm rcp)
|
34.5 |
ln m |
875.00 |
30,187.50 |
600.00 |
20,700.00 |
699.00 |
24,115.50 |
685.00 |
23,632.50 |
| 701-02-E |
cross drain pipe arch (750 mm equiv. rcpa)
|
39.6 |
ln m |
400.00 |
15,840.00 |
350.00 |
13,860.00 |
300.00 |
11,880.00 |
355.00 |
14,058.00 |
| 701-03-F |
storm drain pipe (375 mm pcp/rcp)
|
2,449.9 |
ln m |
105.00 |
257,239.50 |
170.00 |
416,483.00 |
135.00 |
330,736.50 |
215.00 |
526,728.50 |
| 701-03-G |
storm drain pipe (450 mm pcp/rcp)
|
701.4 |
ln m |
125.00 |
87,675.00 |
180.00 |
126,252.00 |
145.00 |
101,703.00 |
225.00 |
157,815.00 |
| 701-03-G-01 |
storm drain pipe (450 mm cmp)(outfall)
|
99.6 |
ln m |
100.00 |
9,960.00 |
240.00 |
23,904.00 |
145.00 |
14,442.00 |
205.00 |
20,418.00 |
| 701-03-I |
storm drain pipe (600 mm pcp/rcp)
|
647.5 |
ln m |
175.00 |
113,312.50 |
210.00 |
135,975.00 |
180.00 |
116,550.00 |
260.00 |
168,350.00 |
| 701-03-I-01 |
storm drain pipe (600 mm cmp)(outfall)
|
10.0 |
ln m |
185.00 |
1,850.00 |
290.00 |
2,900.00 |
188.00 |
1,880.00 |
475.00 |
4,750.00 |
| 701-03-K |
storm drain pipe (750 mm pcp/rcp)
|
464.6 |
ln m |
244.00 |
113,362.40 |
250.00 |
116,150.00 |
222.00 |
103,141.20 |
330.00 |
153,318.00 |
| 701-03-K-01 |
storm drain pipe (750 mm cmp)(outfall)
|
14.0 |
ln m |
200.00 |
2,800.00 |
440.00 |
6,160.00 |
222.00 |
3,108.00 |
455.00 |
6,370.00 |
| 701-03-M |
storm drain pipe (900 mm pcp/rcp)
|
414.8 |
ln m |
297.00 |
123,195.60 |
310.00 |
128,588.00 |
292.00 |
121,121.60 |
440.00 |
182,512.00 |
| 701-03-M-01 |
storm drain pipe (900 mm cmp)(outfall)
|
18.7 |
ln m |
297.00 |
5,553.90 |
480.00 |
8,976.00 |
292.00 |
5,460.40 |
455.00 |
8,508.50 |
| 701-03-N |
storm drain pipe (1050 mm pcp/rcp)
|
100.6 |
ln m |
400.00 |
40,240.00 |
440.00 |
44,264.00 |
388.00 |
39,032.80 |
545.00 |
54,827.00 |
| 701-03-N-01 |
storm drain pipe (1050 mm cmp)(outfall)
|
8.5 |
ln m |
400.00 |
3,400.00 |
660.00 |
5,610.00 |
388.00 |
3,298.00 |
790.00 |
6,715.00 |
| 701-03-O |
storm drain pipe (1200 mm pcp/rcp)
|
195.3 |
ln m |
500.00 |
97,650.00 |
490.00 |
95,697.00 |
472.00 |
92,181.60 |
650.00 |
126,945.00 |
| 701-03-O-01 |
storm drain pipe (1200 mm cmp)(outfall)
|
7.7 |
ln m |
400.00 |
3,080.00 |
740.00 |
5,698.00 |
472.00 |
3,634.40 |
965.00 |
7,430.50 |
| 701-04-E |
storm drain pipe arch (750 mm equiv. rcpa)
|
95.3 |
ln m |
265.00 |
25,254.50 |
340.00 |
32,402.00 |
303.00 |
28,875.90 |
475.00 |
45,267.50 |
| 701-05-G |
side drain pipe (450 mm)
|
357.2 |
ln m |
100.00 |
35,720.00 |
170.00 |
60,724.00 |
144.00 |
51,436.80 |
185.00 |
66,082.00 |
| 701-05-G-01 |
side drain pipe (450 mm)(erosion)
|
37.0 |
ln m |
100.00 |
3,700.00 |
180.00 |
6,660.00 |
144.00 |
5,328.00 |
345.00 |
12,765.00 |
| 701-05-I |
side drain pipe (600 mm)
|
138.5 |
ln m |
166.00 |
22,991.00 |
210.00 |
29,085.00 |
191.00 |
26,453.50 |
275.00 |
38,087.50 |
| 701-05-K |
side drain pipe (750 mm)
|
208.4 |
ln m |
200.00 |
41,680.00 |
230.00 |
47,932.00 |
225.00 |
46,890.00 |
300.00 |
62,520.00 |
| 701-05-M |
side drain pipe (900 mm)
|
103.8 |
ln m |
265.00 |
27,507.00 |
280.00 |
29,064.00 |
293.00 |
30,413.40 |
400.00 |
41,520.00 |
| 701-09 |
fabricating pipe fittings
|
4   |
ea |
2,000.00 |
8,000.00 |
3,000.00 |
12,000.00 |
3,000.00 |
12,000.00 |
3,500.00 |
14,000.00 |
| 702-02-F |
manholes (mh-01m)
|
18   |
ea |
3,900.00 |
70,200.00 |
4,400.00 |
79,200.00 |
3,800.00 |
68,400.00 |
5,000.00 |
90,000.00 |
| 702-02-G |
manholes (r-cb-36)
|
57   |
ea |
3,100.00 |
176,700.00 |
4,400.00 |
250,800.00 |
2,500.00 |
142,500.00 |
2,500.00 |
142,500.00 |
| 702-02-H |
manholes (special detail)
|
4   |
ea |
3,900.00 |
15,600.00 |
5,000.00 |
20,000.00 |
2,700.00 |
10,800.00 |
5,500.00 |
22,000.00 |
| 702-03-A |
catch basins (cb-01m)
|
70   |
ea |
3,000.00 |
210,000.00 |
2,400.00 |
168,000.00 |
2,600.00 |
182,000.00 |
2,000.00 |
140,000.00 |
| 702-03-C |
catch basins (cb-06m)
|
123   |
ea |
3,000.00 |
369,000.00 |
4,000.00 |
492,000.00 |
4,030.00 |
495,690.00 |
3,200.00 |
393,600.00 |
| 702-03-I |
catch basins (double curb opening)
|
57   |
ea |
4,000.00 |
228,000.00 |
6,000.00 |
342,000.00 |
3,420.00 |
194,940.00 |
6,000.00 |
342,000.00 |
| 702-03-J |
catch basins (paved gutter drain)
|
59   |
ea |
1,500.00 |
88,500.00 |
4,000.00 |
236,000.00 |
3,500.00 |
206,500.00 |
4,000.00 |
236,000.00 |
| 702-04-A |
adjusting manholes
|
9   |
ea |
1,000.00 |
9,000.00 |
1,300.00 |
11,700.00 |
1,000.00 |
9,000.00 |
1,000.00 |
9,000.00 |
| 702-05-A |
cross drain end treatment ((1 barrel, 600 mm rcp)
|
2   |
ea |
1,000.00 |
2,000.00 |
1,500.00 |
3,000.00 |
1,022.00 |
2,044.00 |
2,000.00 |
4,000.00 |
| 702-05-B |
cross drain end treatment (1 barrel, 750 mm rcp)
|
2   |
ea |
2,500.00 |
5,000.00 |
2,000.00 |
4,000.00 |
1,725.00 |
3,450.00 |
2,500.00 |
5,000.00 |
| 702-05-C |
cross drain end treatment (1 barrel, 750 mm equiv.
