Letting of 1/30/2008 LA DOTD Headquarters


REBID
go back
Go Back
 
Lead Project: 713-10-0106
Parish: CALCASIEU
Routes:
Description: MOSSWOOD DRIVE BRIDGE REHABILITATION
Type Const: guard rail, bridge rehabilitation, and related work
Estimated Construction Cost: $130,404.00
 
RankLicenseBidderConstruction Bid
1 45210 CERES ENVIRONMENTAL SERVICES,INC. $451,137.50
2 00060 F. MILLER CONSTRUCTION LLC $483,246.00
 
Item Number Item Description Quantity Unit of Measure - 1 -
CERES ENVIRONMENTAL SERVICES,INC.
- 2 -
F. MILLER CONSTRUCTION LLC

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
203-07 borrow (vehicular measurement) 60      CUYD 32.50 1,950.00 85.00 5,100.00        
704-01-A guard rail (single thrie beam)(3'-1 1/2" post spacing) 100.0    LNFT 50.00 5,000.00 54.00 5,400.00        
704-01-B guard rail (single thrie beam)(6'-3" post spacing) 318.0    LNFT 68.75 21,862.50 59.00 18,762.00        
704-11-A guard rail end treatment (flared) 4      EACH 2,500.00 10,000.00 2,400.00 9,600.00        
713-01 temporary signs & barricades lump      LUMP 13,750.00 13,750.00 12,000.00 12,000.00        
727-01 mobilization lump      LUMP 224,175.00 224,175.00 45,000.00 45,000.00        
729-16-C object marker assembly (type 3) 4      EACH 100.00 400.00 90.00 360.00        
740-01 construction layout lump      LUMP 5,000.00 5,000.00 6,200.00 6,200.00        
804-02-A treated timber piles (noncoastal treatment) 900      LNFT 50.00 45,000.00 160.00 144,000.00        
812-01-A treated timber (land and fresh water) 0.72   MFBM 12,500.00 9,000.00 34,200.00 24,624.00        
S-101 remove and reinstall span 4      EACH 19,375.00 77,500.00 37,100.00 148,400.00        
S-102 remove and reinstall cap 3      EACH 7,500.00 22,500.00 17,000.00 51,000.00        
S-103 tie rods 8      EACH 1,875.00 15,000.00 1,600.00 12,800.00        
                       
 CONTRACTOR TOTAL       451,137.50   483,246.00        