| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - C W & W CONTRACTORS, INC. |
- 2 - GUINN BROTHERS, LLC. |
- 3 - W. E. MCDONALD & SON, LLC. |
- 4 - KDC CONSTRUCTION CO., LLC |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
10,000.00 |
10,000.00 |
12,000.00 |
12,000.00 |
40,000.00 |
40,000.00 |
35,000.00 |
35,000.00 |
| 202-02-A-01 |
removal of bridge (sta. 105+00, 19' wide x 133' long
timber bridge with wingwalls) |
1   |
EACH |
7,500.00 |
7,500.00 |
10,000.00 |
10,000.00 |
17,500.00 |
17,500.00 |
65,000.00 |
65,000.00 |
| 203-05 |
excavation & embankment
|
lump |
LUMP |
40,000.00 |
40,000.00 |
32,500.00 |
32,500.00 |
20,000.00 |
20,000.00 |
35,000.00 |
35,000.00 |
| 204-02 |
temporary hay or straw bales
|
10   |
EACH |
1.00 |
10.00 |
100.00 |
1,000.00 |
25.00 |
250.00 |
5.00 |
50.00 |
| 204-03 |
temporary slope drains
|
140   |
LNFT |
1.00 |
140.00 |
10.00 |
1,400.00 |
25.00 |
3,500.00 |
10.00 |
1,400.00 |
| 204-05-A |
temporary sediment check dams (hay)
|
4   |
EACH |
1.00 |
4.00 |
200.00 |
800.00 |
500.00 |
2,000.00 |
75.00 |
300.00 |
| 204-06 |
temporary silt fencing
|
230   |
LNFT |
1.00 |
230.00 |
4.00 |
920.00 |
5.00 |
1,150.00 |
5.00 |
1,150.00 |
| 302-01 |
class ii base course
|
214.5 |
CUYD |
100.00 |
21,450.00 |
100.00 |
21,450.00 |
130.00 |
27,885.00 |
85.00 |
18,232.50 |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
20   |
CUYD |
100.00 |
2,000.00 |
100.00 |
2,000.00 |
200.00 |
4,000.00 |
65.00 |
1,300.00 |
| 502-01 |
superpave asphaltic concrete
|
166.9 |
TON |
160.00 |
26,704.00 |
250.00 |
41,725.00 |
225.00 |
37,552.50 |
190.00 |
31,711.00 |
| 701-01-I/K |
cross drain pipe (24" rcp/pcp or 30" cmp)
|
44   |
LNFT |
80.00 |
3,520.00 |
125.00 |
5,500.00 |
220.00 |
9,680.00 |
50.00 |
2,200.00 |
| 701-05-G |
side drain pipe (18")
|
20   |
LNFT |
50.00 |
1,000.00 |
85.00 |
1,700.00 |
180.00 |
3,600.00 |
50.00 |
1,000.00 |
| 704-08-B |
guard rail transitions (double thrie beam)
|
100.0 |
LNFT |
62.00 |
6,200.00 |
65.00 |
6,500.00 |
54.00 |
5,400.00 |
75.00 |
7,500.00 |
| 704-09 |
guard rail anchor sections (turndown)
|
100.0 |
LNFT |
30.00 |
3,000.00 |
34.00 |
3,400.00 |
26.00 |
2,600.00 |
35.00 |
3,500.00 |
| 705-01 |
barbed wire fence
|
250   |
LNFT |
13.00 |
3,250.00 |
8.00 |
2,000.00 |
12.00 |
3,000.00 |
7.50 |
1,875.00 |
| 705-04 |
single swinging driveway gates
|
1   |
EACH |
1,000.00 |
1,000.00 |
1,000.00 |
1,000.00 |
1,000.00 |
1,000.00 |
500.00 |
500.00 |
| 711-01-D |
riprap (55 lb,18" thickness)
|
635   |
SQYD |
90.00 |
57,150.00 |
65.00 |
41,275.00 |
68.00 |
43,180.00 |
105.00 |
66,675.00 |
| 711-04 |
geotextile fabric
|
635   |
SQYD |
3.00 |
1,905.00 |
5.00 |
3,175.00 |
2.00 |
1,270.00 |
4.00 |
2,540.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
7,500.00 |
7,500.00 |
10,000.00 |
10,000.00 |
10,000.00 |