rcpa) |
2   |
ea |
3,000.00 |
6,000.00 |
2,500.00 |
5,000.00 |
2,333.00 |
4,666.00 |
2,500.00 |
5,000.00 |
| 702-05-D |
cross drain end treatment (1 barrel, 900 mm rcp)
|
2   |
ea |
3,000.00 |
6,000.00 |
3,000.00 |
6,000.00 |
2,333.00 |
4,666.00 |
3,000.00 |
6,000.00 |
| 702-05-E |
cross drain end treatment (1 barrel, 1200 mm rcp)
|
2   |
ea |
8,000.00 |
16,000.00 |
8,000.00 |
16,000.00 |
3,000.00 |
6,000.00 |
10,000.00 |
20,000.00 |
| 704-03 |
blocked out guard rail
|
405.77 |
ln m |
72.50 |
29,418.33 |
80.00 |
32,461.60 |
60.00 |
24,346.20 |
60.00 |
24,346.20 |
| 704-08-B |
guard rail transitions (double thrie beam)
|
68.58 |
ln m |
190.00 |
13,030.20 |
200.00 |
13,716.00 |
180.00 |
12,344.40 |
190.00 |
13,030.20 |
| 704-11-A |
guard rail end treatment (flared)
|
9   |
ea |
2,200.00 |
19,800.00 |
3,000.00 |
27,000.00 |
2,200.00 |
19,800.00 |
2,000.00 |
18,000.00 |
| 705-01 |
barbed wire fence
|
2,498   |
ln m |
14.50 |
36,221.00 |
22.00 |
54,956.00 |
25.00 |
62,450.00 |
20.00 |
49,960.00 |
| 705-02 |
combination mesh & barbed wire fence
|
225   |
ln m |
16.50 |
3,712.50 |
25.00 |
5,625.00 |
28.00 |
6,300.00 |
21.00 |
4,725.00 |
| 705-04 |
single swinging driveway gates
|
2   |
each |
450.00 |
900.00 |
800.00 |
1,600.00 |
700.00 |
1,400.00 |
585.00 |
1,170.00 |
| 705-05 |
double swinging driveway gates
|
13   |
dbgt |
600.00 |
7,800.00 |
1,200.00 |
15,600.00 |
800.00 |
10,400.00 |
850.00 |
11,050.00 |
| 705-06-A |
chain link fence (1200 mm height)
|
894   |
ln m |
37.00 |
33,078.00 |
60.00 |
53,640.00 |
80.00 |
71,520.00 |
55.00 |
49,170.00 |
| 705-06-B |
chain link fence (1500 mm height)
|
217   |
ln m |
45.00 |
9,765.00 |
70.00 |
15,190.00 |
95.00 |
20,615.00 |
73.00 |
15,841.00 |
| 705-06-C |
chain link fence (1800 mm height)
|
353   |
ln m |
52.00 |
18,356.00 |
75.00 |
26,475.00 |
102.00 |
36,006.00 |
85.00 |
30,005.00 |
| 705-08-A |
4.0-meter double gates for chain link fence (1200mm
height) |
3   |
dbgt |
700.00 |
2,100.00 |
1,200.00 |
3,600.00 |
1,800.00 |
5,400.00 |
1,100.00 |
3,300.00 |
| 705-08-C |
4.0-meter double gates for chain link fence (1800mm
height) |
3   |
dbgt |
900.00 |
2,700.00 |
1,600.00 |
4,800.00 |
2,400.00 |
7,200.00 |
1,200.00 |
3,600.00 |
| 706-01-A |
concrete walk (100 mm thick)
|
3,759.1 |
sq m |
50.00 |
187,955.00 |
50.00 |
187,955.00 |
38.00 |
142,845.80 |
45.00 |
169,159.50 |
| 706-02-C |
concrete drive (150 mm thick)
|
7,691.8 |
sq m |
60.00 |
461,508.00 |
57.00 |
438,432.60 |
50.00 |
384,590.00 |
55.00 |
423,049.00 |
| 706-03-A |
incidental concrete paving (100 mm thick)
|
29.0 |
sq m |
100.00 |
2,900.00 |
100.00 |
2,900.00 |
60.00 |
1,740.00 |
250.00 |
7,250.00 |
| 706-03-C |
incidental concrete paving (150 mm thick)
|
2,409.0 |
sq m |
60.00 |
144,540.00 |
65.00 |
156,585.00 |
93.00 |
224,037.00 |
55.00 |
132,495.00 |
| 707-01 |
concrete curb
|
8,248.2 |
ln m |
5.00 |
41,241.00 |
20.00 |
164,964.00 |
8.00 |
65,985.60 |
10.00 |
82,482.00 |
| 707-03 |
combination concrete curb & gutter
|
208.9 |
ln m |
66.00 |
13,787.40 |
100.00 |
20,890.00 |
65.00 |
13,578.50 |
75.00 |
15,667.50 |
| 708-01 |
right-of-way monument
|
275   |
ea |
170.00 |
46,750.00 |
120.00 |
33,000.00 |
150.00 |
41,250.00 |
325.00 |
89,375.00 |
| 708-02 |
right-of-way monument witness post
|
135   |
ea |
55.00 |
7,425.00 |
120.00 |
16,200.00 |
60.00 |
8,100.00 |
325.00 |
43,875.00 |
| 711-01-C |
riprap (15 kg, 360 mm thick)
|
11,376   |
sq m |
60.00 |
682,560.00 |
50.00 |
568,800.00 |
57.00 |
648,432.00 |
44.00 |
500,544.00 |
| 711-01-D |
riprap (25 kg, 450 mm thick)
|
426   |
sq m |
75.00 |
31,950.00 |
70.00 |
29,820.00 |
80.00 |
34,080.00 |
60.00 |
25,560.00 |
| 711-04 |
geotextile fabric
|
11,802   |
sq m |
2.00 |
23,604.00 |
2.00 |
23,604.00 |
2.60 |
30,685.20 |
2.40 |
28,324.80 |
| 712-01-C |
concrete cast-in-place revetment (150 mm thick)
|
78   |
sq m |
80.00 |
6,240.00 |
170.00 |
13,260.00 |
240.00 |
18,720.00 |
170.00 |
13,260.00 |
| 712-04 |
flexible revetment
|
2,400   |
sq m |
75.00 |
180,000.00 |
55.00 |
132,000.00 |
70.00 |
168,000.00 |
55.00 |
132,000.00 |
| 713-01 |
temporary signs & barricades
|
lump |
lump |
300,000.00 |
300,000.00 |
400,000.00 |
400,000.00 |
220,000.00 |
220,000.00 |
800,000.00 |
800,000.00 |
| 713-03-A |
temporary pavement markings (broken line)(100 mm width)
(1.2 m length) |
2.010 |
km |
500.00 |
1,005.00 |
550.00 |
1,105.50 |
222.00 |
446.22 |
500.00 |
1,005.00 |
| 713-03-B |
temporary pavement markings (broken line)(100mm width)
(3.0m length) |
0.267 |
km |
220.00 |
58.74 |
300.00 |
80.10 |
292.00 |
77.96 |
600.00 |
160.20 |
| 713-04-A |
temporary pavement markings (solid line)(100 mm width)
|
35.621 |
km |
550.00 |
19,591.55 |
350.00 |
12,467.35 |
344.00 |
12,253.62 |
400.00 |
14,248.40 |
| 713-08 |
temporary precast concrete barrier (department
furnished) |
11   |
ea |
500.00 |
5,500.00 |
440.00 |
4,840.00 |
2,000.00 |
22,000.00 |
1,400.00 |
15,400.00 |
| 716-01-A |
mulch (vegetative)
|
128,558.0 |
kg |
0.50 |
64,279.00 |
1.20 |
154,269.60 |
0.75 |
96,418.50 |
0.58 |
74,563.64 |
| 717-01 |
seeding
|
2,100   |
kg |
15.40 |
32,340.00 |
19.00 |
39,900.00 |
15.00 |
31,500.00 |
18.50 |
38,850.00 |
| 718-01 |
fertilizer
|
67,200   |
kg |
1.10 |
73,920.00 |
0.55 |
36,960.00 |
0.90 |
60,480.00 |
0.80 |
53,760.00 |
| 718-02 |
agricultural lime
|
52.5 |
Mg |
135.00 |
7,087.50 |
130.00 |
6,825.00 |
145.00 |
7,612.50 |
175.00 |
9,187.50 |
| 720-01-A |
erosion control system, slope protection (type a)
|
40,039   |
sq m |
1.35 |
54,052.65 |
1.60 |
64,062.40 |
1.33 |
53,251.87 |
1.40 |
56,054.60 |
| 720-01-C |
erosion control system, flexible channel liner (type c)
|
8,372   |
sq m |
1.53 |
12,809.16 |
1.60 |
13,395.20 |
1.49 |
12,474.28 |
2.90 |
24,278.80 |
| 720-01-D |
erosion control system, flexible channel liner (type d)
|
7,347   |
sq m |
1.53 |
11,240.91 |
1.60 |
11,755.20 |
1.51 |
11,093.97 |
2.90 |
21,306.30 |
| 720-01-E |
erosion control system, flexible channel liner (type e)
|
4,828   |
sq m |
1.53 |
7,386.84 |
3.00 |
14,484.00 |
1.51 |
7,290.28 |
4.00 |
19,312.00 |
| 720-01-F |
erosion control system, flexible channel liner (type f)
|
2,788   |
sq m |
1.53 |
4,265.64 |
4.40 |
12,267.20 |
7.00 |
19,516.00 |
4.00 |
11,152.00 |
| 722-02 |
project site laboratory (equipped)
|
1   |
ea |
20,000.00 |
20,000.00 |
40,000.00 |
40,000.00 |
10,000.00 |
10,000.00 |
200,000.00 |
200,000.00 |
| 725-01-A |
temporary detour roads (6.0 m width)
|
95.0 |
ln m |
360.00 |
34,200.00 |
700.00 |
66,500.00 |
489.35 |
46,488.25 |
445.00 |
42,275.00 |
| 725-01-B |
temporary detour roads (7.3 m width)
|
303.6 |
ln m |
408.00 |
123,868.80 |
700.00 |
212,520.00 |
504.41 |
153,138.88 |
500.00 |
151,800.00 |
| 725-01-C |
temporary detour roads (11.4 m width)
|
406.2 |
ln m |
675.00 |
274,185.00 |
1,000.00 |
406,200.00 |
1,160.55 |
471,415.41 |
700.00 |
284,340.00 |
| 726-01 |
bedding material
|
4,768.1 |
cu m |
75.00 |
357,607.50 |
90.00 |
429,129.00 |
78.00 |
371,911.80 |
100.00 |
476,810.00 |
| 727-01 |
mobilization
|
lump |
lump |
4,000,000.00 |
4,000,000.00 |
4,200,000.00 |
4,200,000.00 |
3,000,000.00 |
3,000,000.00 |
4,000,000.00 |
4,000,000.00 |
| 728-01-01 |
jacked or bored pipe (400 mm sch. 40 steel casing)
|
44.7 |
ln m |
600.00 |
26,820.00 |
200.00 |
8,940.00 |
1,250.00 |
55,875.00 |
620.00 |
27,714.00 |
| 729-01 |
sign (type a)
|
9.00 |
sq m |
330.00 |
2,970.00 |
100.00 |
900.00 |
300.00 |
2,700.00 |
