Letting of 12/05/2007 LA DOTD Headquarters


 
go back
Go Back
 
Lead Project: 850-05-0005
Parish: ST MARTIN
Routes: LA 341, LA 354
Description: LA HWY 31 - LA HWY 31
Type Const: grading, in-place cement stabilized bc, cold planing asphaltic pavement, superpave
asphaltic concrete overlay and related work
Estimated Construction Cost: $2,839,641.82
 
RankLicenseBidderConstruction Bid
1 04089 H & S CONSTRUCTION CO., INC. $2,527,319.12
2 13086 M. MATT DURAND, LLC $2,583,445.00
3 08815 W. E. MCDONALD & SON, LLC. $2,651,493.98
4 34356 PRAIRIE CONTRACTORS INC. $2,912,962.25
5 12312 GILCHRIST CONSTRUCTION CO. LLC $3,186,248.50
 
Item Number Item Description Quantity Unit of Measure - 1 -
H & S CONSTRUCTION CO., INC.
- 2 -
M. MATT DURAND, LLC
- 3 -
W. E. MCDONALD & SON, LLC.
- 4 -
PRAIRIE CONTRACTORS INC.
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-D removal of concrete walks & drives 100      SQYD 25.00 2,500.00 12.00 1,200.00 20.00 2,000.00 25.00 2,500.00
203-07 borrow (vehicular measurement) 4,440      CUYD 1.00 4,440.00 10.00 44,400.00 1.00 4,440.00 1.00 4,440.00
203-07-A borrow (vehicular meas.)(selected soils) 250      CUYD 1.00 250.00 11.00 2,750.00 1.00 250.00 1.00 250.00
204-02 temporary hay or straw bales 30      EACH 20.00 600.00 20.00 600.00 15.00 450.00 200.00 6,000.00
204-05-A temporary sediment check dams (hay) 25      EACH 115.00 2,875.00 110.00 2,750.00 200.00 5,000.00 200.00 5,000.00
303-01-B in-place cement stabilized base course (8 1/2" thick) 60,478      SQYD 4.96 299,970.88 5.80 350,772.40 6.00 362,868.00 6.00 362,868.00
303-02 removal of existing patches 100      SQYD 20.00 2,000.00 15.70 1,570.00 15.00 1,500.00 30.00 3,000.00
304-05 lime treatment (type e) 447.96   TON 410.00 183,663.60 360.00 161,265.60 425.00 190,383.00 400.00 179,184.00
401-02 aggregate surface course (adjusted vehicular
measurement)
2,344      CUYD 50.00 117,200.00 77.20 180,956.80 35.00 82,040.00 76.25 178,730.00
402-01 traffic maintenance aggregate (vehicular measurement) 50.0    CUYD 60.00 3,000.00 60.00 3,000.00 100.00 5,000.00 76.25 3,812.50
502-01 superpave asphaltic concrete 12,970.6    TON 78.00 1,011,706.80 79.50 1,031,162.70 87.00 1,128,442.20 85.00 1,102,501.00
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
971.9    TON 120.00 116,628.00 95.00 92,330.50 115.00 111,768.50 125.00 121,487.50
507-01-A asphaltic material (crs-2p emulsion) 40,091      GAL 4.00 160,364.00 2.65 106,241.15 2.25 90,204.75 3.00 120,273.00
507-02-B aggregate (s2) 58,957      SQYD 1.30 76,644.10 1.00 58,957.00 1.25 73,696.25 1.50 88,435.50
507-02-C aggregate (s3) 58,957      SQYD 1.30 76,644.10 0.80 47,165.60 1.00 58,957.00 1.00 58,957.00
509-01 cold planing asphaltic pavement 51,250      SQYD 3.40 174,250.00 4.10 210,125.00 5.00 256,250.00 5.75 294,687.50
701-10-M reinforced concrete pipe (extension)(36") 8      LNFT 225.00 1,800.00 160.00 1,280.00 500.00 4,000.00 400.00 3,200.00
713-01 temporary signs & barricades lump      LUMP 55,000.00 55,000.00 60,000.00 60,000.00 50,000.00 50,000.00 150,000.00 150,000.00
713-03-A temporary pavement markings (broken line)(4" width)(4'
length)
12.573  MILE 460.00 5,783.58 350.00 4,400.55 400.00 5,029.20 400.00 5,029.20
713-03-B temporary pavement markings (broken line)(4" width)
(10' length)
2.433  MILE 358.00 871.01 400.00 973.20 250.00 608.25 0.01 0.02
713-04-A temporary pavement markings (solid line)(4" width) 13.333  MILE 655.00 8,733.12 700.00 9,333.10 550.00 7,333.15 0.01 0.13
722-02 project site laboratory (equipped) 1      EACH 8,800.00 8,800.00 20,000.00 20,000.00 6,000.00 6,000.00 6,000.00 6,000.00
727-01 mobilization lump      LUMP 150,000.00 150,000.00 80,000.00 80,000.00 150,000.00 150,000.00 150,000.00 150,000.00
729-16-B object marker assembly (type 2) 38      EACH 50.00 1,900.00 55.00 2,090.00 75.00 2,850.00 70.00 2,660.00
731-02 reflectorized raised pavement markers 556      EACH 5.75 3,197.00 6.00 3,336.00 5.00 2,780.00 7.00 3,892.00
732-02-A plastic pavement striping (solid line) (4" width) 13.333  MILE 2,850.00 37,999.05 3,000.00 39,999.00 2,275.00 30,332.58 2,500.00 33,332.50
732-03-A plastic pavement striping (broken line)(4" width) 2.433  MILE 760.00 1,849.08 800.00 1,946.40 700.00 1,703.10 800.00 1,946.40
735-01 mailboxes 78      EACH 1.10 85.80 60.00 4,680.00 1.00 78.00 2.00 156.00
735-02 mailbox supports (single) 50      EACH 116.00 5,800.00 250.00 12,500.00 125.00 6,250.00 150.00 7,500.00
735-03 mailbox supports (double) 10      EACH 176.00 1,760.00 350.00 3,500.00 175.00 1,750.00 200.00 2,000.00
735-04 mailbox supports (multiple) 2      EACH 352.00 704.00 500.00 1,000.00 325.00 650.00 400.00 800.00
740-01 construction layout lump      LUMP 8,500.00 8,500.00 41,000.00 41,000.00 6,000.00 6,000.00 10,000.00 10,000.00
S-002 full depth sawcutting of existing portland cement
concrete drives
1,440      INFT 1.25 1,800.00 1.50 2,160.00 2.00 2,880.00 3.00 4,320.00
                       
