Letting of 1/30/2008 LA DOTD Headquarters


READV
go back
Go Back
DBE GOAL FED
Lead Project: 012-11-0037
Parish: ST LANDRY
Routes: US 190
Description: 3.54 MILES WEST JUNCTION LA 35 TO JUNCTION LA 35
Type Const: grading, drainage structures, cold planing asphaltic conc., in-place stab. cement
treated bc, superpave acp, pavement patching, rubbilizing and related work.
Estimated Construction Cost: $6,497,420.40
 
RankLicenseBidderConstruction Bid
1 34356 PRAIRIE CONTRACTORS INC. $5,973,090.64
2 12312 GILCHRIST CONSTRUCTION CO. LLC $6,230,119.33
3 04089 H & S CONSTRUCTION CO., INC. $6,750,310.59
4 12487 DIAMOND B CONSTRUCTION CO., L.L.C. $7,653,790.44
 
Item Number Item Description Quantity Unit of Measure - 1 -
PRAIRIE CONTRACTORS INC.
- 2 -
GILCHRIST CONSTRUCTION CO. LLC
- 3 -
H & S CONSTRUCTION CO., INC.
- 4 -
DIAMOND B CONSTRUCTION CO., L.L.C.
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
203-07 borrow (vehicular measurement) 4,983      CUYD 20.00 99,660.00 19.50 97,168.50 15.00 74,745.00 12.75 63,533.25
203-07-A borrow (vehicular meas.)(selected soils) 28      CUYD 20.00 560.00 30.00 840.00 16.00 448.00 12.00 336.00
204-05-A temporary sediment check dams (hay) 72      EACH 250.00 18,000.00 165.00 11,880.00 350.00 25,200.00 122.00 8,784.00
302-02-B class ii base course (6" thick) 16,864.0    SQYD 14.00 236,096.00 12.00 202,368.00 35.00 590,240.00 14.75 248,744.00
303-01-B in-place cement stabilized base course (8 1/2" thick) 39,848      SQYD 12.50 498,100.00 8.00 318,784.00 7.50 298,860.00 13.50 537,948.00
401-02 aggregate surface course (adjusted vehicular
measurement)
100      CUYD 60.00 6,000.00 140.00 14,000.00 85.00 8,500.00 28.00 2,800.00
402-01 traffic maintenance aggregate (vehicular measurement) 50.0    CUYD 100.00 5,000.00 80.00 4,000.00 85.00 4,250.00 48.00 2,400.00
502-01 superpave asphaltic concrete 42,190.9    TON 83.75 3,533,487.88 83.00 3,501,844.70 85.00 3,586,226.50 103.00 4,345,662.70
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
755.1    TON 300.00 226,530.00 195.00 147,244.50 150.00 113,265.00 187.00 141,203.70
507-01-A asphaltic material (crs-2p emulsion) 33,831      GAL 2.00 67,662.00 3.40 115,025.40 4.00 135,324.00 2.10 71,045.10
507-02-B aggregate (s2) 49,752      SQYD 1.10 54,727.20 0.55 27,363.60 1.50 74,628.00 1.25 62,190.00
507-02-C aggregate (s3) 49,752      SQYD 1.10 54,727.20 0.55 27,363.60 1.50 74,628.00 1.00 49,752.00
509-01 cold planing asphaltic pavement 45,529      SQYD 2.00 91,058.00 0.90 40,976.10 2.50 113,822.50 3.00 136,587.00
509-02 contractor retained reclaimed asphaltic pavement - 2,577      CUYD 0.01 - 25.77 0.02 - 51.54 0.01 - 25.77 0.10 - 257.70
510-01-B pavement patching (12" minimum thickness) 50      SQYD 150.00 7,500.00 200.00 10,000.00 175.00 8,750.00 271.00 13,550.00
602-02-A cleaning and resealing existing longitudinal pavement
joints
3,605      LNFT 2.00 7,210.00 2.20 7,931.00 3.00 10,815.00 2.50 9,012.50
602-02-B cleaning and resealing existing transverse pavement
joints
4,392      LNFT 3.00 13,176.00 2.20 9,662.40 3.00 13,176.00 2.50 10,980.00
602-03 cleaning and sealing cracks 300      LNFT 4.00 1,200.00 4.50 1,350.00 4.20 1,260.00 5.00 1,500.00
602-05-K-02 full depth patching of jointed conc pvmt (10" thick)
(16.1-48.0 sq yds)
50.0    SQYD 200.00 10,000.00 250.00 12,500.00 210.00 10,500.00 250.00 12,500.00
602-05-K-03 full depth patching of jointed conc pvmt (10" thick)
(48.1 sq yds & over)
50.0    SQYD 200.00 10,000.00 230.00 11,500.00 190.00 9,500.00 225.00 11,250.00
602-08 grinding concrete pavement 266.7    SQYD 30.00 8,001.00 28.00 7,467.60 75.00 20,002.50 75.00 20,002.50
602-10 longitudinal shoulder joints 4,270      LNFT 2.00 8,540.00 2.40 10,248.00 2.35 10,034.50 2.50 10,675.00
703-01 shoulder underdrain systems 51,889      LNFT 7.00 363,223.00 11.25 583,751.25 7.00 363,223.00 8.25 428,084.25
703-02 shoulder outlet underdrains 176      EACH 650.00 114,400.00 625.00 110,000.00 650.00 114,400.00 700.00 123,200.00
