Letting of 12/12/2007 LA DOTD Headquarters


 
go back
Go Back
 
Lead Project: 424-04-0048
Parish: IBERIA
Routes: US 90
Description: LA 14 TO LA 83
Type Const: signing and related work.
Estimated Construction Cost: $614,489.80
 
RankLicenseBidderConstruction Bid
1 34068 ALPHA SERVICE AND PRODUCTS, INC. $670,708.70
2 45210 CERES ENVIRONMENTAL SERVICES,INC. $928,035.00
 
Item Number Item Description Quantity Unit of Measure - 1 -
ALPHA SERVICE AND PRODUCTS, INC.
- 2 -
CERES ENVIRONMENTAL SERVICES,INC.

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-I-01 removal of existing sign (type "a") 406      EACH 50.00 20,300.00 62.50 25,375.00        
202-02-I-03 removal of existing sign (type "d") 69      EACH 55.00 3,795.00 62.50 4,312.50        
202-02-J-01 removal of existing sign supports (2 1/2" dia.) 47      EACH 70.00 3,290.00 187.50 8,812.50        
202-02-J-02 removal of existing sign supports (3 1/2" dia.) 92      EACH 70.00 6,440.00 187.50 17,250.00        
202-02-J-05 removal of existing sign supports (s3 x 5.7) 4      EACH 125.00 500.00 187.50 750.00        
202-02-J-06 removal of existing sign supports (w6 x 12) 13      EACH 125.00 1,625.00 187.50 2,437.50        
202-02-J-10 removal of existing sign supports (misc. conn.) 5      EACH 100.00 500.00 187.50 937.50        
202-02-M removal of existing u-channel supports 183      EACH 30.00 5,490.00 31.25 5,718.75        
706-03-C incidental concrete paving (6" thick) 41.2    SQYD 70.00 2,884.00 75.00 3,090.00        
713-01 temporary signs & barricades lump      LUMP 25,000.00 25,000.00 12,500.00 12,500.00        
727-01 mobilization lump      LUMP 80,000.00 80,000.00 187,500.00 187,500.00        
729-01 sign (type a) 1,963.7    SQFT 17.00 33,382.90 25.00 49,092.50        
729-04 sign (type d) 5,241.9    SQFT 22.00 115,321.80 25.00 131,047.50        
729-05 sign (type e) 324.0    SQFT 27.00 8,748.00 28.75 9,315.00        
729-06 sign (overhead mounted) 206.5    SQFT 28.00 5,782.00 22.50 4,646.25        
729-08-A mounting (2 1/2" post) 28      EACH 650.00 18,200.00 625.00 17,500.00        
729-08-B mounting (3 1/2" post) 77      EACH 750.00 57,750.00 750.00 57,750.00        
729-08-C mounting (5" post) 34      EACH 1,020.00 34,680.00 1,000.00 34,000.00        
729-08-C-01 mounting (5" post)(structure) 4      EACH 1,140.00 4,560.00 1,250.00 5,000.00        
729-08-E mounting (s3 x 5.7) 30      EACH 750.00 22,500.00 562.50 16,875.00        
729-08-F mounting (w6 x 12) 76      EACH 850.00 64,600.00 1,062.50 80,750.00        
729-08-G mounting (w8 x 18) 8      EACH 1,250.00 10,000.00 1,500.00 12,000.00        
729-08-H mounting (w8 x 24) 32      EACH 1,865.00 59,680.00 2,125.00 68,000.00        
729-08-I mounting (w10 x 33) 8      EACH 2,150.00 17,200.00 3,000.00 24,000.00        
729-13 mounting (bridge fascia mounted) 2      EACH 7,000.00 14,000.00 4,000.00 8,000.00        
729-17 milepost assembly (ground mounted) 8      EACH 100.00 800.00 112.50 900.00        
729-18 milepost assembly (structure mounted) 4      EACH 100.00 400.00 437.50 1,750.00        
729-21 u-channel post 22      EACH 90.00 1,980.00 112.50 2,475.00        
740-01 construction layout lump      LUMP 10,000.00 10,000.00 68,750.00 68,750.00        
S-001 remove and remount logo panel 26      ea 50.00 1,300.00 250.00 6,500.00        
S-002 dynamic message sign unit 2      ea 10,000.00 20,000.00 26,250.00 52,500.00        
S-003 structural mounted support bracket for type "a" sign 4      ea 5,000.00 20,000.00 2,125.00 8,500.00        
                       
 CONTRACTOR TOTAL       670,708.70   928,035.00        

Error processing SSI file