| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - MADDEN CONTRACTING CO., INC. |
- 2 - GILCHRIST CONSTRUCTION CO. LLC |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
577   |
CUYD |
1.00 |
577.00 |
120.00 |
69,240.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
971.0 |
TON |
126.40 |
122,734.40 |
110.00 |
106,810.00 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
163.3 |
TON |
50.00 |
8,165.00 |
200.00 |
32,660.00 |
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
222   |
SQYD |
68.50 |
15,207.00 |
25.00 |
5,550.00 |
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 7   |
CUYD |
0.01 |
- 0.07 |
0.02 |
- 0.14 |
|
|
|
|
| 510-01-B |
pavement patching (12" minimum thickness)
|
400   |
SQYD |
105.00 |
42,000.00 |
100.00 |
40,000.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
20,500.00 |
20,500.00 |
25,000.00 |
25,000.00 |
|
|
|
|
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
0.644 |
MILE |
400.00 |
257.60 |
330.00 |
212.52 |
|
|
|
|
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
2.576 |
MILE |
1.00 |
2.58 |
1.00 |
2.58 |
|
|
|
|
| 713-05-D |
temporary pavement legends and symbols (rr crossing)
|
1   |
EACH |
1.00 |
1.00 |
1.00 |
1.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
20,500.00 |
20,500.00 |
34,000.00 |
34,000.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
85   |
EACH |
5.00 |
425.00 |
6.00 |
510.00 |
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
23   |
LNFT |
3.00 |
69.00 |
4.00 |
92.00 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
2.576 |
MILE |
2,150.00 |
5,538.40 |
3,000.00 |
7,728.00 |
|
|
|
|
| 732-04-D |
plastic pavement legends & symbols (rr crossing)
|
1   |
EACH |
400.00 |
400.00 |
500.00 |
500.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
15,000.00 |
15,000.00 |
18,000.00 |
18,000.00 |
|
|
|
|
| S-001 |
saw cutting
|
4,320   |
INFT |
0.01 |
43.20 |
1.50 |
6,480.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
251,420.11 |
|
346,785.96 |
|
|
|
|
|