Error processing SSI file
Error processing SSI file
Bid Tabs Error processing SSI file
Bid Tabulations Error processing SSI file
February 06, 2014 Error processing SSI file

Letting of 1/30/2008 LA DOTD Headquarters


REBID
go back
Go Back
DBE GOAL FED
Lead Project: 084-03-0033
Parish: WEBSTER
Routes: LA 157
Description: SPRINGHILL - JCT. LA 159 (BRIDGES)
Type Const: grading, drainage structures, class ii base course, superpave asphaltic concrete
pavement, concrete slab spans bridges, and related work.
Estimated Construction Cost: $10,962,318.69
Maximum Number of Days Allowed for Construction: 650
Calculated Daily User Cost: $1,000.00
 
RankLicenseBidderConstruction Bid Bidder's Proposed
Contract Time
Total Bid
1 34567 JAMES CONSTRUCTION GROUP LLC $11,476,968.55 650 $12,126,968.55
2 12370 HILL BROTHERS CONSTRUCTION CO., INC $11,963,150.85 650 $12,613,150.85
3 12135 BLOUNT BROS. CONSTRUCTION, INC. $12,027,654.08 600 $12,627,654.08
4 42076 AUSTIN BRIDGE & ROAD, LP $14,822,706.60 650 $15,472,706.60
5 45210 CERES ENVIRONMENTAL SERVICES,INC. $14,849,355.92 450 $15,299,355.92
 