350.00 |
3,150.00 |
| 729-16-C |
object marker assembly (type 3)
|
46   |
ea |
100.00 |
4,600.00 |
100.00 |
4,600.00 |
70.00 |
3,220.00 |
85.00 |
3,910.00 |
| 729-19-A |
dead end road installation (type a)
|
4   |
ea |
2,100.00 |
8,400.00 |
1,600.00 |
6,400.00 |
1,250.00 |
5,000.00 |
1,500.00 |
6,000.00 |
| 730-04 |
jacking or bored casing (1" pec conduit, sch. 80)
|
40   |
ln m |
50.00 |
2,000.00 |
45.00 |
1,800.00 |
40.00 |
1,600.00 |
60.00 |
2,400.00 |
| 731-02 |
reflectorized raised pavement markers
|
7,186   |
ea |
5.60 |
40,241.60 |
4.70 |
33,774.20 |
4.58 |
32,911.88 |
5.30 |
38,085.80 |
| 732-01-C |
plastic pavement striping (200 mm width)
|
912   |
ln m |
3.00 |
2,736.00 |
2.60 |
2,371.20 |
2.47 |
2,252.64 |
2.80 |
2,553.60 |
| 732-01-D |
plastic pavement striping (300 mm width)
|
59   |
ln m |
4.75 |
280.25 |
4.00 |
236.00 |
3.70 |
218.30 |
4.25 |
250.75 |
| 732-01-E |
plastic pavement striping (600 mm width)
|
845   |
ln m |
9.10 |
7,689.50 |
8.00 |
6,760.00 |
7.39 |
6,244.55 |
8.50 |
7,182.50 |
| 732-02-A |
plastic pavement striping (solid line)(100 mm width)
|
41.585 |
km |
1,800.00 |
74,853.00 |
1,300.00 |
54,060.50 |
1,273.49 |
52,958.08 |
1,400.00 |
58,219.00 |
| 732-03-A |
plastic pavement striping (broken line)(100 mm width)
|
8.468 |
km |
460.00 |
3,895.28 |
380.00 |
3,217.84 |
356.58 |
3,019.52 |
400.00 |
3,387.20 |
| 732-03-A-01 |
plastic pvmt striping(broken line)(100mmwidth)
(preformed marking tape) (type v) |
14.639 |
km |
9,000.00 |
131,751.00 |
2,200.00 |
32,205.80 |
2,037.58 |
29,828.13 |
2,300.00 |
33,669.70 |
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
96   |
ea |
200.00 |
19,200.00 |
150.00 |
14,400.00 |
137.54 |
13,203.84 |
155.00 |
14,880.00 |
| 732-04-B |
plastic pavement legends & symbols (double arrow)
|
6   |
ea |
730.00 |
4,380.00 |
160.00 |
960.00 |
152.82 |
916.92 |
175.00 |
1,050.00 |
| 732-04-C |
plastic pavement legends & symbols (only)
|
10   |
ea |
250.00 |
2,500.00 |
150.00 |
1,500.00 |
137.54 |
1,375.40 |
155.00 |
1,550.00 |
| 732-04-D |
plastic pavement legends & symbols (rr crossing)
|
4   |
ea |
470.00 |
1,880.00 |
160.00 |
640.00 |
152.82 |
611.28 |
175.00 |
700.00 |
| 732-05 |
removal of existing markings
|
1.663 |
km |
3,300.00 |
5,487.90 |
5,000.00 |
8,315.00 |
4,075.17 |
6,777.01 |
4,500.00 |
7,483.50 |
| 735-01 |
mailboxes
|
107   |
each |
80.00 |
8,560.00 |
1.00 |
107.00 |
50.00 |
5,350.00 |
30.00 |
3,210.00 |
| 735-02 |
mailbox supports (single)
|
107   |
each |
150.00 |
16,050.00 |
140.00 |
14,980.00 |
140.00 |
14,980.00 |
200.00 |
21,400.00 |
| 736-01 |
trenching and backfilling
|
546   |
ln m |
11.00 |
6,006.00 |
10.00 |
5,460.00 |
10.00 |
5,460.00 |
11.00 |
6,006.00 |
| 736-04-01 |
signal support (9.14 m steel strain pole)
|
8   |
ea |
8,300.00 |
66,400.00 |
8,000.00 |
64,000.00 |
8,000.00 |
64,000.00 |
9,200.00 |
73,600.00 |
| 736-04-02 |
signal support (9.76 m steel strain pole)
|
4   |
ea |
8,300.00 |
33,200.00 |
8,000.00 |
32,000.00 |
8,000.00 |
32,000.00 |
9,200.00 |
36,800.00 |
| 736-05-01 |
signal heads (3 section, ryg)
|
16   |
each |
1,400.00 |
22,400.00 |
1,400.00 |
22,400.00 |
1,300.00 |
20,800.00 |
1,500.00 |
24,000.00 |
| 736-05-02 |
signal heads (5 section, r, lt. y, y, lt. g, g)
|
9   |
each |
2,100.00 |
18,900.00 |
2,200.00 |
19,800.00 |
1,900.00 |
17,100.00 |
2,200.00 |
19,800.00 |
| 736-05-03 |
signal heads (5 section, r, rt. y, y, rt. g, g)
|
2   |
each |
2,100.00 |
4,200.00 |
2,200.00 |
4,400.00 |
1,900.00 |
3,800.00 |
2,200.00 |
4,400.00 |
| 736-06 |
signal service
|
3   |
ea |
1,700.00 |
5,100.00 |
1,600.00 |
4,800.00 |
1,500.00 |
4,500.00 |
1,700.00 |
5,100.00 |
| 736-08 |
signal controller
|
3   |
ea |
20,000.00 |
60,000.00 |
20,000.00 |
60,000.00 |
18,000.00 |
54,000.00 |
20,000.00 |
60,000.00 |
| 736-09 |
loop detector (saw cut, loop wire, sealant)
|
132   |
ln m |
50.00 |
6,600.00 |
50.00 |
6,600.00 |
45.00 |
5,940.00 |
53.00 |
6,996.00 |
| 736-10-A |
underground junction box (type d)
|
6   |
ea |
350.00 |
2,100.00 |
320.00 |
1,920.00 |
300.00 |
1,800.00 |
350.00 |
2,100.00 |
| 736-10-B |
underground junction box (type e)
|
6   |
ea |
500.00 |
3,000.00 |
440.00 |
2,640.00 |
400.00 |
2,400.00 |
470.00 |
2,820.00 |
| 736-10-C |
underground junction box (type f)
|
6   |
ea |
600.00 |
3,600.00 |
550.00 |
3,300.00 |
500.00 |
3,000.00 |
590.00 |
3,540.00 |
| 736-10-D |
underground junction box (type h)
|
3   |
ea |
1,600.00 |
4,800.00 |
1,600.00 |
4,800.00 |
1,500.00 |
4,500.00 |
1,700.00 |
5,100.00 |
| 736-11-A |
conduit (1" pec, sch. 80)
|
530   |
ln m |
5.00 |
2,650.00 |
4.40 |
2,332.00 |
4.00 |
2,120.00 |
4.50 |
2,385.00 |
| 736-11-B |
conduit (3" pec, sch. 80)
|
15   |
ln m |
11.00 |
165.00 |
11.00 |
165.00 |
10.00 |
150.00 |
11.50 |
172.50 |
| 736-12-A |
conductor (2c #14 awg, 600v, with outer shield)
|
2,841   |
ln m |
3.30 |
9,375.30 |
3.30 |
9,375.30 |
3.00 |
8,523.00 |
3.50 |
9,943.50 |
| 736-12-B |
conductor (3c power, 6 gauge #6 awg)
|
12   |
ln m |
20.00 |
240.00 |
17.00 |
204.00 |
16.00 |
192.00 |
18.80 |
225.60 |
| 736-12-C |
conductor (6c #14 awg, 600v)
|
233   |
ln m |
7.00 |
1,631.00 |
7.00 |
1,631.00 |
6.00 |
1,398.00 |
7.50 |
1,747.50 |
| 736-12-D |
conductor (10c #14 awg, 600v)
|
788   |
ln m |
11.00 |
8,668.00 |
11.00 |
8,668.00 |
10.00 |
7,880.00 |
11.50 |
9,062.00 |
| 739-01 |
hydro-seeding
|
40.0 |
hctr |
4,000.00 |
160,000.00 |
2,600.00 |
104,000.00 |
2,500.00 |
100,000.00 |
2,800.00 |
112,000.00 |
| 740-01 |
construction layout
|
lump |
lump |
500,000.00 |
500,000.00 |
500,000.00 |
500,000.00 |
380,000.00 |
380,000.00 |
630,000.00 |
630,000.00 |
| 741-11 |
adjusting water valve and meter box
|
4   |
ea |
300.00 |
1,200.00 |
600.00 |
2,400.00 |
300.00 |
1,200.00 |
1,000.00 |
4,000.00 |
| 742-01-A |
sanitary sewer pipe (200 mm, pvc sdr 35)
|
2,318   |
ln m |
110.00 |
254,980.00 |
140.00 |
324,520.00 |
147.00 |
340,746.00 |
165.00 |
382,470.00 |
| 742-01-B |
sanitary sewer pipe (250 mm, pvc sdr 35)
|
33   |
ln m |
110.00 |
3,630.00 |
250.00 |
8,250.00 |
154.00 |
5,082.00 |
175.00 |
5,775.00 |
| 742-01-C |
sanitary sewer pipe (305 mm, pvc sdr 35)
|
34   |
ln m |
120.00 |
4,080.00 |
260.00 |
8,840.00 |
160.00 |
5,440.00 |
180.00 |
6,120.00 |
| 742-01-D |
sanitary sewer pipe (200 mm, ductile iron)
|
48   |
ln m |
250.00 |
12,000.00 |
380.00 |
18,240.00 |
234.00 |
11,232.00 |
265.00 |
12,720.00 |
| 742-01-E |
sanitary sewer pipe (250 mm, ductile iron)
|
54   |
ln m |
275.00 |
14,850.00 |
360.00 |
19,440.00 |
262.00 |
14,148.00 |
300.00 |
16,200.00 |
| 742-01-F |
sanitary sewer pipe (305 mm, ductile iron)
|
12   |
ln m |
275.00 |
3,300.00 |
400.00 |
4,800.00 |
288.00 |
3,456.00 |
325.00 |
3,900.00 |
| 742-02 |
adjusting sanitary sewer house connections
|
105   |
ea |
450.00 |
47,250.00 |
420.00 |
44,100.00 |
125.00 |
13,125.00 |
140.00 |
14,700.00 |
| 742-03 |
adjusting sanitary sewer service lines
|
1,176   |
ln m |
50.00 |
58,800.00 |
42.00 |
49,392.00 |
36.00 |
42,336.00 |
42.00 |
49,392.00 |
| 804-01-B |
precast concrete piles (350 mm)
|
580.8 |
ln m |
175.00 |
101,640.00 |
250.00 |
145,200.00 |
230.00 |
133,584.00 |
197.00 |
114,417.60 |
| 804-01-D |
precast concrete piles (450 mm)
|
1,360.0 |
ln m |
228.00 |
310,080.00 |
250.00 |
340,000.00 |
285.00 |
387,600.00 |
215.00 |
292,400.00 |
| 804-01-F |
precast concrete piles (600 mm)
|
184.0 |
ln m |
384.00 |
70,656.00 |
600.00 |
110,400.00 |
418.00 |
76,912.00 |
