Lead Project: 451-06-0112
Parish: OUACHITA
Routes: I-20
Description: RAMP REHABILITATION
Type Const: grading, cold planing asphaltic concrete, class ii base course, asphaltic surface
treatment, pavement patching, pvmt widening, s'pave asphaltic concrete ovly & related work
Estimated Construction Cost: $3,693,686.89
 
RankLicenseBidderConstruction Bid
1 46547 KNISH CORPORATION $4,993,767.71
2 44289 JEFF MERCER LLC $5,844,411.25
 
Item Number Item Description Quantity Unit of Measure - 1 -
KNISH CORPORATION
- 2 -
JEFF MERCER LLC

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-01 removal of structures & obstructions lump      LUMP 5,785.59 5,785.59 87,000.00 87,000.00        
202-02-E removal of concrete curbs 13.0    LNFT 10.00 130.00 100.00 1,300.00        
202-02-G removal of surfacing & stabilized base 5,804.1    SQYD 8.90 51,656.49 5.00 29,020.50        
202-02-I removal of trees 7      EACH 680.88 4,766.16 500.00 3,500.00        
203-05 excavation and embankment lump      LUMP 150,000.00 150,000.00 84,000.00 84,000.00        
204-05-A temporary sediment check dams (hay) 10      EACH 75.00 750.00 100.00 1,000.00        
204-06 temporary silt fencing 6,000      LNFT 1.35 8,100.00 1.50 9,000.00        
302-01 class ii base course 237.1    CUYD 10.00 2,371.00 78.00 18,493.80        
302-02-E class ii base course (10" thick) 13,245.9    SQYD 25.44 336,975.70 30.00 397,377.00        
304-05 lime treatment (type e) 186.22   TON 123.26 22,953.48 145.00 27,001.90        
502-01 superpave asphaltic concrete 1,666.2    TON 170.00 283,254.00 231.00 384,892.20        
507-01-A asphaltic material (crs-2p emulsion) 13,822      GAL 4.00 55,288.00 3.98 55,011.56        
507-02-B aggregate (s2) 20,326      SQYD 1.13 22,968.38 1.55 31,505.30        
507-02-C aggregate (s3) 20,326      SQYD 1.13 22,968.38 1.38 28,049.88        
509-01 cold planing asphaltic pavement 15,147      SQYD 8.00 121,176.00 2.25 34,080.75        
509-02 contractor retained reclaimed asphalt pavement - 842      CUYD 0.01 - 8.42 0.01 - 8.42        
510-01-B pavement patching (12" minimum thickness) 1,017      SQYD 175.00 177,975.00 143.00 145,431.00        
510-02 pavement widening 1,371.3    SQYD 125.00 171,412.50 154.00 211,180.20        
510-03 pavement joint repair 0.7    TON 7,500.00 5,250.00 8,250.00 5,775.00        
602-02-A cleaning and resealing existing longitudinal pavement
joints
3,122      LNFT 2.00 6,244.00 1.65 5,151.30        
602-02-B cleaning and resealing existing transverse pavement
joints
15,570      LNFT 2.00 31,140.00 1.75 27,247.50        
602-05-I-01 full depth patching of jointed concrete pavement (9"
thick) (16.0 sq yds & under)
458.9    SQYD 275.00 126,197.50 215.00 98,663.50        
602-05-I-02 full depth patching of jointed concrete pavement (9"
thick) (16.1 sq yds - 48.0 sq yds)
789.0    SQYD 275.00 216,975.00 180.00 142,020.00        
602-05-I-03 full depth patching of jointed concrete pavement (9"
thick) (48.1 sq yds & over)
17,252.5    SQYD 125.00 2,156,562.50 130.00 2,242,825.00        
602-10 longitudinal shoulder joints 34,689      LNFT 1.25 43,361.25 1.60 55,502.40        
701-10-G reinforced concrete pipe (extension)(18") 12      LNFT 333.99 4,007.88 200.00 2,400.00        
702-04-B adjusting catch basins 1      EACH 15,094.01 15,094.01 6,000.00 6,000.00        
707-01 concrete curb 1,215.0    LNFT 18.00 21,870.00 18.00 21,870.00        
713-01 temporary signs & barricades lump      LUMP 100,000.00 100,000.00 50,250.00 50,250.00        
713-04-A temporary pavement markings (solid line)(4" width) 0.770  MILE 3,300.00 2,541.00 290.00 223.30        
716-01-A mulch (vegetative) 12.5    TON 295.00 3,687.50 350.00 4,375.00        
717-01 seeding 281      LB 6.50 1,826.50 7.25 2,037.25        
718-01 fertilizer 6,237      LB 0.29 1,808.73 0.35 2,182.95        
726-01 bedding material 4.5    CUYD 213.03 958.64 400.00 1,800.00        
727-01 mobilization lump      LUMP 550,000.00 550,000.00 1,400,000.00 1,400,000.00        
731-02 reflectorized raised pavement markers 1,181      EACH 5.25 6,200.25 7.70 9,093.70        
732-01-C plastic pavement striping (8" width) 4,860      LNFT 0.95 4,617.00 6.00 29,160.00        
732-01-E plastic pavement striping (24" width) 720      LNFT 3.75 2,700.00 8.00 5,760.00        
732-02-A plastic pavement striping (solid line) (4" width) 10.693  MILE 2,610.00 27,908.73 2,640.00 28,229.52        
732-03-A plastic pavement striping (broken line)(4" width) 0.814  MILE 790.00 643.06 1,430.00 1,164.02        
732-04-A plastic pavement legends & symbols (arrow) 22      EACH 195.00 4,290.00 450.00 9,900.00        
732-05 removal of existing markings 7.857  MILE 5,700.00 44,784.90 3,520.00 27,656.64        
740-01 construction layout lump      LUMP 92,000.00 92,000.00 59,500.00 59,500.00        
S-001 dynamic message sign unit 4      EACH 17,000.00 68,000.00 10,000.00 40,000.00        
S-002 traffic maintenance superpave asphaltic concrete 100.0    TON 50.00 5,000.00 120.00 12,000.00        
S-004 sawcuts in pavement patching 3,859      LNFT 3.00 11,577.00 1.50 5,788.50        
                       
 CONTRACTOR TOTAL       4,993,767.71   5,844,411.25        