Lead Project: 207-06-0011
Parish: ACADIA
Routes: LA 35
Description: JCT. HABETZ LOOP (SOUTH) - SOUTH JCT. US 90 (CM)
Type Const: cold plane, base rehab, & overlay
Estimated Construction Cost: $1,017,816.15
 
RankLicenseBidderConstruction Bid
1 04089 H & S CONSTRUCTION CO., INC. $1,071,368.40
2 12487 DIAMOND B CONSTRUCTION CO., L.L.C. $1,332,493.11
3 12312 GILCHRIST CONSTRUCTION CO. LLC $1,480,132.28
 
Item Number Item Description Quantity Unit of Measure - 1 -
H & S CONSTRUCTION CO., INC.
- 2 -
DIAMOND B CONSTRUCTION CO., L.L.C.
- 3 -
GILCHRIST CONSTRUCTION CO. LLC

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-D removal of concrete walks & drives 132      SQYD 15.00 1,980.00 29.00 3,828.00 14.00 1,848.00    
202-02-G removal of surfacing & stabilized base 82.0    SQYD 15.00 1,230.00 50.00 4,100.00 30.00 2,460.00    
204-05-A temporary sediment check dams (hay) 12      EACH 125.00 1,500.00 250.00 3,000.00 200.00 2,400.00    
303-01-B in-place cement stabilized base course (8 1/2" thick) 13,036      SQYD 11.00 143,396.00 12.00 156,432.00 11.00 143,396.00    
401-02 aggregate surface course (adjusted vehicular
measurement)
698      CUYD 55.00 38,390.00 46.00 32,108.00 75.00 52,350.00    
402-01 traffic maintenance aggregate (vehicular measurement) 50.0    CUYD 95.00 4,750.00 50.00 2,500.00 75.00 3,750.00    
502-01 superpave asphaltic concrete 4,842.3    TON 77.00 372,857.10 107.00 518,126.10 100.00 484,230.00    
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
335.5    TON 125.00 41,937.50 250.00 83,875.00 230.00 77,165.00    
507-01-A asphaltic material (crs-2p emulsion) 13,890      GAL 4.00 55,560.00 3.00 41,670.00 4.00 55,560.00    
507-02-B aggregate (s2) 20,426      SQYD 1.50 30,639.00 1.75 35,745.50 0.90 18,383.40    
507-02-C aggregate (s3) 20,426      SQYD 1.30 26,553.80 1.75 35,745.50 0.90 18,383.40    
509-01 cold planing asphaltic pavement 19,286      SQYD 3.00 57,858.00 3.25 62,679.50 3.20 61,715.20    
509-02 contractor retained reclaimed asphaltic pavement - 1,291      CUYD 0.01 - 12.91 0.10 - 129.10 0.02 - 25.82    
510-01-B pavement patching (12" minimum thickness) 50      SQYD 150.00 7,500.00 275.00 13,750.00 220.00 11,000.00    
510-02 pavement widening 1,140.0    SQYD 85.00 96,900.00 70.00 79,800.00 70.00 79,800.00    
702-04-B adjusting catch basins 1      EACH 3,500.00 3,500.00 5,500.00 5,500.00 3,200.00 3,200.00    
713-01 temporary signs & barricades lump      LUMP 30,000.00 30,000.00 18,000.00 18,000.00 150,000.00 150,000.00    
713-03-A temporary pavement markings (broken line)(4" width)(4'
length)
4.258  MILE 388.00 1,652.10 150.00 638.70 440.00 1,873.52    
713-03-B temporary pavement markings (broken line)(4" width)
(10' length)
1.419  MILE 352.00 499.49 325.00 461.18 370.00 525.03    
713-04-A temporary pavement markings (solid line)(4" width) 3.197  MILE 590.00 1,886.23 675.00 2,157.98 620.00 1,982.14    
713-05-A temporary pavement legends and symbols (arrow) 2      EACH 90.00 180.00 70.00 140.00 90.00 180.00    
713-05-C temporary pavement legends and symbols (only) 2      EACH 90.00 180.00 80.00 160.00 90.00 180.00    
713-06 temporary reflectorized raised pavement markers 206      EACH 6.00 1,236.00 5.50 1,133.00 6.00 1,236.00    
713-06-A temporary reflectorized raised pavement markers (tabs) 376      EACH 1.25 470.00 1.75 658.00 1.00 376.00    
722-02 project site laboratory (equipped) 1      EACH 8,500.00 8,500.00 7,000.00 7,000.00 20,000.00 20,000.00    
727-01 mobilization lump      LUMP 65,000.00 65,000.00 130,000.00 130,000.00 140,000.00 140,000.00    
729-16-B object marker assembly (type 2) 2      EACH 60.00 120.00 60.00 120.00 60.00 120.00    
731-02 reflectorized raised pavement markers 206      EACH 6.00 1,236.00 5.00 1,030.00 6.40 1,318.40    
732-02-A plastic pavement striping (solid line) (4" width) 3.178  MILE 3,226.00 10,252.23 2,500.00 7,945.00 3,400.00 10,805.20    
732-03-A plastic pavement striping (broken line)(4" width) 1.419  MILE 940.00 1,333.86 750.00 1,064.25 990.00 1,404.81    
732-04-A plastic pavement legends & symbols (arrow) 1      EACH 209.00 209.00 165.00 165.00 220.00 220.00    
732-04-C plastic pavement legends & symbols (only) 1      EACH 268.00 268.00 165.00 165.00 280.00 280.00    
735-01 mailboxes 30      EACH 1.20 36.00 1.25 37.50 10.00 300.00    
735-02 mailbox supports (single) 32      EACH 137.00 4,384.00 125.00 4,000.00 200.00 6,400.00    
740-01 construction layout lump      LUMP 5,000.00 5,000.00 8,000.00 8,000.00 35,000.00 35,000.00    
S-002 cement treatment (10" thickness) 6,600      SQYD 7.50 49,500.00 10.00 66,000.00 13.00 85,800.00    
S-003 full depth sawcutting of existing portland cement
concrete drives
3,258      INFT 1.50 4,887.00 1.50 4,887.00 2.00 6,516.00    
                       
 CONTRACTOR TOTAL       1,071,368.40   1,332,493.11   1,480,132.28    