| 201-01 |
clearing & grubbing
|
lump |
LUMP |
4,000.00 |
4,000.00 |
25,000.00 |
25,000.00 |
5,000.00 |
5,000.00 |
5,000.00 |
5,000.00 |
| 202-01 |
removal of structures and obstructions
|
lump |
LUMP |
1,000.00 |
1,000.00 |
25,000.00 |
25,000.00 |
2,000.00 |
2,000.00 |
5,000.00 |
5,000.00 |
| 202-02-A |
removal of bridges
|
1   |
EACH |
12,000.00 |
12,000.00 |
25,000.00 |
25,000.00 |
5,000.00 |
5,000.00 |
15,000.00 |
15,000.00 |
| 202-02-H |
removal of guard rail
|
540   |
LNFT |
5.00 |
2,700.00 |
4.00 |
2,160.00 |
3.50 |
1,890.00 |
5.00 |
2,700.00 |
| 203-02 |
drainage excavation
|
470   |
CUYD |
12.00 |
5,640.00 |
10.00 |
4,700.00 |
12.00 |
5,640.00 |
15.00 |
7,050.00 |
| 203-05 |
excavation and embankment
|
lump |
LUMP |
25,000.00 |
25,000.00 |
25,000.00 |
25,000.00 |
20,000.00 |
20,000.00 |
50,000.00 |
50,000.00 |
| 204-06 |
temporary silt fencing
|
351   |
LNFT |
3.00 |
1,053.00 |
2.50 |
877.50 |
3.00 |
1,053.00 |
1.00 |
351.00 |
| 302-02-B |
class ii base course (6" thick)
|
1,526.5 |
SQYD |
18.00 |
27,477.00 |
13.00 |
19,844.50 |
25.00 |
38,162.50 |
16.50 |
25,187.25 |
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
100.0 |
CUYD |
60.00 |
6,000.00 |
25.00 |
2,500.00 |
60.00 |
6,000.00 |
100.00 |
10,000.00 |
| 502-01 |
superpave asphaltic concrete
|
727.2 |
TON |
120.00 |
87,264.00 |
130.00 |
94,536.00 |
85.00 |
61,812.00 |
140.00 |
101,808.00 |
| 509-01 |
cold planing asphaltic pavement
|
749   |
SQYD |
15.00 |
11,235.00 |
10.00 |
7,490.00 |
2.25 |
1,685.25 |
12.00 |
8,988.00 |
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 18   |
CUYD |
5.00 |
- 90.00 |
1.00 |
- 18.00 |
5.00 |
- 90.00 |
1.00 |
- 18.00 |
| 704-03 |
blocked out guard rail
|
262.5 |
LNFT |
21.00 |
5,512.50 |
25.00 |
6,562.50 |
25.00 |
6,562.50 |
26.00 |
6,825.00 |
| 704-08-B |
guard rail transitions (double thrie beam)
|
100.0 |
LNFT |
55.00 |
5,500.00 |
67.00 |
6,700.00 |
60.00 |
6,000.00 |
70.00 |
7,000.00 |
| 704-11-A |
guard rail end treatment (flared)
|
4   |
EACH |
2,300.00 |
9,200.00 |
2,350.00 |
9,400.00 |
2,500.00 |
10,000.00 |
2,500.00 |
10,000.00 |
| 705-01 |
barbed wire fence
|
279   |
LNFT |
12.00 |
3,348.00 |
9.00 |
2,511.00 |
8.80 |
2,455.20 |
10.00 |
2,790.00 |
| 708-01 |
right-of-way monument
|
10   |
EACH |
150.00 |
1,500.00 |
200.00 |
2,000.00 |
225.00 |
2,250.00 |
300.00 |
3,000.00 |
| 708-02 |
right-of-way monument witness post
|
10   |
EACH |
200.00 |
2,000.00 |
200.00 |
2,000.00 |
225.00 |
2,250.00 |
300.00 |
3,000.00 |
| 712-04 |
flexible revetment
|
460   |
SQYD |
80.00 |
36,800.00 |
55.00 |
25,300.00 |
60.00 |
27,600.00 |
80.00 |
36,800.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
5,000.00 |
5,000.00 |
17,000.00 |
17,000.00 |
15,000.00 |
