Letting of 12/12/2007 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 090-01-0020
Parish: BOSSIER
Routes: LA 154
Description: CROSS BAYOU BRIDGE
Type Const: grading, cold planing asphaltic concrete pavement, superpave asphaltic concrete
pavement, bridge repairs, and related work.
Estimated Construction Cost: $888,413.28
 
RankLicenseBidderConstruction Bid
1 12136 SHILOH CONTRACTORS, INC. $728,851.45
2 28218 F. J. BURNELL, INC. $749,886.80
3 12135 BLOUNT BROS. CONSTRUCTION, INC. $777,835.85
4 18546 C W & W CONTRACTORS, INC. $868,932.45
 
Item Number Item Description Quantity Unit of Measure - 1 -
SHILOH CONTRACTORS, INC.
- 2 -
F. J. BURNELL, INC.
- 3 -
BLOUNT BROS. CONSTRUCTION, INC.
- 4 -
C W & W CONTRACTORS, INC.
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 4,000.00 4,000.00 25,000.00 25,000.00 5,000.00 5,000.00 5,000.00 5,000.00
202-01 removal of structures and obstructions lump      LUMP 1,000.00 1,000.00 25,000.00 25,000.00 2,000.00 2,000.00 5,000.00 5,000.00
202-02-A removal of bridges 1      EACH 12,000.00 12,000.00 25,000.00 25,000.00 5,000.00 5,000.00 15,000.00 15,000.00
202-02-H removal of guard rail 540      LNFT 5.00 2,700.00 4.00 2,160.00 3.50 1,890.00 5.00 2,700.00
203-02 drainage excavation 470      CUYD 12.00 5,640.00 10.00 4,700.00 12.00 5,640.00 15.00 7,050.00
203-05 excavation and embankment lump      LUMP 25,000.00 25,000.00 25,000.00 25,000.00 20,000.00 20,000.00 50,000.00 50,000.00
204-06 temporary silt fencing 351      LNFT 3.00 1,053.00 2.50 877.50 3.00 1,053.00 1.00 351.00
302-02-B class ii base course (6" thick) 1,526.5    SQYD 18.00 27,477.00 13.00 19,844.50 25.00 38,162.50 16.50 25,187.25
402-01 traffic maintenance aggregate (vehicular measurement) 100.0    CUYD 60.00 6,000.00 25.00 2,500.00 60.00 6,000.00 100.00 10,000.00
502-01 superpave asphaltic concrete 727.2    TON 120.00 87,264.00 130.00 94,536.00 85.00 61,812.00 140.00 101,808.00
509-01 cold planing asphaltic pavement 749      SQYD 15.00 11,235.00 10.00 7,490.00 2.25 1,685.25 12.00 8,988.00
509-02 contractor retained reclaimed asphaltic pavement - 18      CUYD 5.00 - 90.00 1.00 - 18.00 5.00 - 90.00 1.00 - 18.00
704-03 blocked out guard rail 262.5    LNFT 21.00 5,512.50 25.00 6,562.50 25.00 6,562.50 26.00 6,825.00
704-08-B guard rail transitions (double thrie beam) 100.0    LNFT 55.00 5,500.00 67.00 6,700.00 60.00 6,000.00 70.00 7,000.00
704-11-A guard rail end treatment (flared) 4      EACH 2,300.00 9,200.00 2,350.00 9,400.00 2,500.00 10,000.00 2,500.00 10,000.00
705-01 barbed wire fence 279      LNFT 12.00 3,348.00 9.00 2,511.00 8.80 2,455.20 10.00 2,790.00
708-01 right-of-way monument 10      EACH 150.00 1,500.00 200.00 2,000.00 225.00 2,250.00 300.00 3,000.00
708-02 right-of-way monument witness post 10      EACH 200.00 2,000.00 200.00 2,000.00 225.00 2,250.00 300.00 3,000.00
712-04 flexible revetment 460      SQYD 80.00 36,800.00 55.00 25,300.00 60.00 27,600.00 80.00 36,800.00
713-01 temporary signs & barricades lump      LUMP 5,000.00 5,000.00 17,000.00 17,000.00 15,000.00 15,000.00 8,000.00 8,000.00
716-01-A mulch (vegetative) 0.81   ACRE 2,000.00 1,620.00 1,000.00 810.00 750.00 607.50 3,000.00 2,430.00
717-01 seeding 24      LB 20.00 480.00 11.00 264.00 7.50 180.00 30.00 720.00
718-01 fertilizer 810      LB 2.00 1,620.00 1.00 810.00 0.60 486.00 1.00 810.00
720-01-A erosion control system, slope protection (type a) 375      SQYD 5.00 1,875.00 2.50 937.50 1.50 562.50 3.00 1,125.00
722-02 project site laboratory (equipped) 1      EACH 4,000.00 4,000.00 10,000.00 10,000.00 25,000.00 25,000.00 20,000.00 20,000.00
727-01 mobilization lump      LUMP 70,000.00 70,000.00 70,000.00 70,000.00 80,000.00 80,000.00 50,000.00 50,000.00
729-16-C object marker assembly (type 3) 4      EACH 75.00 300.00 125.00 500.00 125.00 500.00 100.00 400.00
731-02 reflectorized raised pavement markers 21      EACH 5.10 107.10 6.00 126.00 7.00 147.00 10.00 210.00
732-02-A plastic pavement striping (solid line) (4" width) 0.551  MILE 2,650.00 1,460.15 3,000.00 1,653.00 2,500.00 1,377.50 3,200.00 1,763.20
732-03-A plastic pavement striping (broken line)(4" width) 0.054  MILE 750.00 40.50 5,000.00 270.00 900.00 48.60 1,000.00 54.00
732-05 removal of existing markings 0.458  MILE 5,700.00 2,610.60 6,500.00 2,977.00 4,700.00 2,152.60 15,000.00 6,870.00
740-01 construction layout lump      LUMP 8,000.00 8,000.00 15,000.00 15,000.00 30,000.00 30,000.00 8,000.00 8,000.00
804-01-B precast concrete piles (14") 1,752      LNFT 58.00 101,616.00 60.00 105,120.00 60.00 105,120.00 85.00 148,920.00
804-12 loading permanent piles 1      EACH FREE FREE 100.00 100.00 22,000.00 22,000.00 1.00 1.00
805-01-F class a concrete (bents) 45.00   CUYD 1,100.00 49,500.00 755.00 33,975.00 800.00 36,000.00 1,000.00 45,000.00
805-03 class aa concrete 179.30   CUYD 800.00 143,440.00 625.00 112,062.50 750.00 134,475.00 800.00 143,440.00
806-01 deformed reinforcing steel 40,132      LB 1.00 40,132.00 0.90 36,118.80 1.50 60,198.00 2.00 80,264.00
810-01 concrete railing (barrier) 200.00   LNFT 40.00 8,000.00 73.00 14,600.00 125.00 25,000.00 70.00 14,000.00
813-01 concrete approach slabs 182.22   SQYD 230.00 41,910.60 225.00 40,999.50 185.00 33,710.70 200.00 36,444.00
                       
 CONTRACTOR TOTAL       728,851.45   749,886.80   777,835.85   868,932.45