290.00 |
53,360.00 |
| 804-12-B |
loading permanent piles (350 mm)
|
1   |
ea |
13,000.00 |
13,000.00 |
1,000.00 |
1,000.00 |
20,000.00 |
20,000.00 |
1,000.00 |
1,000.00 |
| 804-12-D |
loading permanent piles (450 mm)
|
1   |
ea |
14,000.00 |
14,000.00 |
1,000.00 |
1,000.00 |
22,000.00 |
22,000.00 |
1,000.00 |
1,000.00 |
| 804-12-F |
loading permanent piles (600 mm)
|
1   |
ea |
17,000.00 |
17,000.00 |
1,000.00 |
1,000.00 |
20,027.70 |
20,027.70 |
1,000.00 |
1,000.00 |
| 804-13-B |
precast concrete indicator piles (350 mm)
|
1   |
ea |
12,500.00 |
12,500.00 |
10,000.00 |
10,000.00 |
4,600.00 |
4,600.00 |
8,000.00 |
8,000.00 |
| 804-13-D |
precast concrete indicator piles (450 mm)
|
2   |
ea |
13,300.00 |
26,600.00 |
11,000.00 |
22,000.00 |
7,000.00 |
14,000.00 |
15,000.00 |
30,000.00 |
| 804-13-F |
precast concrete indicator piles (600 mm)
|
2   |
ea |
20,500.00 |
41,000.00 |
14,000.00 |
28,000.00 |
8,000.00 |
16,000.00 |
16,000.00 |
32,000.00 |
| 804-17 |
dynamic monitoring
|
5   |
ea |
2,600.00 |
13,000.00 |
1,200.00 |
6,000.00 |
1,650.00 |
8,250.00 |
5,000.00 |
25,000.00 |
| 805-01 |
class a concrete
|
30.74 |
cu m |
945.00 |
29,049.30 |
900.00 |
27,666.00 |
800.00 |
24,592.00 |
2,400.00 |
73,776.00 |
| 805-01-B |
class a concrete (box culvert headwalls)
|
193.41 |
cu m |
800.00 |
154,728.00 |
1,500.00 |
290,115.00 |
2,500.00 |
483,525.00 |
1,300.00 |
251,433.00 |
| 805-01-F |
class a concrete (bents)
|
342.24 |
cu m |
950.00 |
325,128.00 |
1,000.00 |
342,240.00 |
1,228.54 |
420,455.53 |
1,100.00 |
376,464.00 |
| 805-03 |
class aa concrete
|
807.37 |
cu m |
850.00 |
686,264.50 |
850.00 |
686,264.50 |
1,350.00 |
1,089,949.50 |
1,100.00 |
888,107.00 |
| 805-08-B |
precast-prestressed concrete girders (type ii)
|
951.00 |
ln m |
341.00 |
324,291.00 |
260.00 |
247,260.00 |
250.00 |
237,750.00 |
168.00 |
159,768.00 |
| 805-11 |
strip seal joints
|
97.40 |
ln m |
671.00 |
65,355.40 |
480.00 |
46,752.00 |
500.00 |
48,700.00 |
475.00 |
46,265.00 |
| 805-12-E |
reinforced concrete box culverts (1200 mm x 1200 mm)
|
255.00 |
ln m |
1,000.00 |
255,000.00 |
800.00 |
204,000.00 |
750.00 |
191,250.00 |
925.00 |
235,875.00 |
| 805-12-P |
reinforced concrete box culverts (2100 mm x 2100 mm)
|
128.40 |
ln m |
2,000.00 |
256,800.00 |
1,800.00 |
231,120.00 |
1,650.00 |
211,860.00 |
1,800.00 |
231,120.00 |
| 805-12-S |
reinforced concrete box culverts (2400 mm x 2400 mm)
|
359.00 |
ln m |
2,137.00 |
767,183.00 |
1,800.00 |
646,200.00 |
1,750.00 |
628,250.00 |
2,000.00 |
718,000.00 |
| 805-12-Y |
reinforced concrete box culverts (900 mm x 900 mm)
|
167.00 |
ln m |
550.00 |
91,850.00 |
550.00 |
91,850.00 |
700.00 |
116,900.00 |
750.00 |
125,250.00 |
| 806-01 |
deformed reinforcing steel
|
51,976   |
kg |
2.25 |
116,946.00 |
2.00 |
103,952.00 |
2.30 |
119,544.80 |
1.85 |
96,155.60 |
| 806-02 |
deformed reinforcing steel (epoxy coated)
|
107,847   |
kg |
3.08 |
332,168.76 |
2.70 |
291,186.90 |
2.50 |
269,617.50 |
1.25 |
134,808.75 |
| 807-08 |
structural metalwork
|
lump |
lump |
34,000.00 |
34,000.00 |
8,000.00 |
8,000.00 |
19,000.00 |
19,000.00 |
15,000.00 |
15,000.00 |
| 810-01 |
concrete railing (barrier)
|
391.92 |
ln m |
268.00 |
105,034.56 |
210.00 |
82,303.20 |
250.00 |
97,980.00 |
200.00 |
78,384.00 |
| 813-01 |
concrete approach slabs
|
1,682.40 |
sq m |
255.00 |
429,012.00 |
230.00 |
386,952.00 |
275.00 |
462,660.00 |
255.00 |
429,012.00 |
| S-001 |
video detector device and connection
|
11   |
each |
8,500.00 |
93,500.00 |
8,000.00 |
88,000.00 |
7,400.00 |
81,400.00 |
8,200.00 |
90,200.00 |
| S-002 |
temporary sediment basin
|
lump |
lump |
10,000.00 |
10,000.00 |
11,000.00 |
11,000.00 |
20,000.00 |
20,000.00 |
6,000.00 |
6,000.00 |
| S-003 |
temporary diversions associated with box culvert
|
lump |
lump |
10,000.00 |
10,000.00 |
20,000.00 |
20,000.00 |
25,000.00 |
25,000.00 |
30,000.00 |
30,000.00 |
| S-004 |
diversions associated with graded slopes
|
lump |
lump |
20,000.00 |
20,000.00 |
20,000.00 |
20,000.00 |
30,000.00 |
30,000.00 |
30,000.00 |
30,000.00 |
| S-005 |
video detection system
|
lump |
lump |
6,000.00 |
6,000.00 |
5,500.00 |
5,500.00 |
5,000.00 |
5,000.00 |
5,500.00 |
5,500.00 |
| S-006 |
field office
|
lump |
lump |
100,000.00 |
100,000.00 |
150,000.00 |
150,000.00 |
200,000.00 |
200,000.00 |
125,000.00 |
125,000.00 |
| S-007 |
archaelogical construction monitoring
|
lump |
lump |
20,000.00 |
20,000.00 |
20,000.00 |
20,000.00 |
5,000.00 |
5,000.00 |
6,000.00 |
6,000.00 |
| S-103 |
impact attenuator (construction zone)
|
2   |
each |
20,000.00 |
40,000.00 |
24,000.00 |
48,000.00 |
16,000.00 |
32,000.00 |
20,000.00 |
40,000.00 |
| S-104 |
retroreflective sheeting panels
|
lump |
lump |
2,500.00 |
2,500.00 |
7,000.00 |
7,000.00 |
1,500.00 |
1,500.00 |
4,500.00 |
4,500.00 |
| S-105 |
precast concrete piles (600 mm)(dotd furnished)
|
592.0 |
ln m |
245.00 |
145,040.00 |
400.00 |
236,800.00 |
240.00 |
142,080.00 |
130.00 |
76,960.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | ITEM TOTAL (CONSTRUCTION BID) |
|
|
|
42,426,114.61 |
|
42,616,118.26 |
|
42,994,229.76 |
|
43,412,711.98 |
| | NUMBER OF DAYS BID AT $4,600 PER DAY. |
|
|
|
2,760,000.00 |
|
3,565,000.00 |
|
3,404,000.00 |
|
3,445,400.00 |
| | TOTAL BID |
|
|
|
45,186,114.61 |
|
46,181,118.26 |
|
46,398,229.76 |
|
46,858,111.98 |
|
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 5 - JAMES CONSTRUCTION GROUP LLC |
|
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing and grubbing
|
lump |
lump |
800,000.00 |
800,000.00 |
|
|
|
|
|
|
| 202-01 |
removal of structures and obstructions
|
lump |
lump |
200,000.00 |
200,000.00 |
|
|
|
|
|
|
| 202-02-A |
removal of 13.3 m x 30.5 m concrete slab span bridge
(sta. 11+476) |
1   |
ea |
35,000.00 |
35,000.00 |
|
|
|
|
|
|
| 202-02-B-01 |
removal of box culvert (sta. 5+440; 1-1200 mm x 914 mm
x 14.7 m) |
1   |
ea |
3,000.00 |
3,000.00 |
|
|
|
|
|
|
| 202-02-B-02 |
removal of box culvert (sta. 6+140; 1-609 mm x 609 mm
x 14.2 m) |
1   |
ea |
3,000.00 |
3,000.00 |
|
|
|
|
|
|
| 202-02-B-03 |
removal of box culvert (sta. 5+559; 6-1800 mm x
1800 mm x 20.42 m) |
1   |
ea |
20,000.00 |
20,000.00 |
|
|
|
|
|
|
| 202-02-B-04 |
removal of box culvert (sta. 7+371; 2-1900 mm x
1066 mm x 53.65 m) |
1   |
ea |
16,000.00 |
16,000.00 |
|
|
|
|
|
|
| 202-02-B-05 |
removal of box culvert (sta. 9+150; 3-1800 mm x
1800 mm x 15.60 m) |
1   |
ea |
10,000.00 |
10,000.00 |
|
|
|
|
|
|
| 202-02-B-06 |
removal of box culvert (sta. 9+869.500 (la 3103);
900 mm x 600 mm x 13.0 m) |
1   |
ea |
2,800.00 |
2,800.00 |
|
|
|
|
|
|
| 202-02-C |
removal of portland cement concrete pavement
|
52,670   |
sq m |
6.00 |
316,020.00 |
|
|
|
|
|
|
| 202-02-D |
removal of concrete walks & drives
|
9,132   |
sq m |
10.00 |
91,320.00 |
|
|
|
|
|
|
| 202-02-E |
removal of concrete curbs
|
799.8 |
ln m |
30.00 |
23,994.00 |
|
|
|
|
|
|
| 202-02-F |
removal of concrete combination curb & gutter
|
947.5 |
ln m |
30.00 |
28,425.00 |
|
|
|
|
|
|
| 202-02-G |
removal of surfacing & stabilized base
|
32,547.0 |
sq m |
4.00 |
130,188.00 |
|
|
|
|
|
|
| 202-02-H |
removal of guard rail
|
124   |
ln m |
10.00 |
1,240.00 |
|
|
|
|
|
|
| 202-02-01 |
removal of 7.6 m x 19.0 m single story wood frame
residence (rt. of sta. 5+115)(contains friable asbestos) |
1   |
each |
1,000.00 |
1,000.00 |
|
|
|
|
|
|
| 202-02-02 |
removal of 13.3 m x 16.8 m wood frame residence (lt.