15,000.00 |
8,000.00 |
8,000.00 |
| 716-01-A |
mulch (vegetative)
|
0.81 |
ACRE |
2,000.00 |
1,620.00 |
1,000.00 |
810.00 |
750.00 |
607.50 |
3,000.00 |
2,430.00 |
| 717-01 |
seeding
|
24   |
LB |
20.00 |
480.00 |
11.00 |
264.00 |
7.50 |
180.00 |
30.00 |
720.00 |
| 718-01 |
fertilizer
|
810   |
LB |
2.00 |
1,620.00 |
1.00 |
810.00 |
0.60 |
486.00 |
1.00 |
810.00 |
| 720-01-A |
erosion control system, slope protection (type a)
|
375   |
SQYD |
5.00 |
1,875.00 |
2.50 |
937.50 |
1.50 |
562.50 |
3.00 |
1,125.00 |
| 722-02 |
project site laboratory (equipped)
|
1   |
EACH |
4,000.00 |
4,000.00 |
10,000.00 |
10,000.00 |
25,000.00 |
25,000.00 |
20,000.00 |
20,000.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
70,000.00 |
70,000.00 |
70,000.00 |
70,000.00 |
80,000.00 |
80,000.00 |
50,000.00 |
50,000.00 |
| 729-16-C |
object marker assembly (type 3)
|
4   |
EACH |
75.00 |
300.00 |
125.00 |
500.00 |
125.00 |
500.00 |
100.00 |
400.00 |
| 731-02 |
reflectorized raised pavement markers
|
21   |
EACH |
5.10 |
107.10 |
6.00 |
126.00 |
7.00 |
147.00 |
10.00 |
210.00 |
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
0.551 |
MILE |
2,650.00 |
1,460.15 |
3,000.00 |
1,653.00 |
2,500.00 |
1,377.50 |
3,200.00 |
1,763.20 |
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
0.054 |
MILE |
750.00 |
40.50 |
5,000.00 |
270.00 |
900.00 |
48.60 |
1,000.00 |
54.00 |
| 732-05 |
removal of existing markings
|
0.458 |
MILE |
5,700.00 |
2,610.60 |
6,500.00 |
2,977.00 |
4,700.00 |
2,152.60 |
15,000.00 |
6,870.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
8,000.00 |
8,000.00 |
15,000.00 |
15,000.00 |
30,000.00 |
30,000.00 |
8,000.00 |
8,000.00 |
| 804-01-B |
precast concrete piles (14")
|
1,752   |
LNFT |
58.00 |
101,616.00 |
60.00 |
105,120.00 |
60.00 |
105,120.00 |
85.00 |
148,920.00 |
| 804-12 |
loading permanent piles
|
1   |
EACH |
FREE |
FREE |
100.00 |
100.00 |
22,000.00 |
22,000.00 |
1.00 |
1.00 |
| 805-01-F |
class a concrete (bents)
|
45.00 |
CUYD |
1,100.00 |
49,500.00 |
755.00 |
33,975.00 |
800.00 |
36,000.00 |
1,000.00 |
45,000.00 |
| 805-03 |
class aa concrete
|
179.30 |
CUYD |
800.00 |
143,440.00 |
625.00 |
112,062.50 |
750.00 |
134,475.00 |
800.00 |
143,440.00 |
| 806-01 |
deformed reinforcing steel
|
40,132   |
LB |
1.00 |
40,132.00 |
0.90 |
36,118.80 |
1.50 |
60,198.00 |
2.00 |
80,264.00 |
| 810-01 |
concrete railing (barrier)
|
200.00 |
LNFT |
40.00 |
8,000.00 |
73.00 |
14,600.00 |
125.00 |
25,000.00 |
70.00 |
14,000.00 |
| 813-01 |
concrete approach slabs
|
182.22 |
SQYD |
230.00 |
41,910.60 |
225.00 |
40,999.50 |
185.00 |
33,710.70 |
200.00 |
36,444.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
728,851.45 |
|
749,886.80 |
|
777,835.85 |
|
868,932.45 |
|