Bid Tabulations
Letting of
06/29/2011
LA DOTD Headquarters
| Lead Project: 077-02-0020 | |
| Parish: Ascension | |
| Routes: LA 73 | |
| Description: I-10 TO US 61 | |
| Type Const: DRAINAGE STRUCTURES; GRAVITY SEWER COLLECTION LINE AND SEWER FORCE MAIN; SUBGRADE LAYER; CLASS II BASE COURSE; TRAFFIC SIGNALIZATION; ALTERNATE AA1, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT; ALTERNATE AA2, PORTLAND CEMENT CONCRETE PAVEMENT; AND RELATED WORK. | |
| Estimated Construction Cost: $18,511,226.43 | |
| Maximum Number of Days Allowed for Construction: 9999 | |
| Calculated Daily User Cost: $3,000.00 | |
| Rank | License | Bidder | Construction Bid | Bidder's Proposed Contract Time |
Total Bid |
|---|---|---|---|---|---|
| 1 | 00046 | Barber Bros. Contracting Co., L.L.C | $15,507,969.25 | 600 | $17,307,969.25 |
| 2 | 39462 | Jb James Construction Llc | $15,810,745.40 | 660 | $17,790,745.40 |
| 3 | 34567 | James Construction Group LLC | $15,599,286.70 | 810 | $18,029,286.70 |
| 4 | 55564 | Coastal Industries Llc | $15,981,820.50 | 700 | $18,081,820.50 |
| 5 | 12312 | Gilchrist Construction Co. LLC | $17,935,545.93 | 600 | $19,735,545.93 |
| 6 | 53750 | Texas Sterling Construction Co. | $17,634,336.65 | 852 | $20,190,336.65 |
| 7 | 00849 | F.G. Sullivan, Jr. Contractor LLC | $19,675,854.20 | 800 | $22,075,854.20 |
| 8 | 06276 | Barriere Construction Co., LLC | $23,675,892.20 | 885 | $26,330,892.20 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Barber Bros. Contracting Co., L.L.C |
- 2 - Jb James Construction Llc |
- 3 - James Construction Group LLC |
- 4 - Coastal Industries Llc |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 260,000.00 | 260,000.00 | 520,000.00 | 520,000.00 | 285,000.00 | 285,000.00 | 535,000.00 | 535,000.00 |
| 0002 | 201-01-00200 | Clearing and Grubbing (Selective) (Tree Trimming, Root Pruning and Trenching) | 1 | LUMP | 60,000.00 | 60,000.00 | 75,000.00 | 75,000.00 | 33,000.00 | 33,000.00 | 50,000.00 | 50,000.00 |
| 0003 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 30,000.00 | 30,000.00 | 50,000.00 | 50,000.00 | 10,000.00 | 10,000.00 | 35,000.00 | 35,000.00 |
| 0004 | 202-02-04000 | Removal of Bridge Sta. 257+74.00; (19' x 32' Concrete Precast Slab Units) | 1 | EACH | 15,000.00 | 15,000.00 | 8,000.00 | 8,000.00 | 50,000.00 | 50,000.00 | 5,000.00 | 5,000.00 |
| 0005 | 202-02-05000 | Removal of Building Sta. 284+35.20, 27.5' Lt.; (10' x 10' Brick Veneer Building) | 1 | EACH | 5,000.00 | 5,000.00 | 600.00 | 600.00 | 500.00 | 500.00 | 15,000.00 | 15,000.00 |
| 0006 | 202-02-06100 | Removal of Concrete Walks and Drives | 3,757 | SQYD | 15.00 | 56,355.00 | 9.00 | 33,813.00 | 6.50 | 24,420.50 | 5.00 | 18,785.00 |
| 0007 | 202-02-06140 | Removal of Curbs (Concrete) | 617.3 | LNFT | 10.00 | 6,173.00 | 3.50 | 2,160.55 | 2.00 | 1,234.60 | 10.00 | 6,173.00 |
| 0008 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 1,191 | SQYD | 15.00 | 17,865.00 | 10.00 | 11,910.00 | 15.00 | 17,865.00 | 10.00 | 11,910.00 |
| 0009 | 202-02-38500 | Removal of Surfacing and Stablized Base | 37,742.2 | SQYD | 6.50 | 245,324.30 | 3.00 | 113,226.60 | 5.00 | 188,711.00 | 3.50 | 132,097.70 |
| 0010 | 202-02-40100 | Removal of Traffic Signal Equipment | 1 | LUMP | 4,000.00 | 4,000.00 | 4,000.00 | 4,000.00 | 3,000.00 | 3,000.00 | 3,000.00 | 3,000.00 |
| 0011 | 202-02-40120 | Removal of Traffic Detectors and Associated Equipment | 1 | LUMP | 2,000.00 | 2,000.00 | 400.00 | 400.00 | 1,200.00 | 1,200.00 | 1,250.00 | 1,250.00 |
| 0012 | 203-01-00100 | General Excavation | 17,526 | CUYD | 7.50 | 131,445.00 | 5.00 | 87,630.00 | 3.50 | 61,341.00 | 5.75 | 100,774.50 |
| 0013 | 203-03-00100 | Embankment | 19,121 | CUYD | 10.00 | 191,210.00 | 16.00 | 305,936.00 | 10.00 | 191,210.00 | 15.00 | 286,815.00 |
| 0014 | 203-08-00100 | Geotextile Fabric | 62 | SQYD | 4.00 | 248.00 | 5.00 | 310.00 | 5.00 | 310.00 | 4.00 | 248.00 |
| 0015 | 204-02-00100 | Temporary Hay or Straw Bales | 1,757 | EACH | 16.00 | 28,112.00 | 10.00 | 17,570.00 | 15.00 | 26,355.00 | 10.00 | 17,570.00 |
| 0016 | 204-06-00100 | Temporary Silt Fencing | 35,534 | LNFT | 1.50 | 53,301.00 | 1.30 | 46,194.20 | 2.50 | 88,835.00 | 1.00 | 35,534.00 |
| 0017 | 302-02-02080 | Class II Base Course (6" Thick) (Stone) | 41 | SQYD | 85.00 | 3,485.00 | 25.00 | 1,025.00 | 15.00 | 615.00 | 100.00 | 4,100.00 |
| 0019 | 305-01-04020 | Subgrade Layer (12" Thick) (Treated) | 75,090 | SQYD | 7.25 | 544,402.50 | 7.00 | 525,630.00 | 9.00 | 675,810.00 | 8.25 | 619,492.50 |
| 0020 | 401-01-00100 | Aggregate Surface Course (Net Section) | 6.9 | CUYD | 100.00 | 690.00 | 120.00 | 828.00 | 100.00 | 690.00 | 100.00 | 690.00 |
| 0021 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 1,308.3 | CUYD | 40.00 | 52,332.00 | 60.00 | 78,498.00 | 75.00 | 98,122.50 | 100.00 | 130,830.00 |
| 0022 | 509-01-00100 | Cold Planing Asphaltic Pavement | 1,081 | SQYD | 6.00 | 6,486.00 | 6.00 | 6,486.00 | 5.00 | 5,405.00 | 10.00 | 10,810.00 |
| 0023 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -60 | CUYD | 0.00 | 0.00 | 0.01 | -0.60 | 0.01 | -0.60 | 1.00 | -60.00 |
| 0024 | 701-03-01000 | Storm Drain Pipe (15" RCP/PP) | 4,698 | LNFT | 40.00 | 187,920.00 | 48.00 | 225,504.00 | 43.00 | 202,014.00 | 80.00 | 375,840.00 |
| 0025 | 701-03-01020 | Storm Drain Pipe (18" RCP/PP) | 2,630 | LNFT | 45.00 | 118,350.00 | 54.00 | 142,020.00 | 46.00 | 120,980.00 | 80.00 | 210,400.00 |
