| 202-02-G |
removal of surfacing & stabilized base
|
1,772.0 |
SQYD |
5.00 |
8,860.00 |
15.00 |
26,580.00 |
|
|
|
|
| 202-02-H |
removal of guard rail
|
2,483   |
LNFT |
10.00 |
24,830.00 |
12.00 |
29,796.00 |
|
|
|
|
| 203-07 |
borrow (vehicular measurement)
|
500   |
CUYD |
25.00 |
12,500.00 |
30.00 |
15,000.00 |
|
|
|
|
| 302-02-A |
class ii base course (4" thick)
|
49,329.0 |
SQYD |
10.50 |
517,954.50 |
9.50 |
468,625.50 |
|
|
|
|
| 303-01-B |
in-place cement stabilized base course (8 1/2" thick)
|
38,056   |
SQYD |
7.00 |
266,392.00 |
8.00 |
304,448.00 |
|
|
|
|
| 303-02 |
removal of existing patches
|
500   |
SQYD |
30.00 |
15,000.00 |
6.00 |
3,000.00 |
|
|
|
|
| 304-01 |
lime
|
115.50 |
TON |
170.00 |
19,635.00 |
170.00 |
19,635.00 |
|
|
|
|
| 304-03-B |
lime treatment (type c) (8 1/2" thick)
|
6,111   |
SQYD |
6.50 |
39,721.50 |
3.50 |
21,388.50 |
|
|
|
|
| 305-01-D |
subgrade layer (12" thick)
|
38,056   |
SQYD |
7.00 |
266,392.00 |
10.00 |
380,560.00 |
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
7,934   |
CUYD |
65.00 |
515,710.00 |
85.00 |
674,390.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
31,067.3 |
TON |
80.00 |
2,485,384.00 |
85.00 |
2,640,720.50 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
4,403.2 |
TON |
60.00 |
264,192.00 |
105.00 |
462,336.00 |
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
31,776   |
SQYD |
4.75 |
150,936.00 |
2.00 |
63,552.00 |
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 1,281   |
CUYD |
0.01 |
- 12.81 |
0.01 |
- 12.81 |
|
|
|
|
| 510-01-B |
pavement patching (12" minimum thickness)
|
2,001   |
SQYD |
81.00 |
162,081.00 |
90.00 |
180,090.00 |
|
|
|
|
| 510-02 |
pavement widening
|
3,950.4 |
SQYD |
38.50 |
152,090.40 |
85.00 |
335,784.00 |
|
|
|
|
| 602-02-A |
cleaning and resealing existing longitudinal pavement
joints |
194   |
LNFT |
10.00 |
1,940.00 |
1.70 |
329.80 |
|
|
|
|
| 602-02-B |
cleaning and resealing existing transverse pavement
joints |
312   |
LNFT |
10.00 |
3,120.00 |
1.70 |
530.40 |
|
|
|
|
| 701-01-G |
cross drain pipe (18" rcp/cmp/pcp)
|
134   |
LNFT |
75.00 |
10,050.00 |
110.00 |
14,740.00 |
|
|
|
|
| 701-01-G/I |
cross drain pipe (18" rcp/pcp or 24" cmp)
|
506   |
LNFT |
75.00 |
37,950.00 |
110.00 |
55,660.00 |
|
|
|
|
| 701-01-I |
cross drain pipe (24" rcp/pcp)
|
256   |
LNFT |
85.00 |
21,760.00 |
120.00 |
30,720.00 |
|
|
|
|
| 701-01-I/K |
cross drain pipe (24" rcp/pcp or 30" cmp)
|
132   |
LNFT |
85.00 |
11,220.00 |
120.00 |
15,840.00 |
|
|
|
|
| 701-01-K/M |
cross drain pipe (30" rcp/pcp or 36" cmp)
|
430   |
LNFT |
105.00 |
45,150.00 |
140.00 |
60,200.00 |
|
|
|
|
| 704-01-A |
guard rail (single thrie beam)(3'-1 1/2" post spacing)
|
156.3 |
LNFT |
30.00 |
4,689.00 |
30.00 |
4,689.00 |
|
|
|
|
| 704-01-B |