Item Number Item Description Quantity Unit of Measure - 1 -
JAMES CONSTRUCTION GROUP LLC
- 2 -
HILL BROTHERS CONSTRUCTION CO., INC
- 3 -
BLOUNT BROS. CONSTRUCTION, INC.
- 4 -
AUSTIN BRIDGE & ROAD, LP
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 750,000.00 750,000.00 500,000.00 500,000.00 150,000.00 150,000.00 500,000.00 500,000.00
202-01 removal of structures & obstructions lump      LUMP 10,000.00 10,000.00 50,000.00 50,000.00 200,000.00 200,000.00 60,000.00 60,000.00
202-02-A-01 removal of bridge (sta. 110+00.00; 24' x 95' precast
concrete span bridge)
1      EACH 25,000.00 25,000.00 50,000.00 50,000.00 20,000.00 20,000.00 90,000.00 90,000.00
202-02-A-02 removal of bridge (sta. 122+78.30; 24' x 286' precast
concrete span bridge)
1      EACH 50,000.00 50,000.00 125,000.00 125,000.00 50,000.00 50,000.00 160,000.00 160,000.00
202-02-A-03 removal of bridge (sta. 129+78.36; 24' x 439' precast
concrete span bridge)
1      EACH 70,000.00 70,000.00 200,000.00 200,000.00 80,000.00 80,000.00 180,000.00 180,000.00
202-02-A-04 removal of bridge (sta. 211+96.90; 24' x 248' precast
concrete span bridge)
1      EACH 45,000.00 45,000.00 125,000.00 125,000.00 45,000.00 45,000.00 85,000.00 85,000.00
202-02-G removal of surfacing & stabilized base 15,046.0    SQYD 5.00 75,230.00 5.00 75,230.00 4.70 70,716.20 6.60 99,303.60
203-01 general excavation 21,082      CUYD 5.00 105,410.00 4.00 84,328.00 6.00 126,492.00 8.00 168,656.00
203-02 drainage excavation 905      CUYD 16.00 14,480.00 15.00 13,575.00 12.00 10,860.00 14.00 12,670.00
203-03 embankment 142,899      CUYD 8.70 1,243,221.30 9.50 1,357,540.50 12.00 1,714,788.00 15.00 2,143,485.00
204-02 temporary hay or straw bales 200      EACH 15.00 3,000.00 20.00 4,000.00 15.00 3,000.00 17.00 3,400.00
204-05-A temporary sediment check dams (hay) 11      EACH 150.00 1,650.00 250.00 2,750.00 90.00 990.00 225.00 2,475.00
204-06 temporary silt fencing 500      LNFT 3.00 1,500.00 10.00 5,000.00 3.00 1,500.00 6.00 3,000.00
204-07 temporary stone construction entrance 8      EACH 4,000.00 32,000.00 10,000.00 80,000.00 2,600.00 20,800.00 3,000.00 24,000.00
302-02-D class ii base course (8 1/2" thick) 15,054.0    SQYD 22.00 331,188.00 16.00 240,864.00 18.00 270,972.00 19.00 286,026.00
304-01 lime 151.15   TON 1.00 151.15 175.00 26,451.25 160.00 24,184.00 180.00 27,207.00
304-04-B lime treatment (type d) (8 1/2" thick) 15,054      SQYD 0.01 150.54 2.75 41,398.50 3.50 52,689.00 6.00 90,324.00
402-01 traffic maintenance aggregate (vehicular measurement) 132.0    CUYD 70.00 9,240.00 100.00 13,200.00 50.00 6,600.00 60.00 7,920.00
502-01 superpave asphaltic concrete 9,390.2    TON 100.00 939,020.00 100.00 939,020.00 100.00 939,020.00 105.00 985,971.00
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
373.6    TON 130.00 48,568.00 130.00 48,568.00 110.00 41,096.00 130.00 48,568.00
701-01-M cross drain pipe (36" rcp/pcp) 160      LNFT 116.00 18,560.00 100.00 16,000.00 110.00 17,600.00 220.00 35,200.00
701-05-G side drain pipe (18") 90      LNFT 48.00 4,320.00 30.00 2,700.00 35.00 3,150.00 50.00 4,500.00