| 0026 | 701-03-01040 | Storm Drain Pipe (24" RCP/PP) | 2,126 | LNFT | 55.00 | 116,930.00 | 68.00 | 144,568.00 | 56.00 | 119,056.00 | 90.00 | 191,340.00 |
| 0027 | 701-03-01060 | Storm Drain Pipe (30" RCP/PP) | 1,822 | LNFT | 70.00 | 127,540.00 | 87.00 | 158,514.00 | 75.00 | 136,650.00 | 100.00 | 182,200.00 |
| 0028 | 701-03-01080 | Storm Drain Pipe (36" RCP/PP) | 1,358 | LNFT | 75.00 | 101,850.00 | 100.00 | 135,800.00 | 84.00 | 114,072.00 | 115.00 | 156,170.00 |
| 0029 | 701-03-01090 | Storm Drain Pipe (42" RCP/PP) | 1,560 | LNFT | 80.00 | 124,800.00 | 120.00 | 187,200.00 | 101.00 | 157,560.00 | 130.00 | 202,800.00 |
| 0030 | 701-03-01100 | Storm Drain Pipe (48" RCP/PP) | 2,284 | LNFT | 115.00 | 262,660.00 | 150.00 | 342,600.00 | 120.00 | 274,080.00 | 160.00 | 365,440.00 |
| 0031 | 701-03-01120 | Storm Drain Pipe (54" RCP) | 52 | LNFT | 225.00 | 11,700.00 | 210.00 | 10,920.00 | 150.00 | 7,800.00 | 200.00 | 10,400.00 |
| 0032 | 701-03-01140 | Storm Drain Pipe (60" RCP) | 1,568 | LNFT | 160.00 | 250,880.00 | 220.00 | 344,960.00 | 215.00 | 337,120.00 | 200.00 | 313,600.00 |
| 0033 | 701-04-01040 | Storm Drain Pipe Arch (24" Equiv. RCPA) | 850 | LNFT | 65.00 | 55,250.00 | 70.00 | 59,500.00 | 65.00 | 55,250.00 | 100.00 | 85,000.00 |
| 0034 | 701-04-01060 | Storm Drain Pipe Arch (30" Equiv. RCPA) | 1,312 | LNFT | 80.00 | 104,960.00 | 90.00 | 118,080.00 | 70.00 | 91,840.00 | 105.00 | 137,760.00 |
| 0035 | 701-04-01080 | Storm Drain Pipe Arch (36" Equiv. RCPA) | 648 | LNFT | 85.00 | 55,080.00 | 110.00 | 71,280.00 | 83.00 | 53,784.00 | 120.00 | 77,760.00 |
| 0036 | 701-04-01100 | Storm Drain Pipe Arch (42" Equiv. RCPA) | 1,360 | LNFT | 90.00 | 122,400.00 | 130.00 | 176,800.00 | 107.00 | 145,520.00 | 140.00 | 190,400.00 |
| 0037 | 701-04-01120 | Storm Drain Pipe Arch (48" Equiv. RCPA) | 1,062 | LNFT | 120.00 | 127,440.00 | 150.00 | 159,300.00 | 125.00 | 132,750.00 | 200.00 | 212,400.00 |
| 0038 | 701-04-01140 | Storm Drain Pipe Arch (54" Equiv. RCPA) | 712 | LNFT | 180.00 | 128,160.00 | 230.00 | 163,760.00 | 152.00 | 108,224.00 | 225.00 | 160,200.00 |
| 0039 | 701-09-00100 | Fabricating Pipe Fittings | 6 | EACH | 3,500.00 | 21,000.00 | 1,500.00 | 9,000.00 | 780.00 | 4,680.00 | 1,000.00 | 6,000.00 |
| 0040 | 702-02-00200 | Manholes (R-CB-11) | 5 | EACH | 4,000.00 | 20,000.00 | 3,000.00 | 15,000.00 | 3,400.00 | 17,000.00 | 3,000.00 | 15,000.00 |
| 0041 | 702-02-00300 | Manholes (R-CB-11 MOD) | 14 | EACH | 8,000.00 | 112,000.00 | 3,500.00 | 49,000.00 | 3,900.00 | 54,600.00 | 5,000.00 | 70,000.00 |
| 0042 | 702-02-00600 | Manholes (R-CB-36) | 87 | EACH | 4,000.00 | 348,000.00 | 4,500.00 | 391,500.00 | 5,800.00 | 504,600.00 | 4,950.00 | 430,650.00 |
| 0043 | 702-03-00100 | Catch Basins (CB-01) | 45 | EACH | 2,500.00 | 112,500.00 | 2,000.00 | 90,000.00 | 2,400.00 | 108,000.00 | 2,100.00 | 94,500.00 |
| 0044 | 702-03-00200 | Catch Basins (CB-02) | 1 | EACH | 4,000.00 | 4,000.00 | 3,500.00 | 3,500.00 | 4,800.00 | 4,800.00 | 5,000.00 | 5,000.00 |
| 0045 | 702-03-00300 | Catch Basins (CB-04) | 50 | EACH | 1,600.00 | 80,000.00 | 2,500.00 | 125,000.00 | 2,100.00 | 105,000.00 | 1,250.00 | 62,500.00 |
| 0046 | 702-03-00500 | Catch Basins (CB-06) | 74 | EACH | 3,600.00 | 266,400.00 | 3,000.00 | 222,000.00 | 2,800.00 | 207,200.00 | 2,800.00 | 207,200.00 |
| 0047 | 702-03-00700 | Catch Basins (CB-08) | 42 | EACH | 8,000.00 | 336,000.00 | 5,000.00 | 210,000.00 | 5,000.00 | 210,000.00 | 6,800.00 | 285,600.00 |
| 0048 | 702-03-00800 | Catch Basins (CB-09) | 2 | EACH | 7,500.00 | 15,000.00 | 5,000.00 | 10,000.00 | 4,400.00 | 8,800.00 | 4,500.00 | 9,000.00 |
| 0049 | 706-02-00200 | Concrete Drive (6" Thick) | 3,924.9 | SQYD | 50.00 | 196,245.00 | 42.00 | 164,845.80 | 65.00 | 255,118.50 | 40.00 | 156,996.00 |
| 0050 | 706-03-00100 | Incidental Concrete Paving (4" Thick) | 403.8 | SQYD | 50.00 | 20,190.00 | 40.00 | 16,152.00 | 55.00 | 22,209.00 | 35.00 | 14,133.00 |
| 0051 | 708-01-00100 | Right-of-Way Monument | 59 | EACH | 400.00 | 23,600.00 | 150.00 | 8,850.00 | 200.00 | 11,800.00 | 500.00 | 29,500.00 |
| 0052 | 711-01-03000 | Riprap (30 lb, 14" Thick) | 121 | SQYD | 120.00 | 14,520.00 | 50.00 | 6,050.00 | 75.00 | 9,075.00 | 50.00 | 6,050.00 |
| 0053 | 711-04-00100 | Geotextile Fabric | 121 | SQYD | 1.00 | 121.00 | 3.00 | 363.00 | 2.50 | 302.50 | 2.00 | 242.00 |
| 0054 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 150,000.00 | 150,000.00 | 120,000.00 | 120,000.00 | 45,000.00 | 45,000.00 | 195,000.00 | 195,000.00 |
| 0055 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 130 | LNFT | 1.50 | 195.00 | 1.20 | 156.00 | 1.20 | 156.00 | 0.75 | 97.50 |
| 0056 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 13.46 | MILE | 700.00 | 9,422.00 | 600.00 | 8,076.00 | 600.00 | 8,076.00 | 550.00 | 7,403.00 |
| 0057 | 725-01-00100 | Temporary Detour Roads | 13,444.6 | SQYD | 26.00 | 349,559.60 | 35.00 | 470,561.00 | 60.00 | 806,676.00 | 35.25 | 473,922.15 |
| 0058 | 726-01-00100 | Bedding Material | 4,785.6 | CUYD | 10.00 | 47,856.00 | 35.00 | 167,496.00 | 60.00 | 287,136.00 | 55.00 | 263,208.00 |
| 0059 | 727-01-00100 | Mobilization | 1 | LUMP | 1,000,000.00 | 1,000,000.00 | 1,500,000.00 | 1,500,000.00 | 1,400,000.00 | 1,400,000.00 | 1,150,000.00 | 1,150,000.00 |
| 0060 | 729-01-00100 | Sign (Type A) | 20 | SQFT | 60.00 | 1,200.00 | 45.00 | 900.00 | 50.00 | 1,000.00 | 75.00 | 1,500.00 |
