| 201-01 |
clearing & grubbing
|
lump |
LUMP |
35,000.00 |
35,000.00 |
50,000.00 |
50,000.00 |
190,000.00 |
190,000.00 |
35,000.00 |
35,000.00 |
| 202-02-A-01 |
removal of bridges, (sta. 110+98.58; 23.2' x 61.0'
concrete deck girder bridge) |
1   |
EACH |
20,000.00 |
20,000.00 |
30,000.00 |
30,000.00 |
15,000.00 |
15,000.00 |
20,000.00 |
20,000.00 |
| 202-02-A-02 |
removal of bridges,(sta. 110+64.26; 23.2' x 61.0'
concrete deck girder bridge) |
1   |
EACH |
20,000.00 |
20,000.00 |
30,000.00 |
30,000.00 |
15,000.00 |
15,000.00 |
20,000.00 |
20,000.00 |
| 202-02-G |
removal of surfacing & stabilized base
|
7,111.1 |
SQYD |
3.00 |
21,333.30 |
3.50 |
24,888.85 |
3.50 |
24,888.85 |
6.00 |
42,666.60 |
| 202-02-H |
removal of guard rail
|
555   |
LNFT |
2.00 |
1,110.00 |
6.00 |
3,330.00 |
11.00 |
6,105.00 |
5.00 |
2,775.00 |
| 203-06 |
excavation & embankment
|
lump |
LUMP |
110,000.00 |
110,000.00 |
30,000.00 |
30,000.00 |
175,000.00 |
175,000.00 |
100,000.00 |
100,000.00 |
| 204-05-A |
temporary sediment check dams (hay)
|
8   |
EACH |
300.00 |
2,400.00 |
150.00 |
1,200.00 |
240.00 |
1,920.00 |
100.00 |
800.00 |
| 204-06 |
temporary silt fencing
|
537   |
LNFT |
3.00 |
1,611.00 |
1.50 |
805.50 |
2.30 |
1,235.10 |
5.00 |
2,685.00 |
| 302-01 |
class ii base course
|
2,370.4 |
CUYD |
98.00 |
232,299.20 |
80.00 |
189,632.00 |
85.00 |
201,484.00 |
100.00 |
237,040.00 |
| 304-01 |
lime
|
25.20 |
TON |
200.00 |
5,040.00 |
225.00 |
5,670.00 |
150.00 |
3,780.00 |
180.00 |
4,536.00 |
| 304-04-D |
lime treatment (type d) (12" thick)
|
1,778   |
SQYD |
10.00 |
17,780.00 |
10.00 |
17,780.00 |
4.50 |
8,001.00 |
8.50 |
15,113.00 |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
18   |
CUYD |
200.00 |
3,600.00 |
150.00 |
2,700.00 |
100.00 |
1,800.00 |
100.00 |
1,800.00 |
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
50.0 |
CUYD |
100.00 |
5,000.00 |
100.00 |
5,000.00 |
100.00 |
5,000.00 |
50.00 |
2,500.00 |
| 502-01 |
superpave asphaltic concrete
|
1,538.2 |
TON |
110.00 |
169,202.00 |
110.00 |
169,202.00 |
115.00 |
176,893.00 |
155.00 |
238,421.00 |
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
7.1 |
TON |
110.00 |
781.00 |
500.00 |
3,550.00 |
400.00 |
2,840.00 |
155.00 |
1,100.50 |
| 701-05-G |
side drain pipe (18")
|
410   |
LNFT |
60.00 |
24,600.00 |
35.00 |
14,350.00 |
50.00 |
20,500.00 |
55.00 |
22,550.00 |
| 704-03 |
blocked out guard rail
|
581.3 |
LNFT |
17.00 |
9,882.10 |
22.00 |
12,788.60 |
20.00 |
11,626.00 |
20.00 |
11,626.00 |
| 704-08-B |
guard rail transitions (double thrie beam)
|
200.0 |
LNFT |
51.00 |
10,200.00 |
60.00 |
12,000.00 |
60.00 |
12,000.00 |
56.00 |
11,200.00 |
| 704-11-A |
guard rail end treatment (flared)
|
7   |
EACH |
2,000.00 |
14,000.00 |
2,500.00 |
17,500.00 |
2,200.00 |
15,400.00 |
2,200.00 |
15,400.00 |
| 705-01 |
barbed wire fence
|
2,635   |
LNFT |
6.00 |
15,810.00 |
