| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - GUINN BROTHERS, LLC. |
- 2 - CERES ENVIRONMENTAL SERVICES,INC. |
- 3 - L & A CONTRACTING CO. |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
30,000.00 |
30,000.00 |
16,250.00 |
16,250.00 |
100,000.00 |
100,000.00 |
|
|
| 202-02-A-01 |
removal of bridge(sta.105+00,22.40' wide x 57.21'long
timber bridge) |
1   |
EACH |
20,000.00 |
20,000.00 |
13,125.00 |
13,125.00 |
150,000.00 |
150,000.00 |
|
|
| 202-02-G |
removal of surfacing & stabilized base
|
145.8 |
SQYD |
25.00 |
3,645.00 |
3.13 |
456.35 |
65.00 |
9,477.00 |
|
|
| 203-05 |
excavation & embankment
|
lump |
LUMP |
28,500.00 |
28,500.00 |
10,400.00 |
10,400.00 |
185,000.00 |
185,000.00 |
|
|
| 204-02 |
temporary hay or straw bales
|
6   |
EACH |
100.00 |
600.00 |
7.50 |
45.00 |
285.00 |
1,710.00 |
|
|
| 204-03 |
temporary slope drains
|
160   |
LNFT |
10.00 |
1,600.00 |
37.50 |
6,000.00 |
168.00 |
26,880.00 |
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
4   |
EACH |
100.00 |
400.00 |
250.00 |
1,000.00 |
265.00 |
1,060.00 |
|
|
| 204-06 |
temporary silt fencing
|
325   |
LNFT |
5.00 |
1,625.00 |
4.38 |
1,423.50 |
9.75 |
3,168.75 |
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
4   |
CUYD |
125.00 |
500.00 |
87.50 |
350.00 |
420.00 |
1,680.00 |
|
|
| 502-01 |
superpave asphaltic concrete
|
118.7 |
TON |
350.00 |
41,545.00 |
287.50 |
34,126.25 |
310.00 |
36,797.00 |
|
|
| 510-02 |
pavement widening
|
166.2 |
SQYD |
210.00 |
34,902.00 |
175.00 |
29,085.00 |
155.00 |
25,761.00 |
|
|
| 701-05-G-01 |
side drain pipe (18")(erosion)
|
156   |
LNFT |
60.00 |
9,360.00 |
18.75 |
2,925.00 |
125.00 |
19,500.00 |
|
|
| 701-05-K-01 |
side drain pipe (30")(erosion)
|
140   |
LNFT |
95.00 |
13,300.00 |
31.25 |
4,375.00 |
252.00 |
35,280.00 |
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
75.0 |
LNFT |
75.00 |
5,625.00 |
78.75 |
5,906.25 |
125.00 |
9,375.00 |
|
|
| 704-09 |
guard rail anchor sections (turndown)
|
75.0 |
LNFT |
50.00 |
3,750.00 |
70.00 |
5,250.00 |
180.00 |
13,500.00 |
|
|
| 704-11-A |
guard rail end treatment (flared)
|
1   |
EACH |
5,000.00 |
5,000.00 |
2,625.00 |
2,625.00 |
6,000.00 |
6,000.00 |
|
|
| 705-08-A |
20-foot double gates for chain link fence (4-foot
height) |
2   |
DBGT |
750.00 |
1,500.00 |
1,562.50 |
3,125.00 |
3,500.00 |
7,000.00 |
|
|
| 712-03 |
stone revetment
|
424   |
SQYD |
85.00 |
36,040.00 |
55.00 |
23,320.00 |
155.00 |
65,720.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
15,000.00 |
15,000.00 |
9,462.50 |
9,462.50 |
75,000.00 |
75,000.00 |
|
|
| 716-01-A |
mulch (vegetative)
|
0.3 |
TON |
10,000.00 |
3,000.00 |
5,000.00 |
1,500.00 |
7,500.00 |
2,250.00 |
|
|
| 717-01 |
seeding
|
7   |
LB |
50.00 |
350.00 |
37.50 |
262.50 |
150.00 |
1,050.00 |
|
|
| 718-01 |
fertilizer
|
147   |
LB |
4.00 |
588.00 |
5.00 |
735.00 |
50.00 |
7,350.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
75,000.00 |
75,000.00 |
185,375.00 |
185,375.00 |
500,000.00 |
500,000.00 |
|
|
| 729-16-C |
object marker assembly (type 3)
|
7   |
EACH |
125.00 |
875.00 |
93.75 |
656.25 |
200.00 |
1,400.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
15,000.00 |
15,000.00 |
25,000.00 |
25,000.00 |
175,000.00 |
175,000.00 |
|
|
| 804-01-C |
precast concrete piles (16")
|
1,416   |
LNFT |
74.00 |
104,784.00 |
98.75 |
139,830.00 |
150.00 |
212,400.00 |
|
|
| 804-12 |
loading permanent piles
|
1   |
EACH |
1.00 |
1.00 |
1.25 |
1.25 |
10,000.00 |
10,000.00 |
|
|
| 805-10-A |
bridge superstructure & substructure (28'clear roadway;
60 degree crossing) (cast-in-place bents) |
5   |
SPAN |
35,000.00 |
175,000.00 |
32,500.00 |
162,500.00 |
120,000.00 |
600,000.00 |
|
|
| S-001 |
vibration monitoring
|
lump |
LUMP |
15,000.00 |
15,000.00 |
12,500.00 |
12,500.00 |
15,000.00 |
15,000.00 |
|
|
| S-101 |
concrete approach slabs( 28'clear roadway;60 degree
crossing)(w/o asphalt) |
2   |
EACH |
14,500.00 |
29,000.00 |
12,500.00 |
25,000.00 |
95,000.00 |
190,000.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
671,490.00 |
|
722,609.85 |
|
2,487,358.75 |
|
|
|