Letting of 12/12/2007 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 042-05-0015
Parish: NATCHITOCHES
Routes: LA 120
Description: LA 120 BRIDGES NEAR ROBELINE
Type Const: grading, drainage structures, lime treatment, class ii bc, superpave asph conc pavement,
concrete slab span bridges, and related work
Estimated Construction Cost: $2,637,197.10
 
RankLicenseBidderConstruction Bid
1 08815 W. E. MCDONALD & SON, LLC. $2,179,211.43
2 33685 SPECIALTY CONTRACTORS $2,575,664.70
3 12312 GILCHRIST CONSTRUCTION CO. LLC $2,790,042.30
4 09090 GUINN BROTHERS, LLC. $2,928,230.35
5 45210 CERES ENVIRONMENTAL SERVICES,INC. $3,753,340.74
 
Item Number Item Description Quantity Unit of Measure - 1 -
W. E. MCDONALD & SON, LLC.
- 2 -
SPECIALTY CONTRACTORS
- 3 -
GILCHRIST CONSTRUCTION CO. LLC
- 4 -
GUINN BROTHERS, LLC.
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 35,000.00 35,000.00 50,000.00 50,000.00 190,000.00 190,000.00 35,000.00 35,000.00
202-02-A-01 removal of bridges, (sta. 110+98.58; 23.2' x 61.0'
concrete deck girder bridge)
1      EACH 20,000.00 20,000.00 30,000.00 30,000.00 15,000.00 15,000.00 20,000.00 20,000.00
202-02-A-02 removal of bridges,(sta. 110+64.26; 23.2' x 61.0'
concrete deck girder bridge)
1      EACH 20,000.00 20,000.00 30,000.00 30,000.00 15,000.00 15,000.00 20,000.00 20,000.00
202-02-G removal of surfacing & stabilized base 7,111.1    SQYD 3.00 21,333.30 3.50 24,888.85 3.50 24,888.85 6.00 42,666.60
202-02-H removal of guard rail 555      LNFT 2.00 1,110.00 6.00 3,330.00 11.00 6,105.00 5.00 2,775.00
203-06 excavation & embankment lump      LUMP 110,000.00 110,000.00 30,000.00 30,000.00 175,000.00 175,000.00 100,000.00 100,000.00
204-05-A temporary sediment check dams (hay) 8      EACH 300.00 2,400.00 150.00 1,200.00 240.00 1,920.00 100.00 800.00
204-06 temporary silt fencing 537      LNFT 3.00 1,611.00 1.50 805.50 2.30 1,235.10 5.00 2,685.00
302-01 class ii base course 2,370.4    CUYD 98.00 232,299.20 80.00 189,632.00 85.00 201,484.00 100.00 237,040.00
304-01 lime 25.20   TON 200.00 5,040.00 225.00 5,670.00 150.00 3,780.00 180.00 4,536.00
304-04-D lime treatment (type d) (12" thick) 1,778      SQYD 10.00 17,780.00 10.00 17,780.00 4.50 8,001.00 8.50 15,113.00
401-02 aggregate surface course (adjusted vehicular
measurement)
18      CUYD 200.00 3,600.00 150.00 2,700.00 100.00 1,800.00 100.00 1,800.00
402-01 traffic maintenance aggregate (vehicular measurement) 50.0    CUYD 100.00 5,000.00 100.00 5,000.00 100.00 5,000.00 50.00 2,500.00
502-01 superpave asphaltic concrete 1,538.2    TON 110.00 169,202.00 110.00 169,202.00 115.00 176,893.00 155.00 238,421.00
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
7.1    TON 110.00 781.00 500.00 3,550.00 400.00 2,840.00 155.00 1,100.50
701-05-G side drain pipe (18") 410      LNFT 60.00 24,600.00 35.00 14,350.00 50.00 20,500.00 55.00 22,550.00
704-03 blocked out guard rail 581.3    LNFT 17.00 9,882.10 22.00 12,788.60 20.00 11,626.00 20.00 11,626.00
704-08-B guard rail transitions (double thrie beam) 200.0    LNFT 51.00 10,200.00 60.00 12,000.00 60.00 12,000.00 56.00 11,200.00
704-11-A guard rail end treatment (flared) 7      EACH 2,000.00 14,000.00 2,500.00 17,500.00 2,200.00 15,400.00 2,200.00 15,400.00
705-01 barbed wire fence 2,635      LNFT 6.00 15,810.00 7.00 18,445.00 7.00 18,445.00 10.00 26,350.00
705-02 combination mesh & barbed wire fence 573      LNFT 7.00 4,011.00 8.00 4,584.00 7.50 4,297.50 15.00 8,595.00
