| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - MADDEN CONTRACTING CO., INC. |
- 2 - GILCHRIST CONSTRUCTION CO. LLC |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 502-01 |
superpave asphaltic concrete
|
1,307.1 |
TON |
96.50 |
126,135.15 |
130.00 |
169,923.00 |
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
11,882   |
SQYD |
3.90 |
46,339.80 |
4.00 |
47,528.00 |
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 627   |
CUYD |
0.01 |
- 6.27 |
0.02 |
- 12.54 |
|
|
|
|
| 510-01-B |
pavement patching (12" minimum thickness)
|
450   |
SQYD |
20.00 |
9,000.00 |
82.00 |
36,900.00 |
|
|
|
|
| 702-04-A |
adjusting manholes
|
7   |
EACH |
500.00 |
3,500.00 |
1,500.00 |
10,500.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
21,000.00 |
21,000.00 |
35,000.00 |
35,000.00 |
|
|
|
|
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
1.174 |
MILE |
325.00 |
381.55 |
440.00 |
516.56 |
|
|
|
|
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
2.348 |
MILE |
1.00 |
2.35 |
1,200.00 |
2,817.60 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
21,000.00 |
21,000.00 |
39,000.00 |
39,000.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
130   |
EACH |
5.00 |
650.00 |
6.00 |
780.00 |
|
|
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
100   |
LNFT |
1.00 |
100.00 |
1.10 |
110.00 |
|
|
|
|
| 732-01-D |
plastic pavement striping (12" width)
|
180   |
LNFT |
1.50 |
270.00 |
1.80 |
324.00 |
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
66   |
LNFT |
3.00 |
198.00 |
3.70 |
244.20 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
1.600 |
MILE |
2,700.00 |
4,320.00 |
3,400.00 |
5,440.00 |
|
|
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
3   |
EACH |
150.00 |
450.00 |
220.00 |
660.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
7,500.00 |
7,500.00 |
25,000.00 |
25,000.00 |
|
|
|
|
| 741-11 |
adjusting water valve and meter box
|
8   |
EACH |
400.00 |
3,200.00 |
600.00 |
4,800.00 |
|
|
|
|
| S-001 |
saw cutting
|
4,500   |
INFT |
0.01 |
45.00 |
1.00 |
4,500.00 |
|
|
|
|
| S-002 |
sawcuts in asphaltic concrete lifts
|
4,478   |
LNFT |
1.25 |
5,597.50 |
1.90 |
8,508.20 |
|
|
|
|
| S-003 |
sawing and sealing transverse joints in asphaltic
concrete overlay |
2,278   |
LNFT |
1.75 |
3,986.50 |
2.20 |
5,011.60 |
|
|
|
|
| S-004 |
sawing and sealing longitudinal joints in asphaltic
concrete overlay |
2,200   |
LNFT |
1.50 |
3,300.00 |
2.30 |
5,060.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
256,969.58 |
|
402,610.62 |
|
|
|
|
|