Bid Tabulations
Letting of
06/23/2010
LA DOTD Headquarters
| Lead Project: 080-01-0032 | |
| Parish: Vermilion | |
| Routes: LA 92, US 167 | |
| Description: DISTRICT 03 EMERGENCY REPAIR PROJECT - FUNCTIONAL OVERLAYS | |
| Type Const: COLD PLANING ASPHALTIC PAVEMENT, SUPERPAVE ASPHALTIC CONCRETE OVERLAY, PAVEMENT PATCHING, AND RELATED WORK. | |
| Estimated Construction Cost: $4,943,454.88 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 12487 | Diamond B Construction Co., L.L.C. | $3,994,935.49 |
| 2 | 34356 | Prairie Contractors Inc. | $4,258,437.31 |
| 3 | 04089 | H & S Construction Co., Inc. | $4,363,072.22 |
| 4 | 33663 | Glenn Lege Construction Inc | $4,444,661.57 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Diamond B Construction Co., L.L.C. |
- 2 - Prairie Contractors Inc. |
- 3 - H & S Construction Co., Inc. |
- 4 - Glenn Lege Construction Inc |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 1,142 | CUYD | 13.91 | 15,885.22 | 22.00 | 25,124.00 | 19.25 | 21,983.50 | 28.00 | 31,976.00 |
| 0002 | 502-01-00100 | Superpave Asphaltic Concrete | 30,761.1 | TON | 70.00 | 2,153,277.00 | 84.00 | 2,583,932.40 | 75.90 | 2,334,767.49 | 75.00 | 2,307,082.50 |
| 0003 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 3,993 | TON | 117.00 | 467,181.00 | 125.00 | 499,125.00 | 87.50 | 349,387.50 | 100.00 | 399,300.00 |
| 0004 | 507-01-00100 | Asphaltic Material (CRS-2P Emulsion) | 80,876 | GAL | 3.03 | 245,054.28 | 3.00 | 242,628.00 | 3.50 | 283,066.00 | 3.22 | 260,420.72 |
| 0005 | 507-02-00200 | Aggregate (S2) | 118,935 | SQYD | 1.06 | 126,071.10 | 1.10 | 130,828.50 | 1.24 | 147,479.40 | 1.13 | 134,396.55 |
| 0006 | 507-02-00300 | Aggregate (S3) | 118,935 | SQYD | 0.90 | 107,041.50 | 1.00 | 118,935.00 | 1.05 | 124,881.75 | 0.96 | 114,177.60 |
| 0007 | 509-01-00100 | Cold Planing Asphaltic Pavement | 272,209 | SQYD | 1.21 | 329,372.89 | 0.40 | 108,883.60 | 1.20 | 326,650.80 | 0.90 | 244,988.10 |
| 0008 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -11,342 | CUYD | 0.10 | -1,134.20 | 0.01 | -113.42 | 0.01 | -113.42 | 1.00 | -11,342.00 |
| 0009 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 600 | SQYD | 69.17 | 41,502.00 | 83.00 | 49,800.00 | 79.57 | 47,742.00 | 82.00 | 49,200.00 |
| 0010 | 510-01-00300 | Pavement Patching (18" Minimum Thickness) | 1,200 | SQYD | 97.93 | 117,516.00 | 120.00 | 144,000.00 | 154.00 | 184,800.00 | 122.00 | 146,400.00 |
| 0011 | 510-03-00100 | Pavement Joint Repair | 300 | TON | 210.00 | 63,000.00 | 175.00 | 52,500.00 | 374.50 | 112,350.00 | 175.00 | 52,500.00 |
| 0012 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 18,295.00 | 18,295.00 | 25,000.00 | 25,000.00 | 15,000.00 | 15,000.00 | 80,000.00 | 80,000.00 |
| 0013 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 2,687 | LNFT | 0.22 | 591.14 | 0.01 | 26.87 | 0.24 | 644.88 | 0.35 | 940.45 |