guard rail (single thrie beam)(6'-3" post spacing)
|
808.0 |
LNFT |
40.00 |
32,320.00 |
40.00 |
32,320.00 |
|
|
|
|
| 704-03 |
blocked out guard rail
|
1,225.2 |
LNFT |
20.00 |
24,504.00 |
19.00 |
23,278.80 |
|
|
|
|
| 704-05 |
guard rail anchor sections (bct)
|
25.0 |
LNFT |
70.00 |
1,750.00 |
74.00 |
1,850.00 |
|
|
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
650.0 |
LNFT |
55.00 |
35,750.00 |
55.00 |
35,750.00 |
|
|
|
|
| 704-11-B |
guard rail end treatment (tangent)
|
32   |
EACH |
2,200.00 |
70,400.00 |
2,500.00 |
80,000.00 |
|
|
|
|
| 710-01 |
flowable fill
|
2,556   |
CUYD |
55.00 |
140,580.00 |
115.00 |
293,940.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
580,000.00 |
580,000.00 |
50,000.00 |
50,000.00 |
|
|
|
|
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
31.420 |
MILE |
400.00 |
12,568.00 |
325.00 |
10,211.50 |
|
|
|
|
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
24.374 |
MILE |
0.01 |
0.24 |
450.00 |
10,968.30 |
|
|
|
|
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
37.212 |
MILE |
0.01 |
0.37 |
650.00 |
24,187.80 |
|
|
|
|
| 717-01 |
seeding
|
67   |
LB |
30.00 |
2,010.00 |
15.00 |
1,005.00 |
|
|
|
|
| 718-01 |
fertilizer
|
1,120   |
LB |
2.00 |
2,240.00 |
1.00 |
1,120.00 |
|
|
|
|
| 726-01 |
bedding material
|
129.0 |
CUYD |
85.00 |
10,965.00 |
90.00 |
11,610.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
580,000.00 |
580,000.00 |
300,000.00 |
300,000.00 |
|
|
|
|
| 729-16-B |
object marker assembly (type 2)
|
104   |
EACH |
62.00 |
6,448.00 |
70.00 |
7,280.00 |
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
32   |
EACH |
69.00 |
2,208.00 |
75.00 |
2,400.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
2,074   |
EACH |
5.00 |
10,370.00 |
5.50 |
11,407.00 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
18.606 |
MILE |
2,500.00 |
46,515.00 |
2,800.00 |
52,096.80 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
12.187 |
MILE |
700.00 |
8,530.90 |
900.00 |
10,968.30 |
|
|
|
|
| 735-01 |
mailboxes
|
195   |
EACH |
2.00 |
390.00 |
8.00 |
1,560.00 |
|
|
|
|
| 735-02 |
mailbox supports (single)
|
109   |
EACH |
125.00 |
13,625.00 |
125.00 |
13,625.00 |
|
|
|
|
| 735-03 |
mailbox supports (double)
|
18   |
EACH |
200.00 |
3,600.00 |
200.00 |
3,600.00 |
|
|
|
|
| 735-04 |
mailbox supports (multiple)
|
16   |
EACH |
350.00 |
5,600.00 |
400.00 |
6,400.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
1,000.00 |
1,000.00 |
35,000.00 |
35,000.00 |
|
|
|
|
| S-002 |
surface preparation
|
lump |
LUMP |
150,000.00 |
150,000.00 |
145,000.00 |
145,000.00 |
|
|
|
|
| S-127 |
sawcuts in asphaltic concrete lifts
|
506   |
LNFT |
7.00 |
3,542.00 |
1.00 |
506.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
6,782,461.10 |
|
6,974,686.39 |
|
|
|
|
|