Letting of 12/12/2007 LA DOTD Headquarters


 
go back
Go Back
 
Lead Project: 452-90-0125
Parish: TANGIPAHOA
Routes: I-55
Description: LA 10 - JUNCTION LA 1049
Type Const: grading, drain struct, class ii bc, pvmt patch, cold planing asph pvmt, rubblizing
pccp,superpave acp and related work.
Estimated Construction Cost: $25,484,652.99
 
RankLicenseBidderConstruction Bid
1 12487 DIAMOND B CONSTRUCTION CO., L.L.C. $19,101,462.47
2 06276 BARRIERE CONSTRUCTION CO., LLC. $19,774,136.47
3 10989 DICKERSON & BOWEN, INC. $28,612,933.17
 
Item Number Item Description Quantity Unit of Measure - 1 -
DIAMOND B CONSTRUCTION CO., L.L.C.
- 2 -
BARRIERE CONSTRUCTION CO., LLC.
- 3 -
DICKERSON & BOWEN, INC.

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 500,000.00 500,000.00 300,000.00 300,000.00 950,000.00 950,000.00    
202-02-C removal of portland cement concrete pavement 984      SQYD 21.00 20,664.00 12.00 11,808.00 25.67 25,259.28    
202-02-G removal of surfacing & stabilized base 18,641.9    SQYD 1.85 34,487.52 3.00 55,925.70 2.37 44,181.30    
202-02-H removal of guard rail 5,411      LNFT 12.00 64,932.00 3.00 16,233.00 3.48 18,830.28    
202-02-K removal of asphalt curb 4,088      LNFT 1.00 4,088.00 2.00 8,176.00 1.35 5,518.80    
202-02-L removal of incidental asphalt pavement 614      SQYD 4.50 2,763.00 8.00 4,912.00 17.42 10,695.88    
203-01-A general excavation (plan quantity measurement) 5,000      CUYD 7.50 37,500.00 12.00 60,000.00 22.98 114,900.00    
203-04-A embankment (plan quantity measurement) 100,000      CUYD 14.50 1,450,000.00 17.00 1,700,000.00 21.67 2,167,000.00    
204-02 temporary baled hay or straw 500      EACH 9.00 4,500.00 11.00 5,500.00 9.01 4,505.00    
204-06 temporary silt fencing 2,000      LNFT 6.50 13,000.00 3.00 6,000.00 1.70 3,400.00    
302-02-F class ii base course (12" thick) 11,268.8    SQYD 30.00 338,064.00 23.40 263,689.92 35.07 395,196.82    
401-02 aggregate surface course (adjusted vehicular
measurement)
700      CUYD 22.00 15,400.00 90.00 63,000.00 69.02 48,314.00    
402-01 traffic maintenance aggregate (vehicular measurement) 500.0    CUYD 12.00 6,000.00 50.00 25,000.00 29.03 14,515.00    
502-01 superpave asphaltic concrete 198,462.5    TON 60.50 12,006,981.25 62.50 12,403,906.25 94.64 18,782,491.00    
509-01-A cold planing asphaltic pavement (2"thick) 47,326      SQYD 2.60 123,047.60 1.00 47,326.00 1.63 77,141.38    
509-01-B cold planing asphaltic pavement (3.85" avg. thick) 77,670      SQYD 1.90 147,573.00 2.40 186,408.00 1.77 137,475.90    
509-01-C cold planing asphaltic pavement (4" thick) 8,255      SQYD 2.75 22,701.25 4.00 33,020.00 2.32 19,151.60    
509-02 contractor retained reclaimed asphaltic pavement - 8,936      CUYD 0.10 - 893.60 0.10 - 893.60 0.10 - 893.60    
510-01-A pavement patching (6" minimum thickness) 5,000      SQYD 1.00 5,000.00 12.00 60,000.00 34.76 173,800.00    
510-01-B pavement patching (12" minimum thickness) 10,000      SQYD 1.00 10,000.00 16.00 160,000.00 64.38 643,800.00    
602-02-A cleaning and resealing existing longitudinal joints 20,032      LNFT 1.85 37,059.20 1.60 32,051.20 1.86 37,259.52    
602-02-B cleaning and resealing existing transverse joints 20,684      LNFT 2.25 46,539.00 1.60 33,094.40 2.12 43,850.08    