| 0014 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 37.932 | MILE | 138.51 | 5,253.96 | 400.00 | 15,172.80 | 605.00 | 22,948.86 | 350.00 | 13,276.20 |
| 0015 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 18.425 | MILE | 483.74 | 8,912.91 | 0.01 | 0.18 | 937.00 | 17,264.23 | 463.00 | 8,530.78 |
| 0016 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 40.899 | MILE | 560.12 | 22,908.35 | 0.01 | 0.41 | 2,750.00 | 112,472.25 | 708.00 | 28,956.49 |
| 0017 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | 2 | EACH | 45.83 | 91.66 | 0.01 | 0.02 | 50.00 | 100.00 | 81.70 | 163.40 |
| 0018 | 713-06-00200 | Temporary Reflectorized Raised Pavement Markers (Tabs) | 2,475 | EACH | 0.92 | 2,277.00 | 1.00 | 2,475.00 | 0.25 | 618.75 | 1.15 | 2,846.25 |
| 0019 | 727-01-00100 | Mobilization | 1 | LUMP | 61,650.00 | 61,650.00 | 50,000.00 | 50,000.00 | 10,000.00 | 10,000.00 | 377,000.00 | 377,000.00 |
| 0020 | 731-02-00100 | Reflectorized Raised Pavement Markers | 5,008 | EACH | 5.35 | 26,792.80 | 5.00 | 25,040.00 | 6.00 | 30,048.00 | 5.25 | 26,292.00 |
| 0021 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 2,687 | LNFT | 1.37 | 3,681.19 | 1.25 | 3,358.75 | 0.25 | 671.75 | 1.10 | 2,955.70 |
| 0022 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 455 | LNFT | 4.58 | 2,083.90 | 3.00 | 1,365.00 | 5.00 | 2,275.00 | 3.30 | 1,501.50 |
| 0023 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 24 | LNFT | 5.09 | 122.16 | 6.00 | 144.00 | 5.50 | 132.00 | 3.40 | 81.60 |
| 0024 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 40.899 | MILE | 2,545.99 | 104,128.45 | 2,550.00 | 104,292.45 | 2,750.00 | 112,472.25 | 2,400.00 | 98,157.60 |
| 0025 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 18.425 | MILE | 865.64 | 15,949.42 | 750.00 | 13,818.75 | 937.00 | 17,264.23 | 965.00 | 17,780.13 |
| 0026 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 18 | EACH | 218.95 | 3,941.10 | 300.00 | 5,400.00 | 237.00 | 4,266.00 | 180.00 | 3,240.00 |
| 0027 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 1 | EACH | 218.95 | 218.95 | 300.00 | 300.00 | 237.00 | 237.00 | 180.00 | 180.00 |
| 0028 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 19 | EACH | 229.14 | 4,353.66 | 300.00 | 5,700.00 | 248.00 | 4,712.00 | 190.00 | 3,610.00 |
| 0029 | 740-01-00100 | Construction Layout | 1 | LUMP | 11,100.50 | 11,100.50 | 700.00 | 700.00 | 5,000.00 | 5,000.00 | 10,000.00 | 10,000.00 |
| 0030 | NS-500-00280 | Surface Preparation | 1 | LUMP | 26,066.55 | 26,066.55 | 25,000.00 | 25,000.00 | 50,200.00 | 50,200.00 | 13,300.00 | 13,300.00 |
| 0031 | NS-500-00360 | Saw Cutting Asphaltic Concrete Pavement Over Portland Cement Concrete Composite Pavement | 25,000 | INLF | 0.47 | 11,750.00 | 1.00 | 25,000.00 | 0.95 | 23,750.00 | 1.07 | 26,750.00 |
| CONTRACTOR TOTAL | 3,994,935.49 | 4,258,437.31 | 4,363,072.22 | 4,444,661.57 | ||||||||