10,000.00 |
10,000.00 |
10,000.00 |
| 716-01-A |
mulch (vegetative)
|
0.5 |
TON |
4,000.00 |
2,000.00 |
2,000.00 |
1,000.00 |
4,000.00 |
2,000.00 |
2,500.00 |
1,250.00 |
| 717-01 |
seeding
|
10   |
LB |
50.00 |
500.00 |
15.00 |
150.00 |
25.00 |
250.00 |
50.00 |
500.00 |
| 718-01 |
fertilizer
|
214   |
LB |
2.00 |
428.00 |
2.00 |
428.00 |
5.00 |
1,070.00 |
3.00 |
642.00 |
| 720-01-A |
erosion control system, slope protection (type a)
|
383   |
SQYD |
3.00 |
1,149.00 |
5.00 |
1,915.00 |
3.00 |
1,149.00 |
7.50 |
2,872.50 |
| 726-01 |
bedding material
|
8.7 |
CUYD |
100.00 |
870.00 |
100.00 |
870.00 |
95.00 |
826.50 |
85.00 |
739.50 |
| 727-01 |
mobilization
|
lump |
LUMP |
40,000.00 |
40,000.00 |
65,000.00 |
65,000.00 |
50,000.00 |
50,000.00 |
35,347.50 |
35,347.50 |
| 729-16-B |
object marker assembly (type 2)
|
2   |
EACH |
100.00 |
200.00 |
100.00 |
200.00 |
70.00 |
140.00 |
80.00 |
160.00 |
| 729-16-C |
object marker assembly (type 3)
|
8   |
EACH |
100.00 |
800.00 |
100.00 |
800.00 |
70.00 |
560.00 |
80.00 |
640.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
7,200.00 |
7,200.00 |
6,500.00 |
6,500.00 |
8,500.00 |
8,500.00 |
8,500.00 |
8,500.00 |
| 804-01-D |
precast concrete piles (18")
|
1,830   |
LNFT |
90.00 |
164,700.00 |
70.00 |
128,100.00 |
70.00 |
128,100.00 |
110.00 |
201,300.00 |
| 804-12 |
loading permanent piles
|
1   |
EACH |
1.00 |
1.00 |
1.00 |
1.00 |
1,500.00 |
1,500.00 |
500.00 |
500.00 |
| 805-10-A |
bridge superstructure & substructure (24' clear
roadway; 60 degree crossing) (cast-in-place bents) |
8   |
SPAN |
20,000.00 |
160,000.00 |
26,250.00 |
210,000.00 |
23,000.00 |
184,000.00 |
24,750.00 |
198,000.00 |
| S-101 |
concrete approach slab (24' clear roadway; 60 degree
crossing) (w/ asphalt) |
2   |
EACH |
8,000.00 |
16,000.00 |
8,000.00 |
16,000.00 |
10,000.00 |
20,000.00 |
12,000.00 |
24,000.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
586,411.00 |
|
629,309.00 |
|
631,663.00 |
|
759,385.00 |
|
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 5 - PETERS CONSTRUCTION CO., INC. |
- 6 - DENTON-JAMES LLC |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
7,000.00 |
7,000.00 |
150,000.00 |
150,000.00 |
|
|
|
|
| 202-02-A-01 |
removal of bridge (sta. 105+00, 19' wide x 133' long
timber bridge with wingwalls) |
1   |
EACH |
30,000.00 |
30,000.00 |
20,000.00 |
20,000.00 |
|
|
|
|
| 203-05 |
excavation & embankment
|
lump |
LUMP |
15,000.00 |
15,000.00 |
60,000.00 |
60,000.00 |
|
|
|
|
| 204-02 |
temporary hay or straw bales
|
10   |
EACH |
10.00 |
100.00 |
10.00 |
100.00 |
|
|
|
|
| 204-03 |
temporary slope drains
|
140   |
LNFT |
5.00 |
700.00 |
20.00 |
2,800.00 |
|
|
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
4   |
EACH |
100.00 |
400.00 |
150.00 |
600.00 |
|
|
|
|
| 204-06 |
