Letting of 1/30/2008 LA DOTD Headquarters


REBID
go back
Go Back
DBE GOAL FED
Lead Project: 704-44-0003
Parish: ST BERNARD
Routes:
Description: LA 300 EMERGENCY EMBANKMENT REPAIR (JCT LA 39 TO LM 2.40)
Type Const: embankment,class ii base course, pavement patching, drainage,
Estimated Construction Cost: $395,388.50
 
RankLicenseBidderConstruction Bid
1 25088 RCS CONTRACTORS, INC. $364,071.02
2 45210 CERES ENVIRONMENTAL SERVICES,INC. $454,675.00
3 27634 PHYLWAY CONSTRUCTION LLC $639,715.00
4 06276 BARRIERE CONSTRUCTION CO., LLC. $736,049.00
 
Item Number Item Description Quantity Unit of Measure - 1 -
RCS CONTRACTORS, INC.
- 2 -
CERES ENVIRONMENTAL SERVICES,INC.
- 3 -
PHYLWAY CONSTRUCTION LLC
- 4 -
BARRIERE CONSTRUCTION CO., LLC.
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-I removal of pipe 48'' diameter pipe 140      LNFT 8.50 1,190.00 87.50 12,250.00 35.00 4,900.00 122.00 17,080.00
202-02-J removal of gabion baskets lump      LUMP 2,750.00 2,750.00 5,625.00 5,625.00 13,000.00 13,000.00 24,000.00 24,000.00
203-04 nonplastic embankment 1,000      CUYD 14.75 14,750.00 38.75 38,750.00 40.00 40,000.00 37.00 37,000.00
203-05 excavation and embankment lump      LUMP 31,600.00 31,600.00 37,500.00 37,500.00 85,000.00 85,000.00 55,000.00 55,000.00
302-02-F class ii base course (12" thick) 156.0    SQYD 77.30 12,058.80 31.25 4,875.00 75.00 11,700.00 48.00 7,488.00
401-02 aggregate surface course (adjusted vehicular
measurement)
1,168      CUYD 85.25 99,572.00 68.75 80,300.00 125.00 146,000.00 135.00 157,680.00
510-01-B pavement patching (12" minimum thickness) 278      SQYD 145.00 40,310.00 162.50 45,175.00 190.00 52,820.00 140.00 38,920.00
701-01-S-01 cross drain pipe (72" bccmp) 280      LNFT 433.12 121,273.60 212.50 59,500.00 625.00 175,000.00 1,240.00 347,200.00
711-03-C riprap (30 lb) 75.0    TON 96.12 7,209.00 75.00 5,625.00 95.00 7,125.00 128.00 9,600.00
726-01 bedding material 104.0    CUYD 81.28 8,453.12 68.75 7,150.00 130.00 13,520.00 86.00 8,944.00
727-01 mobilization lump      LUMP 19,500.00 19,500.00 128,075.00 128,075.00 60,000.00 60,000.00 28,000.00 28,000.00
731-02 reflectorized raised pavement markers 5      EACH 5.90 29.50 7.50 37.50 10.00 50.00 7.60 38.00
732-02-A plastic pavement striping (solid line) (4" width) 0.150  MILE 2,500.00 375.00 23,750.00 3,562.50 4,000.00 600.00 2,660.00 399.00
740-01 construction layout lump      LUMP 5,000.00 5,000.00 26,250.00 26,250.00 30,000.00 30,000.00 4,700.00 4,700.00
                       
 CONTRACTOR TOTAL       364,071.02   454,675.00   639,715.00   736,049.00