Letting of 1/30/2008 LA DOTD Headquarters


READV
go back
Go Back
DBE GOAL FED
Lead Project: 705-57-0014
Parish: VERMILION
Routes: LA 82
Description: CAMERON PARISH LINE - JUNCTION LA 35
Type Const: asphaltic concrete overlay
Estimated Construction Cost: $4,892,617.91
 
RankLicenseBidderConstruction Bid
1 04089 H & S CONSTRUCTION CO., INC. $4,326,258.19
2 12487 DIAMOND B CONSTRUCTION CO., L.L.C. $4,365,108.21
3 12312 GILCHRIST CONSTRUCTION CO. LLC $4,689,897.70
 
Item Number Item Description Quantity Unit of Measure - 1 -
H & S CONSTRUCTION CO., INC.
- 2 -
DIAMOND B CONSTRUCTION CO., L.L.C.
- 3 -
GILCHRIST CONSTRUCTION CO. LLC

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
401-02 aggregate surface course (adjusted vehicular
measurement)
9,382      CUYD 55.00 516,010.00 80.00 750,560.00 79.00 741,178.00    
502-01 superpave asphaltic concrete 37,040.7    TON 85.00 3,148,459.50 80.50 2,981,776.35 90.00 3,333,663.00    
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
400.0    TON 130.00 52,000.00 184.00 73,600.00 175.00 70,000.00    
509-01 cold planing asphaltic pavement 6,800      SQYD 8.50 57,800.00 4.50 30,600.00 3.00 20,400.00    
509-02 contractor retained reclaimed asphaltic pavement - 189      CUYD 0.01 - 1.89 0.10 - 18.90 0.01 - 1.89    
510-01-C pavement patching (15" minimum thickness) 150      SQYD 150.00 22,500.00 257.00 38,550.00 165.00 24,750.00    
713-01 temporary signs & barricades lump      LUMP 95,000.00 95,000.00 22,000.00 22,000.00 35,000.00 35,000.00    
713-03-A temporary pavement markings (broken line)(4" width)(4'
length)
23.000  MILE 285.00 6,555.00 130.00 2,990.00 200.00 4,600.00    
713-03-B temporary pavement markings (broken line)(4" width)
(10' length)
19.279  MILE 568.00 10,950.47 300.00 5,783.70 330.00 6,362.07    
713-04-A temporary pavement markings (solid line)(4" width) 54.834  MILE 712.00 39,041.81 600.00 32,900.40 530.00 29,062.02    
727-01 mobilization lump      LUMP 150,000.00 150,000.00 244,000.00 244,000.00 235,000.00 235,000.00    
731-02 reflectorized raised pavement markers 3,038      EACH 6.10 18,531.80 5.00 15,190.00 5.60 17,012.80    
732-02-A plastic pavement striping (solid line) (4" width) 54.834  MILE 3,166.00 173,604.44 2,300.00 126,118.20 2,600.00 142,568.40    
732-03-A plastic pavement striping (broken line)(4" width) 19.279  MILE 778.00 14,999.06 740.00 14,266.46 700.00 13,495.30    
732-05 removal of existing markings 0.968  MILE 6,000.00 5,808.00 6,500.00 6,292.00 6,000.00 5,808.00    
740-01 construction layout lump      LUMP 15,000.00 15,000.00 20,500.00 20,500.00 11,000.00 11,000.00    
                       
 CONTRACTOR TOTAL       4,326,258.19   4,365,108.21   4,689,897.70    