of sta. 5+236) |
1   |
each |
1,000.00 |
1,000.00 |
|
|
|
|
|
|
| 202-02-03 |
removal of 13.0 m x 14.6 m wood frame residence (rt.
of sta. 5+5+371) |
1   |
each |
1,000.00 |
1,000.00 |
|
|
|
|
|
|
| 202-02-04 |
removal of 8.8 m x 22.8 m wood frame residence (rt. of
sta. 5+756) (contains non-friable asbestos) |
1   |
each |
1,000.00 |
1,000.00 |
|
|
|
|
|
|
| 202-02-05 |
removal of 8.7 m x 22.5 m wood frame residence (rt. of
sta. 5+778) (contains friable asbestos) |
1   |
each |
1,000.00 |
1,000.00 |
|
|
|
|
|
|
| 202-02-06 |
removal of 3.7 m x 5.5 m metal storage building (rt.
of sta. 5+816) |
1   |
each |
1,000.00 |
1,000.00 |
|
|
|
|
|
|
| 202-02-07 |
removal of 9.9 m x 8.6 m wood frame residence (rt. of
sta. 5+916)(contains non-friable asbestos) |
1   |
each |
1,000.00 |
1,000.00 |
|
|
|
|
|
|
| 202-02-08 |
removal of 12.5 m x 10.7 m single story concrete block
building (rt. of sta. 6+408) |
1   |
each |
1,000.00 |
1,000.00 |
|
|
|
|
|
|
| 202-02-09 |
removal of 13.7 m x 8.7 m single story wood frame
residence (lt. of sta. 6+532) |
1   |
each |
1,000.00 |
1,000.00 |
|
|
|
|
|
|
| 202-02-10 |
removal of 18.2 m x 4.1 m mobile home (rt. of sta.
6+682) |
1   |
each |
500.00 |
500.00 |
|
|
|
|
|
|
| 202-02-11 |
removal of 8.7 m x 14.2 m wood frame residence (rt. of
sta. 6+850) |
1   |
each |
1,000.00 |
1,000.00 |
|
|
|
|
|
|
| 202-02-12 |
removal of 9.2 m x 15.4 m wood frame residence (rt. of
sta. 5+886) |
1   |
each |
1,000.00 |
1,000.00 |
|
|
|
|
|
|
| 202-02-13 |
removal of 11.9 m x 19.3 m single story wood frame
building (lt. of sta. 6+915) |
1   |
each |
1,000.00 |
1,000.00 |
|
|
|
|
|
|
| 202-02-14 |
removal of 8.8 m x 16.5 m wood frame residence (rt. of
sta. 6+970) (contains non-friable asbestos) |
1   |
each |
1,000.00 |
1,000.00 |
|
|
|
|
|
|
| 202-02-15 |
removal of 8.7 m x 13.5 m wood frame building (rt. of
sta. 7+040)(contains non-friable asbestos) |
1   |
each |
1,000.00 |
1,000.00 |
|
|
|
|
|
|
| 202-02-16 |
removal of 10.4 m x 12.0 m single story wood frame
residence (rt. of sta. 7+070) |
1   |
each |
1,000.00 |
1,000.00 |
|
|
|
|
|
|
| 202-02-17 |
removal of wood frame building (rt. of sta. 7+228)
|
1   |
each |
1,000.00 |
1,000.00 |
|
|
|
|
|
|
| 202-02-18 |
removal of 7.5 m x 30.7 m metal gas canopy (rt. of
sta. 7+400) |
1   |
each |
500.00 |
500.00 |
|
|
|
|
|
|
| 202-02-19 |
removal of 10.0 m x 12.4 m wood garage (lt. of sta.
7+450) |
1   |
each |
1,000.00 |
1,000.00 |
|
|
|
|
|
|
| 202-02-20 |
removal of 7.6 m x 13.9 m single story wood frame
residence (rt. of sta. 7+555)(contains non-friable asbestos) |
1   |
each |
1,000.00 |
1,000.00 |
|
|
|
|
|
|
| 202-02-21 |
removal of 8.9 m x 14.7 m single story wood frame
residence (lt. of sta. 7+632)(contains non-friable asbestos) |
1   |
each |
1,000.00 |
1,000.00 |
|
|
|
|
|
|
| 202-02-22 |
removal of wood frame building (lt. of sta. 7+650)
(contains non-friable asbestos) |
1   |
each |
1,000.00 |
1,000.00 |
|
|
|
|
|
|
| 202-02-23 |
removal of 30.6 m x 9.1 m metal building (rt. of sta.
7+828) |
1   |
each |
1,000.00 |
1,000.00 |
|
|
|
|
|
|
| 202-02-24 |
removal of 18.5 m x 15.1 m metal building on slab (rt.
of sta. 7+838) (contains non-friable asbestos) |
1   |
each |
1,000.00 |
1,000.00 |
|
|
|
|
|
|
| 202-02-25 |
removal of 3.2 m x 6.1 m metal portable building (rt.
of sta. 7+855) |
1   |
each |
50.00 |
50.00 |
|
|
|
|
|
|
| 202-02-26 |
removal of 14.0 m x 19.8 m single story brick
residence (rt. of sta. 8+130)(contains friable asbestos) |
1   |
each |
1,000.00 |
1,000.00 |
|
|
|
|
|
|
| 202-02-27 |
removal of 10.6 m x 18.6 m single story brick
residence (rt. of sta. 8+200)(contains non-friable asbestos) |
1   |
each |
1,000.00 |
1,000.00 |
|
|
|
|
|
|
| 202-02-28 |
removal of 6.9 m x 9.2 m wood frame garage (rt. of
sta. 8+209) |
1   |
each |
1,000.00 |
1,000.00 |
|
|
|
|
|
|
| 202-02-29 |
removal of 9.3 m x 9.4 m single story wood frame
building (rt. of sta. 8+300) |
1   |
each |
1,000.00 |
1,000.00 |
|
|
|
|
|
|
| 202-02-30 |
removal of 3.0 m x 6.2 portable metal storage building
(rt. of sta. 8+774) |
1   |
each |
50.00 |
50.00 |
|
|
|
|
|
|
| 202-02-31 |
removal of 17.9 m x 8.3 m abandoned wood frame
building (rt. of sta. 9+423)(contains non-friable asbestos) |
1   |
each |
1,000.00 |
1,000.00 |
|
|
|
|
|
|
| 202-02-32 |
removal of 16.1 m x 14.9 m single story wood frame
residence (lt. of sta. 10+102 mcenery street) |
1   |
each |
1,000.00 |
1,000.00 |
|
|
|
|
|
|
| 202-02-33 |
removal of storage building (lt. of sta.
10+102 mcenery street) |
1   |
each |
50.00 |
50.00 |
|
|
|
|
|
|
| 202-02-34 |
removal of 33.7 m x 35.8 m wood frame building (rt. of
sta. 10+180 polk street)(contains non-friable asbestos) |
1   |
each |
1,000.00 |
1,000.00 |
|
|
|
|
|
|
| 202-02-35 |
removal of 10.2 m x 13.7 m brick bank teller building
(rt. of sta. 10+239 polk street) |
1   |
each |
1,000.00 |
1,000.00 |
|
|
|
|
|
|
| 202-02-36 |
removal of 10.2 m x 13.7 m drive thru canopy (rt. of
sta. 10+239 polk street) |
1   |
each |
1,000.00 |
1,000.00 |
|
|
|
|
|
|
| 202-02-37 |
removal of 18.3 m x 33.4 m brick building (lt. of sta.
10+250 polk street) |
1   |
each |
1,000.00 |
1,000.00 |
|
|
|
|
|
|
| 202-02-38 |
removal of 20.4 m x 26.4 m brick building (lt. of sta.
10+300 polk street) (contains non-friable asbestos) |
1   |
each |
1,000.00 |
1,000.00 |
|
|
|
|
|
|
| 202-02-39 |
removal of 11.7 m x 12.7 m single story wood frame
residence (lt. of sta. 9+880 kings highway) |
1   |
each |
1,000.00 |
1,000.00 |
|
|
|
|
|
|
| 202-02-40 |
removal of 17.1 m x 3.8 m mobile home (rt. of sta.
