| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BOH BROS. CONSTRUCTION CO., LLC. |
- 2 - CERES ENVIRONMENTAL SERVICES,INC. |
- 3 - RCS CONTRACTORS, INC. |
- 4 - PHYLWAY CONSTRUCTION LLC |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
10,000.00 |
10,000.00 |
9,600.00 |
9,600.00 |
5,000.00 |
5,000.00 |
26,000.00 |
26,000.00 |
| 202-02-C |
removal of portland cement concrete pavement
|
75   |
SQYD |
45.00 |
3,375.00 |
15.60 |
1,170.00 |
15.00 |
1,125.00 |
25.00 |
1,875.00 |
| 202-02-I |
removal of steel sheet piling
|
106   |
LNFT |
10.00 |
1,060.00 |
108.00 |
11,448.00 |
12.00 |
1,272.00 |
60.00 |
6,360.00 |
| 202-02-L |
removal of abandoned (12x6x7) telephone vault
|
8   |
EACH |
7,500.00 |
60,000.00 |
960.00 |
7,680.00 |
500.00 |
4,000.00 |
3,500.00 |
28,000.00 |
| 202-02-M |
removal of abandoned (16x6x9) telephone vault
|
2   |
EACH |
8,000.00 |
16,000.00 |
960.00 |
1,920.00 |
500.00 |
1,000.00 |
3,500.00 |
7,000.00 |
| 203-05 |
excavation and embankment
|
lump |
LUMP |
100,000.00 |
100,000.00 |
156,000.00 |
156,000.00 |
5,000.00 |
5,000.00 |
75,000.00 |
75,000.00 |
| 203-07-A |
borrow (vehicular meas.)(selected soils)
|
1,350   |
CUYD |
10.00 |
13,500.00 |
19.20 |
25,920.00 |
20.00 |
27,000.00 |
25.00 |
33,750.00 |
| 204-06 |
temporary silt fencing
|
336   |
LNFT |
2.00 |
672.00 |
3.00 |
1,008.00 |
4.00 |
1,344.00 |
4.00 |
1,344.00 |
| 502-01 |
superpave asphaltic concrete
|
587.5 |
TON |
190.00 |
111,625.00 |
142.80 |
83,895.00 |
120.00 |
70,500.00 |
125.00 |
73,437.50 |
| 509-01 |
cold planing asphaltic pavement
|
2,671   |
SQYD |
1.00 |
2,671.00 |
4.80 |
12,820.80 |
4.40 |
11,752.40 |
5.00 |
13,355.00 |
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 111   |
CUYD |
15.00 |
- 1,665.00 |
FREE |
FREE |
1.00 |
- 111.00 |
1.00 |
- 111.00 |
| 601-02-O |
portland cement concrete pavement (12" thick)
(crossovers & turnouts) |
75.0 |
SQYD |
200.00 |
15,000.00 |
138.00 |
10,350.00 |
100.00 |
7,500.00 |
140.00 |
10,500.00 |
| 701-10-E |
reinforced concrete pipe (extension)(12")
|
86   |
LNFT |
125.00 |
10,750.00 |
69.60 |
5,985.60 |
57.00 |
4,902.00 |
80.00 |
6,880.00 |
| 701-10-I |
reinforced concrete pipe (extension)(24")
|
52   |
LNFT |
150.00 |
7,800.00 |
102.00 |
5,304.00 |
81.00 |
4,212.00 |
140.00 |
7,280.00 |
| 701-10-M |
reinforced concrete pipe (extension)(36")
|
32   |
LNFT |
240.00 |
7,680.00 |
198.00 |
6,336.00 |
92.50 |
2,960.00 |
220.00 |
7,040.00 |
| 702-03-A |
catch basins (cb-01)
|
19   |
EACH |
3,000.00 |
57,000.00 |
2,400.00 |
45,600.00 |
2,300.00 |
43,700.00 |
2,800.00 |
53,200.00 |
| 702-03-B |
catch basins (cb-02)
|
2   |
EACH |
5,500.00 |
11,000.00 |
3,720.00 |
7,440.00 |
3,100.00 |
6,200.00 |
5,000.00 |
10,000.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
25,000.00 |
25,000.00 |
28,800.00 |
28,800.00 |
34,000.00 |
34,000.00 |
45,000.00 |
45,000.00 |
| 717-01 |
seeding
|
105   |
LB |
5.00 |
525.00 |
13.20 |
1,386.00 |
11.10 |
1,165.50 |
12.00 |
1,260.00 |
| 718-01 |
fertilizer
|
3,500   |
LB |
0.50 |
1,750.00 |
0.60 |
2,100.00 |
0.40 |
1,400.00 |
0.60 |
2,100.00 |
| 726-01 |
bedding material
|
1,600.0 |
CUYD |
60.00 |
96,000.00 |
74.40 |
119,040.00 |
0.01 |
16.00 |
90.00 |
144,000.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
135,000.00 |
135,000.00 |
296,520.00 |
296,520.00 |
280,250.00 |
280,250.00 |
360,000.00 |
360,000.00 |
| 729-19-C |
dead end road installations(type c)
|
2   |
EACH |
1,100.00 |
2,200.00 |
2,400.00 |
4,800.00 |
800.00 |
1,600.00 |
800.00 |
1,600.00 |
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
0.570 |
MILE |
3,500.00 |
1,995.00 |
7,200.00 |
4,104.00 |
3,300.00 |
1,881.00 |
3,400.00 |
1,938.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
30,000.00 |
30,000.00 |
54,000.00 |
54,000.00 |
148,000.00 |
148,000.00 |
40,000.00 |
40,000.00 |
| S-001 |
rumble strips (ground-in)
|
1.8 |
MILE |
1,500.00 |
2,700.00 |
3,600.00 |
6,480.00 |
1,530.00 |
2,754.00 |
1,800.00 |
3,240.00 |
| S-003 |