temporary silt fencing
|
230   |
LNFT |
3.00 |
690.00 |
2.50 |
575.00 |
|
|
|
|
| 302-01 |
class ii base course
|
214.5 |
CUYD |
90.00 |
19,305.00 |
148.00 |
31,746.00 |
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
20   |
CUYD |
50.00 |
1,000.00 |
100.00 |
2,000.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
166.9 |
TON |
250.00 |
41,725.00 |
250.00 |
41,725.00 |
|
|
|
|
| 701-01-I/K |
cross drain pipe (24" rcp/pcp or 30" cmp)
|
44   |
LNFT |
100.00 |
4,400.00 |
95.00 |
4,180.00 |
|
|
|
|
| 701-05-G |
side drain pipe (18")
|
20   |
LNFT |
50.00 |
1,000.00 |
75.00 |
1,500.00 |
|
|
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
100.0 |
LNFT |
60.00 |
6,000.00 |
54.00 |
5,400.00 |
|
|
|
|
| 704-09 |
guard rail anchor sections (turndown)
|
100.0 |
LNFT |
35.00 |
3,500.00 |
26.00 |
2,600.00 |
|
|
|
|
| 705-01 |
barbed wire fence
|
250   |
LNFT |
9.00 |
2,250.00 |
10.00 |
2,500.00 |
|
|
|
|
| 705-04 |
single swinging driveway gates
|
1   |
EACH |
550.00 |
550.00 |
650.00 |
650.00 |
|
|
|
|
| 711-01-D |
riprap (55 lb,18" thickness)
|
635   |
SQYD |
75.00 |
47,625.00 |
68.00 |
43,180.00 |
|
|
|
|
| 711-04 |
geotextile fabric
|
635   |
SQYD |
3.00 |
1,905.00 |
2.00 |
1,270.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
20,000.00 |
20,000.00 |
10,000.00 |
10,000.00 |
|
|
|
|
| 716-01-A |
mulch (vegetative)
|
0.5 |
TON |
4,000.00 |
2,000.00 |
2,000.00 |
1,000.00 |
|
|
|
|
| 717-01 |
seeding
|
10   |
LB |
40.00 |
400.00 |
50.00 |
500.00 |
|
|
|
|
| 718-01 |
fertilizer
|
214   |
LB |
0.75 |
160.50 |
2.00 |
428.00 |
|
|
|
|
| 720-01-A |
erosion control system, slope protection (type a)
|
383   |
SQYD |
1.25 |
478.75 |
2.50 |
957.50 |
|
|
|
|
| 726-01 |
bedding material
|
8.7 |
CUYD |
50.00 |
435.00 |
75.00 |
652.50 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
55,000.00 |
55,000.00 |
95,000.00 |
95,000.00 |
|
|
|
|
| 729-16-B |
object marker assembly (type 2)
|
2   |
EACH |
80.00 |
160.00 |
70.00 |
140.00 |
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
8   |
EACH |
80.00 |
640.00 |
70.00 |
560.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
20,000.00 |
20,000.00 |
20,000.00 |
20,000.00 |
|
|
|
|
| 804-01-D |
precast concrete piles (18")
|
1,830   |
LNFT |
194.92 |
356,703.60 |
90.00 |
164,700.00 |
|
|
|
|
| 804-12 |
loading permanent piles
|
1   |
EACH |
7,000.00 |
7,000.00 |
1,000.00 |
1,000.00 |
|
|
|
|
| 805-10-A |
bridge superstructure & substructure (24' clear
roadway; 60 degree crossing) (cast-in-place bents) |
8   |
SPAN |
26,000.00 |
208,000.00 |
30,000.00 |
240,000.00 |
|
|
|
|
| S-101 |
concrete approach slab (24' clear roadway; 60 degree
crossing) (w/ asphalt) |
2   |
EACH |
12,500.00 |
25,000.00 |
11,000.00 |
22,000.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
879,127.85 |
|
927,764.00 |
|
|
|
|
|