7.00 |
18,445.00 |
7.00 |
18,445.00 |
10.00 |
26,350.00 |
| 705-02 |
combination mesh & barbed wire fence
|
573   |
LNFT |
7.00 |
4,011.00 |
8.00 |
4,584.00 |
7.50 |
4,297.50 |
15.00 |
8,595.00 |
| 705-04 |
single swinging driveway gates
|
2   |
EACH |
600.00 |
1,200.00 |
500.00 |
1,000.00 |
650.00 |
1,300.00 |
1,000.00 |
2,000.00 |
| 708-01 |
right-of-way monument
|
16   |
EACH |
300.00 |
4,800.00 |
150.00 |
2,400.00 |
300.00 |
4,800.00 |
150.00 |
2,400.00 |
| 708-02 |
right-of-way monument witness post
|
16   |
EACH |
300.00 |
4,800.00 |
50.00 |
800.00 |
300.00 |
4,800.00 |
150.00 |
2,400.00 |
| 711-02-D |
riprap (55 lb)
|
693   |
CUYD |
143.00 |
99,099.00 |
75.00 |
51,975.00 |
90.00 |
62,370.00 |
150.00 |
103,950.00 |
| 711-04 |
geotextile fabric
|
1,385   |
SQYD |
3.00 |
4,155.00 |
2.25 |
3,116.25 |
3.00 |
4,155.00 |
5.00 |
6,925.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
27,000.00 |
27,000.00 |
10,000.00 |
10,000.00 |
100,000.00 |
100,000.00 |
20,000.00 |
20,000.00 |
| 716-01-A |
mulch (vegetative)
|
4.90 |
ACRE |
700.00 |
3,430.00 |
850.00 |
4,165.00 |
840.00 |
4,116.00 |
1,500.00 |
7,350.00 |
| 717-01 |
seeding
|
147   |
LB |
8.00 |
1,176.00 |
7.00 |
1,029.00 |
9.50 |
1,396.50 |
10.00 |
1,470.00 |
| 718-01 |
fertilizer
|
4,900   |
LB |
0.35 |
1,715.00 |
0.60 |
2,940.00 |
0.50 |
2,450.00 |
0.50 |
2,450.00 |
| 722-01 |
project site laboratory
|
1   |
EACH |
3,500.00 |
3,500.00 |
10,000.00 |
10,000.00 |
35,000.00 |
35,000.00 |
10,000.00 |
10,000.00 |
| 725-01 |
temporary detour roads
|
5,815.8 |
SQYD |
55.00 |
319,869.00 |
40.00 |
232,632.00 |
71.00 |
412,921.80 |
79.50 |
462,356.10 |
| 725-03 |
temporary detour bridging
|
160.00 |
LNFT |
550.00 |
88,000.00 |
2,000.00 |
320,000.00 |
925.00 |
148,000.00 |
1,625.00 |
260,000.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
70,000.00 |
70,000.00 |
30,000.00 |
30,000.00 |
270,000.00 |
270,000.00 |
260,000.00 |
260,000.00 |
| 729-16-C |
object marker assembly (type 3)
|
8   |
EACH |
70.00 |
560.00 |
85.00 |
680.00 |
85.00 |
680.00 |
100.00 |
800.00 |
| 731-02 |
reflectorized raised pavement markers
|
47   |
EACH |
6.00 |
282.00 |
8.00 |
376.00 |
6.25 |
293.75 |
10.00 |
470.00 |
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
0.393 |
MILE |
3,000.00 |
1,179.00 |
18,000.00 |
7,074.00 |
3,200.00 |
1,257.60 |
22,500.00 |
8,842.50 |
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
0.197 |
MILE |
1,000.00 |
197.00 |
4,500.00 |
886.50 |
1,200.00 |
236.40 |
2,000.00 |
394.00 |
| 735-01 |
mailboxes
|
6   |
EACH |
1.00 |
6.00 |
40.00 |
240.00 |
20.00 |
120.00 |
100.00 |
600.00 |
| 735-02 |
mailbox supports (single)
|
6   |
EACH |
500.00 |
3,000.00 |
150.00 |
900.00 |
200.00 |
1,200.00 |
100.00 |
600.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
12,000.00 |
12,000.00 |
30,000.00 |
30,000.00 |
50,000.00 |
50,000.00 |
22,750.00 |
