| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BARRIERE CONSTRUCTION CO., LLC. |
- 2 - DIAMOND B CONSTRUCTION CO., L.L.C. |
- 3 - F.G. SULLIVAN, JR. CONTRACTOR LLC |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-H |
removal of guard rail
|
554   |
LNFT |
5.00 |
2,770.00 |
19.00 |
10,526.00 |
10.00 |
5,540.00 |
|
|
| 202-02-I |
removal of surfacing
|
401   |
SQYD |
20.00 |
8,020.00 |
25.00 |
10,025.00 |
25.00 |
10,025.00 |
|
|
| 202-02-J |
removal of wingwalls
|
8   |
EACH |
550.00 |
4,400.00 |
525.00 |
4,200.00 |
250.00 |
2,000.00 |
|
|
| 203-07 |
borrow (vehicular measurement)
|
2,742   |
CUYD |
10.00 |
27,420.00 |
16.00 |
43,872.00 |
20.00 |
54,840.00 |
|
|
| 203-07-A |
borrow (vehicular meas.)(selected soils)
|
2,241   |
CUYD |
10.00 |
22,410.00 |
17.50 |
39,217.50 |
5.00 |
11,205.00 |
|
|
| 204-02 |
temporary hay or straw bales
|
100   |
EACH |
10.00 |
1,000.00 |
11.00 |
1,100.00 |
10.00 |
1,000.00 |
|
|
| 204-06 |
temporary silt fencing
|
10,876   |
LNFT |
1.00 |
10,876.00 |
1.40 |
15,226.40 |
1.40 |
15,226.40 |
|
|
| 308-01-A |
in-place cement treated base course (12" thick)
|
80,867   |
SQYD |
5.00 |
404,335.00 |
5.65 |
456,898.55 |
6.00 |
485,202.00 |
|
|
| 308-02 |
removal of existing patches
|
1,740   |
SQYD |
0.50 |
870.00 |
9.00 |
15,660.00 |
0.10 |
174.00 |
|
|
| 502-01 |
superpave asphaltic concrete
|
15,302.3 |
TON |
70.00 |
1,071,161.00 |
68.00 |
1,040,556.40 |
70.00 |
1,071,161.00 |
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
830.9 |
TON |
70.00 |
58,163.00 |
143.00 |
118,818.70 |
150.00 |
124,635.00 |
|
|
| 510-01-B |
pavement patching (12" minimum thickness)
|
65   |
SQYD |
60.00 |
3,900.00 |
100.00 |
6,500.00 |
160.00 |
10,400.00 |
|
|
| 702-04-A |
adjusting manholes
|
2   |
EACH |
200.00 |
400.00 |
1,000.00 |
2,000.00 |
200.00 |
400.00 |
|
|
| 704-01-A |
guard rail (single thrie beam)(3'-1 1/2" post spacing)
|
400.0 |
LNFT |
60.00 |
24,000.00 |
37.50 |
15,000.00 |
32.00 |
12,800.00 |
|
|
| 704-01-B |
guard rail (single thrie beam)(6'-3" post spacing)
|
274.0 |
LNFT |
45.00 |
12,330.00 |
50.00 |
13,700.00 |
48.00 |
13,152.00 |
|
|
| 704-03 |
blocked out guard rail
|
200.0 |
LNFT |
20.00 |
4,000.00 |
18.50 |
3,700.00 |
19.00 |
3,800.00 |
|
|
| 704-11-A |
guard rail end treatment (flared)
|
20   |
EACH |
2,200.00 |
44,000.00 |
2,100.00 |
42,000.00 |
2,000.00 |
40,000.00 |
|
|
| 711-03-C |
riprap (30 lb)
|
11.7 |
TON |
110.00 |
1,287.00 |
105.00 |
1,228.50 |
175.00 |
2,047.50 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
60,000.00 |
60,000.00 |
36,000.00 |
36,000.00 |
99,900.00 |
99,900.00 |
|
|
| 713-02-E |
temporary pavement markings (24" width)
|
99   |
LNFT |
1.00 |
99.00 |
0.65 |
64.35 |
0.50 |
49.50 |
|
|
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