705-04 single swinging driveway gates 2      EACH 600.00 1,200.00 500.00 1,000.00 650.00 1,300.00 1,000.00 2,000.00
708-01 right-of-way monument 16      EACH 300.00 4,800.00 150.00 2,400.00 300.00 4,800.00 150.00 2,400.00
708-02 right-of-way monument witness post 16      EACH 300.00 4,800.00 50.00 800.00 300.00 4,800.00 150.00 2,400.00
711-02-D riprap (55 lb) 693      CUYD 143.00 99,099.00 75.00 51,975.00 90.00 62,370.00 150.00 103,950.00
711-04 geotextile fabric 1,385      SQYD 3.00 4,155.00 2.25 3,116.25 3.00 4,155.00 5.00 6,925.00
713-01 temporary signs & barricades lump      LUMP 27,000.00 27,000.00 10,000.00 10,000.00 100,000.00 100,000.00 20,000.00 20,000.00
716-01-A mulch (vegetative) 4.90   ACRE 700.00 3,430.00 850.00 4,165.00 840.00 4,116.00 1,500.00 7,350.00
717-01 seeding 147      LB 8.00 1,176.00 7.00 1,029.00 9.50 1,396.50 10.00 1,470.00
718-01 fertilizer 4,900      LB 0.35 1,715.00 0.60 2,940.00 0.50 2,450.00 0.50 2,450.00
722-01 project site laboratory 1      EACH 3,500.00 3,500.00 10,000.00 10,000.00 35,000.00 35,000.00 10,000.00 10,000.00
725-01 temporary detour roads 5,815.8    SQYD 55.00 319,869.00 40.00 232,632.00 71.00 412,921.80 79.50 462,356.10
725-03 temporary detour bridging 160.00   LNFT 550.00 88,000.00 2,000.00 320,000.00 925.00 148,000.00 1,625.00 260,000.00
727-01 mobilization lump      LUMP 70,000.00 70,000.00 30,000.00 30,000.00 270,000.00 270,000.00 260,000.00 260,000.00
729-16-C object marker assembly (type 3) 8      EACH 70.00 560.00 85.00 680.00 85.00 680.00 100.00 800.00
731-02 reflectorized raised pavement markers 47      EACH 6.00 282.00 8.00 376.00 6.25 293.75 10.00 470.00
732-02-A plastic pavement striping (solid line) (4" width) 0.393  MILE 3,000.00 1,179.00 18,000.00 7,074.00 3,200.00 1,257.60 22,500.00 8,842.50
732-03-A plastic pavement striping (broken line)(4" width) 0.197  MILE 1,000.00 197.00 4,500.00 886.50 1,200.00 236.40 2,000.00 394.00
735-01 mailboxes 6      EACH 1.00 6.00 40.00 240.00 20.00 120.00 100.00 600.00
735-02 mailbox supports (single) 6      EACH 500.00 3,000.00 150.00 900.00 200.00 1,200.00 100.00 600.00
740-01 construction layout lump      LUMP 12,000.00 12,000.00 30,000.00 30,000.00 50,000.00 50,000.00 22,750.00 22,750.00
804-01-C precast concrete piles (16") 3,168      LNFT 70.00 221,760.00 120.00 380,160.00 51.00 161,568.00 75.00 237,600.00
804-12 loading permanant piles 2      EACH 1.00 2.00 2,500.00 5,000.00 500.00 1,000.00 100.00 200.00
805-01-F class a concrete (bents) 89.58   CUYD 880.00 78,830.40 1,500.00 134,370.00 1,500.00 134,370.00 1,250.00 111,975.00
805-03 class aa concrete 354.30   CUYD 750.00 265,725.00 1,100.00 389,730.00 600.00 212,580.00 1,000.00 354,300.00
806-01 deformed reinforcing steel 80,289      LB 1.25 100,361.25 1.50 120,433.50 1.20 96,346.80 0.95 76,274.55
810-01 concrete railing (barrier) 400.00   LNFT 50.00 20,000.00 100.00 40,000.00 75.00 30,000.00 55.00 22,000.00
813-01 concrete approach slabs 546.66   SQYD 223.00 121,905.18 275.00 150,331.50 250.00 136,665.00 235.00 128,465.10
S-101 special anchor section 1      EACH 1,000.00 1,000.00 2,000.00 2,000.00 1,200.00 1,200.00 1,500.00 1,500.00
                       
 CONTRACTOR TOTAL       2,179,211.43   2,575,664.70   2,790,042.30   2,928,230.35
 
Item Number Item Description Quantity Unit of Measure - 5 -
CERES ENVIRONMENTAL SERVICES,INC.