602-03 cleaning and sealing random cracks 13,000      LNFT 3.00 39,000.00 2.60 33,800.00 2.92 37,960.00    
602-04 full depth corner patching of jointed concrete
pavement
100.0    SQYD 325.00 32,500.00 320.00 32,000.00 334.06 33,406.00    
602-05-I-02 full depth patching of jointed concrete pavement
(16.1 sq yds to 48.0 sq yds)
340.0    SQYD 190.00 64,600.00 220.00 74,800.00 190.89 64,902.60    
602-11 removal of existing shoulder underdrain systems 77,567      LNFT 2.15 166,769.05 1.00 77,567.00 3.66 283,895.22    
701-15 concrete collars 12      EACH 700.00 8,400.00 1,000.00 12,000.00 689.33 8,271.96    
702-04-B adjusting catch basins 13      EACH 1,250.00 16,250.00 1,500.00 19,500.00 1,272.60 16,543.80    
702-07-A cross drain safety end (type 3      EACH 2,300.00 6,900.00 3,000.00 9,000.00 2,386.13 7,158.39    
703-01 shoulder underdrains systems 78,067      LNFT 4.00 312,268.00 8.00 624,536.00 4.38 341,933.46    
703-02 shoulder outlet underdrains 170      EACH 590.00 100,300.00 300.00 51,000.00 556.76 94,649.20    
704-01-A guard rail (single thrie beam)(3'-1 1/2" post spacing) 125.0    LNFT 31.00 3,875.00 32.00 4,000.00 31.82 3,977.50    
704-01-B guard rail (single thrie beam)(6'-3" post spacing) 2,012.5    LNFT 31.00 62,387.50 32.00 64,400.00 31.82 64,037.75    
704-03 blocked out guard rail 3,112.5    LNFT 20.00 62,250.00 19.00 59,137.50 19.62 61,067.25    
704-06-A guard rail anchor sections (trailing end)(single thrie
beam)
37.5    LNFT 90.00 3,375.00 90.00 3,375.00 90.14 3,380.25    
704-08-B guard rail transitions (double thrie beam) 400.0    LNFT 60.00 24,000.00 60.00 24,000.00 58.33 23,332.00    
704-11-A guard rail end treatment (flared) 22      EACH 2,000.00 44,000.00 2,000.00 44,000.00 2,014.95 44,328.90    
706-03-A incidental concrete paving (4" thick) 1,305.6    SQYD 50.00 65,280.00 50.00 65,280.00 51.17 66,807.55    
710-01 flowable fill 100      CUYD 130.00 13,000.00 150.00 15,000.00 219.14 21,914.00    
711-01-C riprap (30 lb,1 foot) 307      SQYD 80.00 24,560.00 120.00 36,840.00 79.54 24,418.78    
712-01-A concrete cast-in-place revetment ( 4" thick) 487      SQYD 60.00 29,220.00 55.00 26,785.00 62.04 30,213.48    
713-01 temporary signs & barricades lump      LUMP 400,000.00 400,000.00 380,000.00 380,000.00 208,000.00 208,000.00    
713-02-C temporary pavement markings (8" width) 750      LNFT 0.40 300.00 0.40 300.00 0.37 277.50    
713-02-E temporary pavement markings (24" width) 100      LNFT 1.00 100.00 1.00 100.00 1.00 100.00    
713-03-A temporary pavement markings (broken line)(4" width)(4'
length)
43.720  MILE 130.00 5,683.60 370.00 16,176.40 253.21 11,070.34    
713-04-A temporary pavement markings (solid line)(4" width) 193.388  MILE 900.00 174,049.20 800.00 154,710.40 837.80 162,020.47    
713-04-A-01 temporary pavement markings (solid line)(4" width)
(type 1 removable)
1.252  MILE 16,000.00 20,032.00 17,000.00 21,284.00 16,490.78 20,646.46    
713-08 temporary precast barrier (dotd furnished) 30      EACH 75.00 2,250.00 1,000.00 30,000.00 586.05 17,581.50    
720-01-A erosion control system, slope protection (type a) 150,000      SQYD 1.10 165,000.00 0.20 30,000.00 1.06 159,000.00    