9+884 kings highway) |
1   |
each |
500.00 |
500.00 |
|
|
|
|
|
|
| 202-02-41 |
removal of 19.1 m x 10.1 m single story wood frame
residence (rt. of sta. 9+910 kings highway) |
1   |
each |
1,000.00 |
1,000.00 |
|
|
|
|
|
|
| 202-02-42 |
removal of 20.7 m x 13.0 m single story wood frame
residence (rt. of sta. 9+928 kings highway) |
1   |
each |
1,000.00 |
1,000.00 |
|
|
|
|
|
|
| 202-02-43 |
removal of 23.3 m x 15.3 m moveable storage building
(lt. of sta. 9+980 kings highway) |
1   |
each |
50.00 |
50.00 |
|
|
|
|
|
|
| 202-02-44 |
removal of 7.4 m x 11.2 m single story wood frame
residence (lt. of sta. 10+100 miss. st.)(cont. non-friable asb.) |
1   |
each |
1,000.00 |
1,000.00 |
|
|
|
|
|
|
| 202-02-45 |
removal of 11.0 m x 9.6 m wood frame residence (lt. of
sta. 10+055 clark street)(contains non-friable asbestos) |
1   |
each |
1,000.00 |
1,000.00 |
|
|
|
|
|
|
| 202-07 |
plugging existing water wells
|
4   |
each |
1,500.00 |
6,000.00 |
|
|
|
|
|
|
| 203-01 |
general excavation
|
592,600   |
cu m |
5.00 |
2,963,000.00 |
|
|
|
|
|
|
| 203-02 |
drainage excavation
|
53,661   |
cu m |
12.00 |
643,932.00 |
|
|
|
|
|
|
| 203-03 |
embankment
|
704,527   |
cu m |
8.00 |
5,636,216.00 |
|
|
|
|
|
|
| 203-04 |
nonplastic embankment)
|
27   |
cu m |
220.00 |
5,940.00 |
|
|
|
|
|
|
| 203-07-B |
borrow (vehicular measurement)(plastic soils)
|
96   |
cu m |
40.00 |
3,840.00 |
|
|
|
|
|
|
| 204-02 |
temporary hay or straw bales
|
2,347   |
ea |
14.00 |
32,858.00 |
|
|
|
|
|
|
| 204-03 |
temporary slope drains
|
790   |
ln m |
42.00 |
33,180.00 |
|
|
|
|
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
57   |
ea |
120.00 |
6,840.00 |
|
|
|
|
|
|
| 204-05-B |
temporary sediment check dams (stone)
|
11   |
ea |
500.00 |
5,500.00 |
|
|
|
|
|
|
| 204-06 |
temporary silt fencing
|
8,974   |
ln m |
7.60 |
68,202.40 |
|
|
|
|
|
|
| 204-07 |
temporary stone construction entrance
|
6   |
ea |
6,000.00 |
36,000.00 |
|
|
|
|
|
|
| 302-02-C-01 |
class ii base course (200 mm thick)(soil cement)
|
176,541.7 |
sq m |
10.50 |
1,853,687.85 |
|
|
|
|
|
|
| 302-02-F-01 |
class ii base course (300 mm thick)(stone or recycled
pccp) |
6,947.0 |
sq m |
35.00 |
243,145.00 |
|
|
|
|
|
|
| 302-02-G-01 |
class ii base course (100 mm thick)(stone or recycled
pccp) |
176,541.7 |
sq m |
12.00 |
2,118,500.40 |
|
|
|
|
|
|
| 304-05 |
lime treatment (type e)
|
1,630.84 |
Mg |
200.00 |
326,168.00 |
|
|
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
582   |
cu m |
105.00 |
61,110.00 |
|
|
|
|
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
10,000.0 |
cu m |
80.00 |
800,000.00 |
|
|
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
4,492.2 |
Mg |
135.63 |
609,277.09 |
|
|
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
209.4 |
Mg |
248.15 |
51,962.61 |
|
|
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
9,576   |
sq m |
2.52 |
24,131.52 |
|
|
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 479   |
cu m |
1.00 |
- 479.00 |
|
|
|
|
|
|
| 510-01-C |
pavement patching (400 mm minimum thickness)
|
252   |
sq m |
140.00 |
35,280.00 |
|
|
|
|
|
|
| 510-02 |
pavement widening (200 mm thickness)
|
1,082.8 |
sq m |
85.00 |
92,038.00 |
|
|
|
|
|
|
| 601-01-K |
portland cement concrete pavement (250 mm thick)
|
141,664.2 |
sq m |
62.50 |
8,854,012.50 |
|
|
|
|
|
|
| 601-02-K |
portland cement concrete pavement (250 mm thick)
(crossovers & turnouts) |
10,367.7 |
sq m |
80.00 |
829,416.00 |
|
|
|
|
|
|
| 601-03-A-K |
portland cement concrete shoulder (125 mm thick -
250 mm thick) |
19,360.6 |
sq m |
60.00 |
1,161,636.00 |
|
|
|
|
|
|
| 601-04 |
portland cement concrete pavement coring
|
215   |
ea |
70.00 |
15,050.00 |
|
|
|
|
|
|
| 602-08 |
grinding concrete pavement
|
1,184.5 |
sq m |
30.00 |
35,535.00 |
|
|
|
|
|
|
| 701-01-G |
cross drain pipe (450 mm pcp/rcp)
|
172.7 |
ln m |
170.00 |
29,359.00 |
|
|
|
|
|
|
| 701-01-I |
cross drain pipe (600 mm pcp/rcp)
|
108.8 |
ln m |
220.00 |
23,936.00 |
|
|
|
|
|
|
| 701-01-K |
cross drain pipe (750 mm pcp/rcp)
|
26.0 |
ln m |
310.00 |
8,060.00 |
|
|
|
|
|
|
| 701-01-M |
cross drain pipe (900 mm pcp/rcp)
|
81.4 |
ln m |
345.00 |
28,083.00 |
|
|
|
|
|
|
| 701-01-O |
cross drain pipe (1200 mm pcp/rcp)
|
47.3 |
ln m |
530.00 |
25,069.00 |
|
|
|
|
|
|
| 701-01-P |
cross drain pipe (1350 mm rcp)
|
34.5 |
ln m |
780.00 |
26,910.00 |
|
|
|
|
|
|
| 701-02-E |
cross drain pipe arch (750 mm equiv. rcpa)
|
39.6 |
ln m |
400.00 |
15,840.00 |
|
|
|
|
|
|
| 701-03-F |
storm drain pipe (375 mm pcp/rcp)
|
2,449.9 |
ln m |
160.00 |
391,984.00 |
|
|
|
|
|
|
| 701-03-G |
storm drain pipe (450 mm pcp/rcp)
|
701.4 |
ln m |
170.00 |
119,238.00 |
|
|
|
|
|
|
| 701-03-G-01 |
storm drain pipe (450 mm cmp)(outfall)
|
99.6 |
ln m |
170.00 |
16,932.00 |
|
|
|
|
|
|
| 701-03-I |
storm drain pipe (600 mm pcp/rcp)
|
647.5 |
ln m |
220.00 |
142,450.00 |
|
|
|
|
|
|
| 701-03-I-01 |
storm drain pipe (600 mm cmp)(outfall)
|
10.0 |
ln m |
220.00 |
2,200.00 |
|
|
|
|
|
|
| 701-03-K |
storm drain pipe (750 mm pcp/rcp)
|
464.6 |
ln m |
260.00 |
120,796.00 |
|
|
|
|
|
|
| 701-03-K-01 |
storm drain pipe (750 mm cmp)(outfall)
|
14.0 |
ln m |
260.00 |
3,640.00 |
|
|
|
|
|
|
| 701-03-M |
storm drain pipe (900 mm pcp/rcp)
|
414.8 |
ln m |
335.00 |
138,958.00 |
|
|
|
|
|
|
| 701-03-M-01 |
storm drain pipe (900 mm cmp)(outfall)
|
18.7 |
ln m |
335.00 |
6,264.50 |
|
|
|
|
|
|
| 701-03-N |
storm drain pipe (1050 mm pcp/rcp)
|
100.6 |
ln m |
330.00 |
33,198.00 |
|
|
|
|
|
|
| 701-03-N-01 |
storm drain pipe (1050 mm cmp)(outfall)
|
8.5 |
ln m |
330.00 |
2,805.00 |
|
|
|
|
|
|
| 701-03-O |
storm drain pipe (1200 mm pcp/rcp)
|
195.3 |
ln m |
530.00 |
103,509.00 |
|
|
|
|
|
|
| 701-03-O-01 |
storm drain pipe (1200 mm cmp)(outfall)
|
7.7 |
ln m |
530.00 |
4,081.00 |
|
|
|
|
|
|
| 701-04-E |
storm drain pipe arch (750 mm equiv. rcpa)
|
95.3 |
ln m |
330.00 |
31,449.00 |
|
|
|
|
|
|
| 701-05-G |
side drain pipe (450 mm)
|
357.2 |
ln m |
170.00 |
60,724.00 |
|
|
|
|
|
|
| 701-05-G-01 |
side drain pipe (450 mm)(erosion)
|
37.0 |
ln m |
170.00 |
6,290.00 |
|
|
|
|
|
|
| 701-05-I |
side drain pipe (600 mm)
|
138.5 |
ln m |
220.00 |
30,470.00 |
|
|
|
|
|
|
| 701-05-K |
side drain pipe (750 mm)
|
208.4 |
ln m |
350.00 |
72,940.00 |
|
|
|
|
|
|
| 701-05-M |
side drain pipe (900 mm)
|
103.8 |
ln m |
335.00 |
34,773.00 |
|
|
|
|
|
|
| 701-09 |
fabricating pipe fittings
|
4   |
ea |
2,000.00 |
8,000.00 |
|
|
|
|
|
|
| 702-02-F |
manholes (mh-01m)
|
18   |
ea |
3,550.00 |
63,900.00 |
|
|
|
|
|
|
| 702-02-G |
manholes (r-cb-36)
|
57   |
ea |
2,400.00 |
136,800.00 |
|
|
|
|
|
|
| 702-02-H |
manholes (special detail)
|
4   |
ea |
12,500.00 |
50,000.00 |
|
|
|
|
|
|
| 702-03-A |
catch basins (cb-01m)
|
70   |
ea |
2,450.00 |
171,500.00 |
|
|
|
|
|
|
| 702-03-C |
catch basins (cb-06m)
|
123   |
ea |
1,830.00 |
225,090.00 |
|
|
|
|
|
|
| 702-03-I |
catch basins (double curb opening)
|
57   |
ea |
3,050.00 |
173,850.00 |
|
|
|
|
|
|
| 702-03-J |
catch basins (paved gutter drain)
|
59   |
ea |
4,000.00 |
236,000.00 |
|
|
|
|
|
|
| 702-04-A |
adjusting manholes
|
9   |
ea |
2,270.00 |
20,430.00 |
|
|
|
|
|
|
| 702-05-A |
cross drain end treatment ((1 barrel, 600 mm rcp)
|
2   |
ea |
1,100.00 |
2,200.00 |
|
|
|
|
|
|
| 702-05-B |
cross drain end treatment (1 barrel, 750 mm rcp)
|
2   |
ea |
1,700.00 |
3,400.00 |
|
|
|
|
|
|
| 702-05-C |
cross drain end treatment (1 barrel, 750 mm equiv.
