Lead Project: 450-36-0033
Parish: ST CHARLES
Routes: I-310
Description: I-10 - NORTH END OF MISSISSIPPI RIVER BRIDGE
Type Const: grading, cold planing asphaltic concrete, superpave asphaltic concrete, pavement
patching and related work.
Estimated Construction Cost: $810,223.25
 
RankLicenseBidderConstruction Bid
1 06276 BARRIERE CONSTRUCTION CO., LLC $876,503.60
2 02179 BOH BROS. CONSTRUCTION CO., LLC. $1,059,086.40
 
Item Number Item Description Quantity Unit of Measure - 1 -
BARRIERE CONSTRUCTION CO., LLC
- 2 -
BOH BROS. CONSTRUCTION CO., LLC.

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-H removal of guard rail 519      LNFT 5.00 2,595.00 6.00 3,114.00        
203-07 borrow (vehicular measurement) 350      CUYD 40.00 14,000.00 50.00 17,500.00        
502-01 superpave asphaltic concrete 4,914.1    TON 76.00 373,471.60 120.00 589,692.00        
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
170.0    TON 76.00 12,920.00 150.00 25,500.00        
509-01 cold planing asphaltic pavement 40,128      SQYD 2.00 80,256.00 2.00 80,256.00        
509-02 contractor retained reclaimed asphaltic pavement - 1,672      CUYD 1.00 - 1,672.00 10.00 - 16,720.00        
510-01-B pavement patching (12" minimum thickness) 350      SQYD 70.00 24,500.00 150.00 52,500.00        
704-03 blocked out guard rail 431.2    LNFT 25.00 10,780.00 22.00 9,486.40        
704-07-A guard rail bridge attachments (single thrie beam) 75.0    LNFT 40.00 3,000.00 45.00 3,375.00        
704-08-B guard rail transitions (double thrie beam) 75.0    LNFT 62.00 4,650.00 70.00 5,250.00        
704-11-A guard rail end treatment (flared) 3      EACH 2,500.00 7,500.00 2,800.00 8,400.00        
713-01 temporary signs & barricades lump      LUMP 80,000.00 80,000.00 35,000.00 35,000.00        
713-03-A temporary pavement markings (broken line)(4" width)(4'
length)
1.800  MILE 200.00 360.00 400.00 720.00        
713-03-B temporary pavement markings (broken line)(4" width)
(10' length)
1.800  MILE 200.00 360.00 500.00 900.00        
713-04-A temporary pavement markings (solid line)(4" width) 3.600  MILE 300.00 1,080.00 800.00 2,880.00        
727-01 mobilization lump      LUMP 87,000.00 87,000.00 90,000.00 90,000.00        
729-16-C object marker assembly (type 3) 3      EACH 100.00 300.00 450.00 1,350.00        
731-01 nonreflectorized raised pavement markers 807      EACH 20.00 16,140.00 18.00 14,526.00        
731-02 reflectorized raised pavement markers 1,900      EACH 6.00 11,400.00 6.00 11,400.00        
732-01-C plastic pavement striping (8" width) 9,516      LNFT 1.00 9,516.00 1.00 9,516.00        
732-01-E plastic pavement striping (24" width) 3,177      LNFT 5.00 15,885.00 4.00 12,708.00        
732-02-A plastic pavement striping (solid line) (4" width) 13.750  MILE 3,000.00 41,250.00 3,000.00 41,250.00        
732-03-A plastic pavement striping (broken line)(4" width) 1.800  MILE 1,000.00 1,800.00 900.00 1,620.00        
732-05 removal of existing markings 5.702  MILE 6,000.00 34,212.00 6,500.00 37,063.00        
740-01 construction layout lump      LUMP 18,000.00 18,000.00 5,000.00 5,000.00        
S-001 dynamic message sign unit 2      EACH 10,000.00 20,000.00 3,000.00 6,000.00        
S-002 rumble strips (ground-in) 3.6    MILE 2,000.00 7,200.00 3,000.00 10,800.00        
                       
 CONTRACTOR TOTAL       876,503.60   1,059,086.40        