| 0061 | 729-19-00100 | Dead End Road Installations (Type A) | 2 | EACH | 6,000.00 | 12,000.00 | 1,600.00 | 3,200.00 | 1,800.00 | 3,600.00 | 2,500.00 | 5,000.00 |
| 0062 | 731-02-00100 | Reflectorized Raised Pavement Markers | 802 | EACH | 5.50 | 4,411.00 | 5.00 | 4,010.00 | 5.00 | 4,010.00 | 5.25 | 4,210.50 |
| 0063 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 2,069 | LNFT | 1.15 | 2,379.35 | 1.00 | 2,069.00 | 1.00 | 2,069.00 | 1.35 | 2,793.15 |
| 0064 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 508 | LNFT | 6.00 | 3,048.00 | 5.00 | 2,540.00 | 5.00 | 2,540.00 | 4.50 | 2,286.00 |
| 0065 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 9.904 | MILE | 3,500.00 | 34,664.00 | 2,900.00 | 28,721.60 | 2,800.00 | 27,731.20 | 2,750.00 | 27,236.00 |
| 0066 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 3.88 | MILE | 1,200.00 | 4,656.00 | 1,000.00 | 3,880.00 | 950.00 | 3,686.00 | 850.00 | 3,298.00 |
| 0067 | 732-04-01040 | Plastic Pavement Legends and Symbols (Arrow - Double) | 1 | EACH | 250.00 | 250.00 | 200.00 | 200.00 | 200.00 | 200.00 | 265.00 | 265.00 |
| 0068 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 84 | EACH | 205.00 | 17,220.00 | 200.00 | 16,800.00 | 180.00 | 15,120.00 | 215.00 | 18,060.00 |
| 0069 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 6 | EACH | 210.00 | 1,260.00 | 200.00 | 1,200.00 | 180.00 | 1,080.00 | 215.00 | 1,290.00 |
| 0070 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 17 | EACH | 230.00 | 3,910.00 | 200.00 | 3,400.00 | 200.00 | 3,400.00 | 225.00 | 3,825.00 |
| 0071 | 732-04-18000 | Plastic Pavement Legends and Symbols (RR Crossing) | 2 | EACH | 525.00 | 1,050.00 | 450.00 | 900.00 | 450.00 | 900.00 | 400.00 | 800.00 |
| 0072 | 732-05-00100 | Removal of Existing Markings | 2.242 | MILE | 3,000.00 | 6,726.00 | 2,000.00 | 4,484.00 | 2,000.00 | 4,484.00 | 3,500.00 | 7,847.00 |
| 0073 | 735-01-00100 | Mailboxes | 51 | EACH | 7.00 | 357.00 | 1.00 | 51.00 | 5.00 | 255.00 | 25.00 | 1,275.00 |
| 0074 | 735-02-00100 | Mailbox Supports (Single) | 51 | EACH | 150.00 | 7,650.00 | 120.00 | 6,120.00 | 200.00 | 10,200.00 | 200.00 | 10,200.00 |
| 0075 | 736-01-00100 | Trenching and Backfilling | 100 | LNFT | 4.00 | 400.00 | 4.00 | 400.00 | 4.00 | 400.00 | 3.50 | 350.00 |
| 0076 | 736-03-00300 | Jacked or Bored Conduit (3" HPDE, Sch 80) | 570 | LNFT | 20.00 | 11,400.00 | 14.00 | 7,980.00 | 14.00 | 7,980.00 | 20.00 | 11,400.00 |
| 0077 | 736-04-04080 | Signal Support (25' Single Mast Arm) | 4 | EACH | 8,800.00 | 35,200.00 | 7,500.00 | 30,000.00 | 7,100.00 | 28,400.00 | 8,000.00 | 32,000.00 |
| 0078 | 736-04-04160 | Signal Support (45' Single Mast Arm) | 2 | EACH | 10,750.00 | 21,500.00 | 10,000.00 | 20,000.00 | 9,800.00 | 19,600.00 | 9,500.00 | 19,000.00 |
| 0079 | 736-04-04180 | Signal Support (50' Single Mast Arm) | 2 | EACH | 12,000.00 | 24,000.00 | 12,000.00 | 24,000.00 | 11,500.00 | 23,000.00 | 10,500.00 | 21,000.00 |
| 0080 | 736-05-02000 | Signal Heads (3 Section, 12" Led Lens, R, Y, G) | 16 | EACH | 1,250.00 | 20,000.00 | 900.00 | 14,400.00 | 900.00 | 14,400.00 | 1,100.00 | 17,600.00 |
| 0081 | 736-05-04000 | Signal Heads (5 Section, 12" Led Lens, R, LT. Y, Y, LT. G, G) | 4 | EACH | 2,000.00 | 8,000.00 | 1,400.00 | 5,600.00 | 1,300.00 | 5,200.00 | 1,600.00 | 6,400.00 |
| 0082 | 736-06-00600 | Signal Service (Existing Pole) | 2 | EACH | 1,200.00 | 2,400.00 | 900.00 | 1,800.00 | 1,000.00 | 2,000.00 | 1,000.00 | 2,000.00 |
| 0083 | 736-08-00070 | Sig Cntrlr (TS-2, Type 2, w/Eth cap)(Type 6E Cabinet) (F&I) | 2 | EACH | 30,000.00 | 60,000.00 | 24,000.00 | 48,000.00 | 23,500.00 | 47,000.00 | 25,000.00 | 50,000.00 |
| 0084 | 736-10-00300 | Underground Junction Box (Type F) | 6 | EACH | 500.00 | 3,000.00 | 500.00 | 3,000.00 | 475.00 | 2,850.00 | 500.00 | 3,000.00 |
| 0085 | 736-10-00500 | Underground Junction Box (Type H) | 2 | EACH | 1,200.00 | 2,400.00 | 900.00 | 1,800.00 | 900.00 | 1,800.00 | 1,000.00 | 2,000.00 |
| 0086 | 736-11-00300 | Conduit (2" HDPE, Schedule 80) | 80 | LNFT | 2.00 | 160.00 | 4.50 | 360.00 | 4.50 | 360.00 | 1.50 | 120.00 |
| 0087 | 736-11-00400 | Conduit (3" HDPE, Schedule 80) | 30 | LNFT | 3.00 | 90.00 | 5.50 | 165.00 | 5.50 | 165.00 | 2.50 | 75.00 |
| 0088 | 736-12-02000 | Conductor (3c, 6 gauge / #6 awg) | 40 | LNFT | 5.00 | 200.00 | 5.80 | 232.00 | 5.50 | 220.00 | 3.75 | 150.00 |
| 0089 | 736-12-06000 | Conductor (10c, #14 awg) | 1,965 | LNFT | 3.00 | 5,895.00 | 2.00 | 3,930.00 | 2.00 | 3,930.00 | 2.50 | 4,912.50 |
| 0090 | 739-01-00100 | Hydro-Seeding | 10.27 | ACRE | 1,500.00 | 15,405.00 | 1,100.00 | 11,297.00 | 1,050.00 | 10,783.50 | 1,000.00 | 10,270.00 |
| 0091 | 740-01-00100 | Construction Layout | 1 | LUMP | 50,000.00 | 50,000.00 | 220,000.00 | 220,000.00 | 135,000.00 | 135,000.00 | 175,000.00 | 175,000.00 |
| 0092 | 740-02-00100 | Utility Oversight and Coordination | 1 | LUMP | 50,000.00 | 50,000.00 | 10,000.00 | 10,000.00 | 18,000.00 | 18,000.00 | 50,000.00 | 50,000.00 |
| 0093 | 805-01-00300 | Class A Concrete (Box Culvert Headwalls) | 23.61 | CUYD | 1,000.00 | 23,610.00 | 1,100.00 | 25,971.00 | 1,800.00 | 42,498.00 | 1,500.00 | 35,415.00 |
| 0094 | 805-12-22040 | Reinforced Concrete Box Culverts (8' x 6') (Precast) | 140 | LNFT | 500.00 | 70,000.00 | 490.00 | 68,600.00 | 600.00 | 84,000.00 | 600.00 | 84,000.00 |