701-05-I side drain pipe (24") 28      LNFT 65.00 1,820.00 45.00 1,260.00 45.00 1,260.00 80.00 2,240.00
701-05-K side drain pipe (30") 56      LNFT 79.00 4,424.00 70.00 3,920.00 100.00 5,600.00 90.00 5,040.00
701-05-M side drain pipe (36") 250      LNFT 92.00 23,000.00 75.00 18,750.00 90.00 22,500.00 125.00 31,250.00
701-05-N side drain pipe (42") 30      LNFT 112.00 3,360.00 125.00 3,750.00 120.00 3,600.00 200.00 6,000.00
704-03 blocked out guard rail 750.0    LNFT 17.00 12,750.00 18.50 13,875.00 19.50 14,625.00 20.00 15,000.00
704-08-B guard rail transitions (double thrie beam) 400.0    LNFT 50.00 20,000.00 55.00 22,000.00 58.00 23,200.00 55.00 22,000.00
704-11-A guard rail end treatment (flared) 16      EACH 2,000.00 32,000.00 2,100.00 33,600.00 2,500.00 40,000.00 1,950.00 31,200.00
705-01 barbed wire fence 1,698      LNFT 4.60 7,810.80 5.00 8,490.00 6.00 10,188.00 4.75 8,065.50
705-02 combination mesh & barbed wire fence 1,764      LNFT 5.00 8,820.00 5.50 9,702.00 12.00 21,168.00 5.25 9,261.00
705-04 single swinging driveway gates 1      EACH 540.00 540.00 600.00 600.00 600.00 600.00 550.00 550.00
708-01 right-of-way monument 48      EACH 150.00 7,200.00 150.00 7,200.00 187.00 8,976.00 250.00 12,000.00
708-02 right-of-way monument witness post 48      EACH 150.00 7,200.00 125.00 6,000.00 200.00 9,600.00 180.00 8,640.00
711-01-E riprap (130 lb, 24" thick) 10,796      SQYD 73.00 788,108.00 50.00 539,800.00 80.00 863,680.00 90.00 971,640.00
711-04 geotextile fabric 10,796      SQYD 4.00 43,184.00 2.50 26,990.00 3.20 34,547.20 3.10 33,467.60
713-01 temporary signs & barricades lump      LUMP 60,000.00 60,000.00 75,000.00 75,000.00 75,000.00 75,000.00 65,000.00 65,000.00
713-04-A temporary pavement markings (solid line)(4" width) 5.923  MILE 550.00 3,257.65 550.00 3,257.65 825.00 4,886.48 550.00 3,257.65
713-06 temporary reflectorized raised pavement markers 785      EACH 5.00 3,925.00 6.00 4,710.00 10.00 7,850.00 6.00 4,710.00
716-01-A mulch (vegetative) 31.6    TON 750.00 23,700.00 665.00 21,014.00 520.00 16,432.00 570.00 18,012.00
720-01-A erosion control system, slope protection (type a) 5,995      SQYD 1.20 7,194.00 1.10 6,594.50 3.00 17,985.00 2.00 11,990.00
720-01-B erosion control system, slope protection (type b) 4,199      SQYD 1.20 5,038.80 1.70 7,138.30 3.00 12,597.00 1.70 7,138.30
720-01-C erosion control system, flexible channel liner (type c) 658      SQYD 1.90 1,250.20 1.70 1,118.60 4.00 2,632.00 3.20 2,105.60
720-01-D erosion control system, flexible channel liner (type d) 3,880      SQYD 1.90 7,372.00 2.00 7,760.00 5.00 19,400.00 3.20 12,416.00
720-01-F erosion control system, flexible channel liner (type f) 592      SQYD 3.00 1,776.00 3.00 1,776.00 5.00 2,960.00 3.20 1,894.40
722-01 project site laboratory 1      EACH 15,000.00 15,000.00 20,000.00 20,000.00 40,000.00 40,000.00 20,000.00 20,000.00
725-01 temporary detour roads 4,377.5    SQYD 90.00 393,975.00 70.00 306,425.00 75.00 328,312.50 105.00 459,637.50
725-03 temporary detour bridging 120.00   LNFT 1,500.00 180,000.00 3,500.00 420,000.00 3,160.00 379,200.00 2,500.00 300,000.00
