Estimated Construction Cost: $4,943,454.88


RankLicenseBidderConstruction Bid
1 12487 Diamond B Construction Co., L.L.C. $3,994,935.49
2 34356 Prairie Contractors Inc. $4,258,437.31
3 04089 H & S Construction Co., Inc. $4,363,072.22
4 33663 Glenn Lege Construction Inc $4,444,661.57


Line
Number
Item Number Item Description Quantity Unit of
Measure
- 1 -
Diamond B Construction Co., L.L.C.
- 2 -
Prairie Contractors Inc.
- 3 -
H & S Construction Co., Inc.
- 4 -
Glenn Lege Construction Inc
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001 401-02-00100 Aggregate Surface Course (Adjusted Vehicular Measurement) 1,142      CUYD 13.91 15,885.22 22.00 25,124.00 19.25 21,983.50 28.00 31,976.00
0002 502-01-00100 Superpave Asphaltic Concrete 30,761.1    TON 70.00 2,153,277.00 84.00 2,583,932.40 75.90 2,334,767.49 75.00 2,307,082.50
0003 502-01-00200 Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous 3,993      TON 117.00 467,181.00 125.00 499,125.00 87.50 349,387.50 100.00 399,300.00
0004 507-01-00100 Asphaltic Material (CRS-2P Emulsion) 80,876      GAL 3.03 245,054.28 3.00 242,628.00 3.50 283,066.00 3.22 260,420.72
0005 507-02-00200 Aggregate (S2) 118,935      SQYD 1.06 126,071.10 1.10 130,828.50 1.24 147,479.40 1.13 134,396.55
0006 507-02-00300 Aggregate (S3) 118,935      SQYD 0.90 107,041.50 1.00 118,935.00 1.05 124,881.75 0.96 114,177.60
0007 509-01-00100 Cold Planing Asphaltic Pavement 272,209      SQYD 1.21 329,372.89 0.40 108,883.60 1.20 326,650.80 0.90 244,988.10
0008 509-02-00100 Contractor Retained Reclaimed Asphaltic Pavement -11,342      CUYD 0.10 -1,134.20 0.01 -113.42 0.01 -113.42 1.00 -11,342.00
0009 510-01-00200 Pavement Patching (12" Minimum Thickness) 600      SQYD 69.17 41,502.00 83.00 49,800.00 79.57 47,742.00 82.00 49,200.00
0010 510-01-00300 Pavement Patching (18" Minimum Thickness) 1,200      SQYD 97.93 117,516.00 120.00 144,000.00 154.00 184,800.00 122.00 146,400.00
0011 510-03-00100 Pavement Joint Repair 300      TON 210.00 63,000.00 175.00 52,500.00 374.50 112,350.00 175.00 52,500.00
0012 713-01-00100 Temporary Signs and Barricades 1      LUMP 18,295.00 18,295.00 25,000.00 25,000.00 15,000.00 15,000.00 80,000.00 80,000.00
0013 713-02-00300 Temporary Pavement Markings (8" Width) 2,687      LNFT 0.22 591.14 0.01 26.87 0.24 644.88 0.35 940.45
0014 713-03-01000 Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) 37.932  MILE 138.51 5,253.96 400.00 15,172.80 605.00 22,948.86 350.00 13,276.20
0015 713-03-02000 Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) 18.425  MILE 483.74 8,912.91 0.01 0.18 937.00 17,264.23 463.00 8,530.78
0016 713-04-01000 Temporary Pavement Markings (Solid Line) (4" Width) 40.899  MILE 560.12 22,908.35 0.01 0.41 2,750.00 112,472.25 708.00 28,956.49
0017 713-05-00100 Temporary Pavement Legends & Symbols (Arrow) 2      EACH 45.83 91.66 0.01 0.02 50.00 100.00 81.70 163.40
0018 713-06-00200 Temporary Reflectorized Raised Pavement Markers (Tabs) 2,475      EACH 0.92 2,277.00 1.00 2,475.00 0.25 618.75 1.15 2,846.25
0019 727-01-00100 Mobilization 1      LUMP 61,650.00 61,650.00 50,000.00 50,000.00 10,000.00 10,000.00 377,000.00 377,000.00
0020 731-02-00100 Reflectorized Raised Pavement Markers 5,008      EACH 5.35 26,792.80 5.00 25,040.00 6.00 30,048.00 5.25 26,292.00
0021 732-01-01040 Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) 2,687      LNFT 1.37 3,681.19 1.25 3,358.75 0.25 671.75 1.10 2,955.70
0022 732-01-01080 Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) 455      LNFT 4.58 2,083.90 3.00 1,365.00 5.00 2,275.00 3.30 1,501.50
0023 732-01-02080 Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) 24      LNFT 5.09 122.16 6.00 144.00 5.50 132.00 3.40 81.60
0024 732-02-02000 Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) 40.899  MILE 2,545.99 104,128.45 2,550.00 104,292.45 2,750.00 112,472.25 2,400.00 98,157.60
0025 732-03-02000 Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) 18.425  MILE 865.64 15,949.42 750.00 13,818.75 937.00 17,264.23 965.00 17,780.13
0026 732-04-01080 Plastic Pavement Legends and Symbols (Arrow - Left Turn) 18      EACH 218.95 3,941.10 300.00 5,400.00 237.00 4,266.00 180.00 3,240.00
0027 732-04-01100 Plastic Pavement Legends and Symbols (Arrow - Right Turn) 1      EACH 218.95 218.95 300.00 300.00 237.00 237.00 180.00 180.00
0028 732-04-15020 Plastic Pavement Legends and Symbols (ONLY) 19      EACH 229.14 4,353.66 300.00 5,700.00 248.00 4,712.00 190.00 3,610.00
0029 740-01-00100 Construction Layout 1      LUMP 11,100.50 11,100.50 700.00 700.00 5,000.00 5,000.00 10,000.00 10,000.00
0030 NS-500-00280 Surface Preparation 1      LUMP 26,066.55 26,066.55 25,000.00 25,000.00 50,200.00 50,200.00 13,300.00 13,300.00
0031 NS-500-00360 Saw Cutting Asphaltic Concrete Pavement Over Portland Cement Concrete Composite Pavement 25,000      INLF 0.47 11,750.00 1.00 25,000.00 0.95 23,750.00 1.07 26,750.00
                         
    CONTRACTOR TOTAL       3,994,935.49   4,258,437.31   4,363,072.22   4,444,661.57