| 0095 | 806-01-00100 | Deformed Reinforcing Steel | 1,663 | LB | 1.00 | 1,663.00 | 2.00 | 3,326.00 | 1.00 | 1,663.00 | 1.00 | 1,663.00 |
| 0096 | NS-736-00005 | Video Detection Cabinet Components | 2 | EACH | 9,500.00 | 19,000.00 | 8,000.00 | 16,000.00 | 8,000.00 | 16,000.00 | 8,000.00 | 16,000.00 |
| 0097 | NS-736-00006 | Video Detection Camera | 8 | EACH | 2,000.00 | 16,000.00 | 2,000.00 | 16,000.00 | 1,800.00 | 14,400.00 | 1,800.00 | 14,400.00 |
| 0098 | NS-736-00007 | Video Detection Training | 1 | LUMP | 250.00 | 250.00 | 1.00 | 1.00 | 2.00 | 2.00 | 250.00 | 250.00 |
| 0099 | NS-MSC-00120 | Drainage Structure CATCH BASIN (CB-SD08) | 19 | EACH | 9,000.00 | 171,000.00 | 6,500.00 | 123,500.00 | 7,500.00 | 142,500.00 | 8,000.00 | 152,000.00 |
| 0100 | NS-P03-00002 | Sewer Pipe (8 inch)(6.1-10 ft deep) | 513 | LF | 115.00 | 58,995.00 | 100.00 | 51,300.00 | 70.00 | 35,910.00 | 55.00 | 28,215.00 |
| 0101 | NS-P03-00003 | Sewer Pipe (8 inch)(10.1-12 ft deep) | 451 | LF | 135.00 | 60,885.00 | 100.00 | 45,100.00 | 80.00 | 36,080.00 | 75.00 | 33,825.00 |
| 0102 | NS-P03-00004 | Sewer Pipe (8 inch)(12.1-16 ft deep) | 594 | LF | 180.00 | 106,920.00 | 140.00 | 83,160.00 | 70.00 | 41,580.00 | 90.00 | 53,460.00 |
| 0103 | NS-P03-00005 | Sewer Pipe (8 inch)(16.1-20 ft deep) | 150 | LF | 215.00 | 32,250.00 | 140.00 | 21,000.00 | 80.00 | 12,000.00 | 125.00 | 18,750.00 |
| 0104 | NS-P03-00006 | Sewer Pipe (21 inch)(8.1-10 ft deep) | 3,032 | LF | 135.00 | 409,320.00 | 160.00 | 485,120.00 | 90.00 | 272,880.00 | 95.00 | 288,040.00 |
| 0105 | NS-P03-00007 | Sewer Pipe (21 inch)(10.1-12 ft deep) | 2,943 | LF | 160.00 | 470,880.00 | 180.00 | 529,740.00 | 110.00 | 323,730.00 | 120.00 | 353,160.00 |
| 0106 | NS-P03-00008 | Sewer Pipe (21 inch)(12.1-16 ft deep) | 3,937 | LF | 200.00 | 787,400.00 | 200.00 | 787,400.00 | 120.00 | 472,440.00 | 140.00 | 551,180.00 |
| 0107 | NS-P03-00009 | Sewer Pipe (21 inch)(16.1-20 ft deep) | 958 | LF | 280.00 | 268,240.00 | 220.00 | 210,760.00 | 200.00 | 191,600.00 | 165.00 | 158,070.00 |
| 0108 | NS-P03-00010 | Adjusted Sanitary Sewer Service Lateral Connections | 23 | EACH | 400.00 | 9,200.00 | 2,500.00 | 57,500.00 | 1,500.00 | 34,500.00 | 650.00 | 14,950.00 |
| 0109 | NS-P03-00011 | Sewer Service Lateral (6 inch) | 843 | LF | 100.00 | 84,300.00 | 50.00 | 42,150.00 | 50.00 | 42,150.00 | 25.00 | 21,075.00 |
| 0110 | NS-P03-00012 | Sanitary Sewer Clean-out | 21 | EACH | 2,500.00 | 52,500.00 | 600.00 | 12,600.00 | 600.00 | 12,600.00 | 250.00 | 5,250.00 |
| 0111 | NS-P03-00013 | Unrestrained Joint Sewer Force Main (2 inch) | 24 | LF | 25.00 | 600.00 | 10.00 | 240.00 | 50.00 | 1,200.00 | 55.00 | 1,320.00 |
| 0112 | NS-P03-00014 | Unrestrained Joint Sewer Force Main (10 inch) | 4,300 | LF | 75.00 | 322,500.00 | 80.00 | 344,000.00 | 40.00 | 172,000.00 | 35.00 | 150,500.00 |
| 0113 | NS-P03-00015 | Restrained Joint Sewer Force Main (10 inch) | 480 | LF | 95.00 | 45,600.00 | 80.00 | 38,400.00 | 50.00 | 24,000.00 | 45.00 | 21,600.00 |
| 0114 | NS-P03-00016 | Valve Vault | 1 | EACH | 10,000.00 | 10,000.00 | 25,000.00 | 25,000.00 | 6,000.00 | 6,000.00 | 2,000.00 | 2,000.00 |
| 0115 | NS-P03-00017 | Fittings | 2,880 | LB | 12.00 | 34,560.00 | 20.00 | 57,600.00 | 6.00 | 17,280.00 | 7.50 | 21,600.00 |
| 0116 | NS-P03-00023 | Air Release/Vacuum Valve (2 inch) | 5 | EACH | 6,000.00 | 30,000.00 | 6,000.00 | 30,000.00 | 6,000.00 | 30,000.00 | 1,700.00 | 8,500.00 |
| 0117 | NS-P03-00024 | Install Sewer Grinder Pump Systems | 1 | EACH | 95,000.00 | 95,000.00 | 25,000.00 | 25,000.00 | 5,000.00 | 5,000.00 | 85,000.00 | 85,000.00 |
| 0118 | NS-P03-00025 | Submersible Grinder Pump Station (2 pumps) | 1 | EACH | 6,000.00 | 6,000.00 | 25,000.00 | 25,000.00 | 40,000.00 | 40,000.00 | 16,000.00 | 16,000.00 |
| SUBTOTAL GENERAL | 10,333,462 | 11,523,480 | 10,363,930 | 11,005,118 | ||||||||
| Alternate AA1 | ||||||||||||
| 0119 | 502-01-00100 | Superpave Asphaltic Concrete | 50,873.4 | TON | 75.00 | 3,815,505.00 | 0.00 | 0.00 | 0.00 | 0.00 | 76.00 | 3,866,378.40 |
| 0120 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 7,324.6 | TON | 100.00 | 732,460.00 | 0.00 | 0.00 | 0.00 | 0.00 | 90.00 | 659,214.00 |
| 0121 | 707-03-00100 | Combination Concrete Curb and Gutter | 25,061.7 | LNFT | 25.00 | 626,542.50 | 0.00 | 0.00 | 0.00 | 0.00 | 18.00 | 451,110.60 |
| SUBTOTAL ALT AA1 | 5,174,508 | 00 | 00 | 4,976,703 | ||||||||
| Alternate AA2 | ||||||||||||
| 0122 | 502-01-00100 | Superpave Asphaltic Concrete | 519.5 | TON | 0.00 | 0.00 | 140.00 | 72,730.00 | 120.00 | 62,340.00 | 0.00 | 0.00 |
| 0123 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 536.1 | TON | 0.00 | 0.00 | 180.00 | 96,498.00 | 150.00 | 80,415.00 | 0.00 | 0.00 |
| 0124 | 601-01-00500 | Portland Cement Concrete Pavement (10" Thick) | 63,604 | SQYD | 0.00 | 0.00 | 42.50 | 2,703,170.00 | 50.00 | 3,180,200.00 | 0.00 | 0.00 |
| 0125 | 601-02-01100 | Portland Cement Concrete Pavement (10" Thick) (Crossovers & Turnouts) | 8,573.1 | SQYD | 0.00 | 0.00 | 52.00 | 445,801.20 | 71.00 | 608,690.10 | 0.00 | 0.00 |
| 0126 | 707-01-00200 | Concrete Curb (Barrier) | 3,404.5 | LNFT | 0.00 | 0.00 | 12.00 | 40,854.00 | 10.00 | 34,045.00 | 0.00 | 0.00 |
| 0127 | 707-01-00300 | Concrete Curb (Mountable) | 21,583.7 | LNFT | 0.00 | 0.00 | 2.50 | 53,959.25 | 8.00 | 172,669.60 | 0.00 | 0.00 |
