February 06, 2014 Error processing SSI file

Letting of 12/12/2007 LA DOTD Headquarters


REBID
go back
Go Back
 
Lead Project: 450-90-0213
Parish: ORLEANS
Routes: I-10
Description: I-10 IMPROVEMENTS (DWYER ROAD-MORRISON)
Type Const: grading, drainage structures, fencing, landscaping, concrete barrier wall and related
work
Estimated Construction Cost: $1,323,666.00
 
RankLicenseBidderConstruction Bid
1 38610 THREE C'S PROPERTIES INC $1,478,001.00
2 40038 COMMAND CONSTRUCTION LLC $1,478,366.50
3 45210 CERES ENVIRONMENTAL SERVICES,INC. $1,521,249.50
4 24901 HARD ROCK CONSTRUCTION CO. $1,687,941.00
5 02179 BOH BROS. CONSTRUCTION CO., LLC. $1,689,818.00
6 06276 BARRIERE CONSTRUCTION CO., LLC. $1,838,263.00
 40871 MDI CONSTRUCTION LLC IRREGULAR
 
Item Number Item Description Quantity Unit of Measure - 1 -
THREE C'S PROPERTIES INC
- 2 -
COMMAND CONSTRUCTION LLC
- 3 -
CERES ENVIRONMENTAL SERVICES,INC.
- 4 -
HARD ROCK CONSTRUCTION CO.
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 22,365.00 22,365.00 110,000.00 110,000.00 25,000.00 25,000.00 50,000.00 50,000.00
202-01 removal of structures & obstructions lump      LUMP 15,445.00 15,445.00 1,000.00 1,000.00 126,250.00 126,250.00 50,000.00 50,000.00
203-02 drainage excavation 200      CUYD 20.47 4,094.00 10.00 2,000.00 12.50 2,500.00 20.00 4,000.00
203-07 borrow (vehicular measurement) 2,400      CUYD 21.50 51,600.00 40.00 96,000.00 21.25 51,000.00 25.00 60,000.00
204-06 temporary silt fencing 202      LNFT 3.50 707.00 3.00 606.00 5.00 1,010.00 1.00 202.00
701-01-F-01 cross drain pipe (15" rcp) 26      LNFT 215.00 5,590.00 120.00 3,120.00 90.00 2,340.00 300.00 7,800.00
701-05-O side drain pipe (48") 1,868      LNFT 210.00 392,280.00 250.00 467,000.00 227.50 424,970.00 300.00 560,400.00
701-14 cleaning existing pipes 580      LNFT 7.40 4,292.00 6.00 3,480.00 13.75 7,975.00 7.00 4,060.00
702-01 junction boxes 1      EACH 5,100.00 5,100.00 7,500.00 7,500.00 4,125.00 4,125.00 7,000.00 7,000.00
702-03-B catch basins (cb-02) 13      EACH 4,240.00 55,120.00 7,000.00 91,000.00 3,750.00 48,750.00 5,000.00 65,000.00
705-06-B chain link fence (5-foot height) 585      LNFT 31.00 18,135.00 20.00 11,700.00 27.50 16,087.50 15.00 8,775.00
705-06-B-01 chain link fence (5-foot height)(structure mounted) 1,388      LNFT 33.30 46,220.40 25.00 34,700.00 32.50 45,110.00 20.00 27,760.00
706-03-A incidental concrete paving (4" thick) 930.0    SQYD 55.00 51,150.00 40.00 37,200.00 68.75 63,937.50 55.00 51,150.00
711-04 geotextile fabric 1,950      SQYD 1.80 3,510.00 2.00 3,900.00 3.75 7,312.50 1.00 1,950.00
713-01 temporary signs & barricades lump      LUMP 61,990.00 61,990.00 40,000.00 40,000.00 35,000.00 35,000.00 50,000.00 50,000.00
717-01 seeding 40      LB 4.60 184.00 4.00 160.00 25.00 1,000.00 4.00 160.00
718-01 fertilizer 1,334      LB 0.75 1,000.50 0.75 1,000.50 2.50 3,335.00 1.00 1,334.00
719-01-A plants (lomandra longifolia "breeze" 12" minimum
height,4" pot well rooted)
8,000      EACH 6.00 48,000.00 4.00 32,000.00 6.25 50,000.00 5.00 40,000.00
719-02 top dressing mulch (3" depth) 6,500      SQYD 6.30 40,950.00 4.00 26,000.00 20.00 130,000.00 5.50 35,750.00
726-01 bedding material 500.0    CUYD 59.10 29,550.00 150.00 75,000.00 81.25 40,625.00 100.00 50,000.00
727-01 mobilization lump      LUMP 141,700.90 141,700.90 150,000.00 150,000.00 187,500.00 187,500.00 215,000.00 215,000.00
733-01-B concrete roadway barrier (32") 1,388.0    LNFT 294.40 408,627.20 200.00 277,600.00 112.50 156,150.00 250.00 347,000.00
740-01 construction layout lump      LUMP 34,450.00 34,450.00 1,000.00 1,000.00 62,500.00 62,500.00 25,000.00 25,000.00
S-001 cleaning existing ditches 400      LNFT 16.15 6,460.00 5.00 2,000.00 10.00 4,000.00 20.00 8,000.00
S-002 special surface finish 4,400      LNFT 6.70 29,480.00 1.00 4,400.00 5.63 24,772.00 4.00 17,600.00
                       