22,750.00 |
| 804-01-C |
precast concrete piles (16")
|
3,168   |
LNFT |
70.00 |
221,760.00 |
120.00 |
380,160.00 |
51.00 |
161,568.00 |
75.00 |
237,600.00 |
| 804-12 |
loading permanant piles
|
2   |
EACH |
1.00 |
2.00 |
2,500.00 |
5,000.00 |
500.00 |
1,000.00 |
100.00 |
200.00 |
| 805-01-F |
class a concrete (bents)
|
89.58 |
CUYD |
880.00 |
78,830.40 |
1,500.00 |
134,370.00 |
1,500.00 |
134,370.00 |
1,250.00 |
111,975.00 |
| 805-03 |
class aa concrete
|
354.30 |
CUYD |
750.00 |
265,725.00 |
1,100.00 |
389,730.00 |
600.00 |
212,580.00 |
1,000.00 |
354,300.00 |
| 806-01 |
deformed reinforcing steel
|
80,289   |
LB |
1.25 |
100,361.25 |
1.50 |
120,433.50 |
1.20 |
96,346.80 |
0.95 |
76,274.55 |
| 810-01 |
concrete railing (barrier)
|
400.00 |
LNFT |
50.00 |
20,000.00 |
100.00 |
40,000.00 |
75.00 |
30,000.00 |
55.00 |
22,000.00 |
| 813-01 |
concrete approach slabs
|
546.66 |
SQYD |
223.00 |
121,905.18 |
275.00 |
150,331.50 |
250.00 |
136,665.00 |
235.00 |
128,465.10 |
| S-101 |
special anchor section
|
1   |
EACH |
1,000.00 |
1,000.00 |
2,000.00 |
2,000.00 |
1,200.00 |
1,200.00 |
1,500.00 |
1,500.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
2,179,211.43 |
|
2,575,664.70 |
|
2,790,042.30 |
|
2,928,230.35 |
|
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 5 - CERES ENVIRONMENTAL SERVICES,INC. |
|
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
43,750.00 |
43,750.00 |
|
|
|
|
|
|
| 202-02-A-01 |
removal of bridges, (sta. 110+98.58; 23.2' x 61.0'
concrete deck girder bridge) |
1   |
EACH |
28,750.00 |
28,750.00 |
|
|
|
|
|
|
| 202-02-A-02 |
removal of bridges,(sta. 110+64.26; 23.2' x 61.0'
concrete deck girder bridge) |
1   |
EACH |
28,750.00 |
28,750.00 |
|
|
|
|
|
|
| 202-02-G |
removal of surfacing & stabilized base
|
7,111.1 |
SQYD |
6.25 |
44,444.38 |
|
|
|
|
|
|
| 202-02-H |
removal of guard rail
|
555   |
LNFT |
7.50 |
4,162.50 |
|
|
|
|
|
|
| 203-06 |
excavation & embankment
|
lump |
LUMP |
202,820.00 |
202,820.00 |
|
|
|
|
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
8   |
EACH |
250.00 |
2,000.00 |
|
|
|
|
|
|
| 204-06 |
temporary silt fencing
|
537   |
LNFT |
3.13 |
1,680.81 |
|
|
|
|
|
|
| 302-01 |
class ii base course
|
2,370.4 |
CUYD |
65.00 |
154,076.00 |
|
|
|
|
|
|
| 304-01 |
lime
|
25.20 |
TON |
281.25 |
7,087.50 |
|
|
|
|
|
|
| 304-04-D |
lime treatment (type d) (12" thick)
|
1,778   |
SQYD |
2.50 |
4,445.00 |
|
|
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
18   |
CUYD |
65.00 |
1,170.00 |
|
|
|
|
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
50.0 |
CUYD |
77.50 |
3,875.00 |
|
|
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
1,538.2 |
TON |
131.25 |
201,888.75 |
|
|
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
7.1 |
TON |
162.50 |
1,153.75 |
|
|
|
|
|
|
| 701-05-G |
side drain pipe (18")
|
410   |
LNFT |
87.50 |
35,875.00 |
|
|
|
|