726-01 bedding material 60.0    CUYD 125.00 7,500.00 100.00 6,000.00 80.00 4,800.00 120.00 7,200.00
727-01 mobilization lump      LUMP 1,000,000.00 1,000,000.00 500,000.00 500,000.00 850,000.00 850,000.00 1,300,000.00 1,300,000.00
729-01 sign (type a) 6.0    SQFT 40.00 240.00 45.00 270.00 18.50 111.00 30.00 180.00
729-08-A mounting (2 1/2" post) 2      EACH 850.00 1,700.00 950.00 1,900.00 600.00 1,200.00 150.00 300.00
729-16-C object marker assembly (type 3) 16      EACH 75.00 1,200.00 80.00 1,280.00 80.00 1,280.00 72.00 1,152.00
729-19-A dead end road installations(type a) 1      EACH 1,500.00 1,500.00 1,700.00 1,700.00 2,000.00 2,000.00 1,500.00 1,500.00
731-02 reflectorized raised pavement markers 661      EACH 5.00 3,305.00 6.00 3,966.00 10.00 6,610.00 5.00 3,305.00
732-02-A plastic pavement striping (solid line) (4" width) 4.990  MILE 3,000.00 14,970.00 3,350.00 16,716.50 2,700.00 13,473.00 3,000.00 14,970.00
732-05 removal of existing markings 1.307  MILE 6,000.00 7,842.00 6,650.00 8,691.55 6,000.00 7,842.00 6,000.00 7,842.00
739-01 hydro-seeding 18.03   ACRE 1,050.00 18,931.50 1,200.00 21,636.00 2,000.00 36,060.00 2,000.00 36,060.00
740-01 construction layout lump      LUMP 125,000.00 125,000.00 400,000.00 400,000.00 180,000.00 180,000.00 250,000.00 250,000.00
804-01-C precast concrete piles (16") 1,690      LNFT 75.00 126,750.00 95.00 160,550.00 80.00 135,200.00 80.00 135,200.00
804-01-F precast concrete piles (24") 7,500      LNFT 105.00 787,500.00 175.00 1,312,500.00 120.00 900,000.00 119.00 892,500.00
804-01-G precast concrete piles (30") 3,380      LNFT 128.00 432,640.00 195.00 659,100.00 150.00 507,000.00 150.00 507,000.00
804-12 loading permanent piles 4      EACH 2,500.00 10,000.00 5,500.00 22,000.00 15,000.00 60,000.00 30,000.00 120,000.00
805-01-F class a concrete (bents) 664.94   CUYD 950.00 631,693.00 650.00 432,211.00 700.00 465,458.00 1,100.00 731,434.00
805-03 class aa concrete 1,764.32   CUYD 850.00 1,499,672.00 900.00 1,587,888.00 800.00 1,411,456.00 1,200.00 2,117,184.00
805-08-B precast-prestressed concrete girders (type ii) 2,672.9    LNFT 160.00 427,664.00 100.00 267,290.00 110.00 294,019.00 130.00 347,477.00
805-11 strip seal joints 132.00   LNFT 225.00 29,700.00 140.00 18,480.00 200.00 26,400.00 180.00 23,760.00
806-01 deformed reinforcing steel 460,347      LB 1.00 460,347.00 1.00 460,347.00 1.50 690,520.50 1.25 575,433.75
807-08 structural metalwork lump      LUMP 5,000.00 5,000.00 5,000.00 5,000.00 30,000.00 30,000.00 17,000.00 17,000.00
810-01 concrete railing (barrier) 2,199.26   LNFT 48.10 105,784.41 75.00 164,944.50 150.00 329,889.00 95.00 208,929.70
813-01 concrete approach slabs 1,591.12   SQYD 210.00 334,135.20 200.00 318,224.00 160.00 254,579.20 275.00 437,558.00
S-001 sawcutting existing bituminous pavement 100      LNFT 10.00 1,000.00 11.00 1,100.00 10.00 1,000.00 40.00 4,000.00
S-101 retroreflective sheeting panels lump      LUMP 2,500.00 2,500.00 20,000.00 20,000.00 2,500.00 2,500.00 2,500.00 2,500.00
                       
