| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - CERES ENVIRONMENTAL SERVICES,INC. |
- 2 - F. MILLER CONSTRUCTION LLC |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 203-07 |
borrow (vehicular measurement)
|
60   |
CUYD |
32.50 |
1,950.00 |
85.00 |
5,100.00 |
|
|
|
|
| 704-01-A |
guard rail (single thrie beam)(3'-1 1/2" post spacing)
|
100.0 |
LNFT |
50.00 |
5,000.00 |
54.00 |
5,400.00 |
|
|
|
|
| 704-01-B |
guard rail (single thrie beam)(6'-3" post spacing)
|
318.0 |
LNFT |
68.75 |
21,862.50 |
59.00 |
18,762.00 |
|
|
|
|
| 704-11-A |
guard rail end treatment (flared)
|
4   |
EACH |
2,500.00 |
10,000.00 |
2,400.00 |
9,600.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
13,750.00 |
13,750.00 |
12,000.00 |
12,000.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
224,175.00 |
224,175.00 |
45,000.00 |
45,000.00 |
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
4   |
EACH |
100.00 |
400.00 |
90.00 |
360.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
5,000.00 |
5,000.00 |
6,200.00 |
6,200.00 |
|
|
|
|
| 804-02-A |
treated timber piles (noncoastal treatment)
|
900   |
LNFT |
50.00 |
45,000.00 |
160.00 |
144,000.00 |
|
|
|
|
| 812-01-A |
treated timber (land and fresh water)
|
0.72 |
MFBM |
12,500.00 |
9,000.00 |
34,200.00 |
24,624.00 |
|
|
|
|
| S-101 |
remove and reinstall span
|
4   |
EACH |
19,375.00 |
77,500.00 |
37,100.00 |
148,400.00 |
|
|
|
|
| S-102 |
remove and reinstall cap
|
3   |
EACH |
7,500.00 |
22,500.00 |
17,000.00 |
51,000.00 |
|
|
|
|
| S-103 |
tie rods
|
8   |
EACH |
1,875.00 |
15,000.00 |
1,600.00 |
12,800.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
451,137.50 |
|
483,246.00 |
|
|
|
|
|