| 202-02-D |
removal of concrete walks & drives
|
100   |
SQYD |
25.00 |
2,500.00 |
12.00 |
1,200.00 |
20.00 |
2,000.00 |
25.00 |
2,500.00 |
| 203-07 |
borrow (vehicular measurement)
|
4,440   |
CUYD |
1.00 |
4,440.00 |
10.00 |
44,400.00 |
1.00 |
4,440.00 |
1.00 |
4,440.00 |
| 203-07-A |
borrow (vehicular meas.)(selected soils)
|
250   |
CUYD |
1.00 |
250.00 |
11.00 |
2,750.00 |
1.00 |
250.00 |
1.00 |
250.00 |
| 204-02 |
temporary hay or straw bales
|
30   |
EACH |
20.00 |
600.00 |
20.00 |
600.00 |
15.00 |
450.00 |
200.00 |
6,000.00 |
| 204-05-A |
temporary sediment check dams (hay)
|
25   |
EACH |
115.00 |
2,875.00 |
110.00 |
2,750.00 |
200.00 |
5,000.00 |
200.00 |
5,000.00 |
| 303-01-B |
in-place cement stabilized base course (8 1/2" thick)
|
60,478   |
SQYD |
4.96 |
299,970.88 |
5.80 |
350,772.40 |
6.00 |
362,868.00 |
6.00 |
362,868.00 |
| 303-02 |
removal of existing patches
|
100   |
SQYD |
20.00 |
2,000.00 |
15.70 |
1,570.00 |
15.00 |
1,500.00 |
30.00 |
3,000.00 |
| 304-05 |
lime treatment (type e)
|
447.96 |
TON |
410.00 |
183,663.60 |
360.00 |
161,265.60 |
425.00 |
190,383.00 |
400.00 |
179,184.00 |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
2,344   |
CUYD |
50.00 |
117,200.00 |
77.20 |
180,956.80 |
35.00 |
82,040.00 |
76.25 |
178,730.00 |
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
50.0 |
CUYD |
60.00 |
3,000.00 |
60.00 |
3,000.00 |
100.00 |
5,000.00 |
76.25 |
3,812.50 |
| 502-01 |
superpave asphaltic concrete
|
12,970.6 |
TON |
78.00 |
1,011,706.80 |
79.50 |
1,031,162.70 |
87.00 |
1,128,442.20 |
85.00 |
1,102,501.00 |
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
971.9 |
TON |
120.00 |
116,628.00 |
95.00 |
92,330.50 |
115.00 |
111,768.50 |
125.00 |
121,487.50 |
| 507-01-A |
asphaltic material (crs-2p emulsion)
|
40,091   |
GAL |
4.00 |
160,364.00 |
2.65 |
106,241.15 |
2.25 |
90,204.75 |
3.00 |
120,273.00 |
| 507-02-B |
aggregate (s2)
|
58,957   |
SQYD |
1.30 |
76,644.10 |
1.00 |
58,957.00 |
1.25 |
73,696.25 |
1.50 |
88,435.50 |
| 507-02-C |
aggregate (s3)
|
58,957   |
SQYD |
1.30 |
76,644.10 |
0.80 |
47,165.60 |
1.00 |
58,957.00 |
1.00 |
58,957.00 |
| 509-01 |
cold planing asphaltic pavement
|
51,250   |
SQYD |
3.40 |
174,250.00 |
4.10 |
210,125.00 |
5.00 |
256,250.00 |
5.75 |
294,687.50 |
| 701-10-M |
reinforced concrete pipe (extension)(36")
|
8   |
LNFT |
225.00 |
1,800.00 |
160.00 |
1,280.00 |
500.00 |
4,000.00 |
400.00 |
3,200.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
55,000.00 |
55,000.00 |
60,000.00 |
60,000.00 |
50,000.00 |
50,000.00 |
150,000.00 |
150,000.00 |
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
12.573 |
MILE |
460.00 |
5,783.58 |
350.00 |
4,400.55 |
400.00 |
5,029.20 |
400.00 |
5,029.20 |
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
2.433 |
MILE |
358.00 |
871.01 |
400.00 |
973.20 |
250.00 |
608.25 |
0.01 |
0.02 |
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
13.333 |
MILE |
655.00 |
8,733.12 |
700.00 |
9,333.10 |
550.00 |
7,333.15 |
0.01 |
0.13 |
| 722-02 |
project site laboratory (equipped)
|
1   |
EACH |
8,800.00 |
8,800.00 |
20,000.00 |
20,000.00 |
6,000.00 |
6,000.00 |
6,000.00 |
6,000.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
150,000.00 |
150,000.00 |
80,000.00 |
80,000.00 |
150,000.00 |
150,000.00 |
150,000.00 |
150,000.00 |
| 729-16-B |
object marker assembly (type 2)
|
38   |
EACH |
50.00 |
1,900.00 |
55.00 |
2,090.00 |
75.00 |
2,850.00 |
70.00 |
2,660.00 |
| 731-02 |
reflectorized raised pavement markers
|
556   |
EACH |
5.75 |
3,197.00 |
6.00 |
3,336.00 |
5.00 |
2,780.00 |
7.00 |
3,892.00 |
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
13.333 |
MILE |
2,850.00 |
37,999.05 |
3,000.00 |
39,999.00 |
2,275.00 |
30,332.58 |
2,500.00 |
33,332.50 |
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
2.433 |
MILE |
760.00 |
1,849.08 |
800.00 |
1,946.40 |
700.00 |
1,703.10 |
800.00 |
1,946.40 |
| 735-01 |
mailboxes
|
78   |
EACH |
1.10 |
85.80 |
60.00 |
4,680.00 |
1.00 |
78.00 |
2.00 |
156.00 |
| 735-02 |
mailbox supports (single)
|
50   |
EACH |