720-01-D erosion control sysyem, flexible channel liner (type d) 250      SQYD 1.75 437.50 3.00 750.00 1.75 437.50    
721-01 mowing 264.0    ACRE 60.00 15,840.00 170.00 44,880.00 102.67 27,104.88    
727-01 mobilization lump      LUMP 835,000.00 835,000.00 740,000.00 740,000.00 905,000.00 905,000.00    
729-16-B object marker assembly(type b) 94      EACH 62.00 5,828.00 65.00 6,110.00 63.63 5,981.22    
729-16-C object marker assembly(type c) 24      EACH 77.00 1,848.00 80.00 1,920.00 79.54 1,908.96    
731-01 nonreflectorized raised pavement markers 169      EACH 16.00 2,704.00 20.00 3,380.00 15.91 2,688.79    
731-02 reflectorized raised pavement markers 2,000      EACH 6.00 12,000.00 6.00 12,000.00 5.83 11,660.00    
732-02-A plastic pavement striping (solid line) (4" width) 32.261  MILE 3,000.00 96,783.00 2,800.00 90,330.80 2,916.38 94,085.34    
732-02-C plastic pavement striping (solid line) (8" width) 1.515  MILE 6,200.00 9,393.00 6,000.00 9,090.00 6,256.95 9,479.28    
732-02-E plastic pavement striping (solid line) (24" width) 0.227  MILE 18,500.00 4,199.50 18,000.00 4,086.00 18,982.95 4,309.13    
732-03-A-01 plastic pavement striping (broken line)(4" width)
(marking tape performed type v)
8.200  MILE 4,700.00 38,540.00 4,600.00 37,720.00 4,772.25 39,132.45    
732-04-A plastic pavement legends & symbols (arrow) 6      EACH 210.00 1,260.00 400.00 2,400.00 206.80 1,240.80    
732-05 removal of existing markings 7.332  MILE 6,200.00 45,458.40 6,400.00 46,924.80 6,256.95 45,875.96    
734-01 rubblizing portland cement concrete pavement 198,435      SQYD 3.04 603,242.40 3.30 654,835.50 4.00 793,740.00    
739-01 hydro-seeding 76.00   ACRE 1,000.00 76,000.00 1,000.00 76,000.00 954.45 72,538.20    
740-01 construction layout lump      LUMP 100,000.00 100,000.00 130,000.00 130,000.00 520,000.00 520,000.00    
S-001 rumble strips (ground-in) 29.1    MILE 475.00 13,822.50 610.00 17,751.00 713.10 20,751.21    
S-002 milling concrete pavement 9,338      SQYD 8.00 74,704.00 5.00 46,690.00 4.32 40,340.16    
S-003 concrete apron 38      EACH 800.00 30,400.00 1,000.00 38,000.00 795.38 30,224.44    
S-004 exposing existing pipe (size varies) 148      LNFT 21.00 3,108.00 100.00 14,800.00 21.21 3,139.08    
S-005 remove and relocate sign posts and footings 48      EACH 900.00 43,200.00 1,000.00 48,000.00 927.94 44,541.12    
S-006 traffic maintenance superpave asphaltic concrete 500.0    TON 86.00 43,000.00 130.00 65,000.00 119.62 59,810.00    
S-007 dynamic message sign unit 4      each 11,000.00 44,000.00 27,000.00 108,000.00 26,424.13 105,696.52    
S-008 surface preparation lump      LUMP 38,300.00 38,300.00 30,000.00 30,000.00 18,377.83 18,377.83    
S-009 adjusting guard rail 2,243.5    LNFT 12.00 26,922.00 12.00 26,922.00 12.20 27,370.70    
S-922 sawing and sealing longitudinal joints in asphaltic
concrete overlay
53,930      LNFT 1.30 70,109.00 1.70 91,681.00 1.80 97,074.00    
S-923 sawing and sealing transverse joints in asphaltic
concrete overlay
11,736      LNFT 1.60 18,777.60 1.70 19,951.20 1.80 21,124.80    
S-927 sawcuts in asphaltic concrete lifts 110,830      LNFT 1.00 110,830.00 0.20 22,166.00 0.74 82,014.20    
                       
 CONTRACTOR TOTAL       19,101,462.47   19,774,136.47   28,612,933.17    