|
|
| 704-03 |
blocked out guard rail
|
581.3 |
LNFT |
25.00 |
14,532.50 |
|
|
|
|
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
200.0 |
LNFT |
31.25 |
6,250.00 |
|
|
|
|
|
|
| 704-11-A |
guard rail end treatment (flared)
|
7   |
EACH |
2,812.50 |
19,687.50 |
|
|
|
|
|
|
| 705-01 |
barbed wire fence
|
2,635   |
LNFT |
11.25 |
29,643.75 |
|
|
|
|
|
|
| 705-02 |
combination mesh & barbed wire fence
|
573   |
LNFT |
16.25 |
9,311.25 |
|
|
|
|
|
|
| 705-04 |
single swinging driveway gates
|
2   |
EACH |
812.50 |
1,625.00 |
|
|
|
|
|
|
| 708-01 |
right-of-way monument
|
16   |
EACH |
62.50 |
1,000.00 |
|
|
|
|
|
|
| 708-02 |
right-of-way monument witness post
|
16   |
EACH |
72.50 |
1,160.00 |
|
|
|
|
|
|
| 711-02-D |
riprap (55 lb)
|
693   |
CUYD |
90.00 |
62,370.00 |
|
|
|
|
|
|
| 711-04 |
geotextile fabric
|
1,385   |
SQYD |
3.13 |
4,335.05 |
|
|
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
10,000.00 |
10,000.00 |
|
|
|
|
|
|
| 716-01-A |
mulch (vegetative)
|
4.90 |
ACRE |
1,500.00 |
7,350.00 |
|
|
|
|
|
|
| 717-01 |
seeding
|
147   |
LB |
10.00 |
1,470.00 |
|
|
|
|
|
|
| 718-01 |
fertilizer
|
4,900   |
LB |
0.38 |
1,862.00 |
|
|
|
|
|
|
| 722-01 |
project site laboratory
|
1   |
EACH |
15,000.00 |
15,000.00 |
|
|
|
|
|
|
| 725-01 |
temporary detour roads
|
5,815.8 |
SQYD |
131.25 |
763,323.75 |
|
|
|
|
|
|
| 725-03 |
temporary detour bridging
|
160.00 |
LNFT |
2,437.50 |
390,000.00 |
|
|
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
371,525.00 |
371,525.00 |
|
|
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
8   |
EACH |
93.75 |
750.00 |
|
|
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
47   |
EACH |
6.25 |
293.75 |
|
|
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
0.393 |
MILE |
22,500.00 |
8,842.50 |
|
|
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
0.197 |
MILE |
12,500.00 |
2,462.50 |
|
|
|
|
|
|
| 735-01 |
mailboxes
|
6   |
EACH |
12.50 |
75.00 |
|
|
|
|
|
|
| 735-02 |
mailbox supports (single)
|
6   |
EACH |
187.50 |
1,125.00 |
|
|
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
125,000.00 |
125,000.00 |
|
|
|
|
|
|
| 804-01-C |
precast concrete piles (16")
|
3,168   |
LNFT |
93.75 |
297,000.00 |
|
|
|
|
|
|
| 804-12 |
loading permanant piles
|
2   |
EACH |
1,250.00 |
2,500.00 |
|
|
|
|
|
|
| 805-01-F |
class a concrete (bents)
|
89.58 |
CUYD |
1,000.00 |
89,580.00 |
|
|
|
|
|
|
| 805-03 |
class aa concrete
|
354.30 |
CUYD |
1,250.00 |
442,875.00 |
|
|
|
|
|
|
| 806-01 |
deformed reinforcing steel
|
80,289   |
LB |
1.75 |
140,505.75 |
|
|
|
|
|
|
| 810-01 |
concrete railing (barrier)
|
400.00 |
LNFT |
87.50 |
35,000.00 |
|
|
|
|
|
|
| 813-01 |
concrete approach slabs
|
546.66 |
SQYD |
237.50 |
129,831.75 |
|
|
|
|
|
|
| S-101 |
special anchor section
|
1   |
EACH |
1,125.00 |
1,125.00 |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|