Lead Project: 450-43-0078
Parish: ORLEANS
Routes: I-510
Description: ICWW BRIDGE - I-10
Type Const: grading, cold planing asphaltic concrete, pavement patching, superpave asphaltic
concrete overlay and related work.
Estimated Construction Cost: $2,859,678.55
 
RankLicenseBidderConstruction Bid
1 06276 BARRIERE CONSTRUCTION CO., LLC $3,264,698.32
2 02179 BOH BROS. CONSTRUCTION CO., LLC. $3,448,348.80
 
Item Number Item Description Quantity Unit of Measure - 1 -
BARRIERE CONSTRUCTION CO., LLC
- 2 -
BOH BROS. CONSTRUCTION CO., LLC.

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-H removal of guard rail 4,372      LNFT 5.50 24,046.00 5.00 21,860.00        
203-05 excavation and embankment lump      LUMP 65,000.00 65,000.00 20,000.00 20,000.00        
203-07 borrow (vehicular measurement) 1,500      CUYD 19.00 28,500.00 35.00 52,500.00        
502-01 superpave asphaltic concrete 22,480.1    TON 75.00 1,686,007.50 80.00 1,798,408.00        
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
2,808.7    TON 125.00 351,087.50 90.00 252,783.00        
509-01 cold planing asphaltic pavement 66,380      SQYD 1.50 99,570.00 2.50 165,950.00        
509-02 contractor retained reclaimed asphaltic pavement - 2,074      CUYD 15.00 - 31,110.00 5.00 - 10,370.00        
510-01-A pavement patching (6" minimum thickness) 500      SQYD 32.00 16,000.00 50.00 25,000.00        
510-01-B pavement patching (12" minimum thickness) 3,000      SQYD 54.00 162,000.00 95.00 285,000.00        
704-01-B guard rail (single thrie beam)(6'-3" post spacing) 937.5    LNFT 46.00 43,125.00 50.00 46,875.00        
704-03 blocked out guard rail 3,158.8    LNFT 18.00 56,858.40 20.00 63,176.00        
704-06-A guard rail anchor sections (trailing end)(single thrie
beam)
62.5    LNFT 94.00 5,875.00 100.00 6,250.00        
704-08-B guard rail transitions (double thrie beam) 275.0    LNFT 60.00 16,500.00 60.00 16,500.00        
704-11-A guard rail end treatment (flared) 21      EACH 2,100.00 44,100.00 2,400.00 50,400.00        
713-01 temporary signs & barricades lump      LUMP 266,000.00 266,000.00 180,000.00 180,000.00        
713-02-C temporary pavement markings (8" width) 9,844      LNFT 0.40 3,937.60 0.40 3,937.60        
713-02-D temporary pavement markings (12" width) 156      LNFT 0.50 78.00 0.50 78.00        
713-02-E temporary pavement markings (24" width) 3,606      LNFT 1.00 3,606.00 1.00 3,606.00        
713-03-A temporary pavement markings (broken line)(4" width)(4'
length)
13.292  MILE 200.00 2,658.40 500.00 6,646.00        
713-03-B temporary pavement markings (broken line)(4" width)
(10' length)
20.882  MILE 500.00 10,441.00 100.00 2,088.20        
713-04-A temporary pavement markings (solid line)(4" width) 24.320  MILE 800.00 19,456.00 200.00 4,864.00        
727-01 mobilization lump      LUMP 262,000.00 262,000.00 340,000.00 340,000.00        
729-16-C object marker assembly (type 3) 34      EACH 80.00 2,720.00 90.00 3,060.00        
731-01 nonreflectorized raised pavement markers 50      EACH 16.00 800.00 15.00 750.00        
731-02 reflectorized raised pavement markers 1,379      EACH 5.30 7,308.70 5.50 7,584.50        
732-01-C plastic pavement striping (8" width) 4,922      LNFT 1.00 4,922.00 1.00 4,922.00        
732-01-D plastic pavement striping (12" width) 78      LNFT 1.50 117.00 1.50 117.00        
732-01-E plastic pavement striping (24" width) 1,803      LNFT 4.00 7,212.00 4.00 7,212.00        
732-02-A plastic pavement striping (solid line) (4" width) 20.481  MILE 2,600.00 53,250.60 2,700.00 55,298.70        
732-03-A plastic pavement striping (broken line)(4" width) 11.941  MILE 820.00 9,791.62 800.00 9,552.80        
740-01 construction layout lump      LUMP 6,000.00 6,000.00 4,000.00 4,000.00        
S-001 rumble strips (ground-in) 6.6    MILE 900.00 5,940.00 1,000.00 6,600.00        
S-002 dynamic message sign unit 3      EACH 7,300.00 21,900.00 4,500.00 13,500.00        
S-003 clean catch basins 10      EACH 900.00 9,000.00 20.00 200.00        
                       
 CONTRACTOR TOTAL       3,264,698.32   3,448,348.80        