5.280 |
MILE |
1.00 |
5.28 |
145.00 |
765.60 |
500.00 |
2,640.00 |
|
|
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
5.280 |
MILE |
1.00 |
5.28 |
300.00 |
1,584.00 |
10.00 |
52.80 |
|
|
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
61.950 |
MILE |
1.00 |
61.95 |
575.00 |
35,621.25 |
10.00 |
619.50 |
|
|
| 722-01 |
project site laboratory
|
1   |
EACH |
667.39 |
667.39 |
13,000.00 |
13,000.00 |
3,000.00 |
3,000.00 |
|
|
| 726-01 |
bedding material
|
14.0 |
CUYD |
75.00 |
1,050.00 |
110.00 |
1,540.00 |
150.00 |
2,100.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
167,000.00 |
167,000.00 |
128,000.00 |
128,000.00 |
194,700.00 |
194,700.00 |
|
|
| 729-16-C |
object marker assembly (type 3)
|
60   |
EACH |
80.00 |
4,800.00 |
75.00 |
4,500.00 |
70.00 |
4,200.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
767   |
EACH |
6.00 |
4,602.00 |
5.00 |
3,835.00 |
6.00 |
4,602.00 |
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
33   |
LNFT |
3.40 |
112.20 |
3.25 |
107.25 |
4.00 |
132.00 |
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
20.671 |
MILE |
2,400.00 |
49,610.40 |
2,200.00 |
45,476.20 |
3,000.00 |
62,013.00 |
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
1.760 |
MILE |
650.00 |
1,144.00 |
750.00 |
1,320.00 |
1,000.00 |
1,760.00 |
|
|
| 735-01 |
mailboxes
|
53   |
EACH |
2.00 |
106.00 |
1.00 |
53.00 |
5.00 |
265.00 |
|
|
| 735-02 |
mailbox supports (single)
|
53   |
EACH |
110.00 |
5,830.00 |
110.00 |
5,830.00 |
140.00 |
7,420.00 |
|
|
| 739-01 |
hydro-seeding
|
9.85 |
ACRE |
1,000.00 |
9,850.00 |
1,000.00 |
9,850.00 |
1,100.00 |
10,835.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
25,000.00 |
25,000.00 |
17,500.00 |
17,500.00 |
50,000.00 |
50,000.00 |
|
|
| 805-01-B |
class a concrete (box culvert headwalls)
|
56.22 |
CUYD |
1,600.00 |
89,952.00 |
1,500.00 |
84,330.00 |
1,600.00 |
89,952.00 |
|
|
| 805-12-E |
reinforced concrete box culverts (4'x 4')
|
44.0 |
LNFT |
800.00 |
35,200.00 |
775.00 |
34,100.00 |
2,100.00 |
92,400.00 |
|
|
| 805-12-F |
reinforced concrete box culverts (5'x 4')
|
14.0 |
LNFT |
1,000.00 |
14,000.00 |
950.00 |
13,300.00 |
2,100.00 |
29,400.00 |
|
|
| 806-01 |
deformed reinforcing steel
|
4,041   |
LB |
2.50 |
10,102.50 |
2.50 |
10,102.50 |
1.00 |
4,041.00 |
|
|
| S-001 |
sawcutting of concrete/asphalt driveways and turnouts
(full depth) |
480   |
LNFT |
2.00 |
960.00 |
7.00 |
3,360.00 |
8.00 |
3,840.00 |
|
|
| S-002 |
cleaning existing ditches
|
1,000   |
LNFT |
3.00 |
3,000.00 |
3.25 |
3,250.00 |
12.00 |
12,000.00 |
|
|
| S-003 |
surface preparation
|
lump |
LUMP |
7,500.00 |
7,500.00 |
11,500.00 |
11,500.00 |
5,000.00 |
5,000.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
2,192,000.00 |
|
2,305,218.20 |
|
2,544,529.70 |
|
|
|