Lead Project: 364-02-0004
Parish: WINN
Routes: LA 1228
Description: BEGIN CONTROL - JCT. LA 34
Type Const: drainage strs, cold planing asphaltic concrete, cement treated base course, asphaltic
concrete wearing course
Estimated Construction Cost: $1,485,965.21
 
RankLicenseBidderConstruction Bid
1 08584 MADDEN CONTRACTING CO., INC. $1,412,402.74
2 12312 GILCHRIST CONSTRUCTION CO. LLC $1,570,616.19
3 12487 DIAMOND B CONSTRUCTION CO., L.L.C. $1,600,173.70
4 08815 W. E. MCDONALD & SON, LLC. $1,779,760.73
 
Item Number Item Description Quantity Unit of Measure - 1 -
MADDEN CONTRACTING CO., INC.
- 2 -
GILCHRIST CONSTRUCTION CO. LLC
- 3 -
DIAMOND B CONSTRUCTION CO., L.L.C.
- 4 -
W. E. MCDONALD & SON, LLC.
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-01 removal of structures & obstructions lump      LUMP 5,000.00 5,000.00 10,000.00 10,000.00 5,000.00 5,000.00 10,000.00 10,000.00
202-02-D removal of concrete walks & drives 7      SQYD 25.00 175.00 35.00 245.00 100.00 700.00 250.00 1,750.00
203-01 general excavation 632      CUYD 10.00 6,320.00 7.50 4,740.00 12.00 7,584.00 40.00 25,280.00
203-07 borrow (vehicular measurement) 500      CUYD 15.00 7,500.00 18.00 9,000.00 21.00 10,500.00 12.00 6,000.00
203-07-A borrow (vehicular meas.)(selected soils) 1,111      CUYD 10.00 11,110.00 18.00 19,998.00 21.00 23,331.00 12.00 13,332.00
304-05 lime treatment (type e) 336.45   TON 250.00 84,112.50 235.00 79,065.75 300.00 100,935.00 500.00 168,225.00
308-01-A in-place cement treated base course (12" thick) 65,228      SQYD 7.30 476,164.40 6.20 404,413.60 7.00 456,596.00 6.75 440,289.00
308-02 removal of existing patches 588      SQYD 10.00 5,880.00 3.00 1,764.00 16.50 9,702.00 15.00 8,820.00
401-02 aggregate surface course (adjusted vehicular
measurement)
1,100      CUYD 37.50 41,250.00 55.00 60,500.00 28.00 30,800.00 25.00 27,500.00
502-01 superpave asphaltic concrete 6,784.3    TON 80.00 542,744.00 85.00 576,665.50 80.00 542,744.00 90.00 610,587.00
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
222.0    TON 50.00 11,100.00 200.00 44,400.00 170.00 37,740.00 150.00 33,300.00
509-01 cold planing asphaltic pavement 61,675      SQYD 1.25 77,093.75 1.00 61,675.00 2.25 138,768.75 2.00 123,350.00
509-02 contractor retained reclaimed asphaltic pavement - 4,542      CUYD 0.01 - 45.42 0.01 - 45.42 0.10 - 454.20 0.01 - 45.42
701-01-I/K cross drain pipe (24" rcp/pcp or 30" cmp) 224      LNFT 130.00 29,120.00 145.00 32,480.00 135.00 30,240.00 165.00 36,960.00
712-04 flexible revetment 31      SQYD 80.00 2,480.00 110.00 3,410.00 109.00 3,379.00 250.00 7,750.00
713-01 temporary signs & barricades lump      LUMP 20,000.00 20,000.00 15,000.00 15,000.00 13,000.00 13,000.00 50,000.00 50,000.00
713-03-A temporary pavement markings (broken line)(4" width)(4'
length)
5.213  MILE 400.00 2,085.20 300.00 1,563.90 150.00 781.95 300.00 1,563.90
713-03-B temporary pavement markings (broken line)(4" width)
(10' length)
2.664  MILE 1.00 2.66 1.00 2.66 325.00 865.80 200.00 532.80
713-04-A temporary pavement markings (solid line)(4" width) 17.199  MILE 1.00 17.20 1.00 17.20 1.00 17.20 250.00 4,299.75
716-01-A mulch (vegetative) 1.2    TON 1,000.00 1,200.00 500.00 600.00 500.00 600.00 450.00 540.00
717-01 seeding 18      LB 20.00 360.00 8.00 144.00 7.50 135.00 7.00 126.00
718-01 fertilizer 600      LB 1.00 600.00 0.70 420.00 0.62 372.00 0.56 336.00
722-01 project site laboratory 1      EACH 2,500.00 2,500.00 15,000.00 15,000.00 8,000.00 8,000.00 5,000.00 5,000.00
726-01 bedding material 53.3    CUYD 90.00 4,797.00 120.00 6,396.00 100.00 5,330.00 100.00 5,330.00
727-01 mobilization lump      LUMP 20,000.00 20,000.00 130,000.00 130,000.00 93,000.00 93,000.00 130,000.00 130,000.00
729-16-B object marker assembly (type 2) 8      EACH 100.00 800.00 55.00 440.00 60.00 480.00 75.00 600.00
731-02 reflectorized raised pavement markers 688      EACH 5.00 3,440.00 5.80 3,990.40 6.25 4,300.00 7.00 4,816.00
732-01-E plastic pavement striping (24" width) 9      LNFT 3.00 27.00 4.00 36.00 3.50 31.50 50.00 450.00
732-02-A plastic pavement striping (solid line) (4" width) 17.199  MILE 2,350.00 40,417.65 3,000.00 51,597.00 2,500.00 42,997.50 2,300.00 39,557.70
732-03-A plastic pavement striping (broken line)(4" width) 2.664  MILE 700.00 1,864.80 900.00 2,397.60 750.00 1,998.00 1,000.00 2,664.00
735-01 mailboxes 20      EACH 1.00 20.00 10.00 200.00 1.00 20.00 1.00 20.00
735-02 mailbox supports (single) 18      EACH 129.00 2,322.00 160.00 2,880.00 150.00 2,700.00 129.00 2,322.00
735-03 mailbox supports (double) 1      EACH 185.00 185.00 220.00 220.00 200.00 200.00 185.00 185.00
740-01 construction layout lump      LUMP 10,000.00 10,000.00 25,000.00 25,000.00 22,000.00 22,000.00 10,000.00 10,000.00
S-001 cleaning existing ditches 320      LNFT 5.00 1,600.00 15.00 4,800.00 14.12 4,518.40 20.00 6,400.00
S-002 saw cutting 160      INFT 1.00 160.00 10.00 1,600.00 7.88 1,260.80 12.00 1,920.00
                       
 CONTRACTOR TOTAL       1,412,402.74   1,570,616.19   1,600,173.70   1,779,760.73