Letting of 12/05/2007 LA DOTD Headquarters


 
go back
Go Back
 
Lead Project: 189-01-0020
Parish: BEAUREGARD
Routes: LA 394
Description: US 171 - LA 113
Type Const: drainage structures, cold planing, class ii base course, in-place stabilized base
course, superpave asphaltic conc. overlay, lime treatment, pvmt patching & related work.
Estimated Construction Cost: $6,986,761.89
 
RankLicenseBidderConstruction Bid
1 34356 PRAIRIE CONTRACTORS INC. $6,782,461.10
2 12312 GILCHRIST CONSTRUCTION CO. LLC $6,974,686.39
 
Item Number Item Description Quantity Unit of Measure - 1 -
PRAIRIE CONTRACTORS INC.
- 2 -
GILCHRIST CONSTRUCTION CO. LLC

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-G removal of surfacing & stabilized base 1,772.0    SQYD 5.00 8,860.00 15.00 26,580.00        
202-02-H removal of guard rail 2,483      LNFT 10.00 24,830.00 12.00 29,796.00        
203-07 borrow (vehicular measurement) 500      CUYD 25.00 12,500.00 30.00 15,000.00        
302-02-A class ii base course (4" thick) 49,329.0    SQYD 10.50 517,954.50 9.50 468,625.50        
303-01-B in-place cement stabilized base course (8 1/2" thick) 38,056      SQYD 7.00 266,392.00 8.00 304,448.00        
303-02 removal of existing patches 500      SQYD 30.00 15,000.00 6.00 3,000.00        
304-01 lime 115.50   TON 170.00 19,635.00 170.00 19,635.00        
304-03-B lime treatment (type c) (8 1/2" thick) 6,111      SQYD 6.50 39,721.50 3.50 21,388.50        
305-01-D subgrade layer (12" thick) 38,056      SQYD 7.00 266,392.00 10.00 380,560.00        
401-02 aggregate surface course (adjusted vehicular
measurement)
7,934      CUYD 65.00 515,710.00 85.00 674,390.00        
502-01 superpave asphaltic concrete 31,067.3    TON 80.00 2,485,384.00 85.00 2,640,720.50        
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
4,403.2    TON 60.00 264,192.00 105.00 462,336.00        
509-01 cold planing asphaltic pavement 31,776      SQYD 4.75 150,936.00 2.00 63,552.00        
509-02 contractor retained reclaimed asphaltic pavement - 1,281      CUYD 0.01 - 12.81 0.01 - 12.81        
510-01-B pavement patching (12" minimum thickness) 2,001      SQYD 81.00 162,081.00 90.00 180,090.00        
510-02 pavement widening 3,950.4    SQYD 38.50 152,090.40 85.00 335,784.00        
602-02-A cleaning and resealing existing longitudinal pavement
joints
194      LNFT 10.00 1,940.00 1.70 329.80        
602-02-B cleaning and resealing existing transverse pavement
joints
312      LNFT 10.00 3,120.00 1.70 530.40        
701-01-G cross drain pipe (18" rcp/cmp/pcp) 134      LNFT 75.00 10,050.00 110.00 14,740.00        
701-01-G/I cross drain pipe (18" rcp/pcp or 24" cmp) 506      LNFT 75.00 37,950.00 110.00 55,660.00        
701-01-I cross drain pipe (24" rcp/pcp) 256      LNFT 85.00 21,760.00 120.00 30,720.00        
701-01-I/K cross drain pipe (24" rcp/pcp or 30" cmp) 132      LNFT 85.00 11,220.00 120.00 15,840.00        
701-01-K/M cross drain pipe (30" rcp/pcp or 36" cmp) 430      LNFT 105.00 45,150.00 140.00 60,200.00        
704-01-A guard rail (single thrie beam)(3'-1 1/2" post spacing) 156.3    LNFT 30.00 4,689.00 30.00 4,689.00        
704-01-B guard rail (single thrie beam)(6'-3" post spacing) 808.0    LNFT 40.00 32,320.00 40.00 32,320.00        
704-03 blocked out guard rail 1,225.2    LNFT 20.00 24,504.00 19.00 23,278.80        
704-05 guard rail anchor sections (bct) 25.0    LNFT 70.00 1,750.00 74.00 1,850.00        
704-08-B guard rail transitions (double thrie beam) 650.0    LNFT 55.00 35,750.00 55.00 35,750.00        
704-11-B guard rail end treatment (tangent) 32      EACH 2,200.00 70,400.00 2,500.00 80,000.00        
710-01 flowable fill 2,556      CUYD 55.00 140,580.00 115.00 293,940.00        
713-01 temporary signs & barricades lump      LUMP 580,000.00 580,000.00 50,000.00 50,000.00        
713-03-A temporary pavement markings (broken line)(4" width)(4'
length)
31.420  MILE 400.00 12,568.00 325.00 10,211.50        
713-03-B temporary pavement markings (broken line)(4" width)
(10' length)
24.374  MILE 0.01 0.24 450.00 10,968.30        
713-04-A temporary pavement markings (solid line)(4" width) 37.212  MILE 0.01 0.37 650.00 24,187.80        
717-01 seeding 67      LB 30.00 2,010.00 15.00 1,005.00        
718-01 fertilizer 1,120      LB 2.00 2,240.00 1.00 1,120.00        
726-01 bedding material 129.0    CUYD 85.00 10,965.00 90.00 11,610.00        
727-01 mobilization lump      LUMP 580,000.00 580,000.00 300,000.00 300,000.00        
729-16-B object marker assembly (type 2) 104      EACH 62.00 6,448.00 70.00 7,280.00        
729-16-C object marker assembly (type 3) 32      EACH 69.00 2,208.00 75.00 2,400.00        
731-02 reflectorized raised pavement markers 2,074      EACH 5.00 10,370.00 5.50 11,407.00        
732-02-A plastic pavement striping (solid line) (4" width) 18.606  MILE 2,500.00 46,515.00 2,800.00 52,096.80        
732-03-A plastic pavement striping (broken line)(4" width) 12.187  MILE 700.00 8,530.90 900.00 10,968.30        
735-01 mailboxes 195      EACH 2.00 390.00 8.00 1,560.00        
735-02 mailbox supports (single) 109      EACH 125.00 13,625.00 125.00 13,625.00        
735-03 mailbox supports (double) 18      EACH 200.00 3,600.00 200.00 3,600.00        
735-04 mailbox supports (multiple) 16      EACH 350.00 5,600.00 400.00 6,400.00        
740-01 construction layout lump      LUMP 1,000.00 1,000.00 35,000.00 35,000.00        
S-002 surface preparation lump      LUMP 150,000.00 150,000.00 145,000.00 145,000.00        
S-127 sawcuts in asphaltic concrete lifts 506      LNFT 7.00 3,542.00 1.00 506.00        
                       
 CONTRACTOR TOTAL       6,782,461.10   6,974,686.39        