 ITEM TOTAL (CONSTRUCTION BID)       11,476,968.55   11,963,150.85   12,027,654.08   14,822,706.60
 NUMBER OF DAYS BID AT $1,000 PER DAY.       650,000.00   650,000.00   600,000.00   650,000.00
 TOTAL BID       12,126,968.55   12,613,150.85   12,627,654.08   15,472,706.60
 
Item Number Item Description Quantity Unit of Measure - 5 -
CERES ENVIRONMENTAL SERVICES,INC.

 

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 45,000.00 45,000.00            
202-01 removal of structures & obstructions lump      LUMP 2,500.00 2,500.00            
202-02-A-01 removal of bridge (sta. 110+00.00; 24' x 95' precast
concrete span bridge)
1      EACH 36,250.00 36,250.00            
202-02-A-02 removal of bridge (sta. 122+78.30; 24' x 286' precast
concrete span bridge)
1      EACH 106,250.00 106,250.00            
202-02-A-03 removal of bridge (sta. 129+78.36; 24' x 439' precast
concrete span bridge)
1      EACH 166,250.00 166,250.00            
202-02-A-04 removal of bridge (sta. 211+96.90; 24' x 248' precast
concrete span bridge)
1      EACH 105,000.00 105,000.00            
202-02-G removal of surfacing & stabilized base 15,046.0    SQYD 3.13 47,093.98            
203-01 general excavation 21,082      CUYD 3.13 65,986.66            
203-02 drainage excavation 905      CUYD 4.69 4,244.45            
203-03 embankment 142,899      CUYD 11.88 1,697,640.12            
204-02 temporary hay or straw bales 200      EACH 12.50 2,500.00            
204-05-A temporary sediment check dams (hay) 11      EACH 187.50 2,062.50            
204-06 temporary silt fencing 500      LNFT 1.88 940.00            
204-07 temporary stone construction entrance 8      EACH 375.00 3,000.00            
302-02-D class ii base course (8 1/2" thick) 15,054.0    SQYD 28.75 432,802.50            
304-01 lime 151.15   TON 187.50 28,340.63            
304-04-B lime treatment (type d) (8 1/2" thick) 15,054      SQYD 10.00 150,540.00            
402-01 traffic maintenance aggregate (vehicular measurement) 132.0    CUYD 87.50 11,550.00            
502-01 superpave asphaltic concrete 9,390.2    TON 100.00 939,020.00            
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
373.6    TON 100.00 37,360.00            
701-01-M cross drain pipe (36" rcp/pcp) 160      LNFT 156.25 25,000.00            
701-05-G side drain pipe (18") 90      LNFT 56.25 5,062.50            
701-05-I side drain pipe (24") 28      LNFT 87.50 2,450.00            
701-05-K side drain pipe (30") 56      LNFT 95.00 5,320.00            
701-05-M side drain pipe (36") 250      LNFT 131.25 32,812.50            
701-05-N side drain pipe (42") 30      LNFT 206.25 6,187.50            
704-03 blocked out guard rail 750.0    LNFT 26.25 19,687.50            
704-08-B guard rail transitions (double thrie beam) 400.0    LNFT 68.75 27,500.00            
704-11-A guard rail end treatment (flared) 16      EACH 2,812.50 45,000.00            
705-01 barbed wire fence 1,698      LNFT 15.00 25,470.00            
705-02 combination mesh & barbed wire fence 1,764      LNFT 17.50 30,870.00            
705-04 single swinging driveway gates 1      EACH 625.00 625.00            
708-01 right-of-way monument 48      EACH 162.50 7,800.00            
708-02 right-of-way monument witness post 48      EACH 162.50 7,800.00            
711-01-E riprap (130 lb, 24" thick) 10,796      SQYD 62.50 674,750.00            
711-04 geotextile fabric 10,796      SQYD 2.63 28,393.48            
713-01 temporary signs & barricades lump      LUMP 56,250.00 56,250.00            
713-04-A temporary pavement markings (solid line)(4" width) 5.923  MILE 625.00 3,701.88            
713-06 temporary reflectorized raised pavement markers 785      EACH 6.25 4,906.25            
716-01-A mulch (vegetative) 31.6    TON 687.50 21,725.00            
720-01-A erosion control system, slope protection (type a) 5,995      SQYD 1.88 11,270.60            
720-01-B erosion control system, slope protection (type b) 4,199      SQYD 1.88 7,894.12            
720-01-C erosion control system, flexible channel liner (type c) 658      SQYD 2.50 1,645.00            
720-01-D erosion control system, flexible channel liner (type d) 3,880      SQYD 2.50 9,700.00            
720-01-F erosion control system, flexible channel liner (type f) 592      SQYD 3.75 2,220.00            
722-01 project site laboratory 1      EACH 31,250.00 31,250.00            
725-01 temporary detour roads 4,377.5    SQYD 100.00 437,750.00            
725-03 temporary detour bridging 120.00   LNFT 2,405.00 288,600.00            
726-01 bedding material 60.0    CUYD 81.25 4,875.00            
727-01 mobilization lump      LUMP 930,625.00 930,625.00            
729-01 sign (type a) 6.0    SQFT 62.50 375.00            
729-08-A mounting (2 1/2" post) 2      EACH 1,000.00 2,000.00            
729-16-C object marker assembly (type 3) 16      EACH 93.75 1,500.00            
729-19-A dead end road installations(type a) 1      EACH 1,875.00 1,875.00            
731-02 reflectorized raised pavement markers 661      EACH 6.25 4,131.25            
732-02-A plastic pavement striping (solid line) (4" width) 4.990  MILE 3,750.00 18,712.50            
732-05 removal of existing markings 1.307  MILE 7,500.00 9,802.50            
739-01 hydro-seeding 18.03   ACRE 1,375.00 24,791.25            
740-01 construction layout lump      LUMP 293,750.00 293,750.00            
804-01-C precast concrete piles (16") 1,690      LNFT 151.25 255,612.50            
804-01-F precast concrete piles (24") 7,500      LNFT 250.00 1,875,000.00            
804-01-G precast concrete piles (30") 3,380      LNFT 322.50 1,090,050.00            
804-12 loading permanent piles 4      EACH 6,250.00 25,000.00            
805-01-F class a concrete (bents) 664.94   CUYD 1,500.00 997,410.00            
805-03 class aa concrete 1,764.32   CUYD 1,250.00 2,205,400.00            
805-08-B precast-prestressed concrete girders (type ii) 2,672.9    LNFT 125.00 334,112.50            
805-11 strip seal joints 132.00   LNFT 137.50 18,150.00            
806-01 deformed reinforcing steel 460,347      LB 1.25 575,433.75            
807-08 structural metalwork lump      LUMP 5,000.00 5,000.00            
810-01 concrete railing (barrier) 2,199.26   LNFT 50.00 109,963.00            
813-01 concrete approach slabs 1,591.12   SQYD 225.00 358,002.00            
S-001 sawcutting existing bituminous pavement 100      LNFT 15.00 1,500.00            
S-101 retroreflective sheeting panels lump      LUMP 312.50 312.50            
                       
 ITEM TOTAL (CONSTRUCTION BID)       14,849,355.92            
 NUMBER OF DAYS BID AT $1,000 PER DAY.       450,000.00            
 TOTAL BID       15,299,355.92            

Error processing SSI file