| Lead Project: 069-01-0022 |
| Parish: LINCOLN, UNION |
| Routes: LA 33, LA 15, LA 815, LA 3072 |
| Description: DIST 05 CHIP SEAL ON ROUTES LA 33, LA 15, LA 815, & LA 3072 |
| Type Const:
asphaltic surface treatment
|
| Estimated Construction Cost: $1,014,382.60 |
|
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - T. L. WALLACE CONSTRUCTION, INC. |
- 2 - MISSOURI PETROLEUM PRODUCTS CO. LLC |
- 3 - DREHER CONTRACTING, INC. |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 507-01-A |
asphaltic material (crs-2p emulsion)
|
209,014   |
GAL |
1.92 |
401,306.88 |
1.72 |
359,504.08 |
2.00 |
418,028.00 |
|
|
| 507-02-B |
aggregate (s2)
|
307,373   |
SQYD |
0.81 |
248,972.13 |
0.79 |
242,824.67 |
0.81 |
248,972.13 |
|
|
| 507-02-C |
aggregate (s3)
|
307,373   |
SQYD |
0.67 |
205,939.91 |
0.79 |
242,824.67 |
0.62 |
190,571.26 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
16,500.00 |
16,500.00 |
9,500.00 |
9,500.00 |
15,000.00 |
15,000.00 |
|
|
| 713-06-A |
temporary reflectorized raised pavement markers (tabs)
|
6,218   |
EACH |
1.00 |
6,218.00 |
1.00 |
6,218.00 |
1.50 |
9,327.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
25,000.00 |
25,000.00 |
51,000.00 |
51,000.00 |
60,000.00 |
60,000.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
3,109   |
EACH |
5.00 |
15,545.00 |
2.00 |
6,218.00 |
2.40 |
7,461.60 |
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
80   |
LNFT |
1.00 |
80.00 |
1.00 |
80.00 |
1.20 |
96.00 |
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
185   |
LNFT |
3.00 |
555.00 |
1.00 |
185.00 |
1.20 |
222.00 |
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
1   |
EACH |
150.00 |
150.00 |
150.00 |
150.00 |
180.00 |
180.00 |
|
|
| 732-04-C |
plastic pavement legends & symbols (only)
|
1   |
EACH |
200.00 |
200.00 |
350.00 |
350.00 |
420.00 |
420.00 |
|
|
| 732-04-D |
plastic pavement legends & symbols (rr crossing)
|
2   |
EACH |
400.00 |
800.00 |
350.00 |
700.00 |
420.00 |
840.00 |
|
|
| 737-01-A |
painted traffic striping (solid line)(4" width)
|
73.903 |
MILE |
600.00 |
44,341.80 |
750.00 |
55,427.25 |
900.00 |
66,512.70 |
|
|
| 737-02-A |
painted traffic striping (broken line)(4" width)
|
10.901 |
MILE |
300.00 |
3,270.30 |
250.00 |
2,725.25 |
300.00 |
3,270.30 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
968,879.02 |
|
977,706.92 |
|
1,020,900.99 |
|
|
|