| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - MADDEN CONTRACTING CO., INC. |
- 2 - GILCHRIST CONSTRUCTION CO. LLC |
- 3 - DIAMOND B CONSTRUCTION CO., L.L.C. |
- 4 - W. E. MCDONALD & SON, LLC. |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
5,000.00 |
5,000.00 |
10,000.00 |
10,000.00 |
5,000.00 |
5,000.00 |
10,000.00 |
10,000.00 |
| 202-02-D |
removal of concrete walks & drives
|
7   |
SQYD |
25.00 |
175.00 |
35.00 |
245.00 |
100.00 |
700.00 |
250.00 |
1,750.00 |
| 203-01 |
general excavation
|
632   |
CUYD |
10.00 |
6,320.00 |
7.50 |
4,740.00 |
12.00 |
7,584.00 |
40.00 |
25,280.00 |
| 203-07 |
borrow (vehicular measurement)
|
500   |
CUYD |
15.00 |
7,500.00 |
18.00 |
9,000.00 |
21.00 |
10,500.00 |
12.00 |
6,000.00 |
| 203-07-A |
borrow (vehicular meas.)(selected soils)
|
1,111   |
CUYD |
10.00 |
11,110.00 |
18.00 |
19,998.00 |
21.00 |
23,331.00 |
12.00 |
13,332.00 |
| 304-05 |
lime treatment (type e)
|
336.45 |
TON |
250.00 |
84,112.50 |
235.00 |
79,065.75 |
300.00 |
100,935.00 |
500.00 |
168,225.00 |
| 308-01-A |
in-place cement treated base course (12" thick)
|
65,228   |
SQYD |
7.30 |
476,164.40 |
6.20 |
404,413.60 |
7.00 |
456,596.00 |
6.75 |
440,289.00 |
| 308-02 |
removal of existing patches
|
588   |
SQYD |
10.00 |
5,880.00 |
3.00 |
1,764.00 |
16.50 |
9,702.00 |
15.00 |
8,820.00 |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
1,100   |
CUYD |
37.50 |
41,250.00 |
55.00 |
60,500.00 |
28.00 |
30,800.00 |
25.00 |
27,500.00 |
| 502-01 |
superpave asphaltic concrete
|
6,784.3 |
TON |
80.00 |
542,744.00 |
85.00 |
576,665.50 |
80.00 |
542,744.00 |
90.00 |
610,587.00 |
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
222.0 |
TON |
50.00 |
11,100.00 |
200.00 |
44,400.00 |
170.00 |
37,740.00 |
150.00 |
33,300.00 |
| 509-01 |
cold planing asphaltic pavement
|
61,675   |
SQYD |
1.25 |
77,093.75 |
1.00 |
61,675.00 |
2.25 |
138,768.75 |
2.00 |
123,350.00 |
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 4,542   |
CUYD |
0.01 |
- 45.42 |
0.01 |
- 45.42 |
0.10 |
- 454.20 |
0.01 |
- 45.42 |
| 701-01-I/K |
cross drain pipe (24" rcp/pcp or 30" cmp)
|
224   |
LNFT |
130.00 |
29,120.00 |
145.00 |
32,480.00 |
135.00 |
30,240.00 |
165.00 |
36,960.00 |
| 712-04 |
flexible revetment
|
31   |
SQYD |
80.00 |
2,480.00 |
110.00 |
3,410.00 |
109.00 |
3,379.00 |
250.00 |
7,750.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
20,000.00 |
20,000.00 |
15,000.00 |
15,000.00 |
13,000.00 |
13,000.00 |
50,000.00 |
50,000.00 |
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
5.213 |
MILE |
400.00 |
2,085.20 |
300.00 |
1,563.90 |
150.00 |
781.95 |
300.00 |
1,563.90 |
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
2.664 |
MILE |
1.00 |
2.66 |
1.00 |
2.66 |
325.00 |
865.80 |
200.00 |
532.80 |
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
17.199 |
MILE |
1.00 |
17.20 |
1.00 |
17.20 |
1.00 |
17.20 |
250.00 |
4,299.75 |
| 716-01-A |
mulch (vegetative)
|
1.2 |
TON |
1,000.00 |
1,200.00 |
500.00 |
600.00 |
500.00 |
600.00 |
450.00 |
540.00 |
| 717-01 |
seeding
|
18   |
LB |
20.00 |
360.00 |
8.00 |
144.00 |
7.50 |
135.00 |
7.00 |
126.00 |
| 718-01 |
fertilizer
|
600   |
LB |
1.00 |
600.00 |
0.70 |
420.00 |
0.62 |
372.00 |
0.56 |
336.00 |
| 722-01 |
project site laboratory
|
1   |
EACH |
2,500.00 |
2,500.00 |
15,000.00 |
15,000.00 |
8,000.00 |
8,000.00 |
5,000.00 |
5,000.00 |
| 726-01 |
bedding material
|
53.3 |
CUYD |
90.00 |
4,797.00 |
120.00 |
6,396.00 |
100.00 |
5,330.00 |
100.00 |
5,330.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
20,000.00 |
20,000.00 |
130,000.00 |
130,000.00 |
93,000.00 |
93,000.00 |
130,000.00 |
130,000.00 |
| 729-16-B |
object marker assembly (type 2)
|
8   |
EACH |
100.00 |
800.00 |
55.00 |
440.00 |
60.00 |
480.00 |
75.00 |
600.00 |
| 731-02 |
reflectorized raised pavement markers
|
688   |
EACH |
5.00 |
3,440.00 |
5.80 |
3,990.40 |
6.25 |
4,300.00 |
7.00 |
4,816.00 |
| 732-01-E |
plastic pavement striping (24" width)
|
9   |
LNFT |
3.00 |
27.00 |
4.00 |
36.00 |
3.50 |
31.50 |
50.00 |
450.00 |
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
17.199 |
MILE |
2,350.00 |
40,417.65 |
3,000.00 |
51,597.00 |
2,500.00 |
42,997.50 |
2,300.00 |
39,557.70 |
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
2.664 |
MILE |
700.00 |
1,864.80 |
900.00 |
2,397.60 |
750.00 |
1,998.00 |
1,000.00 |
2,664.00 |
| 735-01 |
mailboxes
|
20   |
EACH |
1.00 |
20.00 |
10.00 |
200.00 |
1.00 |
20.00 |
1.00 |
20.00 |
| 735-02 |
mailbox supports (single)
|
18   |
EACH |
129.00 |
2,322.00 |
160.00 |
2,880.00 |
150.00 |
2,700.00 |
129.00 |
2,322.00 |
| 735-03 |
mailbox supports (double)
|
1   |
EACH |
185.00 |
185.00 |
220.00 |
220.00 |
200.00 |
200.00 |
185.00 |
185.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
10,000.00 |
10,000.00 |
25,000.00 |
25,000.00 |
22,000.00 |
22,000.00 |
10,000.00 |
10,000.00 |
| S-001 |
cleaning existing ditches
|
320   |
LNFT |
5.00 |
1,600.00 |
15.00 |
4,800.00 |
14.12 |
4,518.40 |
20.00 |
6,400.00 |
| S-002 |
saw cutting
|
160   |
INFT |
1.00 |
160.00 |
10.00 |
1,600.00 |
7.88 |
1,260.80 |
12.00 |
1,920.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,412,402.74 |
|
1,570,616.19 |
|
1,600,173.70 |
|
1,779,760.73 |
|