| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BARRIERE CONSTRUCTION CO., LLC |
- 2 - BOH BROS. CONSTRUCTION CO., LLC. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-H |
removal of guard rail
|
4,372   |
LNFT |
5.50 |
24,046.00 |
5.00 |
21,860.00 |
|
|
|
|
| 203-05 |
excavation and embankment
|
lump |
LUMP |
65,000.00 |
65,000.00 |
20,000.00 |
20,000.00 |
|
|
|
|
| 203-07 |
borrow (vehicular measurement)
|
1,500   |
CUYD |
19.00 |
28,500.00 |
35.00 |
52,500.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
22,480.1 |
TON |
75.00 |
1,686,007.50 |
80.00 |
1,798,408.00 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
2,808.7 |
TON |
125.00 |
351,087.50 |
90.00 |
252,783.00 |
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
66,380   |
SQYD |
1.50 |
99,570.00 |
2.50 |
165,950.00 |
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 2,074   |
CUYD |
15.00 |
- 31,110.00 |
5.00 |
- 10,370.00 |
|
|
|
|
| 510-01-A |
pavement patching (6" minimum thickness)
|
500   |
SQYD |
32.00 |
16,000.00 |
50.00 |
25,000.00 |
|
|
|
|
| 510-01-B |
pavement patching (12" minimum thickness)
|
3,000   |
SQYD |
54.00 |
162,000.00 |
95.00 |
285,000.00 |
|
|
|
|
| 704-01-B |
guard rail (single thrie beam)(6'-3" post spacing)
|
937.5 |
LNFT |
46.00 |
43,125.00 |
50.00 |
46,875.00 |
|
|
|
|
| 704-03 |
blocked out guard rail
|
3,158.8 |
LNFT |
18.00 |
56,858.40 |
20.00 |
63,176.00 |
|
|
|
|
| 704-06-A |
guard rail anchor sections (trailing end)(single thrie
beam) |
62.5 |
LNFT |
94.00 |
5,875.00 |
100.00 |
6,250.00 |
|
|
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
275.0 |
LNFT |
60.00 |
16,500.00 |
60.00 |
16,500.00 |
|
|
|
|
| 704-11-A |
guard rail end treatment (flared)
|
21   |
EACH |
2,100.00 |
44,100.00 |
2,400.00 |
50,400.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
266,000.00 |
266,000.00 |
180,000.00 |
180,000.00 |
|
|
|
|
| 713-02-C |
temporary pavement markings (8" width)
|
9,844   |
LNFT |
0.40 |
3,937.60 |
0.40 |
3,937.60 |
|
|
|
|
| 713-02-D |
temporary pavement markings (12" width)
|
156   |
LNFT |
0.50 |
78.00 |
0.50 |
78.00 |
|
|
|
|
| 713-02-E |
temporary pavement markings (24" width)
|
3,606   |
LNFT |
1.00 |
3,606.00 |
1.00 |
3,606.00 |
|
|
|
|
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
13.292 |
MILE |
200.00 |
2,658.40 |
500.00 |
6,646.00 |
|
|
|
|
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
20.882 |
MILE |
500.00 |
10,441.00 |
100.00 |
2,088.20 |
|
|
|
|
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
24.320 |
MILE |
800.00 |
19,456.00 |
200.00 |
4,864.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
262,000.00 |
262,000.00 |
340,000.00 |
340,000.00 |
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
34   |
EACH |
80.00 |
2,720.00 |
90.00 |
3,060.00 |
|
|
|
|
| 731-01 |
nonreflectorized raised pavement markers
|
50   |
EACH |
16.00 |
800.00 |
15.00 |
750.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
1,379   |
EACH |
5.30 |
7,308.70 |
5.50 |
7,584.50 |
|
|
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
4,922   |
LNFT |
1.00 |
4,922.00 |
1.00 |
4,922.00 |
|
|
|
|
| 732-01-D |
plastic pavement striping (12" width)
|
78   |
LNFT |
1.50 |
117.00 |
1.50 |
117.00 |
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
1,803   |
LNFT |
4.00 |
7,212.00 |
4.00 |
7,212.00 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
20.481 |
MILE |
2,600.00 |
53,250.60 |
2,700.00 |
55,298.70 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
11.941 |
MILE |
820.00 |
9,791.62 |
800.00 |
9,552.80 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
6,000.00 |
6,000.00 |
4,000.00 |
4,000.00 |
|
|
|
|
| S-001 |
rumble strips (ground-in)
|
6.6 |
MILE |
900.00 |
5,940.00 |
1,000.00 |
6,600.00 |
|
|
|
|
| S-002 |
dynamic message sign unit
|
3   |
EACH |
7,300.00 |
21,900.00 |
4,500.00 |
13,500.00 |
|
|
|
|
| S-003 |
clean catch basins
|
10   |
EACH |
900.00 |
9,000.00 |
20.00 |
200.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
3,264,698.32 |
|
3,448,348.80 |
|
|
|
|
|