Letting of 12/05/2007 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 713-22-0115
Parish: GRANT
Routes:
Description: MEADE ROAD BRIDGE OVER WALDEN BAYOU
Type Const: clearing and grubbing, grading, drainage structures, class ii base course, superpave
asphaltic concrete pavement concrete slab span bridge, and related work.
Estimated Construction Cost: $634,651.35
 
RankLicenseBidderConstruction Bid
1 18546 C W & W CONTRACTORS, INC. $586,411.00
2 09090 GUINN BROTHERS, LLC. $629,309.00
3 08815 W. E. MCDONALD & SON, LLC. $631,663.00
4 41115 KDC CONSTRUCTION CO., LLC $759,385.00
5 12879 PETERS CONSTRUCTION CO., INC. $879,127.85
6 39462 DENTON-JAMES LLC $927,764.00
 
Item Number Item Description Quantity Unit of Measure - 1 -
C W & W CONTRACTORS, INC.
- 2 -
GUINN BROTHERS, LLC.
- 3 -
W. E. MCDONALD & SON, LLC.
- 4 -
KDC CONSTRUCTION CO., LLC
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 10,000.00 10,000.00 12,000.00 12,000.00 40,000.00 40,000.00 35,000.00 35,000.00
202-02-A-01 removal of bridge (sta. 105+00, 19' wide x 133' long
timber bridge with wingwalls)
1      EACH 7,500.00 7,500.00 10,000.00 10,000.00 17,500.00 17,500.00 65,000.00 65,000.00
203-05 excavation & embankment lump      LUMP 40,000.00 40,000.00 32,500.00 32,500.00 20,000.00 20,000.00 35,000.00 35,000.00
204-02 temporary hay or straw bales 10      EACH 1.00 10.00 100.00 1,000.00 25.00 250.00 5.00 50.00
204-03 temporary slope drains 140      LNFT 1.00 140.00 10.00 1,400.00 25.00 3,500.00 10.00 1,400.00
204-05-A temporary sediment check dams (hay) 4      EACH 1.00 4.00 200.00 800.00 500.00 2,000.00 75.00 300.00
204-06 temporary silt fencing 230      LNFT 1.00 230.00 4.00 920.00 5.00 1,150.00 5.00 1,150.00
302-01 class ii base course 214.5    CUYD 100.00 21,450.00 100.00 21,450.00 130.00 27,885.00 85.00 18,232.50
401-02 aggregate surface course (adjusted vehicular
measurement)
20      CUYD 100.00 2,000.00 100.00 2,000.00 200.00 4,000.00 65.00 1,300.00
502-01 superpave asphaltic concrete 166.9    TON 160.00 26,704.00 250.00 41,725.00 225.00 37,552.50 190.00 31,711.00
701-01-I/K cross drain pipe (24" rcp/pcp or 30" cmp) 44      LNFT 80.00 3,520.00 125.00 5,500.00 220.00 9,680.00 50.00 2,200.00
701-05-G side drain pipe (18") 20      LNFT 50.00 1,000.00 85.00 1,700.00 180.00 3,600.00 50.00 1,000.00
704-08-B guard rail transitions (double thrie beam) 100.0    LNFT 62.00 6,200.00 65.00 6,500.00 54.00 5,400.00 75.00 7,500.00
704-09 guard rail anchor sections (turndown) 100.0    LNFT 30.00 3,000.00 34.00 3,400.00 26.00 2,600.00 35.00 3,500.00
705-01 barbed wire fence 250      LNFT 13.00 3,250.00 8.00 2,000.00 12.00 3,000.00 7.50 1,875.00
705-04 single swinging driveway gates 1      EACH 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 500.00 500.00
711-01-D riprap (55 lb,18" thickness) 635      SQYD 90.00 57,150.00 65.00 41,275.00 68.00 43,180.00 105.00 66,675.00
711-04 geotextile fabric 635      SQYD 3.00 1,905.00 5.00 3,175.00 2.00 1,270.00 4.00 2,540.00
713-01 temporary signs & barricades lump      LUMP 7,500.00 7,500.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00
716-01-A mulch (vegetative) 0.5    TON 4,000.00 2,000.00 2,000.00 1,000.00 4,000.00 2,000.00 2,500.00 1,250.00
717-01 seeding 10      LB 50.00 500.00 15.00 150.00 25.00 250.00 50.00 500.00
718-01 fertilizer 214      LB 2.00 428.00 2.00 428.00 5.00 1,070.00 3.00 642.00
720-01-A erosion control system, slope protection (type a) 383      SQYD 3.00 1,149.00 5.00 1,915.00 3.00 1,149.00 7.50 2,872.50
726-01 bedding material 8.7    CUYD 100.00 870.00 100.00 870.00 95.00 826.50 85.00 739.50
727-01 mobilization lump      LUMP 40,000.00 40,000.00 65,000.00 65,000.00 50,000.00 50,000.00 35,347.50 35,347.50
729-16-B object marker assembly (type 2) 2      EACH 100.00 200.00 100.00 200.00 70.00 140.00 80.00 160.00
729-16-C object marker assembly (type 3) 8      EACH 100.00 800.00 100.00 800.00 70.00 560.00 80.00 640.00
740-01 construction layout lump      LUMP 7,200.00 7,200.00 6,500.00 6,500.00 8,500.00 8,500.00 8,500.00 8,500.00
804-01-D precast concrete piles (18") 1,830      LNFT 90.00 164,700.00 70.00 128,100.00 70.00 128,100.00 110.00 201,300.00
804-12 loading permanent piles 1      EACH 1.00 1.00 1.00 1.00 1,500.00 1,500.00 500.00 500.00
805-10-A bridge superstructure & substructure (24' clear
roadway; 60 degree crossing) (cast-in-place bents)
8      SPAN 20,000.00 160,000.00 26,250.00 210,000.00 23,000.00 184,000.00 24,750.00 198,000.00
S-101 concrete approach slab (24' clear roadway; 60 degree
crossing) (w/ asphalt)
2      EACH 8,000.00 16,000.00 8,000.00 16,000.00 10,000.00 20,000.00 12,000.00 24,000.00
                       