| 0128 | 302-02-01560 | Class II Base Course (5" Thick) (Stone or Recycled Portland Cement Concrete) | 75,090.2 | SQYD | 0.00 | 0.00 | 9.00 | 675,811.80 | 11.50 | 863,537.30 | 0.00 | 0.00 |
| 0129 | 703-03-00100 | Perforated Pipe Underdrains | 23,346 | LNFT | 0.00 | 0.00 | 8.50 | 198,441.00 | 10.00 | 233,460.00 | 0.00 | 0.00 |
| SUBTOTAL ALT AA2 | 0.00 | 4,287,265.25 | 5,235,357.00 | 0.00 | ||||||||
| ITEM TOTAL (CONSTRUCTION BID) | 15,507,969.25 | 15,810,745.40 | 15,599,286.70 | 15,981,820.50 | ||||||||
| NUMBER OF DAYS BID AT $3000 PER DAY. | 1,800,000.00 | 1,980,000.00 | 2,430,000.00 | 2,100,000.00 | ||||||||
| TOTAL BID | 17,307,969.25 | 17,790,745.40 | 18,029,286.70 | 18,081,820.50 | ||||||||
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 5 - Gilchrist Construction Co. LLC |
- 6 - Texas Sterling Construction Co. |
- 7 - F.G. Sullivan, Jr. Contractor LLC |
- 8 - Barriere Construction Co., LLC |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 450,000.00 | 450,000.00 | 200,000.00 | 200,000.00 | 50,000.00 | 50,000.00 | 160,000.00 | 160,000.00 |
| 0002 | 201-01-00200 | Clearing and Grubbing (Selective) (Tree Trimming, Root Pruning and Trenching) | 1 | LUMP | 40,000.00 | 40,000.00 | 50,000.00 | 50,000.00 | 50,000.00 | 50,000.00 | 50,000.00 | 50,000.00 |
| 0003 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 25,000.00 | 25,000.00 | 50,000.00 | 50,000.00 | 25,000.00 | 25,000.00 | 100,000.00 | 100,000.00 |
| 0004 | 202-02-04000 | Removal of Bridge Sta. 257+74.00; (19' x 32' Concrete Precast Slab Units) | 1 | EACH | 5,000.00 | 5,000.00 | 40,000.00 | 40,000.00 | 5,000.00 | 5,000.00 | 60,000.00 | 60,000.00 |
| 0005 | 202-02-05000 | Removal of Building Sta. 284+35.20, 27.5' Lt.; (10' x 10' Brick Veneer Building) | 1 | EACH | 2,000.00 | 2,000.00 | 40,000.00 | 40,000.00 | 1,000.00 | 1,000.00 | 6,000.00 | 6,000.00 |
| 0006 | 202-02-06100 | Removal of Concrete Walks and Drives | 3,757 | SQYD | 6.00 | 22,542.00 | 15.00 | 56,355.00 | 7.00 | 26,299.00 | 15.00 | 56,355.00 |
| 0007 | 202-02-06140 | Removal of Curbs (Concrete) | 617.3 | LNFT | 1.50 | 925.95 | 10.00 | 6,173.00 | 7.00 | 4,321.10 | 10.00 | 6,173.00 |
| 0008 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 1,191 | SQYD | 7.00 | 8,337.00 | 15.00 | 17,865.00 | 7.00 | 8,337.00 | 35.00 | 41,685.00 |
| 0009 | 202-02-38500 | Removal of Surfacing and Stablized Base | 37,742.2 | SQYD | 3.00 | 113,226.60 | 10.00 | 377,422.00 | 12.00 | 452,906.40 | 5.00 | 188,711.00 |
| 0010 | 202-02-40100 | Removal of Traffic Signal Equipment | 1 | LUMP | 4,000.00 | 4,000.00 | 2,765.00 | 2,765.00 | 3,500.00 | 3,500.00 | 4,000.00 | 4,000.00 |
| 0011 | 202-02-40120 | Removal of Traffic Detectors and Associated Equipment | 1 | LUMP | 400.00 | 400.00 | 1,300.00 | 1,300.00 | 400.00 | 400.00 | 400.00 | 400.00 |
| 0012 | 203-01-00100 | General Excavation | 17,526 | CUYD | 6.50 | 113,919.00 | 8.00 | 140,208.00 | 10.00 | 175,260.00 | 8.00 | 140,208.00 |
| 0013 | 203-03-00100 | Embankment | 19,121 | CUYD | 16.00 | 305,936.00 | 8.00 | 152,968.00 | 20.00 | 382,420.00 | 22.00 | 420,662.00 |
| 0014 | 203-08-00100 | Geotextile Fabric | 62 | SQYD | 5.00 | 310.00 | 1.50 | 93.00 | 3.00 | 186.00 | 2.00 | 124.00 |
| 0015 | 204-02-00100 | Temporary Hay or Straw Bales | 1,757 | EACH | 15.00 | 26,355.00 | 10.50 | 18,448.50 | 10.00 | 17,570.00 | 11.00 | 19,327.00 |
| 0016 | 204-06-00100 | Temporary Silt Fencing | 35,534 | LNFT | 1.30 | 46,194.20 | 1.10 | 39,087.40 | 1.00 | 35,534.00 | 3.00 | 106,602.00 |
| 0017 | 302-02-02080 | Class II Base Course (6" Thick) (Stone) | 41 | SQYD | 50.00 | 2,050.00 | 30.00 | 1,230.00 | 60.00 | 2,460.00 | 45.00 | 1,845.00 |
| 0019 | 305-01-04020 | Subgrade Layer (12" Thick) (Treated) | 75,090 | SQYD | 9.00 | 675,810.00 | 22.00 | 1,651,980.00 | 13.00 | 976,170.00 | 8.00 | 600,720.00 |
| 0020 | 401-01-00100 | Aggregate Surface Course (Net Section) | 6.9 | CUYD | 100.00 | 690.00 | 170.00 | 1,173.00 | 75.00 | 517.50 | 70.00 | 483.00 |
| 0021 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 1,308.3 | CUYD | 58.00 | 75,881.40 | 65.00 | 85,039.50 | 120.00 | 156,996.00 | 65.00 | 85,039.50 |
| 0022 | 509-01-00100 | Cold Planing Asphaltic Pavement | 1,081 | SQYD | 8.00 | 8,648.00 | 6.00 | 6,486.00 | 7.00 | 7,567.00 | 15.00 | 16,215.00 |
| 0023 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -60 | CUYD | 1.00 | -60.00 | 1.00 | -60.00 | 0.00 | 0.00 | 11.00 | -660.00 |
| 0024 | 701-03-01000 | Storm Drain Pipe (15" RCP/PP) | 4,698 | LNFT | 55.00 | 258,390.00 | 98.00 | 460,404.00 | 90.00 | 422,820.00 | 80.00 | 375,840.00 |
| 0025 | 701-03-01020 | Storm Drain Pipe (18" RCP/PP) | 2,630 | LNFT | 63.00 | 165,690.00 | 90.00 | 236,700.00 | 95.00 | 249,850.00 | 81.00 | 213,030.00 |
| 0026 | 701-03-01040 | Storm Drain Pipe (24" RCP/PP) | 2,126 | LNFT | 76.00 | 161,576.00 | 100.00 | 212,600.00 | 115.00 | 244,490.00 | 85.00 | 180,710.00 |
| 0027 | 701-03-01060 | Storm Drain Pipe (30" RCP/PP) | 1,822 | LNFT | 86.00 | 156,692.00 | 114.00 | 207,708.00 | 120.00 | 218,640.00 | 100.00 | 182,200.00 |
| 0028 | 701-03-01080 | Storm Drain Pipe (36" RCP/PP) | 1,358 | LNFT | 110.00 | 149,380.00 | 133.00 | 180,614.00 | 135.00 | 183,330.00 | 120.00 | 162,960.00 |
| 0029 | 701-03-01090 | Storm Drain Pipe (42" RCP/PP) | 1,560 | LNFT | 145.00 | 226,200.00 | 152.00 | 237,120.00 | 150.00 | 234,000.00 | 140.00 | 218,400.00 |