rcpa) |
2   |
ea |
2,400.00 |
4,800.00 |
|
|
|
|
|
|
| 702-05-D |
cross drain end treatment (1 barrel, 900 mm rcp)
|
2   |
ea |
2,400.00 |
4,800.00 |
|
|
|
|
|
|
| 702-05-E |
cross drain end treatment (1 barrel, 1200 mm rcp)
|
2   |
ea |
4,000.00 |
8,000.00 |
|
|
|
|
|
|
| 704-03 |
blocked out guard rail
|
405.77 |
ln m |
54.15 |
21,972.45 |
|
|
|
|
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
68.58 |
ln m |
165.00 |
11,315.70 |
|
|
|
|
|
|
| 704-11-A |
guard rail end treatment (flared)
|
9   |
ea |
1,875.00 |
16,875.00 |
|
|
|
|
|
|
| 705-01 |
barbed wire fence
|
2,498   |
ln m |
18.45 |
46,088.10 |
|
|
|
|
|
|
| 705-02 |
combination mesh & barbed wire fence
|
225   |
ln m |
20.12 |
4,527.00 |
|
|
|
|
|
|
| 705-04 |
single swinging driveway gates
|
2   |
each |
450.00 |
900.00 |
|
|
|
|
|
|
| 705-05 |
double swinging driveway gates
|
13   |
dbgt |
675.00 |
8,775.00 |
|
|
|
|
|
|
| 705-06-A |
chain link fence (1200 mm height)
|
894   |
ln m |
57.35 |
51,270.90 |
|
|
|
|
|
|
| 705-06-B |
chain link fence (1500 mm height)
|
217   |
ln m |
68.20 |
14,799.40 |
|
|
|
|
|
|
| 705-06-C |
chain link fence (1800 mm height)
|
353   |
ln m |
86.80 |
30,640.40 |
|
|
|
|
|
|
| 705-08-A |
4.0-meter double gates for chain link fence (1200mm
height) |
3   |
dbgt |
800.00 |
2,400.00 |
|
|
|
|
|
|
| 705-08-C |
4.0-meter double gates for chain link fence (1800mm
height) |
3   |
dbgt |
1,250.00 |
3,750.00 |
|
|
|
|
|
|
| 706-01-A |
concrete walk (100 mm thick)
|
3,759.1 |
sq m |
50.00 |
187,955.00 |
|
|
|
|
|
|
| 706-02-C |
concrete drive (150 mm thick)
|
7,691.8 |
sq m |
50.00 |
384,590.00 |
|
|
|
|
|
|
| 706-03-A |
incidental concrete paving (100 mm thick)
|
29.0 |
sq m |
65.00 |
1,885.00 |
|
|
|
|
|
|
| 706-03-C |
incidental concrete paving (150 mm thick)
|
2,409.0 |
sq m |
45.00 |
108,405.00 |
|
|
|
|
|
|
| 707-01 |
concrete curb
|
8,248.2 |
ln m |
5.00 |
41,241.00 |
|
|
|
|
|
|
| 707-03 |
combination concrete curb & gutter
|
208.9 |
ln m |
82.00 |
17,129.80 |
|
|
|
|
|
|
| 708-01 |
right-of-way monument
|
275   |
ea |
155.00 |
42,625.00 |
|
|
|
|
|
|
| 708-02 |
right-of-way monument witness post
|
135   |
ea |
50.00 |
6,750.00 |
|
|
|
|
|
|
| 711-01-C |
riprap (15 kg, 360 mm thick)
|
11,376   |
sq m |
60.00 |
682,560.00 |
|
|
|
|
|
|
| 711-01-D |
riprap (25 kg, 450 mm thick)
|
426   |
sq m |
60.00 |
25,560.00 |
|
|
|
|
|
|
| 711-04 |
geotextile fabric
|
11,802   |
sq m |
3.00 |
35,406.00 |
|
|
|
|
|
|
| 712-01-C |
concrete cast-in-place revetment (150 mm thick)
|
78   |
sq m |
185.00 |
14,430.00 |
|
|
|
|
|
|
| 712-04 |
flexible revetment
|
2,400   |
sq m |
75.00 |
180,000.00 |
|
|
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
lump |
150,000.00 |
150,000.00 |
|
|
|
|
|
|
| 713-03-A |
temporary pavement markings (broken line)(100 mm width)
(1.2 m length) |
2.010 |
km |
300.00 |
603.00 |
|
|
|
|
|
|
| 713-03-B |
temporary pavement markings (broken line)(100mm width)
(3.0m length) |
0.267 |
km |
246.03 |
65.69 |
|
|
|
|
|
|
| 713-04-A |
temporary pavement markings (solid line)(100 mm width)
|
35.621 |
km |
492.01 |
17,525.89 |
|
|
|
|
|
|
| 713-08 |
temporary precast concrete barrier (department
furnished) |
11   |
ea |
475.00 |
5,225.00 |
|
|
|
|
|
|
| 716-01-A |
mulch (vegetative)
|
128,558.0 |
kg |
0.75 |
96,418.50 |
|
|
|
|
|
|
| 717-01 |
seeding
|
2,100   |
kg |
17.60 |
36,960.00 |
|
|
|
|
|
|
| 718-01 |
fertilizer
|
67,200   |
kg |
0.70 |
47,040.00 |
|
|
|
|
|
|
| 718-02 |
agricultural lime
|
52.5 |
Mg |
90.00 |
4,725.00 |
|
|
|
|
|
|
| 720-01-A |
erosion control system, slope protection (type a)
|
40,039   |
sq m |
1.32 |
52,851.48 |
|
|
|
|
|
|
| 720-01-C |
erosion control system, flexible channel liner (type c)
|
8,372   |
sq m |
1.92 |
16,074.24 |
|
|
|
|
|
|
| 720-01-D |
erosion control system, flexible channel liner (type d)
|
7,347   |
sq m |
1.92 |
14,106.24 |
|
|
|
|
|
|
| 720-01-E |
erosion control system, flexible channel liner (type e)
|
4,828   |
sq m |
2.62 |
12,649.36 |
|
|
|
|
|
|
| 720-01-F |
erosion control system, flexible channel liner (type f)
|
2,788   |
sq m |
2.90 |
8,085.20 |
|
|
|
|
|
|
| 722-02 |
project site laboratory (equipped)
|
1   |
ea |
30,000.00 |
30,000.00 |
|
|
|
|
|
|
| 725-01-A |
temporary detour roads (6.0 m width)
|
95.0 |
ln m |
600.00 |
57,000.00 |
|
|
|
|
|
|
| 725-01-B |
temporary detour roads (7.3 m width)
|
303.6 |
ln m |
600.00 |
182,160.00 |
|
|
|
|
|
|
| 725-01-C |
temporary detour roads (11.4 m width)
|
406.2 |
ln m |
1,350.00 |
548,370.00 |
|
|
|
|
|
|
| 726-01 |
bedding material
|
4,768.1 |
cu m |
80.00 |
381,448.00 |
|
|
|
|
|
|
| 727-01 |
mobilization
|
lump |
lump |
4,000,000.00 |
4,000,000.00 |
|
|
|
|
|
|
| 728-01-01 |
jacked or bored pipe (400 mm sch. 40 steel casing)
|
44.7 |
ln m |
485.00 |
21,679.50 |
|
|
|
|
|
|
| 729-01 |
sign (type a)
|
9.00 |
sq m |
300.00 |
2,700.00 |
|
|
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
46   |
ea |
70.00 |
3,220.00 |
|
|
|
|
|
|
| 729-19-A |
dead end road installation (type a)
|
4   |
ea |
1,250.00 |
5,000.00 |
|
|
|
|
|
|
| 730-04 |
jacking or bored casing (1" pec conduit, sch. 80)
|
40   |
ln m |
40.00 |
1,600.00 |
|
|
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
7,186   |
ea |
5.00 |
35,930.00 |
|
|
|
|
|
|
| 732-01-C |
plastic pavement striping (200 mm width)
|
912   |
ln m |
3.30 |
3,009.60 |
|
|
|
|
|
|
| 732-01-D |
plastic pavement striping (300 mm width)
|
59   |
ln m |
4.95 |
292.05 |
|
|
|
|
|
|
| 732-01-E |
plastic pavement striping (600 mm width)
|
845   |
ln m |
9.90 |
8,365.50 |
|
|
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line)(100 mm width)
|
41.585 |
km |
1,697.00 |
70,569.75 |
|
|
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(100 mm width)
|
8.468 |
km |
493.00 |
4,174.72 |
|
|
|
|
|
|
| 732-03-A-01 |
plastic pvmt striping(broken line)(100mmwidth)
(preformed marking tape) (type v) |
14.639 |
km |
3,259.00 |
47,708.50 |
|
|
|
|
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
96   |
ea |
145.00 |
13,920.00 |
|
|
|
|
|
|
| 732-04-B |
plastic pavement legends & symbols (double arrow)
|
6   |
ea |
165.00 |
990.00 |
|
|
|
|
|
|
| 732-04-C |
plastic pavement legends & symbols (only)
|
10   |
ea |
155.00 |
1,550.00 |
|
|
|
|
|
|
| 732-04-D |
plastic pavement legends & symbols (rr crossing)
|
4   |
ea |
400.00 |
1,600.00 |
|
|
|
|
|
|
| 732-05 |
removal of existing markings
|
1.663 |
km |
10,000.00 |
16,630.00 |
|
|
|
|
|
|
| 735-01 |
mailboxes
|
107   |
each |
1.00 |
107.00 |
|
|
|
|
|
|
| 735-02 |
mailbox supports (single)
|
107   |
each |
