| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - H & S CONSTRUCTION CO., INC. |
- 2 - DIAMOND B CONSTRUCTION CO., L.L.C. |
- 3 - GILCHRIST CONSTRUCTION CO. LLC |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-D |
removal of concrete walks & drives
|
132   |
SQYD |
15.00 |
1,980.00 |
29.00 |
3,828.00 |
14.00 |
1,848.00 |
|
|
| 202-02-G |
removal of surfacing & stabilized base
|
82.0 |
SQYD |
15.00 |
1,230.00 |
50.00 |
4,100.00 |
30.00 |
2,460.00 |
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
12   |
EACH |
125.00 |
1,500.00 |
250.00 |
3,000.00 |
200.00 |
2,400.00 |
|
|
| 303-01-B |
in-place cement stabilized base course (8 1/2" thick)
|
13,036   |
SQYD |
11.00 |
143,396.00 |
12.00 |
156,432.00 |
11.00 |
143,396.00 |
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
698   |
CUYD |
55.00 |
38,390.00 |
46.00 |
32,108.00 |
75.00 |
52,350.00 |
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
50.0 |
CUYD |
95.00 |
4,750.00 |
50.00 |
2,500.00 |
75.00 |
3,750.00 |
|
|
| 502-01 |
superpave asphaltic concrete
|
4,842.3 |
TON |
77.00 |
372,857.10 |
107.00 |
518,126.10 |
100.00 |
484,230.00 |
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
335.5 |
TON |
125.00 |
41,937.50 |
250.00 |
83,875.00 |
230.00 |
77,165.00 |
|
|
| 507-01-A |
asphaltic material (crs-2p emulsion)
|
13,890   |
GAL |
4.00 |
55,560.00 |
3.00 |
41,670.00 |
4.00 |
55,560.00 |
|
|
| 507-02-B |
aggregate (s2)
|
20,426   |
SQYD |
1.50 |
30,639.00 |
1.75 |
35,745.50 |
0.90 |
18,383.40 |
|
|
| 507-02-C |
aggregate (s3)
|
20,426   |
SQYD |
1.30 |
26,553.80 |
1.75 |
35,745.50 |
0.90 |
18,383.40 |
|
|
| 509-01 |
cold planing asphaltic pavement
|
19,286   |
SQYD |
3.00 |
57,858.00 |
3.25 |
62,679.50 |
3.20 |
61,715.20 |
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 1,291   |
CUYD |
0.01 |
- 12.91 |
0.10 |
- 129.10 |
0.02 |
- 25.82 |
|
|
| 510-01-B |
pavement patching (12" minimum thickness)
|
50   |
SQYD |
150.00 |
7,500.00 |
275.00 |
13,750.00 |
220.00 |
11,000.00 |
|
|
| 510-02 |
pavement widening
|
1,140.0 |
SQYD |
85.00 |
96,900.00 |
70.00 |
79,800.00 |
70.00 |
79,800.00 |
|
|
| 702-04-B |
adjusting catch basins
|
1   |
EACH |
3,500.00 |
3,500.00 |
5,500.00 |
5,500.00 |
3,200.00 |
3,200.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
30,000.00 |
30,000.00 |
18,000.00 |
18,000.00 |
150,000.00 |
150,000.00 |
|
|
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
4.258 |
MILE |
388.00 |
1,652.10 |
150.00 |
638.70 |
440.00 |
1,873.52 |
|
|
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
1.419 |
MILE |
352.00 |
499.49 |
325.00 |
461.18 |
370.00 |
525.03 |
|
|
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
3.197 |
MILE |
590.00 |
1,886.23 |
675.00 |
2,157.98 |
620.00 |
1,982.14 |
|
|
| 713-05-A |
temporary pavement legends and symbols (arrow)
|
2   |
EACH |
90.00 |
180.00 |
70.00 |
140.00 |
90.00 |
180.00 |
|
|
| 713-05-C |
temporary pavement legends and symbols (only)
|
2   |
EACH |
90.00 |
180.00 |
80.00 |
160.00 |
90.00 |
180.00 |
|
|
| 713-06 |
temporary reflectorized raised pavement markers
|
206   |
EACH |
6.00 |
1,236.00 |
5.50 |
1,133.00 |
6.00 |
1,236.00 |
|
|
| 713-06-A |
temporary reflectorized raised pavement markers (tabs)
|
376   |
EACH |
1.25 |
470.00 |
1.75 |
658.00 |
1.00 |
376.00 |
|
|
| 722-02 |
project site laboratory (equipped)
|
1   |
EACH |
8,500.00 |
8,500.00 |
7,000.00 |
7,000.00 |
20,000.00 |
20,000.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
65,000.00 |
65,000.00 |
130,000.00 |
130,000.00 |
140,000.00 |
140,000.00 |
|
|
| 729-16-B |
object marker assembly (type 2)
|
2   |
EACH |
60.00 |
120.00 |
60.00 |
120.00 |
60.00 |
120.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
206   |
EACH |
6.00 |
1,236.00 |
5.00 |
1,030.00 |
6.40 |
1,318.40 |
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
3.178 |
MILE |
3,226.00 |
10,252.23 |
2,500.00 |
7,945.00 |
3,400.00 |
10,805.20 |
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
1.419 |
MILE |
940.00 |
1,333.86 |
750.00 |
1,064.25 |
990.00 |
1,404.81 |
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
1   |
EACH |
209.00 |
209.00 |
165.00 |
165.00 |
220.00 |
220.00 |
|
|
| 732-04-C |
plastic pavement legends & symbols (only)
|
1   |
EACH |
268.00 |
268.00 |
165.00 |
165.00 |
280.00 |
280.00 |
|
|
| 735-01 |
mailboxes
|
30   |
EACH |
1.20 |
36.00 |
1.25 |
37.50 |
10.00 |
300.00 |
|
|
| 735-02 |
mailbox supports (single)
|
32   |
EACH |
137.00 |
4,384.00 |
125.00 |
4,000.00 |
200.00 |
6,400.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
5,000.00 |
5,000.00 |
8,000.00 |
8,000.00 |
35,000.00 |
35,000.00 |
|
|
| S-002 |
cement treatment (10" thickness)
|
6,600   |
SQYD |
7.50 |
49,500.00 |
10.00 |
66,000.00 |
13.00 |
85,800.00 |
|
|
| S-003 |
full depth sawcutting of existing portland cement
concrete drives |
3,258   |
INFT |
1.50 |
4,887.00 |
1.50 |
4,887.00 |
2.00 |
6,516.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,071,368.40 |
|
1,332,493.11 |
|
1,480,132.28 |
|
|
|