| 0030 | 701-03-01100 | Storm Drain Pipe (48" RCP/PP) | 2,284 | LNFT | 198.00 | 452,232.00 | 182.00 | 415,688.00 | 190.00 | 433,960.00 | 200.00 | 456,800.00 |
| 0031 | 701-03-01120 | Storm Drain Pipe (54" RCP) | 52 | LNFT | 275.00 | 14,300.00 | 202.00 | 10,504.00 | 210.00 | 10,920.00 | 270.00 | 14,040.00 |
| 0032 | 701-03-01140 | Storm Drain Pipe (60" RCP) | 1,568 | LNFT | 245.00 | 384,160.00 | 245.00 | 384,160.00 | 240.00 | 376,320.00 | 280.00 | 439,040.00 |
| 0033 | 701-04-01040 | Storm Drain Pipe Arch (24" Equiv. RCPA) | 850 | LNFT | 90.00 | 76,500.00 | 112.00 | 95,200.00 | 115.00 | 97,750.00 | 100.00 | 85,000.00 |
| 0034 | 701-04-01060 | Storm Drain Pipe Arch (30" Equiv. RCPA) | 1,312 | LNFT | 95.00 | 124,640.00 | 122.00 | 160,064.00 | 125.00 | 164,000.00 | 120.00 | 157,440.00 |
| 0035 | 701-04-01080 | Storm Drain Pipe Arch (36" Equiv. RCPA) | 648 | LNFT | 115.00 | 74,520.00 | 150.00 | 97,200.00 | 140.00 | 90,720.00 | 140.00 | 90,720.00 |
| 0036 | 701-04-01100 | Storm Drain Pipe Arch (42" Equiv. RCPA) | 1,360 | LNFT | 140.00 | 190,400.00 | 164.00 | 223,040.00 | 165.00 | 224,400.00 | 180.00 | 244,800.00 |
| 0037 | 701-04-01120 | Storm Drain Pipe Arch (48" Equiv. RCPA) | 1,062 | LNFT | 173.00 | 183,726.00 | 205.00 | 217,710.00 | 230.00 | 244,260.00 | 240.00 | 254,880.00 |
| 0038 | 701-04-01140 | Storm Drain Pipe Arch (54" Equiv. RCPA) | 712 | LNFT | 200.00 | 142,400.00 | 195.00 | 138,840.00 | 260.00 | 185,120.00 | 260.00 | 185,120.00 |
| 0039 | 701-09-00100 | Fabricating Pipe Fittings | 6 | EACH | 1,500.00 | 9,000.00 | 1,000.00 | 6,000.00 | 1,100.00 | 6,600.00 | 700.00 | 4,200.00 |
| 0040 | 702-02-00200 | Manholes (R-CB-11) | 5 | EACH | 3,500.00 | 17,500.00 | 5,000.00 | 25,000.00 | 3,600.00 | 18,000.00 | 8,000.00 | 40,000.00 |
| 0041 | 702-02-00300 | Manholes (R-CB-11 MOD) | 14 | EACH | 4,000.00 | 56,000.00 | 5,000.00 | 70,000.00 | 5,600.00 | 78,400.00 | 13,000.00 | 182,000.00 |
| 0042 | 702-02-00600 | Manholes (R-CB-36) | 87 | EACH | 4,200.00 | 365,400.00 | 6,000.00 | 522,000.00 | 4,000.00 | 348,000.00 | 8,000.00 | 696,000.00 |
| 0043 | 702-03-00100 | Catch Basins (CB-01) | 45 | EACH | 2,300.00 | 103,500.00 | 4,000.00 | 180,000.00 | 2,500.00 | 112,500.00 | 3,000.00 | 135,000.00 |
| 0044 | 702-03-00200 | Catch Basins (CB-02) | 1 | EACH | 4,200.00 | 4,200.00 | 4,500.00 | 4,500.00 | 6,000.00 | 6,000.00 | 3,500.00 | 3,500.00 |
| 0045 | 702-03-00300 | Catch Basins (CB-04) | 50 | EACH | 1,800.00 | 90,000.00 | 3,000.00 | 150,000.00 | 1,500.00 | 75,000.00 | 2,000.00 | 100,000.00 |
| 0046 | 702-03-00500 | Catch Basins (CB-06) | 74 | EACH | 3,600.00 | 266,400.00 | 5,500.00 | 407,000.00 | 3,200.00 | 236,800.00 | 7,500.00 | 555,000.00 |
| 0047 | 702-03-00700 | Catch Basins (CB-08) | 42 | EACH | 6,000.00 | 252,000.00 | 6,500.00 | 273,000.00 | 7,100.00 | 298,200.00 | 11,000.00 | 462,000.00 |
| 0048 | 702-03-00800 | Catch Basins (CB-09) | 2 | EACH | 5,000.00 | 10,000.00 | 4,500.00 | 9,000.00 | 5,000.00 | 10,000.00 | 12,000.00 | 24,000.00 |
| 0049 | 706-02-00200 | Concrete Drive (6" Thick) | 3,924.9 | SQYD | 60.00 | 235,494.00 | 60.00 | 235,494.00 | 60.00 | 235,494.00 | 65.00 | 255,118.50 |
| 0050 | 706-03-00100 | Incidental Concrete Paving (4" Thick) | 403.8 | SQYD | 105.00 | 42,399.00 | 60.00 | 24,228.00 | 38.00 | 15,344.40 | 55.00 | 22,209.00 |
| 0051 | 708-01-00100 | Right-of-Way Monument | 59 | EACH | 250.00 | 14,750.00 | 750.00 | 44,250.00 | 200.00 | 11,800.00 | 150.00 | 8,850.00 |
| 0052 | 711-01-03000 | Riprap (30 lb, 14" Thick) | 121 | SQYD | 70.00 | 8,470.00 | 75.00 | 9,075.00 | 55.00 | 6,655.00 | 120.00 | 14,520.00 |
| 0053 | 711-04-00100 | Geotextile Fabric | 121 | SQYD | 2.00 | 242.00 | 1.50 | 181.50 | 1.00 | 121.00 | 2.00 | 242.00 |
| 0054 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 325,000.00 | 325,000.00 | 250,000.00 | 250,000.00 | 790,000.00 | 790,000.00 | 1,000,000.00 | 1,000,000.00 |
| 0055 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 130 | LNFT | 0.85 | 110.50 | 1.25 | 162.50 | 1.20 | 156.00 | 1.00 | 130.00 |
| 0056 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 13.46 | MILE | 625.00 | 8,412.50 | 625.00 | 8,412.50 | 600.00 | 8,076.00 | 1,000.00 | 13,460.00 |
| 0057 | 725-01-00100 | Temporary Detour Roads | 13,444.6 | SQYD | 20.00 | 268,892.00 | 45.00 | 605,007.00 | 60.00 | 806,676.00 | 59.00 | 793,231.40 |
| 0058 | 726-01-00100 | Bedding Material | 4,785.6 | CUYD | 70.00 | 334,992.00 | 75.00 | 358,920.00 | 65.00 | 311,064.00 | 65.00 | 311,064.00 |
| 0059 | 727-01-00100 | Mobilization | 1 | LUMP | 1,700,000.00 | 1,700,000.00 | 1,249,000.00 | 1,249,000.00 | 700,000.00 | 700,000.00 | 3,200,000.00 | 3,200,000.00 |
| 0060 | 729-01-00100 | Sign (Type A) | 20 | SQFT | 50.00 | 1,000.00 | 52.60 | 1,052.00 | 49.00 | 980.00 | 25.00 | 500.00 |
| 0061 | 729-19-00100 | Dead End Road Installations (Type A) | 2 | EACH | 1,800.00 | 3,600.00 | 1,550.00 | 3,100.00 | 1,550.00 | 3,100.00 | 12,000.00 | 24,000.00 |
| 0062 | 731-02-00100 | Reflectorized Raised Pavement Markers | 802 | EACH | 6.00 | 4,812.00 | 5.00 | 4,010.00 | 4.70 | 3,769.40 | 5.00 | 4,010.00 |
| 0063 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 2,069 | LNFT | 1.50 | 3,103.50 | 1.05 | 2,172.45 | 1.00 | 2,069.00 | 1.00 | 2,069.00 |
| 0064 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 508 | LNFT | 5.13 | 2,606.04 | 5.20 | 2,641.60 | 5.00 | 2,540.00 | 5.00 | 2,540.00 |
