| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BARRIERE CONSTRUCTION CO., LLC |
- 2 - BOH BROS. CONSTRUCTION CO., LLC. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-H |
removal of guard rail
|
519   |
LNFT |
5.00 |
2,595.00 |
6.00 |
3,114.00 |
|
|
|
|
| 203-07 |
borrow (vehicular measurement)
|
350   |
CUYD |
40.00 |
14,000.00 |
50.00 |
17,500.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
4,914.1 |
TON |
76.00 |
373,471.60 |
120.00 |
589,692.00 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
170.0 |
TON |
76.00 |
12,920.00 |
150.00 |
25,500.00 |
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
40,128   |
SQYD |
2.00 |
80,256.00 |
2.00 |
80,256.00 |
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 1,672   |
CUYD |
1.00 |
- 1,672.00 |
10.00 |
- 16,720.00 |
|
|
|
|
| 510-01-B |
pavement patching (12" minimum thickness)
|
350   |
SQYD |
70.00 |
24,500.00 |
150.00 |
52,500.00 |
|
|
|
|
| 704-03 |
blocked out guard rail
|
431.2 |
LNFT |
25.00 |
10,780.00 |
22.00 |
9,486.40 |
|
|
|
|
| 704-07-A |
guard rail bridge attachments (single thrie beam)
|
75.0 |
LNFT |
40.00 |
3,000.00 |
45.00 |
3,375.00 |
|
|
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
75.0 |
LNFT |
62.00 |
4,650.00 |
70.00 |
5,250.00 |
|
|
|
|
| 704-11-A |
guard rail end treatment (flared)
|
3   |
EACH |
2,500.00 |
7,500.00 |
2,800.00 |
8,400.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
80,000.00 |
80,000.00 |
35,000.00 |
35,000.00 |
|
|
|
|
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
1.800 |
MILE |
200.00 |
360.00 |
400.00 |
720.00 |
|
|
|
|
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
1.800 |
MILE |
200.00 |
360.00 |
500.00 |
900.00 |
|
|
|
|
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
3.600 |
MILE |
300.00 |
1,080.00 |
800.00 |
2,880.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
87,000.00 |
87,000.00 |
90,000.00 |
90,000.00 |
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
3   |
EACH |
100.00 |
300.00 |
450.00 |
1,350.00 |
|
|
|
|
| 731-01 |
nonreflectorized raised pavement markers
|
807   |
EACH |
20.00 |
16,140.00 |
18.00 |
14,526.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
1,900   |
EACH |
6.00 |
11,400.00 |
6.00 |
11,400.00 |
|
|
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
9,516   |
LNFT |
1.00 |
9,516.00 |
1.00 |
9,516.00 |
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
3,177   |
LNFT |
5.00 |
15,885.00 |
4.00 |
12,708.00 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
13.750 |
MILE |
3,000.00 |
41,250.00 |
3,000.00 |
41,250.00 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
1.800 |
MILE |
1,000.00 |
1,800.00 |
900.00 |
1,620.00 |
|
|
|
|
| 732-05 |
removal of existing markings
|
5.702 |
MILE |
6,000.00 |
34,212.00 |
6,500.00 |
37,063.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
18,000.00 |
18,000.00 |
5,000.00 |
5,000.00 |
|
|
|
|
| S-001 |
dynamic message sign unit
|
2   |
EACH |
10,000.00 |
20,000.00 |
3,000.00 |
6,000.00 |
|
|
|
|
| S-002 |
rumble strips (ground-in)
|
3.6 |
MILE |
2,000.00 |
7,200.00 |
3,000.00 |
10,800.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
876,503.60 |
|
1,059,086.40 |
|
|
|
|
|