 CONTRACTOR TOTAL       586,411.00   629,309.00   631,663.00   759,385.00
 
Item Number Item Description Quantity Unit of Measure - 5 -
PETERS CONSTRUCTION CO., INC.
- 6 -
DENTON-JAMES LLC

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 7,000.00 7,000.00 150,000.00 150,000.00        
202-02-A-01 removal of bridge (sta. 105+00, 19' wide x 133' long
timber bridge with wingwalls)
1      EACH 30,000.00 30,000.00 20,000.00 20,000.00        
203-05 excavation & embankment lump      LUMP 15,000.00 15,000.00 60,000.00 60,000.00        
204-02 temporary hay or straw bales 10      EACH 10.00 100.00 10.00 100.00        
204-03 temporary slope drains 140      LNFT 5.00 700.00 20.00 2,800.00        
204-05-A temporary sediment check dams (hay) 4      EACH 100.00 400.00 150.00 600.00        
204-06 temporary silt fencing 230      LNFT 3.00 690.00 2.50 575.00        
302-01 class ii base course 214.5    CUYD 90.00 19,305.00 148.00 31,746.00        
401-02 aggregate surface course (adjusted vehicular
measurement)
20      CUYD 50.00 1,000.00 100.00 2,000.00        
502-01 superpave asphaltic concrete 166.9    TON 250.00 41,725.00 250.00 41,725.00        
701-01-I/K cross drain pipe (24" rcp/pcp or 30" cmp) 44      LNFT 100.00 4,400.00 95.00 4,180.00        
701-05-G side drain pipe (18") 20      LNFT 50.00 1,000.00 75.00 1,500.00        
704-08-B guard rail transitions (double thrie beam) 100.0    LNFT 60.00 6,000.00 54.00 5,400.00        
704-09 guard rail anchor sections (turndown) 100.0    LNFT 35.00 3,500.00 26.00 2,600.00        
705-01 barbed wire fence 250      LNFT 9.00 2,250.00 10.00 2,500.00        
705-04 single swinging driveway gates 1      EACH 550.00 550.00 650.00 650.00        
711-01-D riprap (55 lb,18" thickness) 635      SQYD 75.00 47,625.00 68.00 43,180.00        
711-04 geotextile fabric 635      SQYD 3.00 1,905.00 2.00 1,270.00        
713-01 temporary signs & barricades lump      LUMP 20,000.00 20,000.00 10,000.00 10,000.00        
716-01-A mulch (vegetative) 0.5    TON 4,000.00 2,000.00 2,000.00 1,000.00        
717-01 seeding 10      LB 40.00 400.00 50.00 500.00        
718-01 fertilizer 214      LB 0.75 160.50 2.00 428.00        
720-01-A erosion control system, slope protection (type a) 383      SQYD 1.25 478.75 2.50 957.50        
726-01 bedding material 8.7    CUYD 50.00 435.00 75.00 652.50        
727-01 mobilization lump      LUMP 55,000.00 55,000.00 95,000.00 95,000.00        
729-16-B object marker assembly (type 2) 2      EACH 80.00 160.00 70.00 140.00        
729-16-C object marker assembly (type 3) 8      EACH 80.00 640.00 70.00 560.00        
740-01 construction layout lump      LUMP 20,000.00 20,000.00 20,000.00 20,000.00        
804-01-D precast concrete piles (18") 1,830      LNFT 194.92 356,703.60 90.00 164,700.00        
804-12 loading permanent piles 1      EACH 7,000.00 7,000.00 1,000.00 1,000.00        
805-10-A bridge superstructure & substructure (24' clear
roadway; 60 degree crossing) (cast-in-place bents)
8      SPAN 26,000.00 208,000.00 30,000.00 240,000.00        
S-101 concrete approach slab (24' clear roadway; 60 degree
crossing) (w/ asphalt)
2      EACH 12,500.00 25,000.00 11,000.00 22,000.00        
                       
 CONTRACTOR TOTAL       879,127.85   927,764.00        