| 0065 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 9.904 | MILE | 3,200.00 | 31,692.80 | 3,000.00 | 29,712.00 | 2,825.00 | 27,978.80 | 3,000.00 | 29,712.00 |
| 0066 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 3.88 | MILE | 974.00 | 3,779.12 | 1,000.00 | 3,880.00 | 950.00 | 3,686.00 | 1,000.00 | 3,880.00 |
| 0067 | 732-04-01040 | Plastic Pavement Legends and Symbols (Arrow - Double) | 1 | EACH | 300.00 | 300.00 | 210.00 | 210.00 | 200.00 | 200.00 | 220.00 | 220.00 |
| 0068 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 84 | EACH | 245.00 | 20,580.00 | 188.00 | 15,792.00 | 180.00 | 15,120.00 | 200.00 | 16,800.00 |
| 0069 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 6 | EACH | 245.00 | 1,470.00 | 188.00 | 1,128.00 | 180.00 | 1,080.00 | 200.00 | 1,200.00 |
| 0070 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 17 | EACH | 250.00 | 4,250.00 | 210.00 | 3,570.00 | 200.00 | 3,400.00 | 210.00 | 3,570.00 |
| 0071 | 732-04-18000 | Plastic Pavement Legends and Symbols (RR Crossing) | 2 | EACH | 450.00 | 900.00 | 470.00 | 940.00 | 450.00 | 900.00 | 500.00 | 1,000.00 |
| 0072 | 732-05-00100 | Removal of Existing Markings | 2.242 | MILE | 4,000.00 | 8,968.00 | 2,100.00 | 4,708.20 | 2,000.00 | 4,484.00 | 3,000.00 | 6,726.00 |
| 0073 | 735-01-00100 | Mailboxes | 51 | EACH | 10.00 | 510.00 | 1.00 | 51.00 | 1.00 | 51.00 | 7.00 | 357.00 |
| 0074 | 735-02-00100 | Mailbox Supports (Single) | 51 | EACH | 125.00 | 6,375.00 | 112.00 | 5,712.00 | 112.00 | 5,712.00 | 150.00 | 7,650.00 |
| 0075 | 736-01-00100 | Trenching and Backfilling | 100 | LNFT | 4.50 | 450.00 | 3.50 | 350.00 | 4.00 | 400.00 | 4.00 | 400.00 |
| 0076 | 736-03-00300 | Jacked or Bored Conduit (3" HPDE, Sch 80) | 570 | LNFT | 15.00 | 8,550.00 | 18.00 | 10,260.00 | 13.50 | 7,695.00 | 15.00 | 8,550.00 |
| 0077 | 736-04-04080 | Signal Support (25' Single Mast Arm) | 4 | EACH | 8,000.00 | 32,000.00 | 8,000.00 | 32,000.00 | 7,100.00 | 28,400.00 | 8,000.00 | 32,000.00 |
| 0078 | 736-04-04160 | Signal Support (45' Single Mast Arm) | 2 | EACH | 11,000.00 | 22,000.00 | 9,900.00 | 19,800.00 | 9,900.00 | 19,800.00 | 12,000.00 | 24,000.00 |
| 0079 | 736-04-04180 | Signal Support (50' Single Mast Arm) | 2 | EACH | 12,800.00 | 25,600.00 | 11,000.00 | 22,000.00 | 11,400.00 | 22,800.00 | 12,000.00 | 24,000.00 |
| 0080 | 736-05-02000 | Signal Heads (3 Section, 12" Led Lens, R, Y, G) | 16 | EACH | 1,000.00 | 16,000.00 | 1,125.00 | 18,000.00 | 900.00 | 14,400.00 | 1,100.00 | 17,600.00 |
| 0081 | 736-05-04000 | Signal Heads (5 Section, 12" Led Lens, R, LT. Y, Y, LT. G, G) | 4 | EACH | 1,400.00 | 5,600.00 | 1,660.00 | 6,640.00 | 1,300.00 | 5,200.00 | 1,500.00 | 6,000.00 |
| 0082 | 736-06-00600 | Signal Service (Existing Pole) | 2 | EACH | 1,000.00 | 2,000.00 | 1,070.00 | 2,140.00 | 900.00 | 1,800.00 | 1,100.00 | 2,200.00 |
| 0083 | 736-08-00070 | Sig Cntrlr (TS-2, Type 2, w/Eth cap)(Type 6E Cabinet) (F&I) | 2 | EACH | 25,000.00 | 50,000.00 | 26,000.00 | 52,000.00 | 23,800.00 | 47,600.00 | 27,000.00 | 54,000.00 |
| 0084 | 736-10-00300 | Underground Junction Box (Type F) | 6 | EACH | 545.00 | 3,270.00 | 450.00 | 2,700.00 | 480.00 | 2,880.00 | 500.00 | 3,000.00 |
| 0085 | 736-10-00500 | Underground Junction Box (Type H) | 2 | EACH | 1,000.00 | 2,000.00 | 970.00 | 1,940.00 | 880.00 | 1,760.00 | 1,100.00 | 2,200.00 |
| 0086 | 736-11-00300 | Conduit (2" HDPE, Schedule 80) | 80 | LNFT | 5.10 | 408.00 | 1.70 | 136.00 | 4.50 | 360.00 | 5.00 | 400.00 |
| 0087 | 736-11-00400 | Conduit (3" HDPE, Schedule 80) | 30 | LNFT | 6.00 | 180.00 | 2.60 | 78.00 | 5.50 | 165.00 | 6.00 | 180.00 |
| 0088 | 736-12-02000 | Conductor (3c, 6 gauge / #6 awg) | 40 | LNFT | 6.40 | 256.00 | 3.80 | 152.00 | 6.00 | 240.00 | 7.00 | 280.00 |
| 0089 | 736-12-06000 | Conductor (10c, #14 awg) | 1,965 | LNFT | 2.25 | 4,421.25 | 2.40 | 4,716.00 | 2.00 | 3,930.00 | 3.00 | 5,895.00 |
| 0090 | 739-01-00100 | Hydro-Seeding | 10.27 | ACRE | 1,200.00 | 12,324.00 | 1,050.00 | 10,783.50 | 1,100.00 | 11,297.00 | 1,200.00 | 12,324.00 |
| 0091 | 740-01-00100 | Construction Layout | 1 | LUMP | 300,000.00 | 300,000.00 | 100,000.00 | 100,000.00 | 300,000.00 | 300,000.00 | 750,000.00 | 750,000.00 |
| 0092 | 740-02-00100 | Utility Oversight and Coordination | 1 | LUMP | 64,000.00 | 64,000.00 | 50,000.00 | 50,000.00 | 35,000.00 | 35,000.00 | 65,000.00 | 65,000.00 |
| 0093 | 805-01-00300 | Class A Concrete (Box Culvert Headwalls) | 23.61 | CUYD | 1,300.00 | 30,693.00 | 650.00 | 15,346.50 | 1,500.00 | 35,415.00 | 2,200.00 | 51,942.00 |
| 0094 | 805-12-22040 | Reinforced Concrete Box Culverts (8' x 6') (Precast) | 140 | LNFT | 835.00 | 116,900.00 | 400.00 | 56,000.00 | 670.00 | 93,800.00 | 700.00 | 98,000.00 |
| 0095 | 806-01-00100 | Deformed Reinforcing Steel | 1,663 | LB | 1.14 | 1,895.82 | 1.00 | 1,663.00 | 1.00 | 1,663.00 | 1.00 | 1,663.00 |
| 0096 | NS-736-00005 | Video Detection Cabinet Components | 2 | EACH | 9,100.00 | 18,200.00 | 8,500.00 | 17,000.00 | 8,000.00 | 16,000.00 | 10,000.00 | 20,000.00 |
| 0097 | NS-736-00006 | Video Detection Camera | 8 | EACH | 2,100.00 | 16,800.00 | 1,830.00 | 14,640.00 | 1,900.00 | 15,200.00 | 2,000.00 | 16,000.00 |
| 0098 | NS-736-00007 | Video Detection Training | 1 | LUMP | 1.15 | 1.15 | 190.00 | 190.00 | 1.00 | 1.00 | 1.00 | 1.00 |
| 0099 | NS-MSC-00120 | Drainage Structure CATCH BASIN (CB-SD08) | 19 | EACH | 7,500.00 | 142,500.00 | 6,300.00 | 119,700.00 | 9,100.00 | 172,900.00 | 25,000.00 | 475,000.00 |