116.00 |
5,800.00 |
250.00 |
12,500.00 |
125.00 |
6,250.00 |
150.00 |
7,500.00 |
| 735-03 |
mailbox supports (double)
|
10   |
EACH |
176.00 |
1,760.00 |
350.00 |
3,500.00 |
175.00 |
1,750.00 |
200.00 |
2,000.00 |
| 735-04 |
mailbox supports (multiple)
|
2   |
EACH |
352.00 |
704.00 |
500.00 |
1,000.00 |
325.00 |
650.00 |
400.00 |
800.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
8,500.00 |
8,500.00 |
41,000.00 |
41,000.00 |
6,000.00 |
6,000.00 |
10,000.00 |
10,000.00 |
| S-002 |
full depth sawcutting of existing portland cement
concrete drives |
1,440   |
INFT |
1.25 |
1,800.00 |
1.50 |
2,160.00 |
2.00 |
2,880.00 |
3.00 |
4,320.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
2,527,319.12 |
|
2,583,445.00 |
|
2,651,493.98 |
|
2,912,962.25 |
|
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 5 - GILCHRIST CONSTRUCTION CO. LLC |
|
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-D |
removal of concrete walks & drives
|
100   |
SQYD |
17.00 |
1,700.00 |
|
|
|
|
|
|
| 203-07 |
borrow (vehicular measurement)
|
4,440   |
CUYD |
22.00 |
97,680.00 |
|
|
|
|
|
|
| 203-07-A |
borrow (vehicular meas.)(selected soils)
|
250   |
CUYD |
22.00 |
5,500.00 |
|
|
|
|
|
|
| 204-02 |
temporary hay or straw bales
|
30   |
EACH |
20.00 |
600.00 |
|
|
|
|
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
25   |
EACH |
200.00 |
5,000.00 |
|
|
|
|
|
|
| 303-01-B |
in-place cement stabilized base course (8 1/2" thick)
|
60,478   |
SQYD |
7.50 |
453,585.00 |
|
|
|
|
|
|
| 303-02 |
removal of existing patches
|
100   |
SQYD |
5.00 |
500.00 |
|
|
|
|
|
|
| 304-05 |
lime treatment (type e)
|
447.96 |
TON |
255.00 |
114,229.80 |
|
|
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
2,344   |
CUYD |
92.00 |
215,648.00 |
|
|
|
|
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
50.0 |
CUYD |
60.00 |
3,000.00 |
|
|
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
12,970.6 |
TON |
92.00 |
1,193,295.20 |
|
|
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
971.9 |
TON |
150.00 |
145,785.00 |
|
|
|
|
|
|
| 507-01-A |
asphaltic material (crs-2p emulsion)
|
40,091   |
GAL |
2.40 |
96,218.40 |
|
|
|
|
|
|
| 507-02-B |
aggregate (s2)
|
58,957   |
SQYD |
1.30 |
76,644.10 |
|
|
|
|
|
|
| 507-02-C |
aggregate (s3)
|
58,957   |
SQYD |
1.30 |
76,644.10 |
|
|
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
51,250   |
SQYD |
4.50 |
230,625.00 |
|
|
|
|
|
|
| 701-10-M |
reinforced concrete pipe (extension)(36")
|
8   |
LNFT |
350.00 |
2,800.00 |
|
|
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
100,000.00 |
100,000.00 |
|
|
|
|
|
|
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
12.573 |
MILE |
450.00 |
5,657.85 |
|
|
|
|
|
|
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
2.433 |
MILE |
350.00 |
851.55 |
|
|
|
|
|
|
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
13.333 |
MILE |
700.00 |
9,333.10 |
|
|
|
|
|
|
| 722-02 |
project site laboratory (equipped)
|
1   |
EACH |
15,000.00 |
15,000.00 |
|
|
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
250,000.00 |
250,000.00 |
|
|
|
|
|
|
| 729-16-B |
object marker assembly (type 2)
|
38   |
EACH |
50.00 |
1,900.00 |
|
|
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
556   |
EACH |
6.00 |
3,336.00 |
|
|
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
13.333 |
MILE |
3,000.00 |
39,999.00 |
|
|
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
2.433 |
MILE |
800.00 |
1,946.40 |
|
|
|
|
|
|
| 735-01 |
mailboxes
|
78   |
EACH |
75.00 |
5,850.00 |
|
|
|
|
|
|
| 735-02 |
mailbox supports (single)
|
50   |
EACH |
120.00 |
6,000.00 |
|
|
|
|
|
|
| 735-03 |
mailbox supports (double)
|
10   |
EACH |
190.00 |
1,900.00 |
|
|
|
|
|
|
| 735-04 |
mailbox supports (multiple)
|
2   |
EACH |
350.00 |
700.00 |
|
|
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
20,000.00 |
20,000.00 |
|
|
|
|
|
|
| S-002 |
full depth sawcutting of existing portland cement
concrete drives |
1,440   |
INFT |
3.00 |
4,320.00 |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
3,186,248.50 |
|
|
|
|
|
|
|