 

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 43,750.00 43,750.00            
202-02-A-01 removal of bridges, (sta. 110+98.58; 23.2' x 61.0'
concrete deck girder bridge)
1      EACH 28,750.00 28,750.00            
202-02-A-02 removal of bridges,(sta. 110+64.26; 23.2' x 61.0'
concrete deck girder bridge)
1      EACH 28,750.00 28,750.00            
202-02-G removal of surfacing & stabilized base 7,111.1    SQYD 6.25 44,444.38            
202-02-H removal of guard rail 555      LNFT 7.50 4,162.50            
203-06 excavation & embankment lump      LUMP 202,820.00 202,820.00            
204-05-A temporary sediment check dams (hay) 8      EACH 250.00 2,000.00            
204-06 temporary silt fencing 537      LNFT 3.13 1,680.81            
302-01 class ii base course 2,370.4    CUYD 65.00 154,076.00            
304-01 lime 25.20   TON 281.25 7,087.50            
304-04-D lime treatment (type d) (12" thick) 1,778      SQYD 2.50 4,445.00            
401-02 aggregate surface course (adjusted vehicular
measurement)
18      CUYD 65.00 1,170.00            
402-01 traffic maintenance aggregate (vehicular measurement) 50.0    CUYD 77.50 3,875.00            
502-01 superpave asphaltic concrete 1,538.2    TON 131.25 201,888.75            
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
7.1    TON 162.50 1,153.75            
701-05-G side drain pipe (18") 410      LNFT 87.50 35,875.00            
704-03 blocked out guard rail 581.3    LNFT 25.00 14,532.50            
704-08-B guard rail transitions (double thrie beam) 200.0    LNFT 31.25 6,250.00            
704-11-A guard rail end treatment (flared) 7      EACH 2,812.50 19,687.50            
705-01 barbed wire fence 2,635      LNFT 11.25 29,643.75            
705-02 combination mesh & barbed wire fence 573      LNFT 16.25 9,311.25            
705-04 single swinging driveway gates 2      EACH 812.50 1,625.00            
708-01 right-of-way monument 16      EACH 62.50 1,000.00            
708-02 right-of-way monument witness post 16      EACH 72.50 1,160.00            
711-02-D riprap (55 lb) 693      CUYD 90.00 62,370.00            
711-04 geotextile fabric 1,385      SQYD 3.13 4,335.05            
713-01 temporary signs & barricades lump      LUMP 10,000.00 10,000.00            
716-01-A mulch (vegetative) 4.90   ACRE 1,500.00 7,350.00            
717-01 seeding 147      LB 10.00 1,470.00            
718-01 fertilizer 4,900      LB 0.38 1,862.00            
722-01 project site laboratory 1      EACH 15,000.00 15,000.00            
725-01 temporary detour roads 5,815.8    SQYD 131.25 763,323.75            
725-03 temporary detour bridging 160.00   LNFT 2,437.50 390,000.00            
727-01 mobilization lump      LUMP 371,525.00 371,525.00            
729-16-C object marker assembly (type 3) 8      EACH 93.75 750.00            
731-02 reflectorized raised pavement markers 47      EACH 6.25 293.75            
732-02-A plastic pavement striping (solid line) (4" width) 0.393  MILE 22,500.00 8,842.50            
732-03-A plastic pavement striping (broken line)(4" width) 0.197  MILE 12,500.00 2,462.50            
735-01 mailboxes 6      EACH 12.50 75.00            
735-02 mailbox supports (single) 6      EACH 187.50 1,125.00            
740-01 construction layout lump      LUMP 125,000.00 125,000.00            
804-01-C precast concrete piles (16") 3,168      LNFT 93.75 297,000.00            
804-12 loading permanant piles 2      EACH 1,250.00 2,500.00            
805-01-F class a concrete (bents) 89.58   CUYD 1,000.00 89,580.00            
805-03 class aa concrete 354.30   CUYD 1,250.00 442,875.00            
806-01 deformed reinforcing steel 80,289      LB 1.75 140,505.75            
810-01 concrete railing (barrier) 400.00   LNFT 87.50 35,000.00            
813-01 concrete approach slabs 546.66   SQYD 237.50 129,831.75            
S-101 special anchor section 1      EACH 1,125.00 1,125.00            
                       
 CONTRACTOR TOTAL       3,753,340.74            