reinforced concrete box culvert (10x5)
|
2,924   |
LNFT |
775.00 |
2,266,100.00 |
870.00 |
2,543,880.00 |
1,090.00 |
3,187,160.00 |
1,150.00 |
3,362,600.00 |
| S-004 |
cleaning existing ditches
|
300   |
LNFT |
15.00 |
4,500.00 |
19.20 |
5,760.00 |
20.00 |
6,000.00 |
30.00 |
9,000.00 |
| S-005 |
roadway joint reinforcing mesh (detail repair system)
|
3,004   |
LNFT |
4.00 |
12,016.00 |
7.20 |
21,628.80 |
12.50 |
37,550.00 |
7.00 |
21,028.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
3,004,254.00 |
|
3,480,976.20 |
|
3,899,132.90 |
|
4,352,676.50 |
|
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 5 - BARRIERE CONSTRUCTION CO., LLC. |
- 6 - BEVERLY CONSTRUCTION CO. LLC |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
25,000.00 |
25,000.00 |
71,000.00 |
71,000.00 |
|
|
|
|
| 202-02-C |
removal of portland cement concrete pavement
|
75   |
SQYD |
11.00 |
825.00 |
62.00 |
4,650.00 |
|
|
|
|
| 202-02-I |
removal of steel sheet piling
|
106   |
LNFT |
80.00 |
8,480.00 |
100.00 |
10,600.00 |
|
|
|
|
| 202-02-L |
removal of abandoned (12x6x7) telephone vault
|
8   |
EACH |
2,000.00 |
16,000.00 |
2,600.00 |
20,800.00 |
|
|
|
|
| 202-02-M |
removal of abandoned (16x6x9) telephone vault
|
2   |
EACH |
3,000.00 |
6,000.00 |
5,000.00 |
10,000.00 |
|
|
|
|
| 203-05 |
excavation and embankment
|
lump |
LUMP |
30,000.00 |
30,000.00 |
84,000.00 |
84,000.00 |
|
|
|
|
| 203-07-A |
borrow (vehicular meas.)(selected soils)
|
1,350   |
CUYD |
22.00 |
29,700.00 |
20.00 |
27,000.00 |
|
|
|
|
| 204-06 |
temporary silt fencing
|
336   |
LNFT |
3.00 |
1,008.00 |
3.75 |
1,260.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
587.5 |
TON |
109.00 |
64,037.50 |
132.50 |
77,843.75 |
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
2,671   |
SQYD |
4.00 |
10,684.00 |
4.50 |
12,019.50 |
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 111   |
CUYD |
1.00 |
- 111.00 |
1.00 |
- 111.00 |
|
|
|
|
| 601-02-O |
portland cement concrete pavement (12" thick)
(crossovers & turnouts) |
75.0 |
SQYD |
110.00 |
8,250.00 |
271.00 |
20,325.00 |
|
|
|
|
| 701-10-E |
reinforced concrete pipe (extension)(12")
|
86   |
LNFT |
220.00 |
18,920.00 |
110.00 |
9,460.00 |
|
|
|
|
| 701-10-I |
reinforced concrete pipe (extension)(24")
|
52   |
LNFT |
270.00 |
14,040.00 |
135.00 |
7,020.00 |
|
|
|
|
| 701-10-M |
reinforced concrete pipe (extension)(36")
|
32   |
LNFT |
400.00 |
12,800.00 |
190.00 |
6,080.00 |
|
|
|
|
| 702-03-A |
catch basins (cb-01)
|
19   |
EACH |
4,100.00 |
77,900.00 |
5,650.00 |
107,350.00 |
|
|
|
|
| 702-03-B |
catch basins (cb-02)
|
2   |
EACH |
5,800.00 |
11,600.00 |
6,000.00 |
12,000.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
125,000.00 |
125,000.00 |
109,000.00 |
109,000.00 |
|
|
|
|
| 717-01 |
seeding
|
105   |
LB |
10.00 |
1,050.00 |
12.30 |
1,291.50 |
|
|
|
|
| 718-01 |
fertilizer
|
3,500   |
LB |
0.30 |
1,050.00 |
0.80 |
2,800.00 |
|
|
|
|
| 726-01 |
bedding material
|
1,600.0 |
CUYD |
60.00 |
96,000.00 |
103.00 |
164,800.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
300,000.00 |
300,000.00 |
165,000.00 |
165,000.00 |
|
|
|
|
| 729-19-C |
dead end road installations(type c)
|
2   |
EACH |
800.00 |
1,600.00 |
625.00 |
1,250.00 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
0.570 |
MILE |
8,000.00 |
4,560.00 |
3,366.00 |
1,918.62 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
45,000.00 |
45,000.00 |
35,000.00 |
35,000.00 |
|
|
|
|
| S-001 |
rumble strips (ground-in)
|
1.8 |
MILE |
2,500.00 |
4,500.00 |
3,120.00 |
5,616.00 |
|
|
|
|
| S-003 |
reinforced concrete box culvert (10x5)
|
2,924   |
LNFT |
1,300.00 |
3,801,200.00 |
1,260.00 |
3,684,240.00 |
|
|
|
|
| S-004 |
cleaning existing ditches
|
300   |
LNFT |
20.00 |
6,000.00 |
33.00 |
9,900.00 |
|
|
|
|
| S-005 |
roadway joint reinforcing mesh (detail repair system)
|
3,004   |
LNFT |
9.50 |
28,538.00 |
71.50 |
214,786.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
4,749,631.50 |
|
4,876,899.37 |
|
|
|
|
|