Letting of 12/12/2007 LA DOTD Headquarters


 
go back
Go Back
 
Lead Project: 846-03-0013
Parish: ST HELENA
Routes: LA 1042
Description: .14 MILE WEST OF SPRING CREEK - JCT. LA 43
Type Const: drainage structures, pavement patching, in-place cement treated base course, surface
preparation, superpave asphaltic concrete overlay, and related work
Estimated Construction Cost: $2,664,593.80
 
RankLicenseBidderConstruction Bid
1 06276 BARRIERE CONSTRUCTION CO., LLC. $2,192,000.00
2 12487 DIAMOND B CONSTRUCTION CO., L.L.C. $2,305,218.20
3 00849 F.G. SULLIVAN, JR. CONTRACTOR LLC $2,544,529.70
 
Item Number Item Description Quantity Unit of Measure - 1 -
BARRIERE CONSTRUCTION CO., LLC.
- 2 -
DIAMOND B CONSTRUCTION CO., L.L.C.
- 3 -
F.G. SULLIVAN, JR. CONTRACTOR LLC

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-H removal of guard rail 554      LNFT 5.00 2,770.00 19.00 10,526.00 10.00 5,540.00    
202-02-I removal of surfacing 401      SQYD 20.00 8,020.00 25.00 10,025.00 25.00 10,025.00    
202-02-J removal of wingwalls 8      EACH 550.00 4,400.00 525.00 4,200.00 250.00 2,000.00    
203-07 borrow (vehicular measurement) 2,742      CUYD 10.00 27,420.00 16.00 43,872.00 20.00 54,840.00    
203-07-A borrow (vehicular meas.)(selected soils) 2,241      CUYD 10.00 22,410.00 17.50 39,217.50 5.00 11,205.00    
204-02 temporary hay or straw bales 100      EACH 10.00 1,000.00 11.00 1,100.00 10.00 1,000.00    
204-06 temporary silt fencing 10,876      LNFT 1.00 10,876.00 1.40 15,226.40 1.40 15,226.40    
308-01-A in-place cement treated base course (12" thick) 80,867      SQYD 5.00 404,335.00 5.65 456,898.55 6.00 485,202.00    
308-02 removal of existing patches 1,740      SQYD 0.50 870.00 9.00 15,660.00 0.10 174.00    
502-01 superpave asphaltic concrete 15,302.3    TON 70.00 1,071,161.00 68.00 1,040,556.40 70.00 1,071,161.00    
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
830.9    TON 70.00 58,163.00 143.00 118,818.70 150.00 124,635.00    
510-01-B pavement patching (12" minimum thickness) 65      SQYD 60.00 3,900.00 100.00 6,500.00 160.00 10,400.00    
702-04-A adjusting manholes 2      EACH 200.00 400.00 1,000.00 2,000.00 200.00 400.00    
704-01-A guard rail (single thrie beam)(3'-1 1/2" post spacing) 400.0    LNFT 60.00 24,000.00 37.50 15,000.00 32.00 12,800.00    
704-01-B guard rail (single thrie beam)(6'-3" post spacing) 274.0    LNFT 45.00 12,330.00 50.00 13,700.00 48.00 13,152.00    
704-03 blocked out guard rail 200.0    LNFT 20.00 4,000.00 18.50 3,700.00 19.00 3,800.00    
704-11-A guard rail end treatment (flared) 20      EACH 2,200.00 44,000.00 2,100.00 42,000.00 2,000.00 40,000.00    
711-03-C riprap (30 lb) 11.7    TON 110.00 1,287.00 105.00 1,228.50 175.00 2,047.50    
713-01 temporary signs & barricades lump      LUMP 60,000.00 60,000.00 36,000.00 36,000.00 99,900.00 99,900.00    
713-02-E temporary pavement markings (24" width) 99      LNFT 1.00 99.00 0.65 64.35 0.50 49.50    
713-03-A temporary pavement markings (broken line)(4" width)(4'
length)
5.280  MILE 1.00 5.28 145.00 765.60 500.00 2,640.00    
713-03-B temporary pavement markings (broken line)(4" width)
(10' length)
5.280  MILE 1.00 5.28 300.00 1,584.00 10.00 52.80    
713-04-A temporary pavement markings (solid line)(4" width) 61.950  MILE 1.00 61.95 575.00 35,621.25 10.00 619.50    
722-01 project site laboratory 1      EACH 667.39 667.39 13,000.00 13,000.00 3,000.00 3,000.00    
726-01 bedding material 14.0    CUYD 75.00 1,050.00 110.00 1,540.00 150.00 2,100.00    
727-01 mobilization lump      LUMP 167,000.00 167,000.00 128,000.00 128,000.00 194,700.00 194,700.00    
729-16-C object marker assembly (type 3) 60      EACH 80.00 4,800.00 75.00 4,500.00 70.00 4,200.00    
731-02 reflectorized raised pavement markers 767      EACH 6.00 4,602.00 5.00 3,835.00 6.00 4,602.00    
732-01-E plastic pavement striping (24" width) 33      LNFT 3.40 112.20 3.25 107.25 4.00 132.00    
732-02-A plastic pavement striping (solid line) (4" width) 20.671  MILE 2,400.00 49,610.40 2,200.00 45,476.20 3,000.00 62,013.00    
732-03-A plastic pavement striping (broken line)(4" width) 1.760  MILE 650.00 1,144.00 750.00 1,320.00 1,000.00 1,760.00    
735-01 mailboxes 53      EACH 2.00 106.00 1.00 53.00 5.00 265.00    
735-02 mailbox supports (single) 53      EACH 110.00 5,830.00 110.00 5,830.00 140.00 7,420.00    
739-01 hydro-seeding 9.85   ACRE 1,000.00 9,850.00 1,000.00 9,850.00 1,100.00 10,835.00    
740-01 construction layout lump      LUMP 25,000.00 25,000.00 17,500.00 17,500.00 50,000.00 50,000.00    
805-01-B class a concrete (box culvert headwalls) 56.22   CUYD 1,600.00 89,952.00 1,500.00 84,330.00 1,600.00 89,952.00    
805-12-E reinforced concrete box culverts (4'x 4') 44.0    LNFT 800.00 35,200.00 775.00 34,100.00 2,100.00 92,400.00    
805-12-F reinforced concrete box culverts (5'x 4') 14.0    LNFT 1,000.00 14,000.00 950.00 13,300.00 2,100.00 29,400.00    
806-01 deformed reinforcing steel 4,041      LB 2.50 10,102.50 2.50 10,102.50 1.00 4,041.00    
S-001 sawcutting of concrete/asphalt driveways and turnouts
(full depth)
480      LNFT 2.00 960.00 7.00 3,360.00 8.00 3,840.00    
S-002 cleaning existing ditches 1,000      LNFT 3.00 3,000.00 3.25 3,250.00 12.00 12,000.00    
S-003 surface preparation lump      LUMP 7,500.00 7,500.00 11,500.00 11,500.00 5,000.00 5,000.00    
                       
 CONTRACTOR TOTAL       2,192,000.00   2,305,218.20   2,544,529.70    