Letting of 12/12/2007 LA DOTD Headquarters


 
go back
Go Back
 
Lead Project: 823-02-0027
Parish: IBERIA
Routes: LA 675
Description: US 90 (NB) @ LA 675 INTERCHANGE - LA 674 (ADMIRAL DOYLE)
Type Const: cold planing, in-place stabalized base course, superpave asphaltic concrete overlay,
pavement patching and related work.
Estimated Construction Cost: $2,381,072.10
 
RankLicenseBidderConstruction Bid
1 04089 H & S CONSTRUCTION CO., INC. $2,140,387.79
 
Item Number Item Description Quantity Unit of Measure - 1 -
H & S CONSTRUCTION CO., INC.

 

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-D removal of concrete walks & drives 116      SQYD 12.00 1,392.00            
202-02-I removal of existing asphaltic base 322      SQYD 18.00 5,796.00            
203-07 borrow (vehicular measurement) 861      CUYD 12.00 10,332.00            
203-07-A borrow (vehicular meas.)(selected soils) 550      CUYD 14.00 7,700.00            
204-05-A temporary sediment check dams (hay) 7      EACH 135.00 945.00            
303-01-B in-place cement stabilized base course (8 1/2" thick) 38,795      SQYD 6.75 261,866.25            
401-02 aggregate surface course (adjusted vehicular
measurement)
77      CUYD 78.00 6,006.00            
502-01 superpave asphaltic concrete 12,991.7    TON 82.00 1,065,319.40            
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
653.3    TON 130.00 84,929.00            
509-01 cold planing asphaltic pavement 31,001      SQYD 2.50 77,502.50            
509-02 contractor retained reclaimed asphaltic pavement - 1,742      CUYD 0.01 - 17.42            
510-01-B pavement patching (12" minimum thickness) 281      SQYD 105.00 29,505.00            
704-01-B guard rail (single thrie beam)(6'-3" post spacing) 120.0    LNFT 39.00 4,680.00            
704-03 blocked out guard rail 172.0    LNFT 22.00 3,784.00            
704-08-B guard rail transitions (double thrie beam) 100.0    LNFT 65.00 6,500.00            
704-11-B guard rail end treatment (tangent) 4      EACH 2,888.00 11,552.00            
706-02-C concrete drive (6" thick) 50.0    SQYD 85.00 4,250.00            
711-01-E riprap (130 lb, 14" thick) 100      SQYD 100.00 10,000.00            
711-04 geotextile fabric 100      SQYD 6.00 600.00            
713-01 temporary signs & barricades lump      LUMP 75,000.00 75,000.00            
713-02-A temporary pavement markings (4" width) 3,684      LNFT 0.12 442.08            
713-02-C temporary pavement markings (8" width) 123      LNFT 0.24 29.52            
713-02-E temporary pavement markings (24" width) 396      LNFT 1.02 403.92            
713-03-A temporary pavement markings (broken line)(4" width)(4'
length)
14.145  MILE 455.40 6,441.63            
713-03-B temporary pavement markings (broken line)(4" width)
(10' length)
12.135  MILE 375.00 4,550.63            
713-04-A temporary pavement markings (solid line)(4" width) 26.985  MILE 570.00 15,381.45            
713-05-A temporary pavement legends and symbols (arrow) 6      EACH 60.00 360.00            
713-05-B temporary pavement legends and symbols (double arrow) 39      EACH 66.00 2,574.00            
722-02 project site laboratory (equipped) 1      EACH 4,500.00 4,500.00            
726-01 bedding material 100.0    CUYD 100.00 10,000.00            
727-01 mobilization lump      LUMP 120,000.00 120,000.00            
729-16-B object marker assembly (type 2) 4      EACH 85.00 340.00            
731-02 reflectorized raised pavement markers 730      EACH 6.12 4,467.60            
732-01-A plastic pavement striping (4" width) 1,228      LNFT 0.48 589.44            
732-01-C plastic pavement striping (8" width) 41      LNFT 1.02 41.82            
732-01-E plastic pavement striping (24" width) 132      LNFT 4.50 594.00            
732-02-A plastic pavement striping (solid line) (4" width) 8.995  MILE 3,131.00 28,163.35            
732-03-A plastic pavement striping (broken line)(4" width) 4.045  MILE 816.00 3,300.72            
732-04-A plastic pavement legends & symbols (arrow) 2      EACH 235.00 470.00            
732-04-B plastic pavement legends & symbols (double arrow) 13      EACH 270.00 3,510.00            
732-05 removal of existing markings 0.538  MILE 6,900.00 3,712.20            
735-01 mailboxes 26      EACH 1.20 31.20            
735-02 mailbox supports (single) 16      EACH 150.00 2,400.00            
735-03 mailbox supports (double) 1      EACH 210.00 210.00            
735-04 mailbox supports (multiple) 2      EACH 391.00 782.00            
740-01 construction layout lump      LUMP 8,500.00 8,500.00            
805-01-B class a concrete (box culvert headwalls) 71.22   CUYD 1,200.00 85,464.00            
805-12-I reinforced concrete box culverts (5'x 5') 80.0    LNFT 850.00 68,000.00            
806-01 deformed reinforcing steel 4,500      LB 2.50 11,250.00            
S-001 cement treatment (10" thick) 20,050      SQYD 4.20 84,210.00            
S-002 full depth sawcutting of existing portland cement
concrete drives
1,158      INFT 1.75 2,026.50            
                       
 CONTRACTOR TOTAL       2,140,387.79            