Letting of 12/12/2007 LA DOTD Headquarters


 
go back
Go Back
 
Lead Project: 201-01-0011
Parish: JEFF DAVIS
Routes: LA 97
Description: LA 102 - ACADIA PARISH LINE
Type Const: grading, drainage structures, subgrade layer, class ii bc, portland cement concrete
pavement and related work.
Estimated Construction Cost: $3,277,067.02
 
RankLicenseBidderConstruction Bid
1 39462 DENTON-JAMES LLC $3,483,111.90
2 12312 GILCHRIST CONSTRUCTION CO. LLC $4,390,785.65
 
Item Number Item Description Quantity Unit of Measure - 1 -
DENTON-JAMES LLC
- 2 -
GILCHRIST CONSTRUCTION CO. LLC

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-01 removal of structures & obstructions lump      LUMP 100,000.00 100,000.00 100,000.00 100,000.00        
202-02-C removal of portland cement concrete pavement 11,810      SQYD 6.00 70,860.00 7.00 82,670.00        
202-02-D removal of concrete walks & drives 2,049      SQYD 10.00 20,490.00 9.00 18,441.00        
202-02-E removal of concrete curbs 7,650.5    LNFT 3.00 22,951.50 2.00 15,301.00        
202-02-I removal of existing trunklines 602      LNFT 20.00 12,040.00 28.00 16,856.00        
202-02-J removal of asphalt drives 653      SQYD 5.00 3,265.00 8.60 5,615.80        
203-05 excavation and embankment lump      LUMP 400,000.00 400,000.00 400,000.00 400,000.00        
204-02 temporary hay or straw bales 240      EACH 9.00 2,160.00 40.00 9,600.00        
204-05-A temporary sediment check dams (hay) 12      EACH 130.00 1,560.00 200.00 2,400.00        
204-06 temporary silt fencing 60      LNFT 4.00 240.00 10.00 600.00        
302-02-C class ii base course (8" thick) 14,742.3    SQYD 25.00 368,557.50 21.00 309,588.30        
305-01-D subgrade layer (12" thick) 14,742      SQYD 10.00 147,420.00 11.00 162,162.00        
402-01 traffic maintenance aggregate (vehicular measurement) 5,000.0    CUYD 60.00 300,000.00 56.00 280,000.00        
510-01-B pavement patching (12" minimum thickness) 131      SQYD 130.00 17,030.00 200.00 26,200.00        
601-01-G portland cement concrete pavement (8" thick) 13,692.3    SQYD 54.00 739,384.20 62.00 848,922.60        
701-03-F storm drain pipe (15" rcp/pcp) 291      LNFT 55.00 16,005.00 165.00 48,015.00        
701-03-G storm drain pipe (18" rcp/pcp) 936      LNFT 80.00 74,880.00 168.00 157,248.00        
701-03-I storm drain pipe (24" rcp/pcp) 196      LNFT 88.00 17,248.00 175.00 34,300.00        
701-03-K storm drain pipe (30" rcp/pcp) 68      LNFT 100.00 6,800.00 230.00 15,640.00        
701-05-I side drain pipe (24") 160      LNFT 72.00 11,520.00 100.00 16,000.00        
701-15 concrete collar 20      EACH 700.00 14,000.00 1,000.00 20,000.00        
702-03-A catch basins (cb-01) 5      EACH 3,000.00 15,000.00 3,300.00 16,500.00        
702-03-C catch basins (cb-06) 49      EACH 4,500.00 220,500.00 3,600.00 176,400.00        
702-04-A adjusting manholes 5      EACH 1,200.00 6,000.00 1,200.00 6,000.00        
703-02 shoulder outlet underdrains 7      EACH 500.00 3,500.00 1,000.00 7,000.00        
703-03 perforated pipe underdrains 9,000      LNFT 10.00 90,000.00 12.00 108,000.00        
703-06 underdrain video inspection 3,010      LNFT 2.50 7,525.00 6.00 18,060.00        
706-01-A concrete walk (4" thick) 19.4    SQYD 70.00 1,358.00 100.00 1,940.00        
706-02-C concrete drive (6" thick) 2,017.3    SQYD 52.00 104,899.60 78.00 157,349.40        
706-03-C incidental concrete paving (6" thick) 50.0    SQYD 75.00 3,750.00 100.00 5,000.00        
707-01 concrete curb 8,394.7    LNFT 5.00 41,973.50 10.00 83,947.00        
713-01 temporary signs & barricades lump      LUMP 100,000.00 100,000.00 450,000.00 450,000.00        
713-02-E temporary pavement markings (24" width) 84      LNFT 1.00 84.00 1.20 100.80        
713-03-A temporary pavement markings (broken line)(4" width)(4'
length)
0.855  MILE 800.00 684.00 1,200.00 1,026.00        
713-03-B temporary pavement markings (broken line)(4" width)
(10' length)
0.855  MILE 400.00 342.00 400.00 342.00        
713-04-A temporary pavement markings (solid line)(4" width) 2.083  MILE 500.00 1,041.50 550.00 1,145.65        
713-05-E temporary pavement legends and symbols (school
crossing)
1      EACH 200.00 200.00 230.00 230.00        
720-01-A erosion control system, slope protection (type a) 2,600      SQYD 1.30 3,380.00 1.50 3,900.00        
722-02 project site laboratory (equipped) 1      EACH 20,000.00 20,000.00 30,000.00 30,000.00        
726-01 bedding material 508.1    CUYD 80.00 40,648.00 90.00 45,729.00        
727-01 mobilization lump      LUMP 340,000.00 340,000.00 425,000.00 425,000.00        
731-02 reflectorized raised pavement markers 115      EACH 5.50 632.50 5.25 603.75        
732-01-E plastic pavement striping (24" width) 84      LNFT 4.00 336.00 4.00 336.00        
732-02-A plastic pavement striping (solid line) (4" width) 2.083  MILE 2,600.00 5,415.80 2,600.00 5,415.80        
732-03-A plastic pvmt striping (broken line)(4"width) 0.819  MILE 800.00 655.20 850.00 696.15        
732-04-E plastic pavement legends & symbols (school crossing) 1      EACH 430.00 430.00 500.00 500.00        
735-01 mailboxes 3      EACH 1.00 3.00 20.00 60.00        
735-02 mailbox supports (single) 3      EACH 250.00 750.00 150.00 450.00        
739-01 hydro-seeding 4.00   ACRE 1,200.00 4,800.00 1,200.00 4,800.00        
740-01 construction layout lump      LUMP 50,000.00 50,000.00 200,000.00 200,000.00        
741-11 adjusting water valve and meter box 3      EACH 800.00 2,400.00 300.00 900.00        
S-001 sawcuts in asphaltic concrete 2,994      INFT 0.80 2,395.20 1.70 5,089.80        
S-002 sawcuts in concrete pavement 8,634      INFT 1.10 9,497.40 1.90 16,404.60        
S-003 paved gutter drains 7      EACH 2,500.00 17,500.00 4,000.00 28,000.00        
S-004 adjusting sewer blowouts 1      EACH 1,000.00 1,000.00 300.00 300.00        
S-005 dynamic message sign unit 2      EACH 20,000.00 40,000.00 10,000.00 20,000.00        
                       
 CONTRACTOR TOTAL       3,483,111.90   4,390,785.65        