130.00 |
13,910.00 |
|
|
|
|
|
|
| 736-01 |
trenching and backfilling
|
546   |
ln m |
10.00 |
5,460.00 |
|
|
|
|
|
|
| 736-04-01 |
signal support (9.14 m steel strain pole)
|
8   |
ea |
8,000.00 |
64,000.00 |
|
|
|
|
|
|
| 736-04-02 |
signal support (9.76 m steel strain pole)
|
4   |
ea |
8,000.00 |
32,000.00 |
|
|
|
|
|
|
| 736-05-01 |
signal heads (3 section, ryg)
|
16   |
each |
1,300.00 |
20,800.00 |
|
|
|
|
|
|
| 736-05-02 |
signal heads (5 section, r, lt. y, y, lt. g, g)
|
9   |
each |
1,900.00 |
17,100.00 |
|
|
|
|
|
|
| 736-05-03 |
signal heads (5 section, r, rt. y, y, rt. g, g)
|
2   |
each |
1,900.00 |
3,800.00 |
|
|
|
|
|
|
| 736-06 |
signal service
|
3   |
ea |
1,500.00 |
4,500.00 |
|
|
|
|
|
|
| 736-08 |
signal controller
|
3   |
ea |
18,000.00 |
54,000.00 |
|
|
|
|
|
|
| 736-09 |
loop detector (saw cut, loop wire, sealant)
|
132   |
ln m |
45.00 |
5,940.00 |
|
|
|
|
|
|
| 736-10-A |
underground junction box (type d)
|
6   |
ea |
300.00 |
1,800.00 |
|
|
|
|
|
|
| 736-10-B |
underground junction box (type e)
|
6   |
ea |
400.00 |
2,400.00 |
|
|
|
|
|
|
| 736-10-C |
underground junction box (type f)
|
6   |
ea |
500.00 |
3,000.00 |
|
|
|
|
|
|
| 736-10-D |
underground junction box (type h)
|
3   |
ea |
1,500.00 |
4,500.00 |
|
|
|
|
|
|
| 736-11-A |
conduit (1" pec, sch. 80)
|
530   |
ln m |
4.00 |
2,120.00 |
|
|
|
|
|
|
| 736-11-B |
conduit (3" pec, sch. 80)
|
15   |
ln m |
10.00 |
150.00 |
|
|
|
|
|
|
| 736-12-A |
conductor (2c #14 awg, 600v, with outer shield)
|
2,841   |
ln m |
3.00 |
8,523.00 |
|
|
|
|
|
|
| 736-12-B |
conductor (3c power, 6 gauge #6 awg)
|
12   |
ln m |
16.00 |
192.00 |
|
|
|
|
|
|
| 736-12-C |
conductor (6c #14 awg, 600v)
|
233   |
ln m |
6.50 |
1,514.50 |
|
|
|
|
|
|
| 736-12-D |
conductor (10c #14 awg, 600v)
|
788   |
ln m |
10.00 |
7,880.00 |
|
|
|
|
|
|
| 739-01 |
hydro-seeding
|
40.0 |
hctr |
2,450.00 |
98,000.00 |
|
|
|
|
|
|
| 740-01 |
construction layout
|
lump |
lump |
420,000.00 |
420,000.00 |
|
|
|
|
|
|
| 741-11 |
adjusting water valve and meter box
|
4   |
ea |
512.44 |
2,049.76 |
|
|
|
|
|
|
| 742-01-A |
sanitary sewer pipe (200 mm, pvc sdr 35)
|
2,318   |
ln m |
85.00 |
197,030.00 |
|
|
|
|
|
|
| 742-01-B |
sanitary sewer pipe (250 mm, pvc sdr 35)
|
33   |
ln m |
95.00 |
3,135.00 |
|
|
|
|
|
|
| 742-01-C |
sanitary sewer pipe (305 mm, pvc sdr 35)
|
34   |
ln m |
105.00 |
3,570.00 |
|
|
|
|
|
|
| 742-01-D |
sanitary sewer pipe (200 mm, ductile iron)
|
48   |
ln m |
200.00 |
9,600.00 |
|
|
|
|
|
|
| 742-01-E |
sanitary sewer pipe (250 mm, ductile iron)
|
54   |
ln m |
225.00 |
12,150.00 |
|
|
|
|
|
|
| 742-01-F |
sanitary sewer pipe (305 mm, ductile iron)
|
12   |
ln m |
250.00 |
3,000.00 |
|
|
|
|
|
|
| 742-02 |
adjusting sanitary sewer house connections
|
105   |
ea |
275.00 |
28,875.00 |
|
|
|
|
|
|
| 742-03 |
adjusting sanitary sewer service lines
|
1,176   |
ln m |
36.00 |
42,336.00 |
|
|
|
|
|
|
| 804-01-B |
precast concrete piles (350 mm)
|
580.8 |
ln m |
235.00 |
136,488.00 |
|
|
|
|
|
|
| 804-01-D |
precast concrete piles (450 mm)
|
1,360.0 |
ln m |
210.00 |
285,600.00 |
|
|
|
|
|
|
| 804-01-F |
precast concrete piles (600 mm)
|
184.0 |
ln m |
350.00 |
64,400.00 |
|
|
|
|
|
|
| 804-12-B |
loading permanent piles (350 mm)
|
1   |
ea |
2,500.00 |
2,500.00 |
|
|
|
|
|
|
| 804-12-D |
loading permanent piles (450 mm)
|
1   |
ea |
2,500.00 |
2,500.00 |
|
|
|
|
|
|
| 804-12-F |
loading permanent piles (600 mm)
|
1   |
ea |
2,500.00 |
2,500.00 |
|
|
|
|
|
|
| 804-13-B |
precast concrete indicator piles (350 mm)
|
1   |
ea |
10,000.00 |
10,000.00 |
|
|
|
|
|
|
| 804-13-D |
precast concrete indicator piles (450 mm)
|
2   |
ea |
10,000.00 |
20,000.00 |
|
|
|
|
|
|
| 804-13-F |
precast concrete indicator piles (600 mm)
|
2   |
ea |
14,000.00 |
28,000.00 |
|
|
|
|
|
|
| 804-17 |
dynamic monitoring
|
5   |
ea |
1,500.00 |
7,500.00 |
|
|
|
|
|
|
| 805-01 |
class a concrete
|
30.74 |
cu m |
2,500.00 |
76,850.00 |
|
|
|
|
|
|
| 805-01-B |
class a concrete (box culvert headwalls)
|
193.41 |
cu m |
1,285.00 |
248,531.85 |
|
|
|
|
|
|
| 805-01-F |
class a concrete (bents)
|
342.24 |
cu m |
815.00 |
278,925.60 |
|
|
|
|
|
|
| 805-03 |
class aa concrete
|
807.37 |
cu m |
800.00 |
645,896.00 |
|
|
|
|
|
|
| 805-08-B |
precast-prestressed concrete girders (type ii)
|
951.00 |
ln m |
270.00 |
256,770.00 |
|
|
|
|
|
|
| 805-11 |
strip seal joints
|
97.40 |
ln m |
515.00 |
50,161.00 |
|
|
|
|
|
|
| 805-12-E |
reinforced concrete box culverts (1200 mm x 1200 mm)
|
255.00 |
ln m |
770.00 |
196,350.00 |
|
|
|
|
|
|
| 805-12-P |
reinforced concrete box culverts (2100 mm x 2100 mm)
|
128.40 |
ln m |
1,700.00 |
218,280.00 |
|
|
|
|
|
|
| 805-12-S |
reinforced concrete box culverts (2400 mm x 2400 mm)
|
359.00 |
ln m |
1,800.00 |
646,200.00 |
|
|
|
|
|
|
| 805-12-Y |
reinforced concrete box culverts (900 mm x 900 mm)
|
167.00 |
ln m |
750.00 |
125,250.00 |
|
|
|
|
|
|
| 806-01 |
deformed reinforcing steel
|
51,976   |
kg |
2.05 |
106,550.80 |
|
|
|
|
|
|
| 806-02 |
deformed reinforcing steel (epoxy coated)
|
107,847   |
kg |
3.10 |
334,325.70 |
|
|
|
|
|
|
| 807-08 |
structural metalwork
|
lump |
lump |
5,000.00 |
5,000.00 |
|
|
|
|
|
|
| 810-01 |
concrete railing (barrier)
|
391.92 |
ln m |
215.00 |
84,262.80 |
|
|
|
|
|
|
| 813-01 |
concrete approach slabs
|
1,682.40 |
sq m |
200.00 |
336,480.00 |
|
|
|
|
|
|
| S-001 |
video detector device and connection
|
11   |
each |
7,500.00 |
82,500.00 |
|
|
|
|
|
|
| S-002 |
temporary sediment basin
|
lump |
lump |
10,000.00 |
10,000.00 |
|
|
|
|
|
|
| S-003 |
temporary diversions associated with box culvert
|
lump |
lump |
6,000.00 |
6,000.00 |
|
|
|
|
|
|
| S-004 |
diversions associated with graded slopes
|
lump |
lump |
35,000.00 |
35,000.00 |
|
|
|
|
|
|
| S-005 |
video detection system
|
lump |
lump |
5,000.00 |
5,000.00 |
|
|
|
|
|
|
| S-006 |
field office
|
lump |
lump |
70,000.00 |
70,000.00 |
|
|
|
|
|
|
| S-007 |
archaelogical construction monitoring
|
lump |
lump |
15,000.00 |
15,000.00 |
|
|
|
|
|
|
| S-103 |
impact attenuator (construction zone)
|
2   |
each |
21,000.00 |
42,000.00 |
|
|
|
|
|
|
| S-104 |
retroreflective sheeting panels
|
lump |
lump |
3,000.00 |
3,000.00 |
|
|
|
|
|
|
| S-105 |
precast concrete piles (600 mm)(dotd furnished)
|
592.0 |
ln m |
180.00 |
106,560.00 |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | ITEM TOTAL (CONSTRUCTION BID) |
|
|
|
44,321,316.85 |
|
|
|
|
|
|
| | NUMBER OF DAYS BID AT $4,600 PER DAY. |
|
|
|
3,565,000.00 |
|
|
|
|
|
|
| | TOTAL BID |
|
|
|
47,886,316.85 |
|
|
|
|
|
|
|