Letting of 1/30/2008 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 713-53-0109
Parish: TANGIPAHOA
Routes:
Description: CITY OF HAMMOND,E.CHURCH ST. BRIDGE OVER PONCHATULA CREEK
Type Const: grading, drainage structures, superpave asphaltic concrete overlay, pavement widening,
concrete slab span bridge, and related work.
Estimated Construction Cost: $525,679.50
 
RankLicenseBidderConstruction Bid
1 09090 GUINN BROTHERS, LLC. $671,490.00
2 45210 CERES ENVIRONMENTAL SERVICES,INC. $722,609.85
3 00755 L & A CONTRACTING CO. $2,487,358.75
 
Item Number Item Description Quantity Unit of Measure - 1 -
GUINN BROTHERS, LLC.
- 2 -
CERES ENVIRONMENTAL SERVICES,INC.
- 3 -
L & A CONTRACTING CO.

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 30,000.00 30,000.00 16,250.00 16,250.00 100,000.00 100,000.00    
202-02-A-01 removal of bridge(sta.105+00,22.40' wide x 57.21'long
timber bridge)
1      EACH 20,000.00 20,000.00 13,125.00 13,125.00 150,000.00 150,000.00    
202-02-G removal of surfacing & stabilized base 145.8    SQYD 25.00 3,645.00 3.13 456.35 65.00 9,477.00    
203-05 excavation & embankment lump      LUMP 28,500.00 28,500.00 10,400.00 10,400.00 185,000.00 185,000.00    
204-02 temporary hay or straw bales 6      EACH 100.00 600.00 7.50 45.00 285.00 1,710.00    
204-03 temporary slope drains 160      LNFT 10.00 1,600.00 37.50 6,000.00 168.00 26,880.00    
204-05-A temporary sediment check dams (hay) 4      EACH 100.00 400.00 250.00 1,000.00 265.00 1,060.00    
204-06 temporary silt fencing 325      LNFT 5.00 1,625.00 4.38 1,423.50 9.75 3,168.75    
401-02 aggregate surface course (adjusted vehicular
measurement)
4      CUYD 125.00 500.00 87.50 350.00 420.00 1,680.00    
502-01 superpave asphaltic concrete 118.7    TON 350.00 41,545.00 287.50 34,126.25 310.00 36,797.00    
510-02 pavement widening 166.2    SQYD 210.00 34,902.00 175.00 29,085.00 155.00 25,761.00    
701-05-G-01 side drain pipe (18")(erosion) 156      LNFT 60.00 9,360.00 18.75 2,925.00 125.00 19,500.00    
701-05-K-01 side drain pipe (30")(erosion) 140      LNFT 95.00 13,300.00 31.25 4,375.00 252.00 35,280.00    
704-08-B guard rail transitions (double thrie beam) 75.0    LNFT 75.00 5,625.00 78.75 5,906.25 125.00 9,375.00    
704-09 guard rail anchor sections (turndown) 75.0    LNFT 50.00 3,750.00 70.00 5,250.00 180.00 13,500.00    
704-11-A guard rail end treatment (flared) 1      EACH 5,000.00 5,000.00 2,625.00 2,625.00 6,000.00 6,000.00    
705-08-A 20-foot double gates for chain link fence (4-foot
height)
2      DBGT 750.00 1,500.00 1,562.50 3,125.00 3,500.00 7,000.00    
712-03 stone revetment 424      SQYD 85.00 36,040.00 55.00 23,320.00 155.00 65,720.00    
713-01 temporary signs & barricades lump      LUMP 15,000.00 15,000.00 9,462.50 9,462.50 75,000.00 75,000.00    
716-01-A mulch (vegetative) 0.3    TON 10,000.00 3,000.00 5,000.00 1,500.00 7,500.00 2,250.00    
717-01 seeding 7      LB 50.00 350.00 37.50 262.50 150.00 1,050.00    
718-01 fertilizer 147      LB 4.00 588.00 5.00 735.00 50.00 7,350.00    
727-01 mobilization lump      LUMP 75,000.00 75,000.00 185,375.00 185,375.00 500,000.00 500,000.00    
729-16-C object marker assembly (type 3) 7      EACH 125.00 875.00 93.75 656.25 200.00 1,400.00    
740-01 construction layout lump      LUMP 15,000.00 15,000.00 25,000.00 25,000.00 175,000.00 175,000.00    
804-01-C precast concrete piles (16") 1,416      LNFT 74.00 104,784.00 98.75 139,830.00 150.00 212,400.00    
804-12 loading permanent piles 1      EACH 1.00 1.00 1.25 1.25 10,000.00 10,000.00    
805-10-A bridge superstructure & substructure (28'clear roadway;
60 degree crossing) (cast-in-place bents)
5      SPAN 35,000.00 175,000.00 32,500.00 162,500.00 120,000.00 600,000.00    
S-001 vibration monitoring lump      LUMP 15,000.00 15,000.00 12,500.00 12,500.00 15,000.00 15,000.00    
S-101 concrete approach slabs( 28'clear roadway;60 degree
crossing)(w/o asphalt)
2      EACH 14,500.00 29,000.00 12,500.00 25,000.00 95,000.00 190,000.00    
                       
 CONTRACTOR TOTAL       671,490.00   722,609.85   2,487,358.75    