| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - HUEY STOCKSTILL, INC. |
- 2 - BARRIERE CONSTRUCTION CO., LLC |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-H |
removal of guard rail
|
250   |
LNFT |
8.00 |
2,000.00 |
5.00 |
1,250.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
14,116.3 |
TON |
66.00 |
931,675.80 |
70.00 |
988,141.00 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
560.7 |
TON |
160.00 |
89,712.00 |
200.00 |
112,140.00 |
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
129,618   |
SQYD |
1.65 |
213,869.70 |
1.00 |
129,618.00 |
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 3,329   |
CUYD |
10.00 |
- 33,290.00 |
0.10 |
- 332.90 |
|
|
|
|
| 510-01-B |
pavement patching (12" minimum thickness)
|
250   |
SQYD |
150.00 |
37,500.00 |
90.00 |
22,500.00 |
|
|
|
|
| 704-03 |
blocked out guard rail
|
50.0 |
LNFT |
25.00 |
1,250.00 |
22.00 |
1,100.00 |
|
|
|
|
| 704-07-A |
guard rail bridge attachments (single thrie beam)
|
50.0 |
LNFT |
42.00 |
2,100.00 |
50.00 |
2,500.00 |
|
|
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
100.0 |
LNFT |
60.00 |
6,000.00 |
65.00 |
6,500.00 |
|
|
|
|
| 704-11-A |
guard rail end treatment (flared)
|
4   |
EACH |
2,500.00 |
10,000.00 |
2,600.00 |
10,400.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
10,000.00 |
10,000.00 |
100,000.00 |
100,000.00 |
|
|
|
|
| 713-02-C |
temporary pavement markings (8" width)
|
44   |
LNFT |
0.10 |
4.40 |
0.10 |
4.40 |
|
|
|
|
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
29.700 |
MILE |
10.00 |
297.00 |
150.00 |
4,455.00 |
|
|
|
|
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
5.700 |
MILE |
300.00 |
1,710.00 |
300.00 |
1,710.00 |
|
|
|
|
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
32.720 |
MILE |
600.00 |
19,632.00 |
500.00 |
16,360.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
159,000.00 |
159,000.00 |
174,000.00 |
174,000.00 |
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
4   |
EACH |
80.00 |
320.00 |
80.00 |
320.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
2,689   |
EACH |
1.50 |
4,033.50 |
5.00 |
13,445.00 |
|
|
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
44   |
LNFT |
1.00 |
44.00 |
1.00 |
44.00 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
32.720 |
MILE |
2,500.00 |
81,800.00 |
2,700.00 |
88,344.00 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
5.700 |
MILE |
900.00 |
5,130.00 |
750.00 |
4,275.00 |
|
|
|
|
| 732-04-E |
plastic pavement legends & symbols (school crossing)
|
2   |
EACH |
500.00 |
1,000.00 |
450.00 |
900.00 |
|
|
|
|
| 735-01 |
mailboxes
|
376   |
EACH |
1.00 |
376.00 |
1.00 |
376.00 |
|
|
|
|
| 735-02 |
mailbox supports (single)
|
247   |
EACH |
100.00 |
24,700.00 |
100.00 |
24,700.00 |
|
|
|
|
| 735-03 |
mailbox supports (double)
|
26   |
EACH |
170.00 |
4,420.00 |
170.00 |
4,420.00 |
|
|
|
|
| 735-04 |
mailbox supports (multiple)
|
20   |
EACH |
330.00 |
6,600.00 |
350.00 |
7,000.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
5,000.00 |
5,000.00 |
26,000.00 |
26,000.00 |
|
|
|
|
| S-001 |
saw cutting asphalt concrete patches (12" deep)
|
476   |
LNFT |
17.00 |
8,092.00 |
10.00 |
4,760.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,592,976.40 |
|
1,744,929.50 |
|
|
|
|
|