| 0100 | NS-P03-00002 | Sewer Pipe (8 inch)(6.1-10 ft deep) | 513 | LF | 90.00 | 46,170.00 | 100.00 | 51,300.00 | 80.00 | 41,040.00 | 110.00 | 56,430.00 |
| 0101 | NS-P03-00003 | Sewer Pipe (8 inch)(10.1-12 ft deep) | 451 | LF | 100.00 | 45,100.00 | 100.00 | 45,100.00 | 90.00 | 40,590.00 | 135.00 | 60,885.00 |
| 0102 | NS-P03-00004 | Sewer Pipe (8 inch)(12.1-16 ft deep) | 594 | LF | 125.00 | 74,250.00 | 123.00 | 73,062.00 | 110.00 | 65,340.00 | 180.00 | 106,920.00 |
| 0103 | NS-P03-00005 | Sewer Pipe (8 inch)(16.1-20 ft deep) | 150 | LF | 145.00 | 21,750.00 | 150.00 | 22,500.00 | 130.00 | 19,500.00 | 220.00 | 33,000.00 |
| 0104 | NS-P03-00006 | Sewer Pipe (21 inch)(8.1-10 ft deep) | 3,032 | LF | 170.00 | 515,440.00 | 108.00 | 327,456.00 | 150.00 | 454,800.00 | 135.00 | 409,320.00 |
| 0105 | NS-P03-00007 | Sewer Pipe (21 inch)(10.1-12 ft deep) | 2,943 | LF | 190.00 | 559,170.00 | 118.00 | 347,274.00 | 170.00 | 500,310.00 | 160.00 | 470,880.00 |
| 0106 | NS-P03-00008 | Sewer Pipe (21 inch)(12.1-16 ft deep) | 3,937 | LF | 210.00 | 826,770.00 | 131.00 | 515,747.00 | 190.00 | 748,030.00 | 200.00 | 787,400.00 |
| 0107 | NS-P03-00009 | Sewer Pipe (21 inch)(16.1-20 ft deep) | 958 | LF | 240.00 | 229,920.00 | 154.00 | 147,532.00 | 210.00 | 201,180.00 | 290.00 | 277,820.00 |
| 0108 | NS-P03-00010 | Adjusted Sanitary Sewer Service Lateral Connections | 23 | EACH | 1,650.00 | 37,950.00 | 900.00 | 20,700.00 | 1,500.00 | 34,500.00 | 410.00 | 9,430.00 |
| 0109 | NS-P03-00011 | Sewer Service Lateral (6 inch) | 843 | LF | 73.00 | 61,539.00 | 95.00 | 80,085.00 | 65.00 | 54,795.00 | 95.00 | 80,085.00 |
| 0110 | NS-P03-00012 | Sanitary Sewer Clean-out | 21 | EACH | 685.00 | 14,385.00 | 400.00 | 8,400.00 | 600.00 | 12,600.00 | 2,200.00 | 46,200.00 |
| 0111 | NS-P03-00013 | Unrestrained Joint Sewer Force Main (2 inch) | 24 | LF | 27.00 | 648.00 | 80.00 | 1,920.00 | 25.00 | 600.00 | 25.00 | 600.00 |
| 0112 | NS-P03-00014 | Unrestrained Joint Sewer Force Main (10 inch) | 4,300 | LF | 55.00 | 236,500.00 | 55.00 | 236,500.00 | 50.00 | 215,000.00 | 75.00 | 322,500.00 |
| 0113 | NS-P03-00015 | Restrained Joint Sewer Force Main (10 inch) | 480 | LF | 73.00 | 35,040.00 | 80.00 | 38,400.00 | 65.00 | 31,200.00 | 97.00 | 46,560.00 |
| 0114 | NS-P03-00016 | Valve Vault | 1 | EACH | 10,000.00 | 10,000.00 | 3,200.00 | 3,200.00 | 6,000.00 | 6,000.00 | 8,000.00 | 8,000.00 |
| 0115 | NS-P03-00017 | Fittings | 2,880 | LB | 6.80 | 19,584.00 | 4.00 | 11,520.00 | 6.00 | 17,280.00 | 11.00 | 31,680.00 |
| 0116 | NS-P03-00023 | Air Release/Vacuum Valve (2 inch) | 5 | EACH | 10,000.00 | 50,000.00 | 4,100.00 | 20,500.00 | 6,000.00 | 30,000.00 | 6,000.00 | 30,000.00 |
| 0117 | NS-P03-00024 | Install Sewer Grinder Pump Systems | 1 | EACH | 12,000.00 | 12,000.00 | 35,000.00 | 35,000.00 | 10,000.00 | 10,000.00 | 100,000.00 | 100,000.00 |
| 0118 | NS-P03-00025 | Submersible Grinder Pump Station (2 pumps) | 1 | EACH | 30,000.00 | 30,000.00 | 58,000.00 | 58,000.00 | 25,000.00 | 25,000.00 | 1.00 | 1.00 |
| SUBTOTAL GENERAL | 12,596,945 | 13,328,426 | 13,258,452 | 17,797,974 | ||||||||
| Alternate AA1 | ||||||||||||
| 0119 | 502-01-00100 | Superpave Asphaltic Concrete | 50,873.4 | TON | 82.00 | 4,171,618.80 | 0.00 | 0.00 | 100.00 | 5,087,340.00 | 85.00 | 4,324,239.00 |
| 0120 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 7,324.6 | TON | 108.00 | 791,056.80 | 0.00 | 0.00 | 120.00 | 878,952.00 | 130.00 | 952,198.00 |
| 0121 | 707-03-00100 | Combination Concrete Curb and Gutter | 25,061.7 | LNFT | 15.00 | 375,925.50 | 0.00 | 0.00 | 18.00 | 451,110.60 | 24.00 | 601,480.80 |
| SUBTOTAL ALT AA1 | 5,338,601 | 00 | 6,417,403 | 5,877,918 | ||||||||
| Alternate AA2 | ||||||||||||
| 0122 | 502-01-00100 | Superpave Asphaltic Concrete | 519.5 | TON | 0.00 | 0.00 | 130.00 | 67,535.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| 0123 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 536.1 | TON | 0.00 | 0.00 | 161.00 | 86,312.10 | 0.00 | 0.00 | 0.00 | 0.00 |
| 0124 | 601-01-00500 | Portland Cement Concrete Pavement (10" Thick) | 63,604 | SQYD | 0.00 | 0.00 | 40.00 | 2,544,160.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| 0125 | 601-02-01100 | Portland Cement Concrete Pavement (10" Thick) (Crossovers & Turnouts) | 8,573.1 | SQYD | 0.00 | 0.00 | 52.10 | 446,658.51 | 0.00 | 0.00 | 0.00 | 0.00 |
| 0126 | 707-01-00200 | Concrete Curb (Barrier) | 3,404.5 | LNFT | 0.00 | 0.00 | 1.00 | 3,404.50 | 0.00 | 0.00 | 0.00 | 0.00 |
| 0127 | 707-01-00300 | Concrete Curb (Mountable) | 21,583.7 | LNFT | 0.00 | 0.00 | 0.70 | 15,108.59 | 0.00 | 0.00 | 0.00 | 0.00 |
| 0128 | 302-02-01560 | Class II Base Course (5" Thick) (Stone or Recycled Portland Cement Concrete) | 75,090.2 | SQYD | 0.00 | 0.00 | 9.00 | 675,811.80 | 0.00 | 0.00 | 0.00 | 0.00 |
| 0129 | 703-03-00100 | Perforated Pipe Underdrains | 23,346 | LNFT | 0.00 | 0.00 | 20.00 | 466,920.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| SUBTOTAL ALT AA2 | 0.00 | 4,305,910.50 | 0.00 | 0.00 | ||||||||
| ITEM TOTAL (CONSTRUCTION BID) | 17,935,545.93 | 17,634,336.65 | 19,675,854.20 | 23,675,892.20 | ||||||||
| NUMBER OF DAYS BID AT $3000 PER DAY. | 1,800,000.00 | 2,556,000.00 | 2,400,000.00 | 2,655,000.00 | ||||||||
| TOTAL BID | 19,735,545.93 | 20,190,336.65 | 22,075,854.20 | 26,330,892.20 | ||||||||