 CONTRACTOR TOTAL       2,527,319.12   2,583,445.00   2,651,493.98   2,912,962.25
 
Item Number Item Description Quantity Unit of Measure - 5 -
GILCHRIST CONSTRUCTION CO. LLC

 

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-D removal of concrete walks & drives 100      SQYD 17.00 1,700.00            
203-07 borrow (vehicular measurement) 4,440      CUYD 22.00 97,680.00            
203-07-A borrow (vehicular meas.)(selected soils) 250      CUYD 22.00 5,500.00            
204-02 temporary hay or straw bales 30      EACH 20.00 600.00            
204-05-A temporary sediment check dams (hay) 25      EACH 200.00 5,000.00            
303-01-B in-place cement stabilized base course (8 1/2" thick) 60,478      SQYD 7.50 453,585.00            
303-02 removal of existing patches 100      SQYD 5.00 500.00            
304-05 lime treatment (type e) 447.96   TON 255.00 114,229.80            
401-02 aggregate surface course (adjusted vehicular
measurement)
2,344      CUYD 92.00 215,648.00            
402-01 traffic maintenance aggregate (vehicular measurement) 50.0    CUYD 60.00 3,000.00            
502-01 superpave asphaltic concrete 12,970.6    TON 92.00 1,193,295.20            
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
971.9    TON 150.00 145,785.00            
507-01-A asphaltic material (crs-2p emulsion) 40,091      GAL 2.40 96,218.40            
507-02-B aggregate (s2) 58,957      SQYD 1.30 76,644.10            
507-02-C aggregate (s3) 58,957      SQYD 1.30 76,644.10            
509-01 cold planing asphaltic pavement 51,250      SQYD 4.50 230,625.00            
701-10-M reinforced concrete pipe (extension)(36") 8      LNFT 350.00 2,800.00            
713-01 temporary signs & barricades lump      LUMP 100,000.00 100,000.00            
713-03-A temporary pavement markings (broken line)(4" width)(4'
length)
12.573  MILE 450.00 5,657.85            
713-03-B temporary pavement markings (broken line)(4" width)
(10' length)
2.433  MILE 350.00 851.55            
713-04-A temporary pavement markings (solid line)(4" width) 13.333  MILE 700.00 9,333.10            
722-02 project site laboratory (equipped) 1      EACH 15,000.00 15,000.00            
727-01 mobilization lump      LUMP 250,000.00 250,000.00            
729-16-B object marker assembly (type 2) 38      EACH 50.00 1,900.00            
731-02 reflectorized raised pavement markers 556      EACH 6.00 3,336.00            
732-02-A plastic pavement striping (solid line) (4" width) 13.333  MILE 3,000.00 39,999.00            
732-03-A plastic pavement striping (broken line)(4" width) 2.433  MILE 800.00 1,946.40            
735-01 mailboxes 78      EACH 75.00 5,850.00            
735-02 mailbox supports (single) 50      EACH 120.00 6,000.00            
735-03 mailbox supports (double) 10      EACH 190.00 1,900.00            
735-04 mailbox supports (multiple) 2      EACH 350.00 700.00            
740-01 construction layout lump      LUMP 20,000.00 20,000.00            
S-002 full depth sawcutting of existing portland cement
concrete drives
1,440      INFT 3.00 4,320.00            
                       
 CONTRACTOR TOTAL       3,186,248.50            