Letting of 12/12/2007 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 855-09-0019
Parish: TERREBONNE
Routes: LA 665
Description: LA 665 PERMANENT REPAIR (LA 55 - CUTOFF CANAL)
Type Const: cold plane asphaltic concrete pavement and superpave asphalt ic concrete overlay
Estimated Construction Cost: $1,965,465.06
 
RankLicenseBidderConstruction Bid
1 06487 HUEY STOCKSTILL, INC. $1,592,976.40
2 06276 BARRIERE CONSTRUCTION CO., LLC $1,744,929.50
 
Item Number Item Description Quantity Unit of Measure - 1 -
HUEY STOCKSTILL, INC.
- 2 -
BARRIERE CONSTRUCTION CO., LLC

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-H removal of guard rail 250      LNFT 8.00 2,000.00 5.00 1,250.00        
502-01 superpave asphaltic concrete 14,116.3    TON 66.00 931,675.80 70.00 988,141.00        
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
560.7    TON 160.00 89,712.00 200.00 112,140.00        
509-01 cold planing asphaltic pavement 129,618      SQYD 1.65 213,869.70 1.00 129,618.00        
509-02 contractor retained reclaimed asphaltic pavement - 3,329      CUYD 10.00 - 33,290.00 0.10 - 332.90        
510-01-B pavement patching (12" minimum thickness) 250      SQYD 150.00 37,500.00 90.00 22,500.00        
704-03 blocked out guard rail 50.0    LNFT 25.00 1,250.00 22.00 1,100.00        
704-07-A guard rail bridge attachments (single thrie beam) 50.0    LNFT 42.00 2,100.00 50.00 2,500.00        
704-08-B guard rail transitions (double thrie beam) 100.0    LNFT 60.00 6,000.00 65.00 6,500.00        
704-11-A guard rail end treatment (flared) 4      EACH 2,500.00 10,000.00 2,600.00 10,400.00        
713-01 temporary signs & barricades lump      LUMP 10,000.00 10,000.00 100,000.00 100,000.00        
713-02-C temporary pavement markings (8" width) 44      LNFT 0.10 4.40 0.10 4.40        
713-03-A temporary pavement markings (broken line)(4" width)(4'
length)
29.700  MILE 10.00 297.00 150.00 4,455.00        
713-03-B temporary pavement markings (broken line)(4" width)
(10' length)
5.700  MILE 300.00 1,710.00 300.00 1,710.00        
713-04-A temporary pavement markings (solid line)(4" width) 32.720  MILE 600.00 19,632.00 500.00 16,360.00        
727-01 mobilization lump      LUMP 159,000.00 159,000.00 174,000.00 174,000.00        
729-16-C object marker assembly (type 3) 4      EACH 80.00 320.00 80.00 320.00        
731-02 reflectorized raised pavement markers 2,689      EACH 1.50 4,033.50 5.00 13,445.00        
732-01-C plastic pavement striping (8" width) 44      LNFT 1.00 44.00 1.00 44.00        
732-02-A plastic pavement striping (solid line) (4" width) 32.720  MILE 2,500.00 81,800.00 2,700.00 88,344.00        
732-03-A plastic pavement striping (broken line)(4" width) 5.700  MILE 900.00 5,130.00 750.00 4,275.00        
732-04-E plastic pavement legends & symbols (school crossing) 2      EACH 500.00 1,000.00 450.00 900.00        
735-01 mailboxes 376      EACH 1.00 376.00 1.00 376.00        
735-02 mailbox supports (single) 247      EACH 100.00 24,700.00 100.00 24,700.00        
735-03 mailbox supports (double) 26      EACH 170.00 4,420.00 170.00 4,420.00        
735-04 mailbox supports (multiple) 20      EACH 330.00 6,600.00 350.00 7,000.00        
740-01 construction layout lump      LUMP 5,000.00 5,000.00 26,000.00 26,000.00        
S-001 saw cutting asphalt concrete patches (12" deep) 476      LNFT 17.00 8,092.00 10.00 4,760.00        
                       
 CONTRACTOR TOTAL       1,592,976.40   1,744,929.50        