 CONTRACTOR TOTAL       1,478,001.00   1,478,366.50   1,521,249.50   1,687,941.00
 
Item Number Item Description Quantity Unit of Measure - 5 -
BOH BROS. CONSTRUCTION CO., LLC.
- 6 -
BARRIERE CONSTRUCTION CO., LLC.

MDI CONSTRUCTION LLC

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 20,000.00 20,000.00 25,000.00 25,000.00 50,000.00 50,000.00    
202-01 removal of structures & obstructions lump      LUMP 5,000.00 5,000.00 10,000.00 10,000.00 10,000.00 10,000.00    
203-02 drainage excavation 200      CUYD 30.00 6,000.00 30.00 6,000.00 500.00 100,000.00    
203-07 borrow (vehicular measurement) 2,400      CUYD 30.00 72,000.00 18.00 43,200.00 12.00 28,800.00    
204-06 temporary silt fencing 202      LNFT 5.00 1,010.00 6.00 1,212.00 2.00 404.00    
701-01-F-01 cross drain pipe (15" rcp) 26      LNFT 130.00 3,380.00 190.00 4,940.00 150.00 3,900.00    
701-05-O side drain pipe (48") 1,868      LNFT 250.00 467,000.00 270.00 504,360.00 198.00 369,864.00    
701-14 cleaning existing pipes 580      LNFT 30.00 17,400.00 15.00 8,700.00 7.00 4,060.00    
702-01 junction boxes 1      EACH 5,000.00 5,000.00 6,000.00 6,000.00 5,000.00 5,000.00    
702-03-B catch basins (cb-02) 13      EACH 4,000.00 52,000.00 5,000.00 65,000.00 3,009.00 39,117.00    
705-06-B chain link fence (5-foot height) 585      LNFT 20.00 11,700.00 21.00 12,285.00 31.00 18,135.00    
705-06-B-01 chain link fence (5-foot height)(structure mounted) 1,388      LNFT 30.00 41,640.00 24.00 33,312.00 32.00 44,416.00    
706-03-A incidental concrete paving (4" thick) 930.0    SQYD 90.00 83,700.00 35.00 32,550.00 65.00 60,450.00    
711-04 geotextile fabric 1,950      SQYD 2.00 3,900.00 1.00 1,950.00 2.50 4,875.00    
713-01 temporary signs & barricades lump      LUMP 150,000.00 150,000.00 100,000.00 100,000.00 50,000.00 50,000.00    
717-01 seeding 40      LB 22.00 880.00 16.00 640.00 5.75 230.00    
718-01 fertilizer 1,334      LB 2.00 2,668.00 1.00 1,334.00 2.00 2,668.00    
719-01-A plants (lomandra longifolia "breeze" 12" minimum
height,4" pot well rooted)
8,000      EACH 5.50 44,000.00 8.50 68,000.00 4.60 36,800.00    
719-02 top dressing mulch (3" depth) 6,500      SQYD 10.00 65,000.00 4.00 26,000.00 2.30 14,950.00    
726-01 bedding material 500.0    CUYD 90.00 45,000.00 57.00 28,500.00 90.00 45,000.00    
727-01 mobilization lump      LUMP 150,000.00 150,000.00 170,000.00 170,000.00 82.00 82.00    
733-01-B concrete roadway barrier (32") 1,388.0    LNFT 280.00 388,640.00 460.00 638,480.00 200.35 278,085.80    
740-01 construction layout lump      LUMP 26,500.00 26,500.00 25,000.00 25,000.00 10,000.00 10,000.00    
S-001 cleaning existing ditches 400      LNFT 30.00 12,000.00 15.00 6,000.00 5.00 2,000.00    
S-002 special surface finish 4,400      LNFT 3.50 15,400.00 4.50 19,800.00 3.30 14,520.00    
                       
 CONTRACTOR TOTAL       1,689,818.00   1,838,263.00   IRREGULAR    