713-01 temporary signs & barricades lump      LUMP 50,000.00 50,000.00 150,000.00 150,000.00 250,000.00 250,000.00 250,000.00 250,000.00
713-02-C temporary pavement markings (8" width) 514      LNFT 0.20 102.80 0.35 179.90 0.36 185.04 0.25 128.50
713-03-A temporary pavement markings (broken line)(4" width)(4'
length)
23.235  MILE 400.00 9,294.00 375.00 8,713.13 350.00 8,132.25 150.00 3,485.25
713-03-B temporary pavement markings (broken line)(4" width)
(10' length)
14.441  MILE 325.00 4,693.33 535.00 7,725.94 570.00 8,231.37 275.00 3,971.28
713-04-A temporary pavement markings (solid line)(4" width) 29.300  MILE 700.00 20,510.00 625.00 18,312.50 706.00 20,685.80 600.00 17,580.00
713-05-A temporary pavement legends and symbols (arrow) 2      EACH 60.00 120.00 55.00 110.00 60.00 120.00 65.00 130.00
713-05-C temporary pavement legends and symbols (only) 2      EACH 60.00 120.00 55.00 110.00 60.00 120.00 65.00 130.00
713-06-A temporary reflectorized raised pavement markers (tabs) 898      EACH 2.00 1,796.00 1.20 1,077.60 1.20 1,077.60 2.00 1,796.00
722-02 project site laboratory (equipped) 1      EACH 10,000.00 10,000.00 20,000.00 20,000.00 14,500.00 14,500.00 9,000.00 9,000.00
727-01 mobilization lump      LUMP 150,000.00 150,000.00 450,000.00 450,000.00 300,000.00 300,000.00 705,000.00 705,000.00
729-16-C object marker assembly (type 3) 4      EACH 150.00 600.00 85.00 340.00 98.00 392.00 96.69 386.76
731-01 nonreflectorized raised pavement markers 176      EACH 15.00 2,640.00 17.00 2,992.00 18.00 3,168.00 14.00 2,464.00
731-02 reflectorized raised pavement markers 998      EACH 6.00 5,988.00 5.80 5,788.40 6.35 6,337.30 6.00 5,988.00
732-01-C plastic pavement striping (8" width) 257      LNFT 2.00 514.00 0.95 244.15 1.00 257.00 1.25 321.25
732-02-A plastic pavement striping (solid line) (4" width) 14.580  MILE 2,500.00 36,450.00 3,000.00 43,740.00 3,150.00 45,927.00 2,600.00 37,908.00
732-03-A plastic pavement striping (broken line)(4" width) 7.220  MILE 800.00 5,776.00 750.00 5,415.00 770.00 5,559.40 800.00 5,776.00
732-04-A plastic pavement legends & symbols (arrow) 2      EACH 200.00 400.00 200.00 400.00 210.00 420.00 165.00 330.00
732-04-C plastic pavement legends & symbols (only) 2      EACH 200.00 400.00 225.00 450.00 240.00 480.00 165.00 330.00
732-05 removal of existing markings 0.063  MILE 15,000.00 945.00 6,200.00 390.60 6,800.00 428.40 10,500.00 661.50
734-01 rubblizing portland cement concrete pavement 44,144      SQYD 3.50 154,504.00 3.00 132,432.00 6.00 264,864.00 3.65 161,125.60
735-01 mailboxes 42      EACH 1.00 42.00 10.00 420.00 1.20 50.40 1.00 42.00
735-02 mailbox supports (single) 32      EACH 115.00 3,680.00 130.00 4,160.00 140.00 4,480.00 125.00 4,000.00
735-03 mailbox supports (double) 3      EACH 150.00 450.00 175.00 525.00 190.00 570.00 175.00 525.00
735-04 mailbox supports (multiple) 1      EACH 250.00 250.00 280.00 280.00 300.00 300.00 275.00 275.00
739-01 hydro-seeding 24.51   ACRE 1,100.00 26,961.00 1,000.00 24,510.00 1,160.00 28,431.60 1,000.00 24,510.00
740-01 construction layout lump      LUMP 12,000.00 12,000.00 30,000.00 30,000.00 67,850.00 67,850.00 31,000.00 31,000.00
S-001 dynamic message sign unit 2      EACH 10,500.00 21,000.00 15,000.00 30,000.00 18,500.00 37,000.00 25,000.00 50,000.00
S-002 rumble strips (ground-in) 14.0    MILE 1,000.00 14,000.00 650.00 9,100.00 1,100.00 15,400.00 1,100.00 15,400.00
S-922 sawing and sealing longitudinal joints in asphaltic
concrete overlay
246      LNFT 3.00 738.00 8.00 1,968.00 2.40 590.40 8.00 1,968.00
S-923 sawing and sealing transverse joints in asphaltic
concrete overlay
312      LNFT 3.00 936.00 8.00 2,496.00 2.40 748.80 8.00 2,496.00
S-927 sawcuts in asphaltic concrete lifts 1,116      LNFT 3.00 3,348.00 4.50 5,022.00 2.00 2,232.00 5.00 5,580.00
                       
 CONTRACTOR TOTAL       5,973,090.64   6,230,119.33   6,750,310.59   7,653,790.44